File Type Posted
BidAbstract_W912C320B0001_RoofRepairs_20200514.pdf PDF
Amend0007_W912C320B0001_RoofRepairs20200506.pdf PDF
Amend0006_W912C320B0001_RoofRepairs20200428.pdf PDF
Amend0005_W912C320B0001_RoofRepairs20200421.pdf PDF
Amend0004_W912C320B0001_RoofRepairs20200409.pdf PDF
Amend0003_W912C320B0001_RoofRepairs20200318.pdf PDF
Photo12Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo2Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo9Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo3Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo8Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo11Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo4Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo7Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo10Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo5Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo1Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Photo6Amend0002_W912C320B0001_RoofRepairs20200316.pdf PDF
Amend0001_W912C320B0001_RoofRepairs20200309.pdf PDF
FIRST-SchedulePrices_W912C320B0001_RoofRepairs_20200306.xlsx XLSX spreadsheet
BASE-SchedulePrices_W912C320B0001_RoofRepairs_20200306.xlsx XLSX spreadsheet
FOURTH-SchedulePrices_W912C320B0001_RoofRepairs_20200306.xlsx XLSX spreadsheet
Solicitation-W912C320B0001-RoofRepair-20200306.pdf PDF
Dwg_W912C320B0001-RoofRepair-20200306.pdf PDF
THIRD-SchedulePrices_W912C320B0001_RoofRepairs_20200306.xlsx XLSX spreadsheet
SOWSpecs_W912C320B0001-RoofRepairs-20200306.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECOND OPTION

SCHEDULE OF PRICES
SECOND OPTION PERIOD: IFB W912C320B0001, ROOF REPAIR INSPECTION & MAINTENANCE
ItemItem DescriptionEstimatedUnitUnit CostTotal Cost
Quantity
2001Roof Inspection Survey and Written Report with As-Built Roof Plan125,000SF
(Section 01 11 00, Para 1.2, 1.2.1, 1.2.2.a through h)

2002 Provide As-Built Roof Plans (Section 01 11 00, Para 1.2.2) 125,000 SF

2003Sampling & Laboratory Testing and Test Report for Asbestos Materials15EA
(Section 01 11 00, Para 1.2.2.e and Para 1.4.6)
2004Repair Concrete Roof (Plain Concrete)1,500SF
(Section 01 11 00, Para 1.4.1.a, b, c, d, e) (See Tech Specs.)
2005Repair Corrugated Metal Roof5,000SF
(Section 01 11 00, Para 1.4.2.a, b, c) (See Tech Specs.)
2006Remove and Dispose Corrugated Metal Roof Panels, GA 24520SF
(Section 01 11 00, Para 1.4.2.e) (See Tech Specs.)
2007Install Corrugated Metal Roof Panels, GA 24520SF
(Section 01 11 00, Para 1.4.2.e) (See Tech Specs.)
2008Remove and Dispose Corrugated Metal Roof Panels, GA 26520SF
(Section 01 11 00, Para 1.4.2.e) (See Tech Specs.)
2009Install Corrugated Metal Roof Panels, GA 26520SF
(Section 01 11 00, Para 1.4.2.e) (See Tech Specs.)
2010Repair Corrugated Metal Roof: Painting5,000SF
(Section 01 11 00, Para 1.4.2. d, f, and g)
2011Repair Modified Bitumen (Insulation, and 3-ply w/cold adhesvie)200SF
(See Tech Specs.)
2012Repair Modified Bitumen (Insulation, and 3-ply w/torched seams)200SF
(See Tech Specs.)
2013Repair Modified Bitumen (Insulation, and 2-ply w/cold200SF
adhesive or torched seams) (See Tech Specs.)
2014Repair Light weight Concrete insulation, Lt weight880SF
cellular roof fill, Port & Cem. 2 inch thick average and foaming agent
(See Tech Specs.)
2015Remove and Dispose Light weight Concrete insulation, Lt weight880SF
cellular roof fill, Port & Cem. 2 inch thick average and foaming agent
(See Tech Specs.)
2016Install Light weight Concrete insulation, Lt weight880SF
cellular roof fill, Port & Cem. 2 inch thick average and foaming agent
(See Tech Specs.)
2017Repair Light weight Concrete insulation, Lt weight880SF
cellular roof fill, Port & Cem. 4 inch thick average and foaming agent
(See Tech Specs.)
2018Remove and Dispose Light weight Concrete insulation, Lt weight880SF
cellular roof fill, Port & Cem. 4 inch thick average and foaming agent
(See Tech Specs.)
2019Install Light weight Concrete insulation, Lt weight880SF
cellular roof fill, Port & Cem. 4 inch thick average and foaming agent
(See Tech Specs.)
2020Remove and Dispose Insulation 2-inch Average Thick1,500SF
(See Tech Specs.)

