This solicitation is for a design-bid-build construction contract for Building 120 and 127 HVAC Repairs at Fort Leavenworth, KS. The work consists of miscellaneous changes to multistack units, replacement of ancillary appurtenances, corrective actions to reduce humidity, replacement of make-up air units, repair of lobby cold air issues, and replacement of heat pumps. The estimated value is between $10-25 million. The contract type is firm fixed price with a performance period of 1,095 calendar days from notice to proceed. The NAICS code is 238220 with a size standard of $16.5 million. The solicitation is full and open to all businesses, with encouragement for small business joint ventures, mentor-protege agreements, and consortiums to leverage bonding and financing. Vendors must register in SAM prior to bidding. The U.S. Army Corps of Engineers Kansas City District will award a single contract.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01 91 00.15 Page 1
SECTION 01 91 00.15
TOTAL BUILDING COMMISSIONING
PART 1 GENERAL
1.1 SUMMARY
Commission the building systems listed herein. Employ the services of an independent Commissioning Firm. The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors. The Commissioning Firm must employ a Lead Commissioning Specialist that coordinates all aspects of the commissioning process. Conform to the commissioning procedures outlined in this specification.
1.2 SYSTEMS TO BE COMMISSIONED
Commission the following systems:
Heating, Ventilating, Air Conditioning, and Refrigeration Systems
(HVAC)
Building Automation System
Utility Monitoring and Control System
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 180 (2012) Standard Practice for Inspection and
Maintenance of Commercial Building HVAC Systems
ASHRAE 202 (2013; Addenda B 2018) Commissioning Process for Buildings and Systems
ASSOCIATED AIR BALANCE COUNCIL (AABC)
ACG Commissioning Guideline (2005) Commissioning Guideline
NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
NEBB Commissioning Standard (2009) Procedural Standards for Whole
Building Systems Commissioning of New Construction; 3rd Edition
Section 01 91 00.15 Page 2
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1429 (1994) HVAC Systems Commissioning Manual, 1st
Edition
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 25-345-1 (2019) Systems Manual
1.4 COMMUNICATION WITH THE GOVERNMENT
The Lead Commissioning Specialist (CxC) must submit all plans, schedules, reports, and documentation directly to the Contracting Officer Representative concurrent with submission to the CQC System Manager. The Lead Commissioning Specialist must have direct communication with the Contracting Officer's Representative regarding all elements of the commissioning process; however, the Government has no direct contract authority with the Lead Commissioning Specialist.
1.5 SEQUENCING AND SCHEDULING
1.5.1 Sequencing
Complete the following prior to starting Functional Performance Tests of mechanical systems:
a. All equipment and systems have been completed, cleaned, flushed, disinfected, calibrated, tested, and operate in accordance with contract documents and construction plans and specifications.
b. Performance Verification Tests of the controls systems have been completed and the Performance Verification Test Report has been submitted and approved in accordance with Specification Section 23 09
00 INSTRUMENTATION AND CONTROL FOR HVAC.
c. Testing, Adjusting, and Balancing has been completed and the Testing, Adjusting, and Balancing Report, has been submitted and approved in accordance with Specification Section 23 05 93 TESTING, ADJUSTING, AND
BALANCING FOR HVAC.
d. The Pre-Functional Checklists have been submitted and approved.
e. The Certificate of Readiness for mechanical systems has been submitted and approved.
1.5.2 Project Schedule
Include the following tasks in the project schedule required. Ensure sufficient time is scheduled to accommodate the requirements of this specification section. The order of items listed below is not intended to imply a specified sequence:
a. Submission and approval of the Testing, Adjusting, and Balancing (TAB) Firm and TAB Specialist specified in Specification Section 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
b. Submission of the Design Review Report specified herein.
Section 01 91 00.15 Page 3
c. Submission of the Design Review Report specified in Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC.
d. Submission and approval of the Construction Phase Commissioning Plan
e. Factory Acceptance Testing for each of the systems to be commissioned as required by technical specifications
f. Manufacturer's Equipment Start-Up for each of the systems to be commissioned.
g. Submission and approval of the TAB Schematic Drawings, Report Forms, and Procedures specified in Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC.
h. Submission and approval of Duct Air Leakage Test Procedures specified in Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING
FOR HVAC
i. Duct Air Leakage Test Execution specified in Specification Section
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
j. Testing, Adjusting, and Balancing (TAB) Field Work required by Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
k. Submission and approval of the TAB Report specified in Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
l. TAB Field Acceptance Testing required by Specification Section 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
m. Submission and approval of the Start-Up Testing Report specified in Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.
n. Submission and approval of the Performance Verification Test Procedures specified in Specification Section 23 09 00 INSTRUMENTATION
AND CONTROL FOR HVAC.
