This solicitation requests proposals for heating, ventilation, and air conditioning (HVAC) repairs at Buildings 120 and 127 at Fort Leavenworth, Kansas. The scope of work includes miscellaneous changes to HVAC equipment and controls, replacement of makeup air units, repair of lobby cold air issues, and replacement of heat pumps. The project value is estimated between $10 million to $25 million.

The solicitation is full and open to all businesses. Proposals are due by September 23, 2020. Award will be made to the responsible offeror providing the best value based on evaluation of corporate experience, technical approach, performance confidence, small business participation, and price factors. The contract type is firm-fixed-price for a period of 1,095 calendar days from notice to proceed. The North American Industry Classification System code is 238220. Small businesses are encouraged to consider teaming arrangements. Registration in the System for Award Management is required to bid.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

Kansas City District Building Strong

BUILDING 120 HVAC REPAIRS

FORT LEAVENWORTH, KANSAS

PN: 464994

CONSTRUCTION SOLICITATION AND

SPECIFICATIONS

VOLUME I – DIVISION 01 THROUGH

DIVISION 28

As Advertised

August 2020

This page was intentionally left blank for duplex printing.

RTA

Ft. Leavenworth Lewis & Clark Center

Building 120

FORT LEAVENWORTH, KS

Architectural

Structural

Mechanical & Electrical

8/3/2020

TPoer Checker Text These seals apply to the complete design for the HVAC repair project including plans and specifications.

DEPARTMENT OF THE ARMY

KANSAS CITY DISTRICT, CORPS OF ENGINEERS

757 FEDERAL BUILDING

KANSAS CITY, MISSOURI 64106

SPECIFICATIONS FOR CONSTRUCTION OF

BUILDING 120 HVAC REPAIRS

FORT LEAVENWORTH, KANSAS

TABLE OF CONTENTS

COVER

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

Section Title

00 10 00 SOLICITATION

00 20 00 INSTRUCTIONS FOR PROCUREMENT

00 21 00 INSTRUCTIONS

00 21 16 INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 FACILITY DATA REQUIREMENTS

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 22 00 ROOF AND DECK INSULATION

07 41 13 METAL ROOF PANELS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 90 00 PAINTS AND COATINGS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00.00 23 LEAK MITIGATION

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL

SYSTEMS

23 11 25 FACILITY GAS PIPING

23 21 23 HYDRONIC PUMPS

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 41 MULTISTACK HEAT RECOVERY CHILLER/HEATER MODEL WITH VARIABLE

SOURCE

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

-- End of Project Table of Contents --

Building 120 and 127 HVAC Repairs at Fort Leavenw orth, KS

This requirement is Full and Open.

This solicitation w il result on aw ard of one Design-Bid- Build (DBB) Firm-Fixed Price (FFP) Construction Contract.

The North American Industry Classif ication is 238220, w ith a Small Business Standard Size of $16.5 million.

The magnitude for this project is betw een $10 million and $25 million.

JACLYN C YOCUM 816-389-2266

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

24-Aug-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1095 calendar days and complete it w ithin ________10 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

816-389-2030FAX:TEL: 816-389-3976 TEL: FAX:

W912DQ20R4019 102

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DQ20R4019

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job B127 Plant work (phase 1) MUST DO FIRST

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Plant work (phase 1) in accordance with the provided plans and specifications.

FOB: Destination

NET AMT

0002 1 Job S3 MAUs

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the S3 MAUs in accordance with the provided plans and specifications.

0003 1 Job B127 S1 MAUs

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 S1 MAU’s in accordance with the provided plans and specifications.

0004 1 Job B120 Mechanical Room Work

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 120 Mechanical Room Work in accordance with the provided plans and specifications.

0005 1 Job Contract Manpower Reporting

FFP

Contractor Manpower Reporting is required. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil

0006 1 Job OPTION B127 S4 MAUs

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 S4 MAU’s in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0007 1 Job OPTION B127 S4 MAUs

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 S5 and S6 MAUs in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0006 if this option is exercised after 545 calendar days and on or before 910 calendar days of contract award.

0008 1 Job OPTION B127 S5 and S6 MAUs

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 S5 and S6 MAU’s in accordance with the provided plans and specifications.