2021 Install Insulation 2-inch Average Thick (See Tech Specs.) 1,500 SF

2022 Remove and Dispose E.P.D.M with Insulation (See Tech Specs.) 2,000 SF

2023 Install E.P.D.M with Insulation (See Tech Specs.) 2,000 SF

2024 Remove and Dispose Built-up Roofing (Insulation 3-ply, Hot Adhesive and Gravel) (See Tech Specs.) 5,000 SF

2025Install Built-up Roofing (Insulation 3-ply, Hot Adhesive and Gravel)5,000SF
(See Tech Specs.)
2026Repair Single Ply with adhesive or Asphalt Moppping1,040SF
(See Tech Specs.)

2027 Repair Insulation and Hot Asphalt Plies 520 SF

2028Remove and Dispose Standing Seam Metal Over Insulation260SF
(Section 07 61 13)
2029Install Standing Seam Metal Over Insulation260SF
(Section 07 61 13)
2030Remove and Dispose Asphalt Shingles over Insulation and over100SF
standing Seam Metal Roof (See Tech Specs.)
2031Install Asphalt Shingles over Insulation and over100SF
standing Seam Metal Roof (See Tech Specs.)

2032 Repair Water Proof Asphalt Coating (See Tech Specs.) 200 SF

2033Repair Sprayed Polyurethane with top Silicone Coating (PUF)7,800SF
(See Tech Specs.)
2034Remove and Dispose Primer and Elastomeric Coating7,800SF
(See Tech Specs.)

2035 Install Primer and Elastomeric Coating (See Tech Specs.) 7,800 SF

2036Blisters Repairs for Modified Bitumen260SF
(Section 01 11 00, Para 1.4.3) (See Tech Specs.)
2037Blister Repairs for E.P.D.M.520SF
(Section 01 11 00, Para 1.4.3) (See Tech Specs.)
2038Blister Repairs for Built-up Roofing1,040SF
(Section 01 11 00, Para 1.4.3) (See Tech Specs.)
2039Blister Repairs for PUF520SF
(Section 01 11 00, Para 1.4.5.d and e.(1) through (8) (See Tech Specs.)
2040PUF Minor Repairs260SF
(Section 01 11 00 , Para 1.4.5.C.(1) through (5) (See Tech Specs.)
2041PUF or Built-up Roofing Repairs w/Asbestos Mastic (ACM)260SF
(Section 01 11 00, Para 1.4.6) (See Tech Specs.)
2042PUF or Built-up Roofing Replacement w/Asbestos Mastic (ACM)5,200SF
(Section 01 11 00, Para 1.4.6) (See Tech Specs.)
2043Remove and Dispose Radiant Barrier Blanket130,000SF
Section 01 11 00, Para 1.5, 1.5.1 and 1.5.2) (See Tech Specs.)
2044Install Radiant Barrier Blanket130,000SF
Section 01 11 00, Para 1.5, 1.5.1 and 1.5.2) (See Tech Specs.)
2045Repair Cracks at Roofing Systems1,040LF
(Section 01 11 00, Para 1.4.3.e) (See Tech Specs.)
2046Correct Water Ponding Areas at Roofing Systems1,040SF
(Section 01 11 00, Para 1.4.3.d) (See Tech Specs.)
2047Maintenance for Roofing Systems130,000SF
(Section 01 11 00, Par1.9.a through c) (See Tech Specs.)
2048Cement parging, 2 coats, waterproofed Portland cement (See Tech1,040SF
Specs.)
2049Structural steel projects, steel surface treatments, wire brush, hand520SF
sanding (See Tech Specs.)
2050Struct. steel projects,sprayed painting,univ primer plus1 paint coat,520SF
phenolic, modified alkyd (See Tech Specs.)
2051Near white blast, (SSPC-10), exist coat blistered/pitted,520SF
9.0 #/SF (See Tech Specs.)
2052Structural steel project,pnts&prot ctg,sprayed,zinc rich primer,epoxy,520SF
spray,organic (See Tech Specs.)

2053 Strl st projs, pnts & prot ctg, sprayed, epoxy, intmd or topcoat (See Tech Specs.) 520 SF

2054Epoxy dk ctg, bitumen modified polyurethane, fld applied,520SF
55 mils thk (See Tech Specs.)

2055 Remove and Dispose Open web joist girders, average (See Tech Specs.) 1 TON

2056 Install Open web joist girders, average (See Tech Specs.) 1 TON

2057 Remove and Dispose Lightweight framing, angle, field fab, 3" x 3" x 3/8" (See Tech Specs.) 45 LF

2058Install Lightweight framing, angle, field fab, 3" x 3" x 3/8" (See Tech45LF
Specs.)

