Amendment 0004 Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- W912DQ20R4019
About this file
This solicitation package includes mechanical and electrical drawings and schedules for HVAC repairs at Building 127 at Fort Leavenworth, Kansas. Work includes replacing make-up air units, correcting humidity issues, repairing a lobby cold air issue, and replacing heat pumps. The solicitation is being issued by the U.S. Army Corps of Engineers, Kansas City District as a request for proposals for a single design-bid-build firm fixed price construction contract with an estimated value between $10-25 million. The performance period is 1,095 calendar days from notice to proceed. Drawings show mechanical piping, ductwork, and electrical plans for the project. Schedules include equipment specifications for air handlers, pumps, fans, and other HVAC components.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AHU
B
CH
UH
H
W R
3" HWS
2 1/2" CHWR
2 1/2" CHWS
3" CR
3" CS
3/4" HWS
3/4"HWR
C
H W
R
3/4" CHWR
C
H W
S
C
H W
R
CF
EX
ET
AS
HWP
CWP
AS
CF
CWP
HWP
4 5
3" CR
3" CS
C D
CDCD
1" HWS
1" HWR
3"
EXISTING
HEAT PUMP
TO REMAIN
1 1/2" CHWS
1 1/2" CHWR
S E
E
S
H E
E T
M
F O
R
C
O N
T I N
U A
T I O
N
ET
FCU
ST
C
H W
R
C D
L
REF
3"
H
W R
C O
O L I N
G
C
O I L
P R
E H
E A
T
C
O I L
V F
D
VFD
R E
H
E A
T
C
O I L
M
2"
2"
2 1/2"
M-424
S E
C T
O R
L E
V E
L
M E
C H
A N
I C
A
N L
A R
G E
D
P
L A
N
M O
F A
D P
B L
US Army Corps of Engineers ®
SHEET ID
U S
M
Y
C
O R
P
F
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B
A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
C
D
F
E
G
1 2 3 4 5 6 7 8 9 10
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
C O
N T
R A
C
S O
L I C
I T
A T
I O
N
N
O
I S
S U
D
T
E
S I Z
E
A N
S I
D
F I L
E
N
U M
B E
R
K A
N S
I T
Y
D
I S
T R
I C
T
E
T
H
S
T R
E E
T
K A
N S
T
Y
M
O
H N
B
R
P O
R A
T I O
N
K
I R
K
D
R I V
E
K
A N
S A
S
C
I T
Y
M
O
BLDG 127
H V
P
A I R
S
B
U I L D
I N
G
F O
A V
E N
W O
R T
H
K
S
T A
K
D
M
B E
R
U S
A C
E
K
A N
S A
S
C
I T
Y
D
I S
T R
I C
T
C
I V
I L
P
L A
N N
I N
G
RTA
KEYPLAN
TRUE
NORTH
U
W
D Q
R
1. CONNECT TO EXISTING CONDENSER WATER SUPPLY AND RETURN.
2. PROVIDE NEW CHEMICAL BY-PASS FEEDER. SEE SHEET M-611 FOR
CHEMICAL BY-PASS FEEDER SCHEDULE.
3. PROVIDE NEW AIR SEPARATOR. SEE SHEET M-611 FOR AIR SEPARATOR
SCHEDULE.
4. PROVIDE NEW INLINE HOT WATER PRIMARY SYSTEM PUMP. SEE M-609
FOR PUMP SCHEDULE.
5. PROVIDE NEW INLINE HOT WATER SECONDARY SYSTEM PUMP. SEE M-609
FOR PUMP SCHEDULE.
6. PROVIDE NEW INLINE CHILLED WATER PRIMARY SYSTEM PUMP. SEE
SHEET M-609 FOR PUMP SCHEDULE.
7. PROVIDE NEW INLINE CHILLED WATER SECONDARY SYSTEM PUMP. SEE
SHEET M-609 FOR PUMP SCHEDULE.