This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0009 1 Job OPTION B127 S5 and S6 MAUs

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 S5 and S6 MAU’s in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0008 if this option is exercised after 545 calendar days and on or before 910 calendar days of contract award.

0010 1 Job OPTION B127 Repair Cold First Floor Lobby

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Repair Cold First Floor Lobby in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0011 1 Job OPTION B127 Repair Cold First Floor Lobby

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Repair Cold First Floor Lobby in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0010 if this option is exercised after 545 calendar days and on or before 910 calendar days of contract award.

0012 1 Job OPTION B127 Kitchen Area

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Kitchen Area in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised

0013 1 Job OPTION B127 Kitchen Area

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Kitchen Area in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0012 if this option is exercised after 545 calendar days and on or before 910 calendar days of contract award.

0014 1 Job OPTION B127 Auditoriums

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Auditoriums in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised

0015 1 Job OPTION B127 Auditoriums

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Auditoriums in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0014 if this option is exercised after 545 calendar days and on or before 910 calendar days of contract award.

0016 1 Job OPTION B127 Water To Air Heat Pumps Split

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to air heat pumps split, sectors 1, 2, 9 in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0017 1 Job OPTION B127 Water To Air Heat Pumps Split

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to air heat pumps split, sectors 1, 2, 9 in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0016 if this option is exercised after 545 calendar days and on or before 910 calendar days of contract award.

0018 1 Job OPTION B127 Water to air heat pumps split, S3

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to air heat pumps split, S3 in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0019 1 Job OPTION B127 Water to air heat pumps split, S3

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to air heat pumps split, S3 in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0018 if this option is exercised after 545 calendar

0020 1 Job OPTION B127 Water to air heat pumps split, S4

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to air heat pumps split, S4 in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0021 1 Job OPTION B127 Water to air heat pumps split, S4

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to air heat pumps split, S4 in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0020 if this option is exercised after 545 calendar

0022 1 Job OPTION B127 Water to Air Heat Pumps Split, S5/6

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to Air Heat Pumps Split, S5/6 in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0023 1 Job OPTION B127 Water to Air Heat Pumps Split, S5/6

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 127 Water to Air Heat Pumps Split, S5/6 in accordance with the provided plans and specifications. This CLIN will only include the price DIFFERENCE, if any, on Option 0022 if this option is exercised after 545 calendar

0024 1 Job B120 Work Outside Mechanical Room

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 120 Work Outside Mechanical Room in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0025 1 Job B120 Library Work

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 120 Library Work in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

0026 1 Job Building 120 Leak Mitigation

FFP

The Contractor shall furnish all labor, equipment, materials, and perform all task necessary for the Building 120 Leak Mitigation in accordance with the provided plans and specifications. This CLIN will only include the price if this option is exercised within 545 calendar days of contract award.

Section 00 20 00 - Instructions for Procurement

CLAUSES INCORPORATED BY FULL TEXT

SCR_CT_007 MAGNITUDE OF PROJECT—CONSTRUCTION (Jul 2002)

The magnitude of this project is represented by the following estimated price range (contracting officer mark as appropriate):

_XX__Between $10,000,000 and $25,000,000

(End)

TPL_NWK_001 Points of Contact

CONTRACT

SPECIALIST:

Jaclyn Yocum PHONE: 816-389-2266 E-MAIL: Jaclyn.C.Yocum@usace.army.mil

PROJECT

MANAGER:

Christine Hendzlik PHONE: 816-389-3269 E-MAIL: Kristine.M.Hendzlik@usace.army.mil

TPL_NWK_002 PROPOSALS TO BECOME PART OF THE CONTRACT

1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.

2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.

3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to Proceed

4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.

(End)

SCOPE OF WORK

B120 work consists of miscellaneous changes to the multistack unit and ancillary replacement/repair of appurtenances; corrective work to space end units throughout the building; and specific corrective action to reduce humidity in the Combined Arms Research Library historic collection area.

B127 work consists of work in the main HVAC plant associated with correcting the humidity and outside air problems existing throughout the building; replace make-up air units throughout the building; repair first floor lobby cold air issue; and replace heat pumps throughout the building.

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUN 2020 52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018 52.204-14 Service Contract Reporting Requirements OCT 2016 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991

CLAUSES INCORPORATED BY FULL TEXT

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)

(a) Definitions. As used in this clause--

Postconsumer fiber means—

(1) Paper, paperboard, and fibrous materials from retail stores, office buildings, homes, and so forth, after they have passed through their end-usage as a consumer item, including: used corrugated boxes; old newspapers; old magazines; mixed waste paper; tabulating cards; and used cordage; or

(2) All paper, paperboard, and fibrous materials that enter and are collected from municipal solid waste; but not

(3) Fiber derived from printers' over-runs, converters' scrap, and over-issue publications.

(b) The Contractor is required to submit paper documents, such as offers, letters, or reports that are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber, whenever practicable, when not using electronic commerce methods to submit information or data to the Government.

(End of clause)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price (FFP) contract resulting from this solicitation.

(End of provision)

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

2.3% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Fort Leavenworth, Leavenworth County, Kansas.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Alice Jeffres, Contracting Officer USACE, Kansas City District Federal Building, RM 647 601 E. 12th Street Kansas City, MO 64106-2896

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for Thursday, September 3, 2020, 9:00 a.m. local time.

(c) Site visit POC is Jeff Jensen, e-mail jeffery.k.jensen@usace.army.mil; 816-389-3648.

(d) Participants who need access to get on post will need to go the Visitor Control Center (VCC) on 4th and Metropolitan. Allow sufficient time to obtain a pass.

(e) Participants will meet at-- PLACE: Building 127 lobby, 100 Stimson Avenue, Ft Leavenworth, KS.

Due to the COVID-19 safety requirements ALL participants shall wear face masks. No one will be allowed to participate in the site visit without a face mask

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

FAR:

https://www.acquisition.gov/browse/index/far

DFARS:

https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

AFARS:

https://www.acquisition.gov/afars

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

mailto:jeffery.k.jensen@usace.army.mil https://www.acquisition.gov/browse/index/far https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/afars

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.204-7017 PROHIBITION ON THE ACQUISITON OF COVERED DEFENSE TELECOMMUNICATIONS

EQUIPMENT OR SERVICES--REPRESENTATION (DEC 2019)

The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services--Representation, that it “does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.”

(a) Definitions. Covered defense telecommunications equipment or services, covered mission, critical technology, and substantial or essential component, as used in this provision, have the meanings given in the 252.204-7018 clause, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services, of this solicitation.

(b) Prohibition. Section 1656 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits agencies from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.

(d) Representation. If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-- Representation, that it “does” provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation:

The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation.

(e) Disclosures. If the Offeror has represented in paragraph (d) of this provision that it “will provide covered defense telecommunications equipment or services,” the Offeror shall provide the following information as part of the offer:

(1) A description of all covered defense telecommunications equipment and services offered (include brand or manufacturer; product, such as model number, original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable).

(2) An explanation of the proposed use of covered defense telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition referenced in paragraph (b) of this provision.

(3) For services, the entity providing the covered defense telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known).

https://www.sam.gov/

(4) For equipment, the entity that produced or provided the covered defense telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).

Section 00 21 16 - Instructions to Proposers

INSTRUCTIONS TO CONTRACTORS

1.0 GENERAL PROPOSAL INFORMATION

The proposal should be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent.

The technical proposal shall address the Offeror’s proposed approach to fully perform the requirements of the Request for Proposal (RFP). Offerors are discouraged from providing information not required by the RFP.

2.0 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS

INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:

DoD SAFE (Secure Access File Exchange) is a web-based tool that provides authenticated DoD CAC users and guests (unauthenticated users) the capability to securely send and receive large files, including files that are too large to be transmitted via email. Guests can receive files from CAC users and (only if CAC users requested files) send files to CAC users. Notification is achieved via email. In effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five

(5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

SAFE INSTRUCTIONS

The Offeror’s proposal shall be submitted electronically, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks within a proposal is prohibited.

NOTE: The only authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall electronically submit their proposals using the following link:

https://safe.apps.mil/

Failure to properly submit a proposal by the due date and time specified in the solicitation will render it late, and late proposals will be rejected. As this is an electronic submission subject to internet connectivity and other potential network traffic issues, offerors are cautioned to plan accordingly.

REQUEST FOR UPLOAD CODE: In order to electronically submit a proposal through DoD SAFE, offerors must email Contract Specialist Jaclyn Yocum at jaclyn.c.yocum@usace.army.mil and Contracting Officer Alice M.

Jeffres at alice.m.jeffres@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code five (5) working days before proposal submission date may not receive a request code in time to upload their submission. For larger submissions that require multiple sessions to upload, multiple codes may need to be requested. Please plan accordingly when requesting a code(s) for uploads in order to have sufficient time to upload prior to the proposal due date.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). Title the files(s):

Solicitation#_COMPANY NAME_Cover letter and TAB A mailto:%20alice.m.jeffres@usace.army.mil

Solicitation#_COMPANY NAME_TABs B-D Solicitation#_COMPANY NAME_TAB E Solicitation#_COMPANYNAME_TAB F

NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

Submission shall be in Adobe PDF format.

INSTRUCTIONS FOR USING THE SAFE WEBSITE:

Once at the SAFE website select the “Drop-off” icon. This allows users without a Common Access Card (CAC) or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.

After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.

When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer.

The email address for the Contract Specialist for this solicitation is jaclyn.c.yocum@usace.army.mil AND the Contracting Officer is alice.m.jeffres@usace.army.mil. The email address of the Government Employee who initiated the request code will be automatically populated. The Offeror must enter the email address for both the Contracting Officer and Specialist. The Offeror can enter an additional email address if desired. After entering an email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. Successful file submission will be confirmed by the ‘Drop-Off Completed” screen which generates once a file is uploaded.

NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS:

For the purposes of determining whether a proposal submission is timely, the government shall utilize the date and time the submission is completely uploaded into the SAFE website as indicated by the SAFE system time stamp. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions will require multiple requests for codes, the Government will utilize the system generated date and time stamp of the last submission. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

Because uploaded documents expire in DoD SAFE, the submission of proposals should only occur during a limited window of time proposals should be submitted no earlier than 5 days before the proposal due date, in order to ensure that the submitted proposals doesn’t expire before the proposal due date.

Offerors are responsible for ensuring that the submitted proposal does not expire prior to proposal due date.

mailto:jaclyn.c.yocum@usace.army.mil mailto:alice.m.jeffres@usace.army.mil

There is a SAFE User Guide available at https://dl.dod.cyber.mil/wp-content/uploads/dcs/pdf/unclass- DOD_SAFE_User_Guidev0_2d1.pdf

If an Offeror needs help, the SAFE helpdesk will not be able to help you. The Contract Specialist listed above will need to open a ticket for them to address system or user help issues.

3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS

In order to be considered for award of a contract for the requirements of this solicitation, the Offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in TABs as follows:

Submit the proposal in a tabbed file identified by the Solicitation Number, project title, name, address, and telephone number of the Offeror(s). Arrange tabs as follows:

(1) File 1 (TAB A), Pro Forma requirements.

(2) File 2 Technical Proposal (TABs B - D):

Tab B, FACTOR 1 – Corporate Experience Tab C, FACTOR 2 – Technical Approach Tab D, FACTOR 3 – Performance Confidence

(3) File 3 Tab E, FACTOR 4 - – Small Business Commitment Document

(4) File 4 TAB F, Price Proposal.

Offerors shall limit the proposal to the following page limits:

Factor 1: Corporate Experience – 3 pages per project, maximum 15 pages Factor 2: Technical Approach – 10 Pages Factor 3: Performance Confidence Factor 4: – Small Business Commitment Document – (excluded from page limits)

Arrange the proposal as follows:

File 1 (TAB A)

Part 1: Cover Letter containing the following:

a. Solicitation number.

b. Name, address, email, and telephone and fax numbers of the Offeror.

c. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this RFP.

d. Name, title and signature of the person authorized to sign the proposal.

e. A statement specifying agreement with all terms, conditions and provisions included in the RFP.

f. CAGE Codes for the Offeror, and all teaming partners who participated in the Factor 1 – Corporate

Experience projects.

Part 2:

1) Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).

2) The…