GFI Atch 2 for Bidders Inquiry #8332507 Pages 3-4 Extracted from SAP for OBOD and Site 8.pdf

PDF 28 KB Posted

Attached to
Optimized Remediation Contract (ORC) TX/LA Group
Solicitation number
W912BV20R0003
Issued by

About this file

This document contains a Sampling and Analysis Plan and related federal contract opportunity. The Sampling and Analysis Plan outlines the procedures for sampling and analysis at the OB/OD Unit and Site 8 at Fort Bliss, including well purging methods, sampling methods, analytical methods, container sizes, preservation techniques, and holding times. Analysis will include parameters such as anions, metals, nitroaromatics, nitramines, perchlorate, volatile organic compounds, dehalococcoides genes, dissolved gases, and total organic carbon.

The related federal contract opportunity is a pre-solicitation notice for an Optimized Remediation Contract to conduct environmental remediation activities at nine Air Force installations in Texas and Louisiana. The requirement is for a performance-based, firm-fixed-price contract with a period of performance of 10 years. Services include investigation, design, remedial action, construction, and remediation support at 99 environmental restoration sites. The estimated contract value is $500M. The solicitation will be issued on November 19, 2019 via SAM.gov with proposals due on February 20, 2020 and contract award anticipated in July 2020. The NAICS code is 562910 and it has been set aside for small businesses with less than 750 employees.

View the file

Other files

File Type Posted
Amd 0005 Atch L-2 Price Schedule with Cost ORC TX-LA 2 Apr 2020.xlsx XLSX spreadsheet
Amd 0005 Atch L-4 Supp Price Info ORC TX-LA 2 Apr 2020.xlsx XLSX spreadsheet
Amd 0005_Solicitation W912BV20R0003_TX-LA Group ORC.pdf PDF
Amd 0004_Solicitation W912BV20R0003_TX-LA Group ORC.pdf PDF
Amd 0004_Section L_ Atch L-2 Price Schedule with Cost_ORC TX-LA 1 Apr 2020.xlsx XLSX spreadsheet
GFI for Inquiry 8469677 - 2012_05_16FinalClosureNOD.PDF PDF
Amd 0003 PWS TX LA Group ORC dtd 13 Mar 2020.pdf PDF
Amd 0003 Section L_Atch L-1 Price Schedule without Cost ORC TX-LA 12 Mar 2020.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A Laughlin.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 3 Lackland GFP List.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A Dyess.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A Goodfellow.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A JBSA FSH and Camp Bullis.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A JBSA Lackland.xlsx XLSX spreadsheet
Amd 0003 Section L_Atch L-4 Supp Price Info ORC TX-LA 12 Mar 2020.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A Sheppard.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A JBSA Randolph.xlsx XLSX spreadsheet
Amd 0003 Section L_Atch L-2 Price Schedule with Cost ORC TX-LA 12 Mar 2020.xlsx XLSX spreadsheet
Amd 0003 PWS Encl 2A Barksdale.xlsx XLSX spreadsheet
Amd 0003_Solicitation W912BV20R0003_TX-LA Group ORC.pdf PDF
GFI for Inquiry #8353815_Tech Memo_PRELIM DRAFT_Biodegradation Injections_2-24-20.pdf PDF
Lackland Site Visit Directions to Luke Gate VC.DOCX DOCX document
Amd #0002, Solicitation #W912BV20R0003, TX-LA Group ORC.pdf PDF
Lackland Site Visit Visitor Request Form.pdf PDF
GFI Atch for Bidders Inquiry 8368754 Map for ERP Landfill Sites at JBSA FSH.PDF PDF
GFI Answer to Bidders Inquiry 8368754 JBSA Fort Sam Houston Landfills.docx DOCX document
GFI Atch for Bidders Inquiry 8355990 FSH Five-Year Report (Draft) 20130401 Complete.pdf PDF
GFI Atch for Bidders Inquiry 8319919 JBSA-FSH LF Insp TM 2018 Final.pdf PDF
GFI for Inquiry 8317068 DRAFT_Camp_Bullis_WP_CD.PDF PDF
GFI Atch 1 for Bidders Inquiry #8332487 Location of Potable Water Camp Bullis.pdf PDF
Amendment #0001, Solicitation #W912BV20R0003, TX-LA Group ORC.pdf PDF
GFI Atch 4 Bidders Inquiry 8324707_TCEQ Ltr Approving Filing of ICs_ERP Site LF002 an....pdf PDF
GFI Atch 2 Bidders Inquiry 8324707_Site 8 Final Deed Notice.pdf PDF
GFI Atch 3 Bidders Inquiry 8324707 Approval with Comments to site 8 LF deed notice.pdf PDF
GFI Atch 1 Bidders Inquiry 8333642_DEED Notice_DA 561 _AOC 13.pdf PDF
GFI for Inquiry 8329066 - Scope of Work for LUCs at Dyess_2019.docx DOCX document
GFI for Inquiry 8329101-Notes on Wells to be Abandoned.docx DOCX document
GFI for Inquiry 8329101-Location of Older Well Hangar 4314.pdf PDF
GFI for Inquiry 8329101-Location of Older Wells Hangar 4225.pdf PDF
GFI Attachment 2_Ltr to TCEQ_Status of Horizontal Injection Wells_Camp Bullis.pdf PDF
GFI Attachment 1_Proposed Location of Nine New Monitoring Wells_ERP Site LF002.jpg JPG image
JBSA ORC Site Visit Sign In Sheets.pdf PDF
Barksdale AFB ORC Site Visit Presentation Slides - 17 Dec 2019.pdf PDF
JBSA ORC Site Visit Presentation Slides 10-12 Dec 2019.pdf PDF
Solicitation #W912BV20R0003 - TX-LA Group ORC.pdf PDF
Section L - Atch L-4 Supplemental Price Info ORC TX-LA 21 Nov 2019.xlsx XLSX spreadsheet
Section L - Atch L-2 Price Schedule with Cost ORC TX-LA 21 Nov 2019.xlsx XLSX spreadsheet
PWS Enclosure 2A - AR Spreadsheet TX-LA Group ORC.xlsx XLSX spreadsheet
Section J Draft MPS with Cost Template 19 Nov 2019 TX-LA Group ORC.xlsx XLSX spreadsheet
Section L - Atch L-1 Price Schedule without Cost ORC TX-LA 21 Nov 2019.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sampling and Analysis Plan, OB/OD Unit and Site 8/Landfill 8 Tetra Tech