2059 Remove and Dispose Framing, joists, 2" x 12" (See Tech Specs.) 55 LF

2060 Install Framing, joists, 2" x 12" (See Tech Specs.) 55 LF

2061 Remove and Dispose Framing, joists, 2" x 4" (See Tech Specs.) 55 LF

2062 Install Framing, joists, 2" x 4" (See Tech Specs.) 55 LF

2063 Remove and Dispose Framing, joists, 2" x 6" (See Tech Specs.) 55 LF

2064 Install Framing, joists, 2" x 6" (See Tech Specs.) 55 LF

2065 Remove and Dispose Framing, joists, 2" x 8" (See Tech Specs.) 55 LF

2066 Install Framing, joists, 2" x 8" (See Tech Specs.) 55 LF

2067 Remove and Dispose Framing, joists, 2" x 10" (See Tech Specs.) 55 LF

2068 Install Framing, joists, 2" x 10" (See Tech Specs.) 55 LF

2069 Remove and Dispose Framing, roofs, fascia boards, 2" x 8" (See Tech Specs.) 55 LF

2070 Install Framing, roofs, fascia boards, 2" x 8" (See Tech Specs.) 55 LF

2071 Remove and Dispose Framing, roofs, rafters, to 4 in 12 pitch, 2" x 8" (See Tech Specs.) 55 LF

2072 Install Framing, roofs, rafters, to 4 in 12 pitch, 2" x 8" (See Tech Specs.) 55 LF

2073 Remove and Dispose Framing, roofs, rafters, to 4 in 12 pitch, 2" x 6" (See Tech Specs.) 55 LF

2074 Install Framing, roofs, rafters, to 4 in 12 pitch, 2" x 6" (See Tech Specs.) 55 LF

2075 Remove and Dispose Framing, roofs, ridge board, #2 or better, 1" x 8" (See Tech Specs.) 55 LF

2076 Install Framing, roofs, ridge board, #2 or better, 1" x 8" (See Tech Specs.) 55 LF

2077 Remove and Dispose Framing, roofs, roof cants, split, 4" x 4" (See Tech Specs.) 55 LF

2078 Install Framing, roofs, roof cants, split, 4" x 4" (See Tech Specs.) 55 LF

2079 Remove and Dispose Framing, miscellaneous, nailers, treated, wood construction, 2" x 6" (See Tech Specs.) 55 LF

2080Install Framing, miscellaneous, nailers, treated, wood construction,55LF
2" x 6" (See Tech Specs.)

2081 Remove and Dispose Exp jt,butyl or nprn ctr W/foam insul,alum,.032"thk for opng to 2-1/2" (See Tech Specs.) 104 LF

2082Install Exp jt,butyl or nprn ctr W/foam insul,alum,.032"thk for opng to104LF
2-1/2" (See Tech Specs.)

2083 Remove and Dispose Exp jt, butyl or nprn ctr W/foam insul, alum, for jt opngs to 3-1/2" (See Tech Specs.) 104 LF

2084Install Exp jt, butyl or nprn ctr W/foam insul, alum, for jt opngs to104LF
3-1/2" (See Tech Specs.)

2085 Remove and Dispose Expansion joint, roof joint with extruded aluminum cover, 2" (See Tech Specs.) 55 LF

2086 Install Expansion joint, roof joint with extruded aluminum cover, 2" (See Tech Specs.) 55 LF

2087 Remove and Dispose Expansion joint, roof to wall joint with extruded aluminum cover (See Tech Specs.) 55 LF

2088Install Expansion joint, roof to wall joint with extruded aluminum cover55LF
(See Tech Specs.)
2089Remove and Dispose Expansion joint, wall joint, closed cell foam on PVC55LF
cover, 9" wide (See Tech Specs.)
2090Remove and Dispose Expansion joint, wall joint, closed cell foam on PVC55LF
cover, 9" wide (See Tech Specs.)

2091 Remove and Dispose Expansion jt, neoprene, dbl-seal type with thick center, 4-1/2" wide (See Tech Specs.) 55 LF

2092Install Expansion jt, neoprene, dbl-seal type with thick center,55LF
4-1/2" wide (See Tech Specs.)

2093 Cleaning high pressure water only, minimum (See Tech Specs.) 130,000 SF

2094 Remove and Dispose Sheathing, with boards, 1" x 12" boards, laid diagonal (See Tech Specs.) 55 SF

2095 Install Sheathing, with boards, 1" x 12" boards, laid diagonal (See Tech Specs.) 55 SF

2096 Remove and Dispose Sheathing, plywood on roof, CDX, 5/8" thick (See Tech Specs.) 55 SF

2097 Install Sheathing, plywood on roof, CDX, 5/8" thick (See Tech Specs.) 55 SF

2098 Remove and Dispose Steel roofing, on steel frame, corrugated or ribbed, galv, 24 ga (See Tech Specs.) 55 SF

2099Install Steel roofing, on steel frame, corrugated or ribbed, galv, 24 ga55SF
(See Tech Specs.)

2100 Remove and Dispose Steel roofing, on steel frame, corrugated or ribbed, galv, 26 ga (See Tech Specs.) 55 SF

2101Install Steel roofing, on steel frame, corrugated or ribbed, galv, 26 ga55SF
(See Tech Specs.)

2102 Remove and Dispose roof flat profile, 1-3/4" stand. seams, 12" w, stand. fin. 24 ga. (See Tech Specs.) 55 SF

2103Install Steel roof flat profile, 1-3/4" stand. seams, 12" w, stand. fin. 24 ga.55SF
(See Tech Specs.)