8. PROVIDE NEW EXPANSION TANK AND NEW 4" PAD. SEE SHEET M-611 FOR
EXPANSION TANK SCHEDULE.
9. PROVIDE REDUCER FOR COIL CONNECTION AS REQUIRED.
10. EXISTING BAS CONTROL PANEL.
11. PROVIDE NEW STORAGE TANK AND NEW 4" PAD. SEE SHEET M-611 FOR
STORAGE TANK SCHEDULE.
12. BALANCE THREE-WAY VALVE BYPASS TO MINIMUM FLOW.
SCALE:
A3
MECHANICAL ENLARGED PIPING PLAN - LEVEL 1 - ROOM 1203
1/4" = 1'-0"
0 4' 8'2'
SHEET KEYED NOTES
XX
1. SEE MECHANICAL SCHEMATIC E1/M-703 AND SHEET M-704 FOR VALVES,
PIPE SIZE AND LOCATION IN THE SYSTEM.
2. COORDINATE ELEVATION OF PIPES WITH OVERHEAD DUCTWORK.
3. ADD REDUCERS AS REQUIRED FOR SYSTEMS INSTALLATION.
GENERAL SHEET NOTES
M
O D
I F
Y
D
E T
A I L
AutoCAD SHX Text
DN
AutoCAD SHX Text
FD
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text
M-609
E
C H
A N
I C
H
E D
U L
E S
M O
F A
D P
B L
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B
A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
C
D
F
E
G
1 2 3 4 5 6 7 8 9 10
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
T
E
S I Z
E
A N
S I
D
F I L
E
N
U M
B E
R
K A
N S
T
Y
D
I S
T R
I C
T
E
T
H
S
T R
E E
T
K A
N S
T
Y
M
O
H N
R
P O
R A
T I O
N
K
I R
K
D
R I V
E
K
A N
S A
S
C
I T
Y
M
O
BLDG 127
H V
P
A I R
S
B
U I L D
I N
G
F O
A V
E N
W O
R T
H
K
S
T A
D
M
B E
R
U S
A C
E
K
A N
S A
S
C
I T
Y
D
I S
T R
I C
T
C
I V
I L
P
L A
N N
I N
G
RTA
W
D Q
R
WATER COOLED CHILLER SCHD. NOTES
1. 30% PROPOLENE GLYCOL IN CHILLED WATER FLOW - NO GLYCOL IN
CONDENSER WATER FLOW.
2. CONTRACTOR TO VERIFY SELECTED CHILLER WILL FIT IN ASSOCIATED
ROOM WITH RELATION TO EXISTING MECHANICAL SYSTEMS AND
CLEARANCES PRIOR TO SUBMITTING SHOP DRAWINGS.
HOT WATER BOILER SCHD. NOTES
1. 30% PROPOLENE GLYCOL.
2. PRE-ENGINEERED BOILER SKID.
3. PROVIDE ENCLOSED 15KVA, 480V PRI., 208V SEC., 3 PHASE TRANSFORMER.
4. PROVIDE ENCLOSED 9KVA, 480V PRI., 208V SEC., 3 PHASE TRANSFORMER.
PUMP SCHEDULE NOTES
1. PUMPS PROVIDED BY BOILER MANUFACTURER ON PRE-ENGINEERED
SKID.
2. 30% PROPOLENE GLYCOL. IN SERVICE LINES.