Contract No. FA3002-07-D-0016, TO 0015 September 2019 to purging with a tape or downhole electronic water level indicator. The indicator will be lowered into the water column only enough to obtain the water level and then will be withdrawn in order to limit suspending sediment that may be present in the bottom of the well. The measurement will be taken from the permanent, surveyed reference point on the well casing. The measurement will be to an accuracy of 0.01 foot and the measurement will be taken at least twice in succession to verify that precision is + 0.01 foot.

After all sampling is complete, the water level indicator will be lowered to the bottom of the well and a measurement will be taken from the surveyed reference point on the well casing. This measurement will be subtracted from the total well depth shown on the well completion log to determine if silting has occurred. The measurement will be repeated to verify precision of + 0.1 foot. All measuring devices should be thoroughly decontaminated before and after use.

2.2.2 Well Purging Methods

Low-flow (micropurge) techniques will be used to minimize mixing between the overlying stagnant casing water and water within the screened interval. The wells will be purged and sampled with a low-flow pump. Pumps should be held to a purge rate of 0.1 to 0.3 liters/minute, with a drawdown of 0.3 feet or less. Both dedicated and portable pumps will be used to purge the wells. The dedicated pumps will remain in their respective wells and thus do not require decontamination. For wells without dedicated pumps, portable pumps will be slowly lowered into the well to limit the mixing of water and the suspension of sediment that may be present in the bottom of the well. Portable pumps must be thoroughly decontaminated before and after use. One equipment blank will be collected using the portable pump at the end of each sampling period.

The pump intake will be located within the screened interval, at the approximate midpoint of the screen, unless previous information suggests otherwise, (e.g., significant sediment has accumulated in the bottom of the well). If possible, the pump should be kept at least 3.0 feet above accumulated sediment but well within the screened interval. The water level and pumping rate will be monitored throughout well purging. The pumping rate will be set to maintain a constant water level. If a constant water level cannot be maintained, the pump will be set at the minimum pumping rate. The well will be allowed to draw down at the lowest pump rate, but not allowed to draw down below the top of the screen, to allow the well to recharge. If, after two hours, the well has not shown sufficient recharge, the samples will be collected.