2104 Remove and Dispose Aluminum roofing, corrugated, painted, .032" thick (See Tech Specs.) 55 SF

2105Install Aluminum roofing, corrugated, painted, .032" thick (See Tech55SF
Specs.)

2106 Remove and Dispose Asphalt shingles, #15 felt underlayment (See Tech Specs.) 55 SF

2107 Install Asphalt shingles, #15 felt underlayment (See Tech Specs.) 55 SF

2108 Remove and Dispose Asphalt shingles, std strip shingles, inorganic, class A, 210-235 lb/sq (See Tech Specs.) 55 SF

2109Install Asphalt shingles, std strip shingles, inorganic, class A,55SF
210-235 lb/sq (See Tech Specs.)

2110 Remove and Dispose Steel roofing, ridge, galvanized, 20" wide (See Tech Specs.) 55 LF

2111 Install Steel roofing, ridge, galvanized, 20" wide (See Tech Specs.) 55 LF

2112 Remove and Dispose Fascia, aluminum, .032" thick, colored, NO furring included (See Tech Specs.) 55 SF

2113Install Fascia, aluminum, .032" thick, colored, NO furring included55SF
(See Tech Specs.)
2114Remove and Dispose Fascia, steel, galv and enameled, stock, NO furring,55SF
long panels (See Tech Specs.)
2115Install Fascia, steel, galv and enameled, stock, NO furring,55SF
long panels (See Tech Specs.)

2116 Remove and Dispose Gutters, aluminum, 5" box type, enameled (See Tech Specs.) 160 LF

2117 Install Gutters, aluminum, 5" box type, enameled (See Tech Specs.) 160 LF

2118 Remove and Dispose Gutters, alum, 5" x 6" comb fascia & gutter, .032" thick, enameled (See Tech Specs.) 160 LF

2119Install Gutters, alum, 5" x 6" comb fascia & gutter, .032" thick,160LF
enameled (See Tech Specs.)
2120Remove and Dispose Gutters, steel, galv, half round or box, 28 ga, 5"104LF
wide, enameled (See Tech Specs.)
2121Install Gutters, steel, galv, half round or box, 28 ga, 5" wide,104LF
enameled (See Tech Specs.)

2122 Remove and Dispose Gravel stop, galv steel, 6" face height (See Tech Specs.) 104 LF

2123 Install Gravel stop, galv steel, 6" face height (See Tech Specs.) 104 LF

2124 Remove and Dispose Gravel stop, aluminum, .050" thick, 6" height, painted (See Tech Specs.) 104 LF

2125 Install Gravel stop, aluminum, .050" thick, 6" height, painted (See Tech Specs.) 104 LF

2126 Remove and Dispose Gravel Gravel stop, aluminum, .050" thick, 8" height, painted (See Tech Specs.) 104 LF

2127 Install Gravel stop, aluminum, .050" thick, 8" height, painted (See Tech Specs.) 104 LF

2128 Remove and Dispose Gravel Gravel Gutters, aluminum, 5" box type, .032" thick, plain (See Tech Specs.) 160 LF

2129Install Gutters, aluminum, 5" box type, .032" thick, plain (See Tech160LF
Specs.)

2130 Remove and Dispose Gutters, steel, galv, half round or box, 28 ga, 5" wide, plain (See Tech Specs.) 160 LF

2131 Install Gutters, steel, galv, half round or box, 28 ga, 5" wide, plain (See Tech Specs.) 160 LF

2132 Remove and Dispose Gravel stop, aluminum, .050" thick, 6" height, duranodic finish (See Tech Specs.) 104 LF

2133Install Gravel stop, aluminum, .050" thick, 6" height, duranodic finish104LF
(See Tech Specs.)

2134 Remove and Dispose Gravel stop, aluminum, .050" thick, 8" height, duranodic finish (See Tech Specs.) 104 LF

2135Install Gravel stop, aluminum, .050" thick, 8" height, duranodic finish104LF
(See Tech Specs.)

2136 Remove and Dispose Downspouts, aluminum 3" x 4", .024" thick, enameled (See Tech Specs.) 60 LF

2137 Install Downspouts, aluminum 3" x 4", .024" thick, enameled (See Tech Specs.) 60 LF

2138Remove and Dispose Downspouts, steel, rectangular, plain, 28 ga, galvanized,60LF
3" x 4" (See Tech Specs.)
2139Install Downspouts, steel, rectangular, plain, 28 ga, galvanized,60LF
3" x 4" (See Tech Specs.)

2140 Remove and Dispose Downspouts, steel, rect, epoxy painted, 24 ga, corrugated, 3" x 4" (See Tech Specs.) 60 LF

2141Install Downspouts, steel, rect, epoxy painted, 24 ga, corrugated,60LF
3" x 4" (See Tech Specs.)