3. VFD CONTROLLED.
FAN COIL SCHEDULE NOTES
1. PROVIDE WALL THERMOSTAT.
2. MANUFACTURER TO PROVIDE CONTROL/BALANCING VALVE.
3. PROVIDE CONDENSATE PUMP. HP = 1/30, WATTS = 73, CAPACITY = 1/2 GALLON.
4. COOLING EWT 43° F, LWT 53° F.
5. HEATING EWT 140° F, LWT 110° F.
M
O D
I F
Y
S
C H
E D
U L E
1 1
M
O D
I F
Y
S
C H
E D
U L E
M-610
E
C H
A N
I C
H
E D
U L
E S
M O
F A
D P
B L
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B
A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
C
D
F
E
G
1 2 3 4 5 6 7 8 9 10
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
T
E
S I Z
E
A N
S I
D
F I L
E
N
U M
B E
R
K A
N S
T
Y
D
I S
T R
I C
T
E
T
H
S
T R
E E
T
K A
N S
T
Y
M
O
H N
R
P O
R A
T I O
N
K
I R
K
D
R I V
E
K
A N
S A
S
C
I T
Y
M
O
BLDG 127
H V
P
A I R
S
B
U I L D
I N
G
F O
A V
E N
W O
R T
H
K
S
T A
D
M
B E
R
U S
A C
E
K
A N
S A
S
C
I T
Y
D
I S
T R
I C
T
C
I V
I L
P
L A
N N
I N
G
RTA
W
D Q
R
MAU AND AHU SCHEDULE NOTES
1. HEATING COILS DESIGN CONDITION BASED ON 140° F EWT AND 110° F
LWT.
2. REHEAT AIR HEATING COIL SIZING BASED ON 53° F EAT, 90° F EWT, AND
75° F LAT, AND 50% RELATIVE HUMIDITY.
3. PRE-HEATING COIL TEMPERATURES BASED ON 0° F EAT AND 55° F LAT.
4. COOLING AIR COIL SIZING IS BASED ON 85°/80° F DB/WB EAT AND 53°/53° F
DB/WB LAT.
5. CHILLED WATER SIZING CONDITION BASED ON 43° F EWT AND 53° F LWT.
6. REHEAT TO 70° F FOR SUPPLY AIR HUMIDITY OF 50% R.H.
7. REUSE EXISTING SHELL, CHILLED WATER AND PREHEAT COILS TO BE
REPLACED.
8. REPLACE FAN MOTOR AND PROVIDE VARIABLE FREQUENCY DRIVE (VFD)
AND CONTROLS FOR TIME SCHEDULED AIR SUPPLY CONTROL.
9. FIELD VERIFY COIL WILL FIT IN THE EXISTING MAU'S SHELL CASING
BEFORE START OF CONSTRUCTION.
10. INSTALL FLOW BALANCE VALVES, DAMPERS, AND TEST, ADJUST, AND
RE-BALANCE THE SUPPLY AIR FAN SPEED (RPM), AIRFLOW (CFM), AND
DISCHARGE TOTAL STATIC PRESSURE (TSP).
11. MODIFY, ADJUST, AND RECONNECT SUPPLY AIR PLENUM AND SUPPLY AIR
DUCT FOR INSTALLATION OF DUCT MOUNTED RE-HEAT COIL
DOWNSTREAM OF MAU.
12. REPLACE EXISTING SUPPLY AIR INTAKE (70% EFF) ANGLE FILTERS IN THE
MAU'S.
13. DISMANTLE AND REPLACE EXISTING MAU HEATING AND COOLING COILS
AND RELATED PIPING. ADJUST THE LOCATION OF THE UNIT TO PROVIDE
MINIMUM ACCESS 3'-0" AREA REQUIRED FOR THE CHILLER EQUIPMENT.
14. RE-ASSEMBLE, INSTALL, AND RECONNECT OUTSIDE AIR INTAKE, SUPPPLY
AIR PLENUM, HEATING WATER SUPPLY AND RETURN PIPING, CHILLED
WATER SUPPLY AND RETURN PIPING. INSTALL CONDENSATE GRAVITY
FLOW DRAIN PIPING TO THE NEAREST FLOOR DRAIN.
15. VERIFY EXISTING EQUIPMENT SUPPLIER FOR SIZING, REQUIREMENTS,
AND CONSTRAINTS.
16. EXISTING AHU CASE TO REMAIN. REPLACE MOTOR, CHILLED WATER COIL,
PREHEAT COIL, AND REHEAT COIL.
17. 100% OUTSIDE AIR UNITS.