o. Performance Verification Tests required by Specification Section
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
p. Performance Verification Test Report specified in Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
q. Pre-Functional Checklist Submittal
r. Functional Performance Testing for each system to be commissioned
s. Post-Test Deficiency Correction for each system to be commissioned
t. Re-Testing
u. Training for each of the systems to be commissioned
v. Submission and approval of the Commissioning Report
w. Seasonal Testing
x. Post-Construction Site Visit
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Commissioning Firm; G, RO
Lead Commissioning Specialist; G, RO
Technical Commissioning Specialists; G, RO
Section 01 91 00.15 Page 4
Commissioning Firm's Contract; G, RO
SD-06 Test Reports
Design Review Report; G, DO
Interim Construction Phase Commissioning Plan; G, CxG
Final Construction Phase Commissioning Plan; G, CxG
Pre-Functional Checklists; G, CxG
Issues Log
Commissioning Report; G, DO
Post-Construction Trend Log Report; G, DO
SD-07 Certificates
Certificate of Readiness; G, DO
SD-10 Operation and Maintenance Data
Training Plan; G, RO
Training Attendance Rosters; G, RO
Systems Manual; G, DO
Systems Manual G, DO
Maintenance and Service Life Plans; G, DO
SD-11 Closeout Submittals
Final Commissioning Report; S, DO
1.7 COMMISSIONING FIRM
Provide a Commissioning Firm that is certified in commissioning by one of the following: the AABC Commissioning Group (ACG); the National Environmental Balancing Bureau (NEBB); the International Certification Board/Testing, Adjusting, and Balancing Bureau (ICB/TABB), the Building Commissioning Association (BCA); the Association of Energy Engineers (AEE).
The Commissioning Firm may employ a commissioning professional certified by the University of Wisconsin-Madison or the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) as required in paragraph LEAD COMMISSIONING SPECIALIST as an alternative to certification of the Commissioning Firm. The Commissioning Firm must be certified in all systems to be commissioned to the extent such certifications are available from the certifying body. Describe any lapses in certification or disciplinary action taken by the certifying body against the proposed Commissioning Firm or Lead Commissioning Specialist in detail. Any firm or commissioning professional that has been the subject of disciplinary action
Section 01 91 00.15 Page 5 by the certifying body within the five years preceding contract award is not eligible to perform any duties related to commissioning.
a. Submit the Commissioning Firm's certification of qualifications including the name of the firm and certifications no later than 30 calendar days after Notice to Proceed. Submit one hard copy and an electronic copy.
b. The Commissioning Firm's and Commissioning Specialists' certifications must be maintained for the entire duration of the duties specified herein. If, for any reason, the firm or a specialist loses a certification during this period, immediately notify the Contracting Officer's Representative and submit another Commissioning Firm or Commissioning Specialist for approval. All work specified in this specification section performed by the Commissioning Firm or associated Commissioning Specialists is invalid if the Commissioning Firm or Commissioning Specialist loses its certification prior to contract completion and must be performed by an approved successor.
c. The Commissioning Firm must oversee and assist the General or Prime
Contractor with the work specified herein. Submit the Commissioning Firm's Contract including the Scope of Work associated with the paragraph POST-CONSTRUCTION SUPPORT no later than 30 calendar days after approval of the Commissioning Firm. Submit one hard copy and an
1.7.1 Lead Commissioning Specialist
The Commissioning Firm must provide a Lead Commissioning Specialist (CxC) that has a minimum of five years of commissioning experience, including two projects of similar size and complexity, and that is one of the following: a NEBB qualified Systems Commissioning Administrator (SCA); ACG Certified Commissioning Authority (CxA); ICB/TABB Certified Commissioning Supervisor;
BCA Certified Commissioning Professional (CCP); AEE Certified Building Commissioning Professional (CBCP); University of Wisconsin-Madison Qualified Commissioning Process Provider (QCxP); ASHRAE Building Commissioning Professional (BCxP).
a. Submit the Lead Commissioning Specialist's certification of qualifications including the name of the specialist and firm;
certifications; years of experience; and a listing of representative projects of similar size and complexity no later than 30 calendar days after Notice to Proceed. Submit one hard copy and an electronic copy.
b. The Lead Commissioning Specialists certifications must be maintained for the entire duration of the duties specified herein. If, for any reason, the specialist loses a certification during this period, immediately notify the Contracting Officer's Representative and submit another Lead Commissioning Specialist for approval. All work specified in this specification section to be performed by the Lead Commissioning Specialist is invalid if the Lead Commissioning Specialist loses its certification prior to contract completion and must be performed by an approved successor.
c. The Lead Commissioning Specialist must lead and oversee the commissioning work specified herein and be the primary point of contact for the Government regarding the commissioning work. One of the
Section 01 91 00.15 Page 6
Technical Commissioning Specialists may be the Lead Commissioning Specialist provided that all of the qualification requirements are met.
1.7.2 Technical Commissioning Specialists
Technical Commissioning Specialists, employed by the Commissioning Firm and that have the following qualifications, must perform the technical work specified herein associated with each system to be commissioned:
a. Mechanical Technical Commissioning Specialist: The technical work associated with mechanical systems including Heating, Ventilating, Air Conditioning, and Refrigeration Systems; Building Automation System;
Utility Monitoring and Control System; must be performed by a Commissioning Specialist certified by NEBB, ACG, ICB/TABB, or BCA in the commissioning of HVAC systems with five years of experience in the commissioning of HVAC systems.
b. Submit the Technical Commissioning Specialist's certification of qualifications including the name of the specialist and firm;
certifications; years of experience; and a listing of representative projects of similar size and complexity no later than 30 calendar days after Notice to Proceed. Submit one hard copy and an electronic copy.