2142 Remove and Dispose Drip edge, aluminum, .016" thick, 5" wide, mill finish (See Tech Specs.) 60 LF

2143 Install Drip edge, aluminum, .016" thick, 5" wide, mill finish (See Tech Specs.) 60 LF

2144 Remove and Dispose and Dispose Drip edge, aluminum, .016" thick, 5" wide, white finish (See Tech Specs.) 60 LF

2145 Install Drip edge, aluminum, .016" thick, 5" wide, white finish (See Tech Specs.) 60 LF

2146 Remove and Dispose Drip edge, galvanized, 5" wide, mill finish (See Tech Specs.) 60 LF

2147 Install Drip edge, galvanized, 5" wide, mill finish (See Tech Specs.) 60 LF

2148 Remove and Dispose Elbows, aluminum, 3" x 4", .025" thick, embossed (See Tech Specs.) 26 EA

2149Install Elbows, aluminum, 3" x 4", .025" thick, embossed (See Tech26EA
Specs.)

2150 Remove and Dispose Elbows, aluminum, 3" x 4", .025" thick, enameled (See Tech Specs.) 26 EA

2151Install Elbows, aluminum, 3" x 4", .025" thick, enameled (See Tech26EA
Specs.)

2152 Remove and Dispose Flashing, aluminum, mill finish, .032" thick (See Tech Specs.) 90 SF

2153 Install Flashing, aluminum, mill finish, .032" thick (See Tech Specs.) 90 SF

2154 Remove and Dispose Vent flashing, aluminum with lead ring, 2" pipe (See Tech Specs.) 9 EA

2155 Install Vent flashing, aluminum with lead ring, 2" pipe (See Tech Specs.) 9 EA

2156 Remove and Dispose Vent flashing, aluminum with lead ring, 3" pipe (See Tech Specs.) 9 EA

2157 Install Vent flashing, aluminum with lead ring, 3" pipe (See Tech Specs.) 9 EA

2158 Remove and Dispose Vent flashing, aluminum with lead ring, 4" pipe (See Tech Specs.) 9 EA

2159 Install Vent flashing, aluminum with lead ring, 4" pipe (See Tech Specs.) 9 EA

2160 Remove and Dispose Vent flashing, aluminum with lead ring, 1-1/2" pipe (See Tech Specs.) 9 EA

2161Install Vent flashing, aluminum with lead ring, 1-1/2" pipe (See Tech9EA
Specs.)

2162 Remove and Dispose Reglet, counter flashing for above, 12" wide, .032" aluminum (See Tech Specs.) 44 LF

2163Install Reglet, counter flashing for above, 12" wide, .032" aluminum44LF
(See Tech Specs.)
2164Remove and Dispose Roof vents, mushroom for built-up roofs, PVC, 6"16EA
high

2165 Install Roof vents, mushroom for built-up roofs, PVC, 6" high 16 EA

2166 Remove and Dispose Vents, one-way, aluminum (See Tech Specs.) 16 EA

2167 Install Vents, one-way, aluminum (See Tech Specs.) 16 EA

2168 Remove and Dispose Drains-scppr flr, oblique strn-CI, 6"x7" top, 2", 3"&4" pipe size (See Tech Specs.) 4 EA

2169Install Drains-scppr flr, oblique strn-CI, 6"x7" top, 2", 3"&4" pipe size4EA
(See Tech Specs.)
2170Remove and Dispose Drains, roof, flat metal deck, C.I. body, 12" C.I.4EA
dome, 3" pipe size (See Tech Specs.)
2171Install Drains, roof, flat metal deck, C.I. body, 12" C.I. dome,4EA
3" pipe size (See Tech Specs.)

2172 Remove and Dispose Drains, roof, flat mtl deck, galvanized body, 12"CI dome, 6" pipe (See Tech Specs.) 4 EA

2173Install Drains, roof, flat mtl deck, galvanized body, 12"CI dome, 6" pipe4EA
(See Tech Specs.)

2174 Remove and Dispose Drains, cornice, C.I., 45< or 90< outlet, 3" and 4" pipe size (See Tech Specs.) 4 EA

2175Install Drains, cornice, C.I., 45< or 90< outlet, 3" and 4" pipe size4EA
(See Tech Specs.)

2176 Remove and Dispose Drains, cornice, C.I., for galvanized body, 3" and 4" pipe size (See Tech Specs.) 4 EA

2177Install Drains, cornice, C.I., for galvanized body, 3" and 4" pipe size4EA
(See Tech Specs.)

2178 Remove and Dispose Elastomeric rfg,poly spray-on W/20mil silicone rbr ctg , 3"thk,r21,min (See Tech Specs.) 1,600 SF

2179Install Elastomeric rfg,poly spray-on W/20mil silicone rbr ctg ,1,600SF
3"thk,r21,min (See Tech Specs.)