18. INSTEAD OF ALTERING UNITS AS SHOWN, THE CONTRACTOR HAS THE
OPTION TO REPLACE MAUS 1-1, 2-1, 3-1, 4-1, 1-3, 2-3, 3-3, 4-3, 1-4, 2-4, 3-4,
4-4, 1-5, 2-5, 3-5, & 4-5 USING THE SCHEDULES ON THE DOCUMENTS AND IN
ACCORDANCE WITH THE FOLLOWING REQUIREMENTS. UNITS SHALL BE
COMPLETE WITH ALL CURRENT FEATURES SHOWN CASING FILTERS, COIL,
PREHEAT AND REHEAT COILS, CONTROLS, FAN, MOTORS, AND VSD'S AND
COMPLY WITH THE GOVERNMENTS SPECIFICATIONS. ADEQUIATE
PROVISIONS FOR COIL REMOVAL SHALL BE PROVIDED. CONTRACTOR
SHALL MAKE ALL CHANGES NECESSARY TO IMPLEMENT THIS WORK
INCLUDING PIPING CHANGES, CONTROLS, MOTOR AND ELECTRICAL
CHANGES, DUCTWORK CONNECTION, AND PAD CHANGES. CONTRACTOR
WILL ASSURE 3' MINIMUM CLEARANCE AROUND THE TWO OPERATING
SIDES OF THE MAU'S. THE CURRENT SPACING BETWEEN THE DISCHARGE
END OF THE UNIT TO THE ADJACENT WALL OF 30” SHALL BE
MAINTAINED. CONTRACTOR SHALL MAKE ANY CHANGES AS NECESSARY
FOR UNIT ACCESS TO THE INDIVIDUAL MAU ROOMS, INCLUDING ANY
ARCHITECTURAL CHANGES AND ANY INCIDENTAL WORK (RELOCATING
ELECTRICAL DEVICES, ETC.) TO ASSURE ACCESS. THE FREIGHT
ELEVATOR SERVING THE FOUR FLOORS OF THE BUILDING IS LIMITED TO
AN ASSEMBLY OF 3'8” W x 7'H x 8'4”L IN SIZE AT ANY ONE TIME. ALL
CHANGES SHALL BE FULLY DOCUMENTED ON SHOP DRAWINGS AND IN
THE AS-BUILT SET SUITABLE FOR FINAL DRAFTING WITHOUT
SUPPLEMENTAL INFORMATION OR SITE VISITS BY THE DESIGN TEAM.
PHOTOS MAY SUPPLEMENT BUT NOT REPLACE MARKED UP AS-BUILT
DRAWINGS WHICH SHOULD STAND ON THEIR OWN IN TERMS OF
ACCURACY AND DETAIL.
