B.08.03 Solicitation W912DQ20R4019 Amendment 0001.pdf

PDF 301 KB Posted

Attached to
Building 120 and 127 HVAC Repairs at Fort Leavenworth, KS
Solicitation number
W912DQ20R4019
Issued by

About this file

This document provides details for a federal construction solicitation seeking HVAC repairs at Fort Leavenworth, Kansas. The U.S. Army Corps of Engineers, Kansas City District is soliciting proposals for HVAC repairs and replacement work at Buildings 120 and 127 located at Fort Leavenworth. The work involves miscellaneous changes and repairs to HVAC equipment in Building 120, including a multistack unit, space end units, and corrective action to reduce humidity in the library. Work for Building 127 includes correcting humidity and outside air problems, replacing make-up air units, repairing lobby cold air issues, and replacing heat pumps. The estimated value of the construction project is between $10-25 million. The solicitation is a Request for Proposals issued as full and open competition to all businesses. The award will be a single design-bid-build firm fixed price construction contract with an estimated performance period of 1,095 calendar days from notice to proceed. The NAICS code is 238220 with a size standard of $16.5 million. Proposals are due by September 23, 2020.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Building 120 and 127 HVAC Repairs at Fort Leavenw oth, KS

The purpose of this amendment is to update Section 00 21 16 – Instructions to Bidders Tab C- Factor 2 – Technical Approach. See the Continuation Page for more deteail.

The proposals are due September 23, 2020 by 10:00 AM (Kansas City time).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ20R4019

X 9B. DATED (SEE ITEM 11)

24-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2020

CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ20R4019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

The solicitation is amended as follows:

Deleted text is shown with a strikethrough. Added text is shown with underline.

1. The purpose of this amendment is to update Section 00 21 16 – Instructions to Bidders Tab C- Factor 2 –

Technical Approach

TAB C – FACTOR 2 – TECHNICAL APPROACH

Submission Requirements

Technical Approach. Offerors shall submit a narrative that addresses the items below.

a. Identify specific steps the offeror will take to minimize noise, trash and dust impacts to occupants. Provide a plan describing specific steps that will be taken to eliminate or minimize detrimental impacts to occupants. . Identify any project from Factor 1 that used the same mitigation strategies successfully.

b. Identify what steps the offeror will take to successfully integrate the new equipment and controls into the existing control system. Describe specific plans to eliminate or minimize risk associated with this approach. Identify any project from Factor 1 that used the same methods successfully.

c. The offeror shall submit a mechanical system diagram (herein known as system diagram) containing a schematic representation of the Building 127 Hydronic System for Sector 1 and how it will operate. The air-side system and chilled water side does not need to be included. An example is attached for reference. The system diagram must show the following details and be based on the design as advertised (actual equipment selections are not required or requested) and shall not consist of copying contract documents:

1) Representation of all equipment associated with the heating hydronic system, to include: pumps, pumps with VFD’s, valves, buffer tanks, boilers, expansion tanks, air separators, sensors (such as differential pressure, temperature, flow), etc.

2) Systematic order of equipment, devices, and tees.

3) Representation of equipment capacities and rated flows (e.g., boiler/chiller MBH or Tons, Pump GPM, etc., as shown in the design)

4) Primary and secondary loops shown as distinct.

5) Pumping systems must be shown with a common discharge orientation and configurations need to be as untangled as possible (limit crossing of duct or pipe) for ease of evaluation.

6) Preparer information (Offeror and any subcontractor or teaming partner involved with preparing the system diagrams). If an offeror uses a subcontractor or teaming partner to develop the mechanical system diagram, the offeror must submit a letter of commitment to use the proposed firm on the project, signed both by the subcontractor/teaming partner and the offeror. The commitment letter must be submitted even if the subcontractor/teaming partner is in some way affiliated with the offeror (for example, the subcontractor/teaming partner is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary).

Offeror shall clearly communicate their approach to this HVAC repairs project and support the approach with past experiences and lessons learned from similar type projects. Offeror shall also include additional information that would demonstrate their overall knowledge and experience in projects of similar size, magnitude and criteria.

The narrative shall thoroughly demonstrate how the Offeror’s experience and lessons learned support their planned approach to this HVAC repairs project. Offeror shall include enough details to communicate their knowledge

/experience in each area. Just mentioning a topic shall not suffice as demonstration of their knowledge or experience.

EVALUATION CRITERIA

Based on the submission provided, the Government will evaluate the Offerors overall technical approach to this construction project and its capability to execute an awarded contract with a cohesive and collaborative team effort.

The Government will evaluate the strengths, weaknesses and any deficiencies in the submission and assign one combined technical and risk rating for this factor.

Additional consideration will be given to those offerors whose proposed technical approach:

1. Demonstrates experience using the same technical approach successfully for projects submitted for Factor 1.

2. Clearly communicates thorough knowledge, application and planning to minimize environmental impacts to occupants.

3. Clearly communicates thorough knowledge, application and planning to successfully integrate the new equipment and controls into the existing control system.

4. Demonstrates understanding of the hydronic system and control design intent based on the following details:

1) Required hydronic system equipment is shown and uses identification as defined in the solicitation.

2) Systematic order of all equipment, devices, and tees is shown correctly.

3) Equipment capacities and rated flows are shown correctly.

4) Primary and secondary loops shown as distinct and accurate.

5) Control loop representation (e.g., differential pressure driving pump variable frequency drive, etc.).

2. Proposals are due by September 23, 2020 by 10:00 AM (Kansas City time).

3. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge this amendment may cause rejections of the proposal.

4. All other terms and conditions remain unchanged and in full force.