1.7.3 Commissioning Standard
Comply with the requirements of the commissioning standard under which the Commissioning Firm and Specialists qualifications are approved. When the firm and specialists are certified by BCA, AEE, ASHRAE, or the University of Wisconsin-Madison, comply with the requirements of one of the acceptable standards unless otherwise stated herein. The acceptable standards are ACG Commissioning Guideline, NEBB Commissioning Standard, SMACNA 1429, or ASHRAE
202. Comply with applicable NETA testing standards for electrical systems.
a. Implement all recommendations and suggested practices contained in the
Commissioning Standard and electrical test standards.
b. Use the Commissioning Standard for all aspects of Commissioning, including calibration of instruments.
c. Where the instrument manufacturer calibration recommendations are more stringent than those listed in the Commissioning Standard, adhere to the manufacturer calibration recommendations.
d. All quality assurance provisions of the Commissioning Standard such as performance guarantees are part of this contract.
e. The Commissioning Specialists must develop commissioning procedures for any systems or system components not covered in the Commissioning Standard.
f. Use any new requirements, recommendations, and procedures published or adopted prior to contract solicitation by the body responsible for the Commissioning Standard.
1.8 GOVERNMENT ACCEPTANCE ENGINEER
A Government Acceptance Engineer will perform many of the Government
Section 01 91 00.15 Page 7
Quality Assurance functions for the project including review of select submittals, plans, procedures, and reports and inspection and testing of systems. The Government Acceptance Engineer will participate in TAB Field Acceptance Testing and Performance Verification Tests. Coordinate submittal transmission and testing schedules with the Contracting Officer's Representative and the Government Acceptance Engineer.
1.9 ISSUES LOG
The Lead Commissioning Specialist must develop and maintain an Issues Log for tracking and resolution of all deficiencies discovered through submittal reviews, inspection, and testing. Include the date of final resolution of issues as confirmed by the Commissioning Specialist. Submit the Issues Log on a monthly basis at a minimum. At any point during construction, any commissioning team member finding deficiencies may communicate those deficiencies in writing to the Commissioning Specialist for inclusion into the Issues Log.
Track construction deficiencies identified in the Issues Log using QCS as specified in Specification Section 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM
CONTRACTOR MODE(RMS CM).
1.10 CERTIFICATE OF READINESS
Prior to scheduling Functional Performance Tests for each system, issue a Certificate of Readiness for the system certifying that the system is ready for Functional Performance Testing. The Certificate of Readiness must include, for each system to be commissioned, all equipment and system start-up reports; Performance Verification Test Reports; completed Pre-Functional Checklists; Testing, Adjusting, and Balancing (TAB) Report; HVAC Controls Start-Up Reports to the extent applicable to the system. The Contractor;
the Lead Commissioning Specialist; the Contractor's Quality Control Representative; the Mechanical, Electrical, Controls, and TAB subcontractor representatives must sign and date the Certificate of Readiness. Submit the Certificate of Readiness for each system no later than 14 calendar days prior to Functional Performance Tests of that system. Submit one hard copy and one electronic copy. Do not schedule Functional Performance Tests for a system until the Certificate of Readiness for that system receives approval by the Government.
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
3.1 CONSTRUCTION PHASE
3.1.1 Construction Commissioning Coordination Meeting
The Lead Commissioning Specialist must lead a Construction Commissioning Coordination Meeting no later than 14 days after approval of the Commissioning Firm and Commissioning Specialists to discuss the commissioning process including contract requirements, lines of communication, roles and responsibilities, schedules, documentation requirements, inspection and test procedures, and logistics as specified in this specification section. The Contractor's Superintendent or Project
Section 01 91 00.15 Page 8
Manager, the Contractor's Quality Control Representative, and the Government must attend this meeting. Invite the User and a Directorate of Public Works Representative to attend this meeting.
3.1.2 Construction Phase Commissioning Plan
3.1.2.1 Interim Construction Phase Commissioning Plan
The Lead Commissioning Specialist (CxC) must prepare the Interim Construction Phase Commissioning Plan. Submit the Interim Construction Phase Commissioning Plan no later than 30 calendar days after the Construction Commissioning Coordination Meeting and no later than 14 days prior to the start of construction. Submit one hard copy and an electronic copy.
Identify the commissioning and testing standards and outline the overall commissioning process, the commissioning schedule, the commissioning team members and responsibilities, lines of communication, documentation requirements for the construction phase of the project in the Interim Construction Phase Commissioning Plan.
3.1.2.1.1 Checklists
Download example Pre-Functional Checklists, Integrated Systems Test Checklists, and Functional Performance Test Checklists for specification section 01 91 00.15 TOTAL BUILDING COMMISSIONING at the following location:
http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables. The checklists submitted in the Interim and Final Construction Phase Commissioning Plans must contain the same level of detail shown in the examples. The submitted checklists are not required to match the format of the examples.
3.1.2.1.2 Contents
In addition to the requirements listed above, include the information provided for the Design Phase Commissioning Plan, updated, and including the following: In addition, include the following in the Interim Construction Phase Commissioning Plan:
a. Listing of all equipment to be commissioned
b. Basis of Design
c. Templates for site observation reports and the issues log.
d. Commissioning scope
e. Systems to be commissioned
f. Examples and description of development of pre-functional, integrated systems test, and functional performance test checklists
g. Building information
h. Roles and responsibilities
i. Management plan http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables
Section 01 91 00.15 Page 9
j. Owner's Project Requirements Document
k. Description of design reviews by the Commissioning Specialists
l. Description and templates for site observation reports and the issues log
m. Listing and description of required meetings
n. Identification and sequence of commissioning and acceptance tasks for incorporation into the Project Schedule
o. Description of execution of pre-functional checks, integrated systems tests, and functional performance tests
p. Acceptance testing of critical systems in accordance with contract specifications
q. Operation and maintenance manual requirements
r. Description of training requirements
s. Description of the Commissioning Report
3.1.2.2 Final Construction Phase Commissioning Plan
The Lead Commissioning Specialist (CxC) must prepare the Final Construction Phase Commissioning Plan. Submit the Final Construction Phase Commissioning Plan no later than 30 calendar days prior to the start of Pre-Functional Checks. Submit one hard copy and an electronic copy.