19. MINIMUM OUTSIDE AIR 1,500 CFM, MAXIMUM OUTSIDE AIR 16,400 CFM
20. MINIMUM OUTSIDE AIR 300 CFM, MAXIMUM OUTSIDE AIR 2,600 CFM
ELECTRIC HEATER SCHEDULE NOTES
1. FLOOR MOUNTED.
2. PROVIDE THERMOSTAT.
ROOF TOP UNIT SCHEDULE NOTES
1. FACTORY INSTALLED DISCONNECT.
2. WIRED CONVENIENCE OUTLET.
3. HAIL GUARDS.
4. SINGLE POINT POWER.
5. FACTORY FURNISHED ROOF CURB.
6. VFD INTEGRAL UNIT.
7. BACNECT CONTROL CARD.
M
O D
I F
Y
S
C H
E D
U L E
M
O D
I F
Y
S
C H
E D
U L E
LEVEL 1
CHEMICAL
BY-PASS
FEEDER
TO EXISTING MAKE UP WATER AND
BACKFLOW PREVENTER
PRESSURE
GAUGE (TYP)
ISOLATION
VALVE
HOT WATER
SECONDARY
PUMP
EXPANSION
TANK
SEE SHEET M-703 FOR HOT
WATER SUPPLY CONTINUATION
SEE SHEET M-703 FOR HOT
WATER RETURN CONTINUATION
BOILER
2 1/2" HWR
AIR SEPARATOR
AIR VENT
3/4" HWR
2 1/2" HWR
3/4" HWS
2 1/2" HWR
3" COMMON PIPE
2 1/2" HWS
CHECK
VALVE (TYP)
3" HWS
3" HWR
DRAIN (TYP)
ISOLATION
VALVE (TYP)
UNION (TYP)
THERMOMETER
(TYP)
HOT WATER
PRIMARY PUMP
(TYP)
2 1/2" HWS
TEST PORT
(TYP)
LEVEL 1
CHEMICAL
BY-PASS
FEEDER
CHILLER
TO EXISTING MAKE UP WATER
AND BACKFLOW PREVENTER
AIR SEPARATOR
DRAIN (TYP)
ISOLATION
VALVE (TYP)
UNION (TYP)
THERMOMETER
(TYP)
PRESSURE
GAUGE (TYP)
CHECK VALVE
CHILLED WATER
PRIMARY PUMP
CHILLED WATER
SECONDARY
PUMP
AIR VENT
3" CHWR
EXPANSION
TANK
SEE SHEET M-703 FOR CHILLED
WATER SUPPLY CONTINUATION
SEE SHEET M-703 FOR CHILLED
WATER RETURN CONTINUATION
C
O M
M O
N
P
I P
E
3" CHWR3" CHWR
3" CHWS
3" CHWR
3" CHWS
3" CHWR
3/4" CHWR
C
H W
R
3/4" CHWR
ISOLATION
VALVE
STORAGE
TANK
C
H W
R
C
H W
R
NC
TEST PORT (TYP)
EXISTING RISER
TO PLANT
12"
3"
CONNECT TO EXISTING
CONDENSER LOOP
CR
CS
M
MOTORIZED
CONTROL VALVE
3" CHWS
M-704
M E
C H
A N
I C
H
E M
A T
A
G R
A M
M O
F A
D P
B L
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B
A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
C
D
F
E
G
1 2 3 4 5 6 7 8 9 10
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
T
E
S I Z
E
A N
S I
D
F I L
E
N
U M
B E
R
K A
N S
T
Y
D
I S
T R
I C
T
E
T
H
S
T R
E E
T
K A
N S
T
Y
M
O
H N
R
P O
R A
T I O
N
K
I R
K
D
R I V
E
K
A N
S A
S
C
I T
Y
M
O
BLDG 127
H V
P
A I R
S
B
U I L D
I N
G
F O
A V
E N
W O
R T
H
K
S
T A
D
M
B E
R
U S
A C
E
K
A N
S A
S
C
I T
Y
D
I S
T R
I C
T
C
I V
I L
P
L A
N N
I N
G
RTA
W
D Q
R
SCALE:
A1
MECHANICAL BOILER PIPING - SECTOR 6 MECHANICAL ROOM
NTS
SCALE:
D1
MECHANICAL CHILLER PIPING - SECTOR 6 MECHANICAL ROOM
NTS
GENERAL SHEET NOTES
M
O D
I F
Y
D
E T
A I L
M
O D
I F
Y
S
C H
E D
U L E
3# 4, 1# 2G, 1-1/4"C
CH
AHU
B
DP1W3-19,21,23
DS-HWP13
30/3
ELP1W2-7,9,11
DS-CWP9
30/3
UH
LP1W1-8
ELP1W2-31,33,35