2180 Remove and Dispose Built-up rfg,asph fl CT W/gvl,ctd gl base sht,3ply gl,nailable dk (See Tech Specs.) 5,200 SF

2181Install Built-up rfg,asph fl CT W/gvl,ctd gl base sht,3ply gl,nailable dk5,200SF
(See Tech Specs.)
2182Remove and Dispose Built-up rfg,asph fl CT W/gvl,ctd gl base sht,4ply gl5,200SF
fbr felt,mopped
2183Install Built-up rfg,asph fl CT W/gvl,ctd gl base sht,4ply gl5,200SF
fbr felt,mopped

2184 Remove and Dispose Cants, 4" x 4" treated timber, cut diagonally (See Tech Specs.) 90 LF

2185 Install Cants, 4" x 4" treated timber, cut diagonally (See Tech Specs.) 90 LF

2186Remove and Dispose B247Single-ply membrane, EPDM, 60 mil, 0.40 PS, fully5,200SF
adhered w/adhesive, w/4" seam tape (See Tech Specs.)
2187Install B247Single-ply membrane, EPDM, 60 mil, 0.40 PS, fully5,200SF
adhered w/adhesive, w/4" seam tape (See Tech Specs.)
2188Remove and Dispose Mod bit rfng, SBS mod, gran surf cap sheet, poly rein, mppd,1,040SF
160 mils w/base sheet, #15 Glass Fiber Felt fully mopped to
deck w/asphalt primer (See Tech Specs.)
2189Install Mod bit rfng, SBS mod, gran surf cap sheet, poly rein, mppd,1,040SF
160 mils w/base sheet, #15 Glass Fiber Felt fully mopped to
deck w/asphalt primer (See Tech Specs.)
2190Remove and Dispose Mod bit, SBS mod, smooth surf cap sheet, glass fiber rein, mppd,1,040SF
160 mils w/base sheet, #15 Glass Fiber Felt fully mopped to
deck w/asphalt primer (See Tech Specs.)
2191Install Mod bit, SBS mod, smooth surf cap sheet, glass fiber rein, mppd,1,040SF
160 mils w/base sheet, #15 Glass Fiber Felt fully mopped to
deck w/asphalt primer (See Tech Specs.)
2192Remove and Dispose Mod bit, APP mod, gran surface cap sheet, poly,1,040SF
rein, torched, 180 mils w/base sheet, #15 Glass Fiber Felt fully mopped to
deck w/asphalt primer (See Tech Specs.)
2193Install Mod bit, APP mod, gran surface cap sheet, poly rein,1,040SF
torched, 180 mils w/base sheet, #15 Glass Fiber Felt fully mopped to
deck w/asphalt primer (See Tech Specs.)
2194Remove and Dispose Mod bit, APP mod, smooth surf cap sheet, poly rein, torched, 160 mils w/base sheet, #15 Glass Fiber Felt fully mopped to1,040SF
deck w/asphalt primer (See Tech Specs.)
2195Install Mod bit, APP mod, smooth surf cap sheet, poly rein, torched,1,040SF
160 mils w/base sheet, #15 Glass Fiber Felt fully mopped to
deck w/asphalt primer (See Tech Specs.)

2196 Remove and Dispose Roof coatings, asphalt primer, 5 gallon (See Tech Specs.) 20,000 SF

2197 Install Roof coatings, asphalt primer, 5 gallon (See Tech Specs.) 20,000 SF

2198 Remove and Dispose Bituminous asphalt coating, with fibers, troweled on, 1/2" thick (See Tech Specs.) 2,600 SF

2199Install Bituminous asphalt coating, with fibers, troweled on, 1/2" thick2,600SF
(See Tech Specs.)

2200 Remove and DisposeBuilt-up rfg,asph fl CT,ctd gl fbr base sht,3 plies,on nailable dks (See Tech Specs.) 2,600 SF

2201Install Built-up rfg,asph fl CT,ctd gl fbr base sht,3 plies,on nailable dks2,600SF
(See Tech Specs.)

2202 Remove and Dispose Built-up rfg,asph fl CT,ctd gl fbr base sht,4ply gl fbr felt,mopped (See Tech Specs.) 2,600 SF

2203Install Built-up rfg,asph fl CT,ctd gl fbr base sht,4ply gl fbr felt,mopped2,600SF
(See Tech Specs.)

2204 Remove and Dispose Rubber coating, silicone or stearate, sprayed on CMU, 2 coats (See Tech Specs.) 1,040 SF

2205Install Rubber coating, silicone or stearate, sprayed on CMU, 2 coats1,040SF
(See Tech Specs.)

2206 Remove and Dispose Pitch Pockets, side extenders, 6" (See Tech Specs.) 18 EA

2207 Install Pitch Pockets, side extenders, 6" (See Tech Specs.) 18 EA

2208 Remove and Dispose Pitch Pockets, adjustable, 4" to 7", welded corners, 4" deep (See Tech Specs.) 18 EA

2209Install Pitch Pockets, adjustable, 4" to 7", welded corners, 4" deep18EA
(See Tech Specs.)

2210 Remove and Dispose Walkway for BUR, asph impregnated, 3' x 3' x 3/4" thk (See Tech Specs.) 700 SF

2211 Install Walkway for BUR, asph impregnated, 3' x 3' x 3/4" thk (See Tech Specs.) 700 SF

2212 Remove and Dispose Caulking & sealants, polyurethane, 1 or 2 component, bulk (See Tech Specs.) 90 LF

2213Install Caulking & sealants, polyurethane, 1 or 2 component, bulk90LF
(See Tech Specs.)