Include the information provided in the Interim Construction Phase Commissioning Plan. In addition, the Technical Commissioning Specialist must develop the Pre-Functional Checklists, Integrated Systems Test Checklists, and Functional Performance Test Checklists for each building, for each system required to be commissioned, and for each component for inclusion in the Final Construction Phase Commissioning Plan.
3.1.2.2.1 Pre-Functional Checklists
The Pre-Functional Checklists must include items for physical inspection or testing that demonstrate that installation and start-up of equipment and systems is complete. Refer to paragraph Pre-Functional Checks for more information.
3.1.2.2.2 Functional Performance Test Checklists
Functional Performance Test Checklists must include procedures that explain, step-by-step, the actions and expected results that will demonstrate that the system performs in accordance with the contract. Refer to paragraph Functional Performance and Integrated Systems Tests for more information. Include the following sections and details appropriate to the systems being tested in the Functional Performance Test Checklists:
a. Notable system features including information about such attributes as system sizing and controls to facilitate understanding of system operation
Section 01 91 00.15 Page 10
b. Conclusions and recommendations based on control system feature, point-to-point, actuator, and system operation observations. Conclusions must clearly indicate if system does or does not perform in accordance with contract requirements. Recommendation must clearly indicate that the system should or should not be accepted by the Government.
c. Test conditions including date, beginning and ending time, and beginning and ending outdoor air conditions
d. Attendees
e. Identification of the equipment involved in the test
f. Control system feature identification including control point description, embedded/visible type, adjustable/monitoring type, actual value, and setpoint value/alarm range
g. Point-to-point observations including demonstrating system flow meters and sensors have been calibrated and are correctly displayed on the Operator work station
h. Actuator operation observations demonstrating actuator responses to commands from the control system
i. As-found condition of the system operation
j. List of test items with step numbers along with the corresponding feature or control operation, intended test procedure, expected system response, and pass/fail indication.
k. Space for comments for each test item.
l. System operation observations for system-based tests demonstrating each control algorithm, operation mode, and alarm condition resulting from control point(s) manipulation. System operation observations must contain the following:
(1) introduction identifying testing methodology
(2) as-found conditions prior to control point(s) manipulation
(3) clear list of test items (step numbers)
(4) control algorithm (design control sequence) segmented by unique functions
(5) intended test procedures following each segmented control algorithm identifying control point(s) required to be manipulated to initiate system response
(6) expected system response
(7) space for comments for each test item complete including resulting control signal such as 0-volts, 10-volts, active, or inactive
(8) pass or fail indication for each test item
3.1.2.2.3 Integrated Systems Test Checklists
Integrated Systems Test Checklists must include test procedures that explain, step-by-step, the actions and expected results that will demonstrate that the interactive operations between systems performs in accordance with the contract. Refer to paragraph Functional Performance and
Section 01 91 00.15 Page 11
Integrated Systems Tests for more information. Include the following sections in the Integrated Systems Test Checklists:
a. Notable features of the interconnected systems organized by discipline including information to facilitate understanding of system operation
b. Conclusions and recommendations. Conclusions must clearly indicate if the systems do or do not perform in accordance with contract requirements. Recommendation must clearly indicate that the systems should or should not be accepted by the Government
c. Test conditions including date and beginning and ending time
d. Attendees
e. Identification of the equipment and systems involved in the test
f. List of test items with step numbers along with the corresponding feature or control operation, intended test procedure, expected system response, and pass/fail indication.
g. Space for comments for each test item.
3.1.3 Design Review
The Lead Commissioning Specialist and Technical Commissioning Specialists must review the construction contract plans and specifications, the Owner's Project Requirements Document, and the Basis of Design. The Owner's Project Requirements Document and Basis of Design documents are not contract documents and are provided for commissioning review purposes only.
a. Advise the Contracting Officer's Representative of any discrepancies between the Basis of Design and Owner's Project Requirements, deficiencies of the design to comply with the Owner's Project Requirements or Basis of Design, and deficiencies that would prevent the building systems and features from operating or performing effectively and from being adequately maintainable.
b. The Commissioning Specialists must provide a Design Review Report individually listing each deficiency and the corresponding proposed corrective action necessary for proper system operation or performance.
Submit one hard copy and an electronic copy of the report to the Contracting Officer's Representative no later than 14 days after approval of the Commissioning Specialists.
c. The Lead Commissioning Specialist must participate in a meeting to discuss any items contained in the report no later than 14 calendar days after submission of the report.
3.1.4 Construction Submittals
Provide all submittals associated with the systems to be commissioned, including shop drawings; equipment submittals; test plans, procedures, and reports; and resubmittal's to the Commissioning Specialists. The Technical Commissioning Specialist must review the submittals to the extent necessary verify that the equipment and system installation will comply with the
Section 01 91 00.15 Page 12 contract requirements and the requirements of the Basis of Design and the Owner's Project Requirements Document.