During well purging, field parameters will be recorded every 2 to 3 minutes until the parameters have stabilized. Parameters are considered stabilized when at least three consecutive measurements meet the following criteria: 1) DO ± 10% or < 1 mg/L; 2) pH ± 0.1 pH units; 3) Specific conductance ±

5%; 4) Turbidity < 10 NTU or as low as practicable given sampling conditions, and ± 10%; 5)

Temperature of all three readings are within 1-degree; and 6) Oxidation/reduction potential (redox) will be recorded but will not be used to determine stabilization. All purged water will be containerized.

All measurements and notes regarding well purging, including the estimated amount of water purged, will be included on the field information sheet.

2.2.3 Well Sampling

Monitor wells will be sampled by the low-flow sampling procedure using a dedicated or portable pump and uninterrupted flow stream that was used to purge the well. Samples will be taken before entering the in-line water quality monitor. Upon completion of well purging, the in-line water quality monitor will be disconnected or bypassed. Sampling flow rate must remain at the established purge rate or less when sampling. Flow rates less than 0.3 liters/minute are appropriate. Samples will be introduced into the sample containers directly from the pump tubing. Care will be taken to minimize turbulence and

Sampling and Analysis Plan, OB/OD Unit and Site 8/Landfill 8 Tetra Tech

Contract No. FA3002-07-D-0016, TO 0015 September 2019 introduction of entrapped air. The container will be filled and capped tightly. If the low-flow sampling procedure is not successful due to recharge rates of the monitoring well, another suitable means of sampling (e.g., disposable bailers) will be utilized.

As prescribed in CP Table IIIA, samples from the OB/OD Unit will be analyzed for anions, metals, nitroaromatics/nitramines, perchlorate, and volatile organic compounds (VOCs). Samples from Site 8 will be analyzed for anions, dehalococcoides, dissolved gases, metals, total organic carbon, and VOCs. All sample bottle labels will include the client name, sample ID, location, comments, preservative, collection date/time, name of the person who collected the sample, bottle type, and project number. Sample IDs will correspond to those listed in the Hazardous Waste Permit and Compliance Plan (CP) No. 50335, CP Table

V. The sampling and analytical requirements for the OB/OD Unit and Site 8 are prescribed by the laboratory for each analytical method and are listed in Tables 2-1 and 2-2 below. The laboratories selected to perform the analysis of the samples will be National Environmental Laboratory Accreditation

Conference (NELAC)-accredited through the Texas Laboratory Accreditation Program and will comply with the requirements of the Texas Commission on Environmental Quality (TCEQ) Regulatory Guidance

Review and Reporting of COC Concentration Data under TRRP (RG-366/TRRP-13).

Table 2-1

OB/OD Unit Sampling and Analytical Requirements

Method Group Analytical

Method Container Size

Preservation

Method Holding Time

Anions

2320B 1000 mL None 14 days

300_ORGFMS 1000 mL None 2 days

300_ORGFM_28D 1000 mL None 28 days

SM4500_S2_D 500 mL Zinc acetate and sodium hydroxide 7 days

Metals SW6020A 250 mL (2) Nitric Acid 180 days

SW7470A 250 mL (2) Nitric Acid 28 days

Nitroaromatics/

Nitramines SW8330A 500 mL (2) None 7 days

Perchlorate SW6860 125 mL None 28 days

VOCs SW8260B 40 mL (3) Hydrochloric Acid 14 days

Table 2-2

Site 8 Sampling and Analytical Requirements

Method Group Analytical

Method Container Size

Preservation

Method Holding Time

Anions SW9056A 125 mL (2) None 2 days/28 days

Dehalococcoides

Gene-Trac

Dehalococcoides

Assay 1000 mL None 7 days

Dissolved Gases RSK-175 40 mL (3) Hydrochloric Acid 14 days

Metals SW6020 250 mL Nitric Acid 180 days

Total Organic

Carbon SW9060A 40 mL (3) Sulfuric Acid 28 days

VOCs SW8260B 40 mL (3) Hydrochloric Acid 14 days