ELP1W2-8,10,12
ELP1W2-25,27,29
S
V F
D
ELP1W2
PANEL-DP1W3
HWP
HWP
PP1W1-38,40,42
CWP
CWP
S
V F
D
V F
D
REF
S
LP1W1-10
VFD-HWP14
VFD-AHU3
VFD-CWP10
3# 10, 1# 10G, 3/4"C
LP1W1-12
S
FCU
ELP1W2-25,27,29
M
M
M
3# 10, 1# 10G, 3/4"C
DD
LP1W2-14,16,18
E-409
S E
C T
E
V E
L
E L
E C
T R
I C
L
A R
G E
D
P
L A
N
J J D
J C
F
R M
W
B L
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B
A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
C
D
F
E
G
1 2 3 4 5 6 7 8 9 10
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
T
E
S I Z
E
A N
S I
D
F I L
E
N
U M
B E
R
K A
N S
T
Y
D
I S
T R
I C
T
E
T
H
S
T R
E E
T
K A
N S
T
Y
M
O
H N
R
P O
R A
T I O
N
K
I R
K
D
R I V
E
K
A N
S A
S
C
I T
Y
M
O
BLDG 127
H V
P
A I R
S
B
U I L D
I N
G
F O
A V
E N
W O
R T
H
K
S
T A
D
M
B E
R
U S
A C
E
K
A N
S A
S
C
I T
Y
D
I S
T R
I C
T
C
I V
I L
P
L A
N N
I N
G
RTA
KEYPLAN
TRUE
NORTH
U
W
D Q
R
SCALE:
A3
ELECTRICAL ENLARGED PLAN - LEVEL 1 - ROOM 1203 & 1204
1/4" = 1'-0"
0 4' 8'2'
1. REPLACE (12) EXISTING 20A/1P CIRCUIT BREAKERS WITH (4) 15A/3P CIRCUIT
BREAKERS IN EXISTING PANEL ELP1W2. (CWP9, CWP10, HWP13, HWP14)
2. INSTALL NEW 70A/3P CIRCUIT BREAKER IN SPARE SLOT IN EXISTING PANEL
DP1W3. (CH5)
3. PROVIDE AND INSTALL MOTOR RATED SWITCH FOR UNIT HEATER.
4. INSTALL 480V, 3 PHASE, 7.5HP VFD FOR AIR HANDLING UNIT (AHU3). VFD
FURNISHED BY MECHANICAL CONTRACTOR.
5. INSTALL 480V, 3 PHASE, 1.5HP VFD FOR BOILER PUMP. VFD FURNISHED BY
MECHANICAL CONTRACTOR.
6. INSTALL NEW DUCT SMOKE DETECTOR IN RETURN AIR DUCT. CONNECT NEW
DUCT DETECTOR TO EXISTING FACP. AFTER INSTALLATION, DUCT DETECTOR
SHALL BE TESTED TO ENSURE PROPER NOTIFICATION AT FACP.
7. INSTALL 480V, 3 PHASE, 1HP VFD FOR CHILLER PUMP. VFD FURNISHED BY
MECHANICAL CONTRACTOR.
8. PROVIDE AND INSTALL MOTOR RATED SWITCH FOR EXHAUST FAN.
9. PROVIDE AND INSTALL MOTOR RATED SWITCH FOR FAN COIL UNIT.
1. REFER TO SHEET E-407 FOR LOCATION OF EXISTING PANELS PP1W1,
PP1W2, LP1W1, AND LP1W2. MECHANICAL ROOM 1203 IS APPROXIMATELY
200' FROM ELECTRICAL ROOM 1304.
SHEET KEYED NOTES
GENERAL SHEET NOTES
XX
M
O D
I F
Y
D
E T
A I L
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
| BLDG127_M-EP-424-M-424 |
| Sheets and Views |
| BLDG127_M-EP-424-M-424 |
| BLDG127_M-SH-609-M-609 |
| Sheets and Views |
| BLDG127_M-SH-609-M-609 |
| BLDG127_M-SH-610-M-610 |
| Sheets and Views |
| BLDG127_M-SH-610-M-610 |
| BLDG127_M-DG-704-M-704 |
| Sheets and Views |
| BLDG127_M-DG-704-M-704 |
| BLDG127_E-EP-409-E-409 |
| Sheets and Views |
| E-409 |
File details come from the government source that posted it. Updated .