3.1.5 Inspection and Testing
Demonstrate that all system components have been installed, that each control device and item of equipment operates, and that the systems operate and perform, including interactive operation between systems, in accordance with contract documents and the Owner's Project Requirements. Requirements in related specification sections are independent from the requirements of this section and do not satisfy any of the requirements specified in this specification section. Provide all materials, services, and labor required to perform the Pre-Functional Checks, Integrated Systems Tests, and Functional Performance Tests.
3.1.5.1 Commissioning Team
Provide a commissioning representative for each sub-contractor associated with the systems to be commissioned. Each commissioning representative is responsible for coordination of their respective sub-contractor's execution of the commissioning activities and participation in the inspection and testing required by this specification section. The designers listed below are the designers of record for their respective systems. Substitutes must be approved by the Contracting Officer's Representative .
3.1.5.1.1 Mechanical System Pre-Functional Checks Team
The following team members must participate in Pre-Functional checks of mechanical systems:
Designation Function
CxM Mechanical System Technical Commissioning Specialist
QAR Contracting Officer's Quality Assurance Representative
CQC Contractor's Quality Control Personnel
MC Contractor's Mechanical Commissioning Representative
EC Contractor's Electrical Commissioning Representative
CC Contractor's Controls Commissioning Representative
TABC Contractor's TAB Commissioning Representative
PC Contractor's Plumbing Commissioning Representative
IC Contractor's Irrigation Commissioning Representative
Section 01 91 00.15 Page 13
3.1.5.1.3 Mechanical Systems Test Team
The following team members must participate in Functional Performance, Seasonal, and Integrated Systems Testing of mechanical systems:
CxM Mechanical System Technical Commissioning Specialist
QAR Contracting Officer's Quality Assurance Representative
CQC Contractor's Quality Control Personnel
MC Contractor's Mechanical Commissioning Representative
EC Contractor's Electrical Commissioning Representative
CC Contractor's Controls Commissioning Representative
TABC Contractor's TAB Commissioning Representative
CxG Government Commissioning Agent
MD Mechanical Designer
3.1.6.1.5 Other Pre-Functional and Functional Performance Participants
The following may participate as team members during Pre-Functional Checks and Functional Performance Testing:
DPW Directorate of Public Works Representative
User Using Agent's Representative
3.1.5.2 Pre-Functional Checks
Pre-Functional Checklists from the approved Final Construction Phase Commissioning Plan must be completed by the commissioning team. Complete one Pre-Functional Checklist for each individual item of equipment or system for each system required to be commissioned including, but not limited to, ductwork, piping, equipment, fixtures (lighting and plumbing), and controls.
Indicate commissioning team member inspection and acceptance of each Pre- Functional Checklist item by initials. Acceptance of each Pre-Functional Checklist item by each team member indicates that item conforms to the construction contract requirements in their area of responsibility.
Section 01 91 00.15 Page 14
Technical Commissioning Specialist acceptance of each Pre-Functional Checklist item indicates that each item has been installed correctly and in accordance with contract documents and the Owner's Project Requirements.
Submit the completed and initialed Pre-Functional Checklists no later than 7 calendar days after completion of inspection of all checklists items for each system. Submit one hard copy and an electronic copy. Include manufacturer start-up checklists associated with equipment with the submission of the Pre-Functional Checklists.
3.1.5.3 Testing, Adjusting, and Balancing (TAB) Report and Field Acceptance Testing
The Mechanical System Technical Commissioning Specialist must review the pre-final TAB Report required by Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC. Identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel. Resolve all deficiencies prior to TAB Field Acceptance Testing.
The Mechanical System Technical Commissioning Specialist must witness the TAB Field Acceptance Testing specified by Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC. Include a certification by the Mechanical Technical Specialist that no outstanding deficiencies exist in the systems relative to Testing, Adjusting, and Balancing with the final TAB Report submittal.
3.1.5.4 HVAC Controls Test Reports
The Mechanical System Technical Commissioning Specialist must review the Start-Up Testing Report and the PVT Procedures and Reports required by Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC and Specification Section 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) Front End and Integration. Include a certification by the Mechanical System Technical Commissioning Specialist that the submittals contain no deficiencies or that the submittals do not indicate any deficiencies in the HVAC systems or HVAC control systems with each of these submittals.
3.1.5.5 Tests
3.1.5.5.1 Functional Performance and Integrated Systems Tests
Schedule Functional Performance Tests for each system only after the Certificate of Readiness has been approved by the Government for the system.
Correct all deficiencies identified through any prior review, inspection, or test activity before the start of Functional Performance Tests. Perform Integrated Systems Tests only after the Functional Performance Tests for each associated system are completed with all deficiencies resolved and after the related Functional Performance Test Checklists have been signed by each commissioning team member.
a. Functional Performance Tests and Integrated Systems Tests must be performed with the Contracting Officer's Quality Assurance Representative and CxG present.
b. Abort Functional Performance Tests or Integrated Systems Tests when any system deficiency prevents the successful completion of the test.
Section 01 91 00.15 Page 15
c. Technical Commissioning Specialists must lead and document all Functional Performance Tests and Integrated Systems Tests for the systems to be commissioned with the Contractor and appropriate sub-contractors performing the Functional Performance Tests and Integrated Systems Tests. The representatives listed in the paragraph Commissioning Team must attend the tests. Abort Functional Performance Tests or Integrated Systems Tests when any required commissioning team member is not present for the test.