2214 Remove and Dispose Caulking and sealants, silicone rubber, cartridges (See Tech Specs.) 90 LF

2215Install Caulking and sealants, silicone rubber, cartridges (See Tech90LF
Specs.)

2216 Remove and Dispose Caulking and sealants, resin epoxy coating, 2 component, heavy duty (See Tech Specs.) 90 LF

2217Install Caulking and sealants, resin epoxy coating, 2 component, heavy90LF
duty (See Tech Specs.)

2218 Remove and Dispose Caulking and sealants, neoprene gaskets, closed cell, 1/4" x 3/4" (See Tech Specs.) 90 LF

2219Install Caulking and sealants, neoprene gaskets, closed cell, 1/4" x 3/4"90LF
(See Tech Specs.)

2220 Remove and Dispose Framing, miscellaneous, nailers, treated, wood construction, 2" x 6" (See Tech Specs.) 90 LF

2221Install Framing, miscellaneous, nailers, treated, wood construction, 2" x 6"90LF
(See Tech Specs.)

2222 Remove and Dispose Framing, miscellaneous, nailers, treated, wood construction, 2" x 4" (See Tech Specs.) 90 LF

2223Install Framing, miscellaneous, nailers, treated, wood construction, 2" x 4"90LF
(See Tech Specs.)

2224 Remove and Dispose Framing, miscellaneous, nailers, treated, wood construction, 2" x 8" (See Tech Specs.) 90 LF

2225Install Framing, miscellaneous, nailers, treated, wood construction, 2" x 8"90LF
(See Tech Specs.)

2226 Remove and Dispose Roof deck insul, polyisocyanurate, 2#/CF density, 2" thk R14.29 (See Tech Specs.) 5,000 SF

2227Install Roof deck insul, polyisocyanurate, 2#/CF density, 2" thk R14.295,000SF
(See Tech Specs.)
2228Remove and Dispose Roof deck insulation, polyisocyanurate 2#/CF5,000SF
density, tapered for drainage (See Tech Specs.)
2229Install Roof deck insulation, polyisocyanurate 2#/CF density,5,000SF
tapered for drainage (See Tech Specs.)

2230 Remove and Dispose Roof deck insulation, expanded polystyrene, 2" thick R7.69 (See Tech Specs.) 5,000 SF

2231Install Roof deck insulation, expanded polystyrene, 2" thick R7.695,000SF
(See Tech Specs.)

2232 Remove and Dispose Roof deck insulation, expanded polystyrene, tapered for drainage (See Tech Specs.) 880 SF

2233Install Roof deck insulation, expanded polystyrene, tapered for drainage880SF
(See Tech Specs.)
2234Remove and Dispose Roof deck insul., extruded polystyrene, 60 PSI4,000SF
comp. strength, 2" thick R10 (See Tech Specs.)
2235Install Roof deck insul., extruded polystyrene, 60 PSI comp.4,000SF
strength, 2" thick R10 (See Tech Specs.)

2236 Remove and Dispose Roof deck insul., extruded polystyrene, 60 PSI comp. strgth., tapered (See Tech Specs.) 1,040 SF

2237Install Roof deck insul., extruded polystyrene, 60 PSI comp. strgth.,1,040SF
tapered (See Tech Specs.)

2238 Remove and Dispose Roof hatch, 2'-6" x 3', w/curb, 1" fbgls insul, galv stl curb/cover (See Tech Specs.) 1 EA

2239Install Roof hatch, 2'-6" x 3', w/curb, 1" fbgls insul, galv stl curb/cover1EA
(See Tech Specs.)

2240 Remove and Dispose Skylight, insulated safety glass with aluminum frame (See Tech Specs.) 260 SF

2241 Install Skylight, insulated safety glass with aluminum frame (See Tech Specs.) 160 SF

2242 Remove and Dispose Ladder, steel, 20" wide, bolted to concrete, with cage (See Tech Specs.) 70 VLF

2243 Install Ladder, steel, 20" wide, bolted to concrete, with cage (See Tech Specs.) 70 VLF

2244 Remove and DisposeLadder, steel, 20" wide, bolted to concrete, w/o cage (See Tech Specs.) 70 VLF

2245 Install Ladder, steel, 20" wide, bolted to concrete, w/o cage (See Tech Specs.) 70 VLF

2246 Replace Insulation/finish syst, field applied, 1 inch (See Tech Specs.) 520 SF

2247 Replace Insulation/finish syst, field applied, 2 inch (See Tech Specs.) 260 SF

2248 Replace Insulation/finish syst, field applied, 3 inch (See Tech Specs.) 260 SF

2249 Replace Ductwork, galv steel, 500-1000 lb, 12"-14"h, 18"w (See Tech Specs.) 90 LB

2250 Replace Ductwork, galv steel, 500-1000 lb, 12"-14"h, 24"w (See Tech Specs.) 90 LB

2251 Replace Ductwork, galv steel, 500-1000 lb, 12"-14"h, 48"w (See Tech Specs.) 90 LB

2252 Pipe, copper, 3/8" dia., type K (See Tech Specs.) 160 LF

2253 Pipe insulation, 3/8" copper pipe, rubber tubing (See Tech Specs.) 160 LF

2254 Vent and Pipe Replacement, PVC schedule 40, 2" dia. (See Tech Specs.) 18 LF

2255 Vent and Pipe Replacement, PVC schedule 40, 3" dia. (See Tech Specs.) 18 LF

2256 Vent and Pipe Replacement, PVC schedule 40, 4" dia. (See Tech Specs.) 18 LF

2257 HVAC demo, Mech equipment (See Tech Specs.) 2,000 LBS

2258 Air cooled condenser, 2 tons, reinstallation (See Tech Specs.) 6 EA

2259 Air cooled condenser, 16 tons,reinstallation (See Tech Specs.) 6 EA

2260 Roof top unit, 7.5 tons, single zone, reinstallation (See Tech Specs.) 6 EA

2261 Replace Wire, 600 volt, type THW, copper, stranded, #12 (See Tech Specs.) 200 LF

2262 Replace Wire, 600 volt, type THW, copper, solid, #12 (See Tech Specs.) 200 LF

2263 Replace Wire, 600 volt, type THW, copper, stranded, #10 (See Tech Specs.) 200 LF

2264 Replace Wire, 600 volt, type THW, copper, solid, #10 (See Tech Specs.) 200 LF

2265Replace Wire, 600 volt, type THW, copper, stranded, #8 (See Tech200LF
Specs.)
2266Replace Wire, 600 volt, type THW, copper, stranded, #6 (See Tech200LF
Specs.)

2267 ReplaceWire, 600 volt, type THW, copper, stranded, #4 (See Tech Specs.) 200 LF

2268Replace Wire, 600 volt, type THW, copper, stranded, #3 (See Tech200LF
Specs.)
2269Replace Wire, 600 volt, type THW, copper, stranded, #2 (See Tech200LF
Specs.)
2270Replace Wire, 600 volt, type THW, copper, stranded, #1 (See Tech200LF
Specs.)

2271 Replace Wire, 600 volt, type THWN-THHN, copper, stranded, #12 (See Tech Specs.) 200 LF

2272 Replace Wire, 600 volt, type THWN-THHN, copper, solid, #12 (See Tech Specs.) 200 LF

2273 Replace Wire, 600 volt, type THWN-THHN, copper, stranded, #10 (See Tech Specs.) 200 LF

2274 Replace Wire, 600 volt, type THWN-THHN, copper, solid, #10 (See Tech Specs.) 200 LF

2275 Replace Wire, 600 volt, type THWN-THHN, copper, stranded, #8 (See Tech Specs.) 200 LF

2276 Replace Wire, 600 volt, type THWN-THHN, copper, stranded, #6 (See Tech Specs.) 200 LF

2277 Replace Wire, 600 volt, type THWN-THHN, copper, stranded, #4 (See Tech Specs.) 200 LF

2278 Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,1/2" dia (See Tech Specs.) 100 LF

2279 Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,3/4" dia (See Tech Specs.) 100 LF

2280Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,1"100LF
dia (See Tech Specs.)

2281 Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,1-1/4"dia (See Tech Specs.) 100 LF

2282 Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,1-1/2"dia (See Tech Specs.) 100 LF

2283Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,2"100LF
dia (See Tech Specs.)

2284 Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,2-1/2"dia (See Tech Specs.) 100 LF

2285Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,3"100LF
dia (See Tech Specs.)

2286 Replace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,3-1/2"dia (See Tech Specs.) 100 LF

2287Relace Cond to 15' H,incl 2 termn,2 elb&11 bm CLP per 100',galv stl,4"100LF
dia (See Tech Specs.)

2288 Replace Safety switches, heavy duty, 240 volt, 3 pole NEMA 1 fusible, 30 amp (See Tech Specs.) 8 EA

2289 Replace Safety switches, heavy duty, 240 volt, 3 pole NEMA 1 fusible, 60 amp (See Tech Specs.) 8 EA

2290 Replace Safety switches, heavy duty, 240 volt, 3 pole NEMA 1 fusible, 100 amp (See Tech Specs.) 8 EA

2291Replace Wire, 600 volt, type THW, copper, stranded, 1/0 (See Tech100LF
Specs.)
2292Replace Wire, 600 volt, type THW, copper, stranded, 2/0 (See Tech100LF
Specs.)
2293Replace Wire, 600 volt, type THW, copper, stranded, 3/0 (See Tech100LF
Specs.)
2294Replace Wire, 600 volt, type THW, copper, stranded, 4/0 (See Tech100LF
Specs.)

2295 Remove & dispose PUF or Built-up Roofing w/Asbestos Mastic (ACM) 100 SF

2001 Grand Total