3.1.5.5.1.1 Checklist
Use the Functional Performance Test and Integrated Systems Test Checklists from the approved Final Construction Phase Commissioning Plan to guide the Functional Performance Tests and Integrated Systems Tests. Functional Performance Tests must be performed for each item of equipment and each system required to be commissioned and verify all sensor calibrations, control responses, safeties, interlocks, operating modes, sequences of operation, capacities, lighting levels, and all other performance requirements comply with construction contract regardless of the specific items listed within the Functional Performance Test and Integrated Systems Test Checklists provided. Testing must progress from equipment or components to subsystems to systems to interlocks and connections between systems. Integrated Systems Tests must be performed for the interactive operation between systems such as HVAC systems, fire protection systems, back-up electrical supply, energy generation systems, and other systems, and verify correct interactive operation, acceptable speed of response, and other contract requirements for both normal and failure modes. Examples of Integrated Systems Tests include the correct operation of HVAC systems during emergency system activation, correct operation of uninterruptible power supplies or energy generators and connected systems, or lighting system operation during power outage or emergency system activation. The order of components and systems to be tested must be determined by the Technical Commissioning Specialists.
3.1.5.5.1.2 Acceptance
Indicate acceptance of each item of equipment and systems tested by signature of each commissioning team member for each Functional Performance Test or Integrated Systems Test Checklist. The Contractor's Quality Control Representative and the Technical Commissioning Specialists must indicate acceptance after the equipment and systems are free of deficiencies.
3.1.5.5.2 HVAC Test Methods
Perform Functional Performance Tests in accordance with the following:
3.1.5.5.2.1 Prior to Testing
Prior to testing operating modes, sequences of operation, interlocks, and safeties, complete control point-to-point observations, test sensor calibrations, and test actuator commands.
Section 01 91 00.15 Page 16
3.1.5.5.2.2 Simulating Conditions
Over-writing control input values through the controls system is not acceptable, unless approved by the Contracting Officer's Representative.
Identify proposed exceptions in a protocol submitted to the Contracting Officer's Representative for approval. Before simulating conditions, overwriting values (if approved), or changing set-points, calibrate all sensors, transducers and devices. Below are several examples of exceptions that would be considered acceptable:
a. When varying static pressures inside ductwork cannot be simulated within the duct, and where a sensor signals the controls system to initiate sequences at various duct static pressures, it is acceptable to simulate the various pressures with a Pneumatic Squeeze-Bulb Type Signaling Device with gauge temporarily attached to the sensing tube leading to the transmitter. It is not acceptable to reset the various set-points, nor to simulate an electric analog signal (unless approved as noted above).
b. Dirty filter pressure drops can be simulated using sheets of cardboard at filter face.
c. Freeze-stat safeties can be simulated by packing portion of sensor with ice.
d. High outside air temperatures can be simulated with a hair blower.
e. High entering cooling coil temperatures can be used to simulate entering cooling coil conditions.
f. Do not use signal generators to simulate sensor signals unless approved by the Contracting Officer's Representative , as noted above, for special cases.
g. Control set points can be altered. For example, to see the air conditioning compressor lockout work at an outside air temperature below 55 degrees F, when the outside air temperature is above 55 degrees F, temporarily change the lockout set point to be 0 degrees F above the current outside air temperature. Caution: Set points are not to be raised or lowered to a point such that damage to the components, systems, or the building structure and/or contents will occur.
h. Test duct mounted smoke detectors in accordance with the manufacturer's recommendations. Perform the tests with air system at minimum airflow condition in ductwork.
i. Test current sensing relays used for fan and pump status signals to control system to indicate unit failure and run status by resetting the set point on the relay to simulate a lost belt or unit failure while the unit is running. Confirm that the failure alarm was generated and received at the control system. After the test is conducted, return the set point to its original set-point or a set-point as indicated by the Contracting Officer's Representative .
Section 01 91 00.15 Page 17
3.1.5.5.2.3 Setup
Perform each test under conditions that simulate actual conditions as close as is practically possible. Provide all necessary materials and system modifications to produce the necessary flows, pressures, temperatures, and other conditions necessary to execute the test according to the specified conditions. At completion of the test, return the affected building equipment and systems to their pre-test condition.
3.1.5.5.3 Sample Strategy
Perform Functional Performance Tests using the following sample strategy.
Prepare and complete a Functional Performance Test Checklist for each item of equipment or system to be tested. For sample sizes less than 100 percent for all similar equipment, the Government will select the specific equipment or system to be tested during testing. Equipment Identifiers are as indicated on the design drawings:
Equipment Identifier Sample Size (Percent)
AHU 100
HP 100
Chiller 100
CWP 100
Perform Integrated Systems Tests for all systems and equipment having interactive operation.
3.1.5.5.4 Seasonal Tests
3.1.5.5.4.1 Initial Functional Performance Tests
Perform Initial Functional Performance Tests as soon as all contract work is completed, regardless of the season. Develop and implement means of artificial loading to demonstrate, to a reasonable level of confidence, the ability of the HVAC systems to handle peak seasonal loads.
3.1.5.5.4.2 Full-Load Conditions
In addition to the Initial Functional Performance Tests, perform Functional Performance Tests of HVAC systems under full-load conditions during peak heating and cooling seasons during outdoor air condition design extremes.
Test cooling equipment and systems with the building fully occupied when performing the Functional Performance Tests during peak cooling season.
Schedule Seasonal Functional Performance Tests in coordination with the Government.
Section 01 91 00.15 Page 18
3.1.5.5.4.3 System Acceptance
Systems may be partially accepted by the Government prior to seasonal testing if they comply with all construction contract that can be tested during initial Functional Performance Tests. All Functional Performance Test procedures must be completed prior to full systems acceptance.
3.1.5.5.5 Aborted Tests and Re-Testing
Abort Functional Performance Tests, Integrated Systems Tests, or Seasonal Tests if any deficiency prevents successful completion of the test or if any required commissioning team member is not present for the test. Reimburse the Government for all costs associated with effort lost due to re-testing due to test failures and aborted tests. These costs must include salary, travel costs, and per diem for Government commissioning team members. Re-test only after all deficiencies identified during the original tests have been corrected.
3.1.5.5.5.1 100 Percent Sample
Systems or equipment for which 100 percent sample size are tested fail if one or more of the test procedures results in discovery of a deficiency and the deficiency cannot be resolved within 5 minutes during the test.
Re-test to the extent necessary to confirm that the deficiencies have been corrected without negatively impacting the performance of the rest of the system.
3.1.6 Training Plan
Develop a training plan which identifies all training required by specification sections associated with commissioned systems. Include a matrix listing each training requirement, content of the training, the trainer name, trainer contact information, and schedule and location of training. Submit one hard copy and an electronic copy of the Training Plan to the Commissioning Specialists and the Government no later than 30 calendar days prior to the associated training.
Document training attendance using training attendance rosters and provide completed attendance rosters to the Commissioning Specialists and the Government no later than 7 calendar days following the completion of training for each system to be commissioned. Submit one hard copy and an
3.1.7 Systems Manual
Prepare and submit a Systems Manual including a signed certification or letter from the Technical Commissioning Specalists and the Lead Commissioning Specialist stating that the Systems Manual is complete, clear, and accurate. The Systems Manual, for all commissioned systems, must conform to Appendix A SYSTEMS MANUAL ORGANIZATION AND CONTENT to ER 25-345- 1, available at the USACE Publications website at the following location:
https://www.publications.usace.army.mil/USACE-Publications/Engineer-https://www.publications.usace.army.mil/USACE-Publications/Engineer-Regulations
Section 01 91 00.15 Page 19
Regulations/ Update and resubmit the Systems Manual based on any corrective action taken during the warranty period.
Submit Systems Manual & Computerized Maintenance Management System Manual no later than 30 calendar days following completion of Functional Performance Tests and Integrated Systems Tests. Submit two hard copies and an
3.1.8 Maintenance and Service Life Plans
3.1.8.1 Maintenance Plan
Prepare and submit a Maintenance Plan for the project mechanical, electrical, plumbing, and fire protection systems. Prepare the HVAC and refrigeration sections of the Maintenance Plan in accordance with ASHRAE
180. Develop required inspection and maintenance tasks similar to Section 5 of ASHRAE 180 for the other commissioned systems and fire protection systems.
Submit the Maintenance Plan no later than 30 calendar days following the completion of Functional Performance Tests and Integrated Systems Tests.
Submit two hard copies and an electronic copy.
3.2 COMMISSIONING REPORT
Following the completion of Functional Performance Tests and Integrated Systems Tests, with the exception of Seasonal Tests, the Lead Commissioning Specialist must prepare a Commissioning Report.
a. Include an executive summary describing the overall commissioning process, the results of the commissioning process, any outstanding deficiencies and recommended resolutions, and any seasonal testing that must be scheduled for a later date. Indicate, in the executive summary, whether the systems meet the requirements of the construction contract and the Owner's Project Requirements.
b. Detail any deficiencies discovered during the commissioning process and the corrective actions taken in the report. Include the completed Pre- Functional Checklists, Functional Performance Test Checklists, Integrated Systems Test Checklists, the Commissioning Plans, the Issues Log, Performance Verification Test Reports, Training Attendance Rosters, the Design Review Report, the final TAB Report.
c. Submit the Commissioning Report no later than 14 calendar days following commissioning team acceptance of all Functional Performance Tests and Integrated Systems Tests with the exception of Seasonal Tests and following completion of Endurance Test. Submit three hard copies and an electronic copy.
d. Following any Seasonal Tests or Post-Construction Activities, update the Final Commissioning Report to reflect any changes and resubmit.
3.3 POST-CONSTRUCTION SUPPORT
3.3.1 Post-Construction Endurance Test
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Regulations
Section 01 91 00.15 Page 20
Perform an Endurance Test in accordance with the paragraph Endurance Test in Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC once during the peak heating season and once during the peak cooling season during outdoor air condition extremes with the exception that network bandwidth usage measurement and recording is not required.
The Mechanical System Commissioning Specialists must review the trend logs from the Endurance Tests to ensure that the systems have stable operation and operate as required by the construction contract, and the Owner's Project Requirements Document. The Commissioning Specialists must provide a Post-Construction Trend Log Report that identifies any deficiencies noted in operation, recommendations for correction, and includes a graphical representation of the trends. Provide one Trend Log Report for the peak cooling season and one Trend Log Report for the peak heating season. Submit one hard copy and one electronic copy of the Post-Construction Trend Log Reports no later than 14 calendar days following receipt of the trend log data by the Commissioning Specialist.
3.3.2 Post-Construction Site Visit
The Commissioning Specialists must visit the building site concurrent with the 9 month warranty inspection to inspect building system equipment and review building operation with the building operating/maintenance staff. The Commissioning Specialists must identify any deficiency of the building systems to operate in accordance with the contract requirements and the Owner's Project Requirements. The Commissioning Specialists must advise the CxG & Contracting Officer's Representative of any identified deficiencies and the proposed corrective action. Submit an updated commissioning report and systems manual documenting the results of the post-construction inspection.
Section 01 91 00.15 Page 21
APPENDIX A - OWNER'S PROJECT REQUIREMENTS DOCUMENT
The plans and specifications provide the owner’s project requirements.
AHU
B
CH
UH
H
W R
3" HWS
2 1/2" CHWR
2 1/2" CHWS
3" CR
3" CS
3/4" HWS
3/4"HWR
C
H W
R
3/4" CHWR
C
H W
S
C
H W
R
CF
EX
ET
AS
HWP
CWP
AS
CF
CWP
HWP
4 5
3" CR
3" CS
C D
CDCD
1" HWS
1" HWR
3"
EXISTING
HEAT PUMP
TO REMAIN
1 1/2" CHWS
1 1/2" CHWR
S E
E
S
H E
E T
M
F O
R
C
O N
T I N
U A
T I O
N
ET
FCU
ST
C
H W
R
C D
L
REF
3"
H
W R
C O
O L I N
G
C
O I L
P R
E H
E A
T
C
O I L
V F
D
VFD
R E
H
E A
T
C
O I L
M
2"
2"
2 1/2"
M-424
S E
C T
O R
L E
V E
L
M E
C H
A N
I C
A
N L
A R
G E
D
P
L A
N
M O
F A
D P
B L
US Army Corps of Engineers ®
SHEET ID
U S
M
Y
C
O R
P
F
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B
A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
C
D
F
E
G
1 2 3 4 5 6 7 8 9 10
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
C O
N T
R A
C
S O
L I C
I T
A T
I O
N
N
O
I S
S U
D
T
E
S I Z
E
A N
S I
D
F I L
E
N
U M
B E
R
K A
N S
I T
Y
D
I S
T R
I C
T
E
T
H
S
T R
E E
T
K A
N S
T
Y
M
O
H N
B
R
P O
R A
T I O
N
K
I R
K
D
R I V
E
K
A N
S A
S
C
I T
Y
M
O
BLDG 127
H V
P
A I R
S
B
U I L D
I N
G
F O
A V
E N
W O
R T
H
K
S
T A
K
D
M
B E
R
U S
A C
E
K
A N
S A
S
C
I T
Y
D
I S
T R
I C
T
C
I V
I L
P
L A
N N
I N
G
RTA
KEYPLAN
TRUE
NORTH
U
W
D Q
R
1. CONNECT TO EXISTING CONDENSER WATER SUPPLY AND RETURN.
2. PROVIDE NEW CHEMICAL BY-PASS FEEDER. SEE SHEET M-611 FOR
CHEMICAL BY-PASS FEEDER SCHEDULE.
3. PROVIDE NEW AIR SEPARATOR. SEE SHEET M-611 FOR AIR SEPARATOR
SCHEDULE.
4. PROVIDE NEW INLINE HOT WATER PRIMARY SYSTEM PUMP. SEE M-609
FOR PUMP SCHEDULE.
5. PROVIDE NEW INLINE HOT WATER SECONDARY SYSTEM PUMP. SEE M-609
FOR PUMP SCHEDULE.
6. PROVIDE NEW INLINE CHILLED WATER PRIMARY SYSTEM PUMP. SEE
SHEET M-609 FOR PUMP SCHEDULE.
7. PROVIDE NEW INLINE CHILLED WATER SECONDARY SYSTEM PUMP. SEE
SHEET M-609 FOR PUMP SCHEDULE.
8. PROVIDE NEW EXPANSION TANK AND NEW 4" PAD. SEE SHEET M-611 FOR
EXPANSION TANK SCHEDULE.
9. PROVIDE REDUCER FOR COIL CONNECTION AS REQUIRED.
10. EXISTING BAS CONTROL PANEL.
11. PROVIDE NEW STORAGE TANK AND NEW 4" PAD. SEE SHEET M-611 FOR
STORAGE TANK SCHEDULE.
12. BALANCE THREE-WAY VALVE BYPASS TO MINIMUM FLOW.
SCALE:
A3
MECHANICAL ENLARGED PIPING PLAN - LEVEL 1 - ROOM 1203
1/4" = 1'-0"
0 4' 8'2'
SHEET KEYED NOTES
XX
1. SEE MECHANICAL SCHEMATIC E1/M-703 AND SHEET M-704 FOR VALVES,
PIPE SIZE AND LOCATION IN THE SYSTEM.
2. COORDINATE ELEVATION OF PIPES WITH OVERHEAD DUCTWORK.
3. ADD REDUCERS AS REQUIRED FOR SYSTEMS INSTALLATION.
GENERAL SHEET NOTES
M
O D
I F
Y
D
E T
A I L
AutoCAD SHX Text
DN
AutoCAD SHX Text
FD
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text
M-609
E
C H
A N
I C
H
E D
U L
E S
M O
F A
D P
B L
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B
A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
C
D
F
E
G
1 2 3 4 5 6 7 8 9 10
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
T
E
S I Z
E
A N
S I
D
F I L
E
N
U M
B E
R
K A
N S
T
Y
D
I S
T R
I C
T
E
T
H
S
T R
E E
T
K A
N S
T
Y
M
O
H N
R
P O
R A
T I O
N
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .