Amd 0003 PWS Encl 2A Dyess.xlsx
XLSX spreadsheet 80 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) TX/LA Group Federal contract opportunity
- Solicitation number
- W912BV20R0003
About this file
This pre-solicitation notice announces the U.S. Army Corps of Engineers' intent to issue a solicitation for an Optimized Remediation Contract to conduct environmental remediation activities at nine Air Force installations in Texas and Louisiana. The contract is estimated at $750 million with a period of performance of ten years. The solicitation will utilize a small business set-aside and require performance-based remediation of 99 sites, including 81 Installation Restoration Program sites and 18 Military Munitions Response Program sites, to complete cleanup and achieve site closeouts. The applicable NAICS code is 562910 and responses are due February 20, 2020, with award anticipated shortly thereafter. The successful offeror will be selected using best value tradeoff procedures.
View the file
Other files for this federal contract opportunity
Show all 50
Optimized Remediation Contract (ORC) TX/LA Group has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Export Worksheet
| Installation Name | AR File | Installation File | Document Date | Subject/Title | Author | Author Affiliation | Recipient | Recipient Affiliation | Site # | Rod # | Image Number | Modification Date | Modification By |
| Dyess AFB, TX | 106945 | AR-437 | 28-FEB-96 | 1995 Annual Groundwater Report Interim Monitoring Point of Compliance Wells | Fluor Daniel, Inc. | Dyess AFB | FT003 | AR-437.pdf | 22-JUN-12 04.15.03.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106946 | AR-443 | 30-APR-96 | 1995 Annual Groundwater Report Interim Monitoring Volume I | Fluor Daniel, Inc. | Dyess AFB | FT001 | AR-443.pdf | 22-JUN-12 03.15.04.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106947 | AR-444 | 30-APR-96 | 1995 Annual Groundwater Report Interim Monitoring Volume II | Fluor Daniel, Inc. | Dyess AFB | FT001 | AR-444.pdf | 22-JUN-12 03.15.05.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106948 | AR-464 | 31-OCT-96 | 1996 Annual Ground Water Report Interim Monitoring Volume I | Fluor Daniel, Inc. | Dyess AFB | FT001 | AR-464.pdf | 22-JUN-12 04.30.03.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106949 | AR-480 | 31-JAN-97 | 1996 Annual Ground Water Report Interim Monitoring Volume I | Dyess AFB | FT001 | AR-480.pdf | 22-JUN-12 04.45.03.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106950 | AR-465 | 31-OCT-96 | 1996 Annual Ground Water Report Interim Monitoring Volume II | Fluor Daniel, Inc. | Dyess AFB | FT001 | AR-465.pdf | 22-JUN-12 03.15.06.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106951 | AR-481 | 31-JAN-97 | 1996 Annual Ground Water Report Interim Monitoring Volume II | Fluor Daniel, Inc. | Dyess AFB | FT001 | AR-481.pdf | 22-JUN-12 03.30.13.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106952 | AR-674 | 31-DEC-05 | 2005 Annual Groundwater Sampling Report, Sampling Performed Pursuant to Compliance Plan CP-50250-000, Approved by TCEQ April 2003, Date of Sampling July 2005 | HydroGeoLogic, Inc. | Dyess AFB | AR-674.pdf | 22-JUN-12 04.45.05.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106953 | AR-683 | 31-DEC-06 | 2006 Annual Groundwater Sampling Report - Sampling Performed Pursuant to Compliance Plan CP-50250-000, Approved by TCEQ April 2003 (Date of Sampling July 2006) | Kenneth Cottrell, CPG., PG | HydroGeoLogic, Inc (HGL) | Judy Overbey | Dyess AFB | AR-683.pdf | 22-JUN-12 05.15.07.000000000 PM | ARSYSTEM | ||
| Dyess AFB, TX | 106954 | AR-677 | 31-MAY-06 | 2006 Semi-Annual Groundwater Sampling Report, Sampling Performed Pursuant to Compliance Plan CP-50250-000, Approved by TCEQ April 2003 Date of Sampling January 2006 | HydroGeoLogic, Inc | Dyess AFB | AR-677.pdf | 22-JUN-12 06.15.03.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106955 | AR-685 | 31-OCT-07 | 2007 Annual Groundwater Sampling Report - Sampling Performed Pursuant to Compliance Plan CP-50250-000, Approved by TCEQ April 2003 (Date of Sampling July 2007) | HydroGeoLogic, Inc. | AFCEE | AR-685.pdf | 22-JUN-12 05.15.10.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106956 | AR-684 | 31-JUL-07 | 2007 Semi-Annual Groundwater Sampling Report - Sampling Performed Pursuant to Compliance Plan CP-50250-000, Approved by TCEQ April 2003 (Date of Sampling January 2007) | HydroGeoLogic, Inc | AFCEE | AR-684.pdf | 22-JUN-12 07.30.03.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106957 | AR-298 | 30-JUN-94 | 3rd Quarter Field Sampling 1994 Field Sampling Plan Groundwater Monitoring Program | 96 CES/CEVR | DP043 | AR-298.pdf | 22-JUN-12 03.15.07.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106958 | AR-232 | 31-JUL-93 | 3rd Quarter Sampling Field Sampling Plan Modification II | 96 CES/CEVR | DP014 | AR-232.pdf | 22-JUN-12 01.30.17.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106959 | AR-706 | 15-JAN-12 | Abilene Reporter News -Tear Sheet Dyess AFB Restoration Advisory Board Adjournment | Judy Overbey | Dyess AFB | DP014 | AR-706.pdf | 22-JUN-12 11.00.29.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 106960 | AR-513 | 31-OCT-97 | ACL Petition - Volume IA Compliance Plan Modification Application Alternate Concentration Limits Petition | Dyess AFB | FT001 | AR-513.pdf | 22-JUN-12 03.30.15.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106961 | AR-514 | 31-OCT-97 | ACL Petition - Volume IB Compliance Plan Modification Application Alternate Concentration Limits Petition | Dyess AFB | DP043 | AR-514.pdf | 22-JUN-12 05.15.11.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106962 | AR-515 | 31-OCT-97 | ACL Petition - Volume IIA Compliance Plan Modification Application Alternate Concentration Limits Petition ACL Demonstration | Dyess AFB | DP043 | AR-515.pdf | 22-JUN-12 05.30.02.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106963 | AR-516 | 31-OCT-97 | ACL Petition - Volume IIB ACL Demonstration Compliance Plan Modification Application Alternate Concentration Limits Petition ACL Demonstration | Dyess AFB | DP043 | AR-516.pdf | 22-JUN-12 05.45.02.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106964 | AR-233 | 31-JUL-93 | Addendum No. 2 - Study Unit a Project Work Plan for Auto Hobby Shop/Background Boring No.2 Work Plan RFI Project Work Plan | 96 CES/CEVR | ST032 | AR-233.pdf | 22-JUN-12 11.30.02.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106965 | AR-432 | 18-JAN-96 | Addendum to Interim RFI OWS 4220, Section 11.0 | Dyess AFB | SD016 | AR-432.pdf | 22-JUN-12 10.30.32.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106966 | AR-433 | 30-JAN-96 | Addendum to Interim RFI OWS 5017 Section 16.0 | Dyess AFB | SD021 | AR-433.pdf | 22-JUN-12 10.30.32.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106967 | AR-434 | 30-JAN-96 | Addendum to Interim RFI OWS 5110, Section 18.0 | Dyess AFB | SD022 | AR-434.pdf | 22-JUN-12 10.45.29.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106968 | AR-431 | 05-JAN-96 | Addendum to Interim RFI OWS 5111, Section 19.0 | Dyess AFB | SD023 | AR-431.pdf | 22-JUN-12 10.45.29.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106969 | AR-046 | 30-APR-88 | Addendum to Remedial Investigation/Feasibility Study Work Plan | Smuin, David R | Oak Ridge National Laboratory | Combs, Johnny D | 96 CES/DEEVE | ST010 | AR-046.pdf | 22-JUN-12 01.30.17.000000000 PM | ARSYSTEM | |
| Dyess AFB, TX | 106970 | AR-083 | 30-JUN-90 | Addendum to Remedial Investigation/Feasibility Study Work Plan | Oak Ridge National laboratory | 96 CSG/DEEV | DP014 | AR-083.pdf | 22-JUN-12 01.30.17.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106971 | AR-440 | 31-MAR-96 | Addendum to RFI FPTA 2 (SWMU 4), Section 8.0 | Dyess AFB | FT003 | AR-440.pdf | 22-JUN-12 11.30.02.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106972 | AR-441 | 31-MAR-96 | Addendum to RFI OWS4311 (SWMU 14), Section 9.0 | Dyess AFB | SD017 | AR-441.pdf | 22-JUN-12 10.45.29.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106973 | AR-445 | 15-APR-96 | Addendum to RFI POL3 (SWMU 11) Section 12.0 | Dyess AFB | WP009 | AR-445.pdf | 22-JUN-12 10.45.29.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106974 | AR-398 | 10-OCT-95 | Addendum to Study Group A RFI, OWS 4116, Section 8.0 | Dyess AFB | SD015 | AR-398.pdf | 22-JUN-12 10.45.30.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106975 | AR-399 | 10-OCT-95 | Addendum to Study Group A RFI, OWS 4316, Section 10.0 | Dyess AFB | SD019 | AR-399.pdf | 22-JUN-12 10.30.32.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106976 | AR-401 | 11-OCT-95 | Addendum to Study Group A RFI, OWS 4317, Section 11.0 | Dyess AFB | SD020 | AR-401.pdf | 22-JUN-12 11.00.29.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106977 | AR-402 | 11-OCT-95 | Addendum to Study Group A RFI, OWS 5305, Section 23.0 | Dyess AFB | SD026 | AR-402.pdf | 22-JUN-12 11.00.29.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106978 | AR-400 | 10-OCT-95 | Addendum to Study Group A RFI, OWSs 7040 North and South, Section 16.0 | Dyess AFB | SD029 | AR-400.pdf | 22-JUN-12 11.00.30.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106979 | AR-059 | 18-NOV-92 | AFCEE Letter to Base Concerning Community Advisory Committee | Lopez, Ed | AFCEE/ESD | Pasini, Ralph, Col | 96 WG/CV | DP014 | AR-059.pdf | 22-JUN-12 09.45.54.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 106980 | AR-221 | 16-SEP-92 | Amendment to Compliance Plan | Combs, Johnny D | 96 CES/CEVR | Rahman, Ata Ur | Texas Water Commission | DP014 | AR-221.pdf | 22-JUN-12 09.45.54.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 106981 | AR-315 | 31-MAR-94 | Annual Groundwater Report Volume I Long -Term Monitoring 1993 Annual Report | Dyess AFB | DP043 | AR-315.pdf | 22-JUN-12 01.30.18.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106982 | AR-374 | 31-MAR-95 | Annual Groundwater Report Volume I Long -Term Monitoring 1994 Annual Report | Dyess AFB | DP043 | AR-374.pdf | 22-JUN-12 01.30.19.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106983 | AR-319 | 28-FEB-94 | Annual Groundwater Report Volume II Long-Term Monitoring 1993 Annual Report | Dyess AFB | FT003 | AR-319.pdf | 22-JUN-12 03.45.04.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106984 | AR-316 | 31-MAR-94 | Annual Groundwater Report Volume II Long-Term Monitoring 1993 Annual Report | Dyess AFB | FT003 | AR-316.pdf | 22-JUN-12 03.45.05.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106985 | AR-375 | 31-MAR-95 | Annual Groundwater Report Volume II Long-Term Monitoring 1994 Annual Report | Dyess AFB | FT003 | AR-375.pdf | 22-JUN-12 04.00.13.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106986 | AR-376 | 31-MAR-95 | Annual Groundwater Report Volume III Long-Term Monitoring 1994 Annual Report | Dyess AFB | DP043 | AR-376.pdf | 22-JUN-12 05.45.03.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106987 | AR-304 | 30-NOV-93 | Appendices A-D RCRA Facility Investigation Study Unit A | Dyess AFB | LF013 | AR-304.pdf | 22-JUN-12 01.30.19.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106988 | AR-309 | 30-NOV-93 | Appendices G-H RCRA Facility Investigation Study Unit A | Dyess AFB | LF013 | AR-309.pdf | 22-JUN-12 03.15.08.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106989 | AR-075 | 31-MAY-92 | Appendices Quality Control Summary Report Remedial Facility Investigation | Woodward-Clyde Consultants | 96 CES/CEVR | DP014 | AR-075.pdf | 22-JUN-12 06.00.02.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 106990 | AR-109 | 30-JUN-93 | Appendix B/C/D/E RCRA Facility Investigation Study Unit B | 96 CES/CEVR | DP043 | AR-109.pdf | 22-JUN-12 06.15.06.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106991 | AR-305 | 30-NOV-93 | Appendix E Part I RCRA Facility Investigation Study Unit A | Dyess AFB | LF013 | AR-305.pdf | 22-JUN-12 06.30.02.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106992 | AR-306 | 30-NOV-93 | Appendix E Part II RCRA Facility Investigation Study Unit A | Dyess AFB | LF013 | AR-306.pdf | 22-JUN-12 04.00.14.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106993 | AR-310 | 30-NOV-93 | Appendix I RCRA Facility Investigation Study Unit A | Dyess AFB | LF013 | AR-310.pdf | 22-JUN-12 04.15.05.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 106994 | AR-181 | 28-MAY-93 | Base Comments on RFI Report Study Group B | Pfeiffer, Michael | 96 CES/CEVR | 96 CES/CEVR | DP043 | AR-181.pdf | 22-JUN-12 10.45.30.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 106995 | AR-604 | 08-FEB-02 | Base Facsimile to TNRCC Transmitting 2002 DSMOA Agreement with Signatures Attached | Ekhoff, John | 7 CES/CEVR | Beyer, Gary | Texas Natural Resource Conservation Commission | DP014 | AR-604.pdf | 22-JUN-12 10.16.03.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 106996 | AR-549 | 17-JUL-00 | Base Facsimile to TNRCC Transmitting DSMOA Agreement | Ekhoff, John | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP014 | AR-549.pdf | 22-JUN-12 09.45.54.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 106997 | AR-588 | 06-NOV-01 | Base Information Repository Hand Receipt | Brown, Heather | DP014 | AR-588.pdf | 22-JUN-12 09.45.54.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106998 | AR-584 | 27-AUG-01 | Base Information Repository Hand Receipt for Dyess AFB Post-Closure Care Permit Renewal, July 2001 | Van Huss, Barbara L. | DP014 | AR-584.pdf | 22-JUN-12 09.45.55.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 106999 | AR-048 | 10-DEC-84 | Base Letter Advising Installation Restoration Program (IRP) Phase I | Hyatt, G R, Col | 96 CSG/CV | 96 BMW/CCP 96 BMW/HO 96 BMW/DA 96 BMW/MA 96 BMW/LGS 96 CSG/DA 96 CSG/DEER 96 CSG/DEMMN 96 CSG/DEMFN 96 MMS/MAWD 463 TAW/HO 463 TAW/DA 1993 CS 96 STRAT HOSP/SGPB | DP014 | AR-048.pdf | 22-JUN-12 10.00.08.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107000 | AR-247 | 13-NOV-92 | Base Letter Concerning Community Advisory Committee | Pasini, Ralph, Col | 96 WG/CV | 96 CES/CEV | DP014 | AR-247.pdf | 22-JUN-12 09.45.55.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107001 | AR-207 | 04-JUN-93 | Base Letter Concerning Community Advisory Committee (CAC) Meeting | Clouse, Teresa A | 96 CES/CEVR | DP014 | AR-207.pdf | 22-JUN-12 10.16.03.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 107002 | AR-509 | 05-JAN-95 | Base Letter to Dr. Stanlake Offering Congratulations on Acceptance to RAB | Foley, Philip A., Col | Dyess AFB | Stanlake, Gary J., Dr | Hardin-Simmons University | AOC01|BNPB01|Building 5021|Building 9197|Building 9198|DP014|DP043|ED844|F1842|F1843|FOA01|FT001|FT002|FT003|FTA01|LF004|LF013|NSNAPR01|NSNBSF01|OT008|OT011|OT012|OT030|OT031|OT034|OT035|OT036|OT037|OT039|SD006|SD007|SD015|SD016|SD017|SD018|SD019|SD020|SD021|SD022|SD023|SD024|SD025|SD026|SD027|SD028|SD029|SD030|SS042|ST010|ST032|ST033|ST040|ST041|TS845|TS846|TS847|TS848|TSB01|WP005|WP009 | AR-509.pdf | 22-JUN-12 09.45.55.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107003 | AR-028 | 28-MAY-85 | Base Letter to Engineering-Science Concerning Installation Restoration Program (IRP) Phase I Draft Report | Ball, Floyd R | 96 CSG/DEEV | Thoem, Robert L | Engineering-Science | FT001 | AR-028.pdf | 22-JUN-12 10.00.08.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107004 | AR-108 | 31-MAR-93 | Base Letter to EPA Region VI and Quarterly Report for Violations 1-24 | Tidmore, Guy L | EPA Region VI | FT003 | AR-108.pdf | 22-JUN-12 10.45.30.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 107005 | AR-095 | 07-SEP-90 | Base Letter to EPA Region VI Concerning Additional Requirements for the Closure Plan for Site ST010 | Lock, Michael A, Col | 96 CSG/CC | Coleman, Samuel E | EPA Region VI | ST010 | AR-095.pdf | 22-JUN-12 10.00.08.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107006 | AR-125 | 08-AUG-90 | Base Letter to EPA Region VI Concerning Decision Documents | Combs, Johnny D | 96 CSG/DEV | Jones, John | EPA Region VI | DP043 | AR-125.pdf | 22-JUN-12 10.00.09.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107007 | AR-255 | 25-SEP-92 | Base Letter to EPA Region VI Concerning Draft/FFCA - 1st Amendment | Heimann, Joseph L, Maj | 96 BW/JA | Holmes, Renee V | EPA Region VI | DP014 | AR-255.pdf | 22-JUN-12 10.16.04.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107008 | AR-178 | 18-FEB-92 | Base Letter to EPA Region VI Concerning Federal Facility Compliance Agreement | Welsh, Brian J, Capt | 96 BMW/JA | Holmes, Renee V | EPA Region VI | DP014 | AR-178.pdf | 22-JUN-12 10.16.04.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107009 | AR-253 | 21-FEB-92 | Base Letter to EPA Region VI Concerning Federal Facility Compliance Agreement | Welsh, Brian J, Capt | 93 BW/PA | Holmes, Renee V | EPA Region VI | DP014 | AR-253.pdf | 22-JUN-12 10.16.04.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107010 | AR-249 | 13-FEB-92 | Base Letter to EPA Region VI Concerning FFA Violation 27 for Failure to Take Appropriate Action Upon Detection of UST Releases | Combs, Johnny D | 96 CSG/DEV | Rhea, William N | EPA Region VI | DP014 | AR-249.pdf | 22-JUN-12 10.30.32.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107011 | AR-085 | 30-JUL-90 | Base Letter to EPA Region VI Confirming Delivery of RI/FS Work Plan, RI Report, and Addendum to RI/FS Work Plan | Ball, Floyd R | 96 CSG/DDE | Stubbelfield, Joyce | EPA Region VI | DP043 | AR-085.pdf | 22-JUN-12 10.00.09.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107012 | AR-026 | 21-MAY-81 | Base Letter to HQ SAC Concerning "Superfund" Site Reporting Requirements | Lanier, Mark E, 2Lt | 96 CSG/DEEV | HQ SAC/DEV | LF004 | AR-026.pdf | 22-JUN-12 10.30.32.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107013 | AR-152 | 18-SEP-91 | Base Letter to HQ SAC Concerning Revisions to Scope of Work on Design, Dyess Pilot Project | Combs, Johnny D | 96 CSG/DEV | HQ SAC/DEE | FT003 | AR-152.pdf | 22-JUN-12 10.00.09.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107014 | AR-002 | 08-AUG-73 | Base Letter to HQ SAC Concerning Sanitary Landfill Requirements | Hesse, G.A., Col | 96 CSG/DEE | HQ SAC/DEV | LF004 | AR-002.pdf | 22-JUN-12 11.30.02.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107015 | AR-248 | 13-NOV-92 | Base Letter to Individuals Requesting Membership and Participation in the Dyess AFB Community Advisory Committee | Pasini, Ralph, Col | 96 WG/CV | Various Recipients | Texas Water Commission Woodward-Clyde Consultants EPA AFCEE/ESD Texas Air Control Board City of Abilene Middle Clear Fork Soil and Water Conserv Dist Military Affairs Committee Abilene Clean and Proud West Texas Council of Governments State Representa | DP014 | AR-248.pdf | 22-JUN-12 10.45.30.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107016 | AR-535 | 24-JAN-00 | Base Letter to RAB Member Fred Perkins Giving Notification of RAB Meeting Scheduled for 7 Feb 00 | Ekhoff, John | Dyess AFB | Perkins, Fred | Middle Clear Fork Conservation District | DP014 | AR-535.pdf | 22-JUN-12 09.45.55.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107017 | AR-678 | 26-JAN-04 | Base Letter to TCEQ Transmitting 2004 Final Work Plan Addendum | 7 CES/CEV | TCEQ | AOC01|BNPB01|Building 5021|Building 9197|Building 9198|DP014|DP043|ED844|F1842|F1843|FOA01|FT001|FT002|FT003|FTA01|LF004|LF013|NSNAPR01|NSNBSF01|OT008|OT011|OT012|OT030|OT031|OT034|OT035|OT036|OT037|OT039|SD006|SD007|SD015|SD016|SD017|SD018|SD019|SD020|SD021|SD022|SD023|SD024|SD025|SD026|SD027|SD028|SD029|SD030|SS042|ST010|ST032|ST033|ST040|ST041|TS845|TS846|TS847|TS848|TSB01|WP005|WP009 | AR-678.pdf | 22-JUN-12 10.45.30.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 107018 | AR-024 | 23-APR-85 | Base Letter to Texas Department of Health Concerning Hazardous Solid Waste-Taylor County, Dyess AFB-Permit Application No. 64003 Additional Permitting Requirements as a Result of RCRA Reauthorization | Barrows, Charles V, Col | 96 CSG/DEEV | Mendieta, Hector H | Texas Department of Health | DP014 | AR-024.pdf | 22-JUN-12 10.16.04.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107019 | AR-520 | 16-APR-99 | Base Letter to TNRCC Concerning Dyess AFB - TNRCC Meeting of 6 April 1999 | Wells, Michael E. | HQ ACC | Pedde, Ronald R. Ralls, Sonia | Texas Natural Resource Conservation Commission | DP014 | AR-520.pdf | 22-JUN-12 10.00.09.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107020 | AR-394 | 29-AUG-95 | Base Letter to TNRCC Concerning Inaccurate Resurveyed Groundwater Well Data Listed in RFI and Annual Groundwater Report | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | FT003 | AR-394.pdf | 22-JUN-12 10.30.33.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107021 | AR-372 | 13-JAN-95 | Base Letter to TNRCC Including Responses to TNRCC Comments from Two Letters Dated Nov 28 and Two Letters Dated Nov 29 | Brewer, Jeff | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP014 | AR-372.pdf | 22-JUN-12 10.45.31.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107022 | AR-071 | 12-DEC-89 | Base Letter to TWC and Publishers Affidavit, Fire Protection Training Area 2 | Rich, Billy D | 96 CSG/DEEV | Stein, Mark J | Texas Water Commission | FT003 | AR-071.pdf | 22-JUN-12 10.16.04.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107023 | AR-199 | 23-FEB-93 | Base Letter to TWC Concerning Bldg 8015 Oil/Water Separator, SD-30 | Crowell, Sylvia D | 96 CES/CEVR | Beyer, Gary | Texas Water Commission | SD030 | AR-199.pdf | 22-JUN-12 11.30.02.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107024 | AR-242 | 05-NOV-92 | Base Letter to TWC Concerning Containment of Spills | Combs, Johnny D | 96 CES/CEVR | Posnick, Allan E | Texas Water Commission | SD006 | AR-242.pdf | 22-JUN-12 09.45.55.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107025 | AR-194 | 18-FEB-93 | Base Letter to TWC Concerning Diversion Ditches, SD-06, SD-07 | Crowell, Sylvia D | 96 CES/CEVR | Beyer, Gary | Texas Water Commission | SD006 | AR-194.pdf | 22-JUN-12 10.00.09.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107026 | AR-143 | 04-MAY-93 | Base Letter to TWC Concerning Landfill, LF-04 | Ball, Floyd R | 96 CES/CD | Posnick, Allan E | Texas Water Commission | LF004 | AR-143.pdf | 22-JUN-12 10.00.10.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107027 | AR-239 | 01-JAN-12 | Base Letter to TWC Concerning North Diversion Ditch | Ball, Floyd R | 96 CES/CEVR | Posnick, Allan E | Texas Water Commission | SD006 | AR-239.pdf | 22-JUN-12 10.00.10.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107028 | AR-062 | 16-MAR-93 | Base Letter to TWC Concerning Notification of IRP Sampling Activities | Woods, Clinton C, LtCol | 96 CES/CEVR | Anderson, Ricky | Texas Water Commission | DP014 | AR-062.pdf | 22-JUN-12 10.00.10.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107029 | AR-205 | 23-FEB-93 | Base Letter to TWC Concerning Oil/Water Separator Removal Plan | Crowell, Sylvia D | 96 CES/CEVR | Posnick, Allan E | Texas Water Commission | SD015 | AR-205.pdf | 22-JUN-12 11.30.04.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107030 | AR-212 | 21-AUG-92 | Base Letter to TWC Concerning Provision of Groundwater Sampling for RCRA Sites | Combs, Johnny D | 96 CES/CEVR | Anderson, Richard M | Texas Water Commission | FT003 | AR-212.pdf | 22-JUN-12 10.00.10.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107031 | AR-171 | 05-DEC-91 | Base Letter to TWC Concerning Removal of UST at BX Service Station | Combs, Johnny D | 96 CSG/DEV | Bates, Jan J | Texas Water Commission | ST033 | AR-171.pdf | 22-JUN-12 10.16.05.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107032 | AR-073 | 28-DEC-89 | Base Letter to TWC Concerning Residual Contaminants At Fire Protection Training Area #2 | Combs, Johnny D | 96 CSG/DEEV | Stein, Mark J | Texas Water Commission | FT003 | AR-073.pdf | 22-JUN-12 10.00.10.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107033 | AR-060 | 12-MAR-93 | Base Letter to TWC Concerning SWMU 7, LF-04 | Ball, Floyd R | 96 CES/CEVR | Posnick, Allan E | Texas Water Commission | LF004 | AR-060.pdf | 22-JUN-12 10.16.05.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107034 | AR-130 | 31-MAY-93 | Base Letter to TWC Concerning Violation 12 and Dyess FFCA Response Update to Violation 12 | Ball, Floyd R | 96 CES/CD | Tidmore, Guy L | US Environmental Protection Agency | FT003 | AR-130.pdf | 22-JUN-12 01.30.20.000000000 PM | ARSYSTEM | |
| Dyess AFB, TX | 107035 | AR-210 | 25-FEB-93 | Base Letter to TWC Concerning Workplan Modifications for Sediment Sampling RCRA Facility Investigation | Crowell, Sylvia D | 96 CES/CEVR | Beyer, Gary | Texas Water Commission | SD006 | AR-210.pdf | 22-JUN-12 11.00.30.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107036 | AR-096 | 07-SEP-90 | Base Letter to TWC Requesting A Time Extension for Final Closure of Sites OT-08, WP-09, and ST-10 | Lock, Michael A, Col | 96 CSG/CC | Stein, Mark J | Texas Water Commission | OT008 | AR-096.pdf | 22-JUN-12 10.00.11.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107037 | AR-709 | 30-SEP-10 | Base Letters to Mr. and Mrs. Anthony Morgan and Glenda Chandler Concerning Responses to Comments on the Engineering and Site Evaluation Reports for B-47 Crash Site. | Peterson, Randal K. | Dyess AFB | Morgan, Anthony Chandler, Glenda | Public | AR-709.pdf | 22-JUN-12 11.30.04.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107038 | AR-064 | 28-JUN-89 | Base Memo to HAZWRAP Providing Comments - Draft Remedial Investigation Report, IRP | Webb, Larry | 96 CSG/DEEV | Davis, Joe | Martin Marietta Energy Systems, Inc. | DP043 | AR-064.pdf | 22-JUN-12 11.00.30.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107039 | AR-580 | 01-JAN-12 | Base Memorandum Concerning Dyess AFB Environmental Restoration Program Status | Ekhoff, John | 7 CES/CEVR | Public Disclosure | DP014 | AR-580.pdf | 22-JUN-12 10.00.11.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107040 | AR-625 | 04-DEC-02 | Base Memorandum to EPA Region VI Concerning Clean Water Act, Section 308 Information Request Oil Spill in Taylor County, on or about 25 July 2002 | Ekhoff, John | 7 CES/CEVR | Gazda, Charles A. | EPA Region VI | AR-625.pdf | 22-JUN-12 10.16.05.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107041 | AR-653 | 02-JUL-03 | Base Memorandum to EPA Region VI Transmitting Requested Materials from Dyess AFB | Laurence, David E. | 7 CES/CEVC, Dyess AFB | Sturdivant, Bob | EPA Region VI | DP014 | AR-653.pdf | 22-JUN-12 09.45.56.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107042 | AR-603 | 07-FEB-02 | Base Memorandum to HQ ACC/CE Concerning Minutes of Restoration Advisory Board (RAB) Meeting | Bell, Thomas D., Col Ekhoff, John | 7 BW/CC 7 CES/CEVR | HQ ACC/CE | DP014 | AR-603.pdf | 22-JUN-12 10.00.11.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107043 | AR-600 | 10-JAN-02 | Base Memorandum to HQ ACC/CEVR Concerning Restoration Advisory Board (RAB) Meeting Frequency | Bell, Thomas D., Col Stanlake, Gary J., PhD | 7 BW/CV Hardin-Simmons University | HQ ACC/CEVR | DP014 | AR-600.pdf | 22-JUN-12 09.45.56.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107044 | AR-511 | 03-MAY-95 | Base Memorandum to RAB Civilian Co-Chair Mr. Rodney Weeks Concerning RAB Meeting Agenda | Heise, Harold | Dyess AFB | Weeks, Rodney | Texas Natural Resource Conservation Commission | AOC01|BNPB01|Building 5021|Building 9197|Building 9198|DP014|DP043|ED844|F1842|F1843|FOA01|FT001|FT002|FT003|FTA01|LF004|LF013|NSNAPR01|NSNBSF01|OT008|OT011|OT012|OT030|OT031|OT034|OT035|OT036|OT037|OT039|SD006|SD007|SD015|SD016|SD017|SD018|SD019|SD020|SD021|SD022|SD023|SD024|SD025|SD026|SD027|SD028|SD029|SD030|SS042|ST010|ST032|ST033|ST040|ST041|TS845|TS846|TS847|TS848|TSB01|WP005|WP009 | AR-511.pdf | 22-JUN-12 09.45.56.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107045 | AR-550 | 31-JUL-00 | Base Memorandum to RAB Member Fred Perkins Concerning Resource Advisory Board (RAB) Meeting | Ekhoff, John | Dyess AFB | Perkins, Fred | Middle Clear Fork Conservation District | DP014 | AR-550.pdf | 22-JUN-12 10.00.11.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107046 | AR-583 | 22-AUG-01 | Base Memorandum to RAB Members and Associates Concerning Minutes of Restoration Advisory Board (RAB) Meeting | Ekhoff, John | 7 BW/CV | RAB Members and Associates | DP014 | AR-583.pdf | 22-JUN-12 10.00.11.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107047 | AR-629 | 19-DEC-02 | Base Memorandum to RAB Members and Associates Distributing RAB Invitation | Ekhoff, John | 7 CES/CEVR | Clouse, Teresa A | 7 CES/CEV | FT001 | AR-629.pdf | 22-JUN-12 10.00.12.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107048 | AR-642 | 26-MAR-03 | Base Memorandum to TCEQ Concerning Application Availability Verification Form | Clouse, Teresa A | 7 CES/CEV | Castanuela, LaDonna | Texas Commission on Environmental Quality | FT003 | AR-642.pdf | 22-JUN-12 10.00.12.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107049 | AR-619 | 12-SEP-02 | Base Memorandum to TCEQ Concerning Dyess AFB Comments on "Draft" Post-Closure Care Permit (PCCP) | Clouse, Teresa A | 7 CES/CEV | Nelson, Katherine | Texas Commission on Environmental Quality | FT003 | AR-619.pdf | 22-JUN-12 10.30.33.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107050 | AR-622 | 10-NOV-02 | Base Memorandum to TCEQ Concerning Dyess AFB Comments on "Initial Draft Compliance Plan Renewal" | Clouse, Teresa A | 7 CES/CEV | Beyer, Gary | Texas Commission on Environmental Quality | DP014 | AR-622.pdf | 22-JUN-12 10.16.05.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107051 | AR-621 | 07-OCT-02 | Base Memorandum to TCEQ Concerning Exceedance of Groundwater Protection Standard (GWPS) Second Round 2002, Semiannual Sampling | Clouse, Teresa A | 7 CES/CEV | Simmons, Kent J. | Texas Commission on Environmental Quality | SD015 | AR-621.pdf | 22-JUN-12 10.00.12.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107052 | AR-641 | 18-MAR-03 | Base Memorandum to TCEQ Concerning Exceedance of Groundwater Protection Standard (GWPS), First Round, Semiannual Sampling | Clouse, Teresa A | 7 CES/CEV | Simmons, Kent J. | Texas Commission on Environmental Quality | DP043 | AR-641.pdf | 22-JUN-12 10.00.12.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107053 | AR-656 | 24-SEP-03 | Base Memorandum to TCEQ Concerning Exceedance of Groundwater Protection Standard (GWPS), Second Round, Semi-Annual Sampling | Clouse, Teresa A | 7 CES/CEV | TCEQ | DP043 | AR-656.pdf | 22-JUN-12 09.45.56.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107054 | AR-647 | 21-MAY-03 | Base Memorandum to TCEQ Concerning Notice of Monitoring Well Abandonment | Laurence, David E. | 7 CES/CEVC | Beyer, Gary | Texas Commission on Environmental Quality | DP043 | AR-647.pdf | 22-JUN-12 10.16.05.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107055 | AR-628 | 17-DEC-02 | Base Memorandum to TCEQ Concerning Notification of Semi-Annual Groundwater Sampling Event, January 2003 | Clouse, Teresa A | 7 CES/CEV | Simmons, Kent J. | Texas Commission on Environmental Quality | DP043 | AR-628.pdf | 22-JUN-12 09.45.56.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107056 | AR-640 | 18-FEB-03 | Base Memorandum to TCEQ Concerning Public Notice of Permit Application and Preliminary Decision | Clouse, Teresa A | 7 CES/CEV | Texas Commission on Environmental Quality | FT003 | AR-640.pdf | 22-JUN-12 11.30.04.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107057 | AR-626 | 10-DEC-02 | Base Memorandum to TCEQ Concerning Removal of Lead Bullet Fragments from Dyess AFB Pistol Range | Scruggs, David | 7 CES/CEVC | Jordon, Troy | Texas Commission on Environmental Quality (Abilene) | OT012 | AR-626.pdf | 22-JUN-12 09.45.56.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107058 | AR-639 | 18-FEB-03 | Base Memorandum to TCEQ Concerning Request for Changes, Compliance Plan CP-050250-0000 | Clouse, Teresa A | 7 CES/CEV | Beyer, Gary | Texas Commission on Environmental Quality | FT003 | AR-639.pdf | 22-JUN-12 10.00.12.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107059 | AR-659 | 13-JAN-04 | Base Memorandum to TCEQ Concerning Semi-Annual Groundwater Sampling Event, January 2004 | Clouse, Teresa A | 7 CES/CEV | Simmons, Kent J. | TCEQ | FT003 | AR-659.pdf | 22-JUN-12 09.45.56.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107060 | AR-650 | 26-JUN-03 | Base Memorandum to TCEQ Concerning Semi-Annual Groundwater Sampling Event, July 2003 | Laurence, David E. | 7 CES/CEV, Dyess AFB | Simmons, Kent J. | Texas Commission on Environmental Quality | DP043 | AR-650.pdf | 22-JUN-12 10.00.13.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107061 | AR-651 | 07-JUL-03 | Base Memorandum to TCEQ Submittal of Field Sampling Plan Addendum | Clouse, Teresa A | 7 CES/CEV, Dyess AFB | Burch, Mike | Texas Commission on Environmental Quality (Abilene) | DP043 | AR-651.pdf | 22-JUN-12 09.45.57.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107062 | AR-627 | 11-DEC-02 | Base Memorandum to TCEQ Transmitting 2002 Annual Groundwater Sampling Report | Scruggs, David | 7 CES/CEVC | Bates, Jan | Texas Commission on Environmental Quality | DP043 | AR-627.pdf | 22-JUN-12 10.00.13.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107063 | AR-657 | 30-DEC-03 | Base Memorandum to TCEQ Transmitting 2003 Annual Groundwater Sampling Report | Clouse, Teresa A | 7 CES/CEV | Bates, Jan | TCEQ | FT001 | AR-657.pdf | 22-JUN-12 10.00.13.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107064 | AR-660 | 14-JAN-04 | Base Memorandum to TCEQ Transmitting 2003 Annual Groundwater Sampling Report Page Changes | Ekhoff, John | 7 CES/CEVR | Bates, Jan | Texas Commission on Environmental Quality | FT003 | AR-660.pdf | 22-JUN-12 09.45.57.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107065 | AR-648 | 20-JUN-03 | Base Memorandum to TCEQ Transmitting 2003 Semi-Annual Groundwater Sampling Report | Laurence, David E. | 7 CES/CEV | Bates, Jan | Texas Commission on Environmental Quality | DP043 | AR-648.pdf | 22-JUN-12 10.30.33.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107066 | AR-403 | 23-OCT-95 | Base Memorandum to TNRCC Concerning Approval to Decrease Groundwater Monitoring Frequency for Non-RCRA Solid Waste Management Units and background Wells | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-403.pdf | 22-JUN-12 10.00.13.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107067 | AR-488 | 09-JUN-97 | Base Memorandum to TNRCC Concerning Closure Plans and 8018 Cap Design for Public Comments Access | Clouse, Teresa A | Dyess AFB | Mueller, Stuart | Texas Natural Resource Conservation Commission | FT003 | AR-488.pdf | 22-JUN-12 10.00.13.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107068 | AR-487 | 30-MAY-97 | Base Memorandum to TNRCC Concerning Closure Plans for Dyess Interim Status Sites | Heise, Harold | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | FT003 | AR-487.pdf | 22-JUN-12 10.00.14.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107069 | AR-498 | 14-AUG-97 | Base Memorandum to TNRCC Concerning Composite Cap Design at FPTA 2 | Heise, Harold | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | FT003 | AR-498.pdf | 22-JUN-12 10.00.14.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107070 | AR-438 | 23-FEB-96 | Base Memorandum to TNRCC Concerning Conceptual Cap Design | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | FT003 | AR-438.pdf | 22-JUN-12 10.16.05.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107071 | AR-554 | 08-SEP-00 | Base Memorandum to TNRCC Concerning Exceedance of Groundwater Protection Standard (GWPS) Second Round, Semiannual Sampling | Clouse, Teresa A | Dyess AFB | Burch, Mike | Texas Natural Resource Conservation Commission (Abilene) | FT003 | AR-554.pdf | 22-JUN-12 10.00.14.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107072 | AR-587 | 26-OCT-01 | Base Memorandum to TNRCC Concerning Exceedance of Groundwater Protection Standard (GWPS), Second Round 2001, Semiannual Sampling | 7 CES/CEV | Texas Natural Resource Conservation Commission | SD015 | AR-587.pdf | 22-JUN-12 10.00.14.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 107073 | AR-537 | 01-FEB-00 | Base Memorandum to TNRCC Concerning Inadvertent Abandonment of Monitoring Wells | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-537.pdf | 22-JUN-12 10.00.14.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107074 | AR-450 | 25-JUN-96 | Base Memorandum to TNRCC Concerning Memo for Record on Procedures for Concrete Lining of North and South Diversion Ditches | Clouse, Teresa A | Dyess AFB | Posnick, Allan E | Texas Natural Resource Conservation Commission | SD006 | AR-450.pdf | 22-JUN-12 11.30.05.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107075 | AR-526 | 09-NOV-99 | Base Memorandum to TNRCC Concerning Notice of Draft Permit for Hazardous Waste Permits, Affidavit of Publication, Newspaper Publication, Affidavit of Radio Broadcast, and Radio Broadcast Script | Clouse, Teresa A | Dyess AFB | Texas Natural Resource Conservation Commission | FT003 | AR-526.pdf | 22-JUN-12 11.00.30.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107076 | AR-527 | 16-NOV-99 | Base Memorandum to TNRCC Concerning Notice of Draft Permit for Hazardous Waste Permits, Affidavits of Radio Broadcast, Radio Broadcast Scripts, and Radio Broadcast Invoices | Clouse, Teresa A | Dyess AFB | Texas Natural Resource Conservation Commission | FT003 | AR-527.pdf | 22-JUN-12 11.00.31.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107077 | AR-605 | 14-MAR-02 | Base Memorandum to TNRCC Concerning Notification and Submittal of Requirements for First Round, Semiannual Sampling | Clouse, Teresa A | 7 CES/CEV | Bates, Jan | Texas Natural Resource Conservation Commission | DP043 | AR-605.pdf | 22-JUN-12 10.16.06.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107078 | AR-574 | 21-MAR-01 | Base Memorandum to TNRCC Concerning Notification and Submittal Requirements for First Round, Semiannual Sampling | Clouse, Teresa A | Dyess AFB | Burch, Mike | Texas Natural Resource Conservation Commission (Abilene) | DP043 | AR-574.pdf | 22-JUN-12 10.00.14.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107079 | AR-449 | 19-JUN-96 | Base Memorandum to TNRCC Concerning Notification of Plugging and Abandoning of Ten Monitoring Wells | Heise, Harold | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | FT001 | AR-449.pdf | 22-JUN-12 10.00.15.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107080 | AR-614 | 18-JUL-02 | Base Memorandum to TNRCC Concerning Permit Renewal, Response to TNRCC Comments | Clouse, Teresa A | 7 CES/CEV | Bates, Jan | Texas Natural Resource Conservation Commission | DP014 | AR-614.pdf | 22-JUN-12 10.00.15.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107081 | AR-565 | 10-JAN-01 | Base Memorandum to TNRCC Concerning Request for Agreement from 4 January 2001 Meeting | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-565.pdf | 22-JUN-12 10.00.15.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107082 | AR-555 | 02-NOV-00 | Base Memorandum to TNRCC Concerning Request for Compliance Plan Modification | Clouse, Teresa A | Dyess AFB | Burch, Mike | Texas Natural Resource Conservation Commission (Abilene) | DP014 | AR-555.pdf | 22-JUN-12 10.16.06.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107083 | AR-615 | 06-AUG-02 | Base Memorandum to TNRCC Concerning Request for Monitoring Well Repair/Replacements | Clouse, Teresa A | 7 CES/CEV | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-615.pdf | 22-JUN-12 10.16.06.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107084 | AR-617 | 01-JAN-12 | Base Memorandum to TNRCC Concerning Request Waiver Approval to Proceed with Construction Near ERP Sites | Clouse, Teresa A | 7 CES/CEV | Beyer, Gary | Texas Natural Resource Conservation Commission | SD017 | AR-617.pdf | 22-JUN-12 10.00.15.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107085 | AR-542 | 17-MAR-00 | Base Memorandum to TNRCC Concerning Satisfactory Fulfillment of Requirements for 20 May 97 Agreed Order (Your Ltr, 2 Jul 99) | Stein, Joseph P., BrigGen | Dyess AFB | Sadlier, John | Texas Natural Resource Conservation Commission | FT003 | AR-542.pdf | 22-JUN-12 09.45.57.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107086 | AR-566 | 02-JAN-01 | Base Memorandum to TNRCC Concerning Semi-Annual Groundwater Sampling Event, 16 Jan - 26 Jan 2001 | Scruggs, David | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-566.pdf | 22-JUN-12 10.00.15.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107087 | AR-562 | 04-JAN-01 | Base Memorandum to TNRCC Concerning Semi-Annual Groundwater Sampling Event, 16 January 01 | Scruggs, David | Dyess AFB | Burch, Mike | Texas Natural Resource Conservation Commission (Abilene) | DP043 | AR-562.pdf | 22-JUN-12 09.45.57.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107088 | AR-577 | 02-JUL-01 | Base Memorandum to TNRCC Concerning Semi-Annual Groundwater Sampling Event, 16 July - 26 July 2001 | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-577.pdf | 22-JUN-12 09.45.57.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107089 | AR-548 | 07-JUL-00 | Base Memorandum to TNRCC Concerning Semi-Annual Groundwater Sampling Event, 17 July - 9 Aug 2000 | Scruggs, David | Dyess AFB | Mueller, Stuart | Texas Natural Resource Conservation Commission | DP043 | AR-548.pdf | 22-JUN-12 10.00.15.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107090 | AR-534 | 20-JAN-00 | Base Memorandum to TNRCC Concerning Semi-Annual Groundwater Sampling Event, 31 Jan - 8 Feb 00 | Clouse, Teresa A | Dyess AFB | Burch, Mike | Texas Natural Resource Conservation Commission (Abilene) | DP043 | AR-534.pdf | 22-JUN-12 10.00.16.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107091 | AR-597 | 02-JAN-02 | Base Memorandum to TNRCC Concerning Semi-Annual Groundwater Sampling Event, January 2002 | Scruggs, David | 7 CES/CEVC | Bates, Jan | Texas Natural Resource Conservation Commission | DP043 | AR-597.pdf | 22-JUN-12 10.00.16.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107092 | AR-609 | 27-JUN-02 | Base Memorandum to TNRCC Concerning Semi-Annual Groundwater Sampling Event, July 2002 | Scruggs, David | 7 CES/CEVC | Jordon, Troy | Texas Natural Resource Conservation Commission (Abilene) | DP043 | AR-609.pdf | 22-JUN-12 09.45.58.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107093 | AR-439 | 26-FEB-96 | Base Memorandum to TNRCC Concerning Submittal of 1995 Annual Groundwater Report, Interim Monitoring Point of Compliance Wells | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-439.pdf | 22-JUN-12 10.00.16.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107094 | AR-478 | 23-OCT-96 | Base Memorandum to TNRCC Concerning Submittal of Proof of Deed Recordation and Public Notification for RRS1 and RRS2 Closure Sites and RCRA Unit Caps | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP014 | AR-478.pdf | 22-JUN-12 11.30.05.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107095 | AR-392 | 20-JUL-95 | Base Memorandum to TNRCC Concerning Submittal of Public Notice and Newspaper Sworn Affidavit for Proposed Site Closures | Brewer, Jeff | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | OT030 | AR-392.pdf | 22-JUN-12 10.30.33.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107096 | AR-492 | 14-JUL-97 | Base Memorandum to TNRCC Concerning Submittal of Public Notification and Newspaper Sworn Affidavit for RCRA Units Closure Plans and Alternate Cap Design for UST 8018, SWMU 5 | Heise, Harold | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | FT003 | AR-492.pdf | 22-JUN-12 11.00.31.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107097 | AR-477 | 18-OCT-96 | Base Memorandum to TNRCC Concerning Submittal of RCRA Facility Investigation for Public Review | Heise, Harold | Dyess AFB | Mueller, Stuart | Texas Natural Resource Conservation Commission | DP014 | AR-477.pdf | 22-JUN-12 10.00.16.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107098 | AR-598 | 04-JAN-02 | Base Memorandum to TNRCC Region 3 Concerning Semi-Annual Groundwater Sampling Event, January 2002 | Clouse, Teresa A | 7 CES/CEV | Burch, Mike | Texas Natural Resource Conservation Commission (Abilene) | DP043 | AR-598.pdf | 22-JUN-12 09.45.58.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107099 | AR-610 | 27-JUN-02 | Base Memorandum to TNRCC Submitting 2002 Semi-Annual Groundwater Sampling Report | Clouse, Teresa A | 7 CES/CEV | Bates, Jan | Texas Natural Resource Conservation Commission | DP043 | AR-610.pdf | 22-JUN-12 10.00.16.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107100 | AR-586 | 23-OCT-01 | Base Memorandum to TNRCC Submitting Compliance Plan Application | Clouse, Teresa A | 7 CES/CEV | Texas Natural Resource Conservation Commission | DP014 | AR-586.pdf | 22-JUN-12 10.00.17.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107101 | AR-576 | 26-JUN-01 | Base Memorandum to TNRCC Submitting January 2001 Semi-Annual Groundwater Sampling Report | Clouse, Teresa A | Dyess AFB | Jordon, Troy | Texas Natural Resource Conservation Commission (Abilene) | DP043 | AR-576.pdf | 22-JUN-12 10.00.17.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107102 | AR-608 | 10-JUN-02 | Base Memorandum to TNRCC Submitting Permit Renewal, Response to TNRCC Comments | Clouse, Teresa A | 7 CES/CEV | Bates, Jan | Texas Natural Resource Conservation Commission | DP014 | AR-608.pdf | 22-JUN-12 11.00.31.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107103 | AR-593 | 17-DEC-01 | Base Memorandum to TNRCC Submitting Public Notice of Permit Application | Clouse, Teresa A | 7 CES/CEV | Castanuela, LaDonna | Texas Natural Resource Conservation Commission | FT003 | AR-593.pdf | 22-JUN-12 11.30.06.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107104 | AR-602 | 22-JAN-02 | Base Memorandum to TNRCC Submitting Public Notice of Permit Application | Clouse, Teresa A | 7 CES/CEV | Castanuela, LaDonna | Texas Natural Resource Conservation Commission | DP014 | AR-602.pdf | 22-JUN-12 10.00.17.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107105 | AR-581 | 22-AUG-01 | Base Memorandum to TNRCC Submitting Request for Permit Renewal | Clouse, Teresa A | 7 CES/CEV | Texas Natural Resource Conservation Commission | DP014 | AR-581.pdf | 22-JUN-12 10.00.17.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107106 | AR-591 | 14-DEC-01 | Base Memorandum to TNRCC Transmitting 2001 Annual Groundwater Sampling Report | Clouse, Teresa A | 7 CES/CEV | Bates, Jan | Texas Natural Resource Conservation Commission | DP043 | AR-591.pdf | 22-JUN-12 10.00.17.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107107 | AR-590 | 30-NOV-01 | Base Memorandum to TNRCC Transmitting Dyess AFB Post Closure Care Permit Renewal - Missing Items | Scruggs, David | 7 CES/CEVC | Bates, Jan | Texas Natural Resource Conservation Commission | FT003 | AR-590.pdf | 22-JUN-12 10.16.06.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107108 | AR-545 | 22-JUN-00 | Base Memorandum to TNRCC Transmitting First Round Sampling Report - Dyess AFB | Ekhoff, John | Dyess AFB | Burch, Mike | Texas Natural Resource Conservation Commission (Abilene) | DP043 | AR-545.pdf | 22-JUN-12 09.45.58.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107109 | AR-546 | 29-JUN-00 | Base Memorandum to TNRCC Transmitting Permit Schedule Correction and Clarification | Scruggs, David | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-546.pdf | 22-JUN-12 10.00.18.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107110 | AR-582 | 22-AUG-01 | Base Memorandum to TNRCC Transmitting Request for Permit Renewal | Clouse, Teresa A | 7 CES/CEV | Texas Natural Resource Conservation Commission | DP014 | AR-582.pdf | 22-JUN-12 10.16.07.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107111 | AR-531 | 06-JAN-00 | Base Memorandum to TNRCC Transmitting United States Environmental Correction Agency RCRA Cleanup Reforms Initiative Goals of the Government Performance Results Act (GPRA) of 1993 | Scruggs, David | Dyess AFB | Texas Natural Resource Conservation Commission | DP014 | AR-531.pdf | 22-JUN-12 10.00.18.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107112 | AR-547 | 29-JUN-00 | Base Memorandum to TNRCC Transmitting Well Installation Reports for Monitoring Wells Installed in Jan 00 to Support Long-Term Monitoring | Scruggs, David | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-547.pdf | 22-JUN-12 11.30.07.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107113 | AR-567 | 11-JAN-01 | Base Memorandum to TNRCC Transmitting Year 2000 Annual Groundwater Sampling Report Sampling Plan - Work Plan Addendum | Scruggs, David | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-567.pdf | 22-JUN-12 10.16.07.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107114 | AR-338 | 09-AUG-94 | Base Memorandum to TNRCC with Comments Concerning RCRA FI Study Unit B Report | Clouse, Teresa A | Dyess AFB | Beyer, Gary | Texas Natural Resource Conservation Commission | DP043 | AR-338.pdf | 22-JUN-12 11.30.07.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107115 | AR-123 | 01-JAN-12 | Base Review Comments to USACE Comments SOW 29 Sites to Omaha COE | US Army Corps of Engineers - Omaha District | DP014 | AR-123.pdf | 22-JUN-12 10.16.07.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 107116 | AR-157 | 24-OCT-91 | Certificate of Tank Destruction | Eagle Construction and Environmental Services, Inc. | 96 CES/CEVR | ST032 | AR-157.pdf | 22-JUN-12 11.00.31.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 107117 | AR-687a | 31-DEC-07 | Class 3 Permit Modification Application for Compliance Plan CP-50250-000 Part 1 of 2. | HydroGeoLogic, Inc. | Dyess AFB | AR-687.pdf | 05-SEP-18 02.34.27.000000000 PM | JUDY.OVERBEY | ||||
| Dyess AFB, TX | 107118 | AR-688 | 18-MAR-08 | Class 3 Permit Modification Misc Documents (Application Signature Page, Correspondence, Etc.) | Teresa A. Clouse | Dyess AFB | AR-688.pdf | 22-JUN-12 03.30.16.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107119 | AR-503 | 31-JAN-98 | Closure Certification Report for Building 8018 UST | Woodward Clyde Consultants | Dyess AFB | ST010 | AR-503.pdf | 22-JUN-12 11.00.32.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 107120 | AR-500 | 31-JAN-98 | Closure Certification Report for Fire Protection Training Area #2 | Woodward Clyde Consultants | Dyess AFB | FT003 | AR-500.pdf | 22-JUN-12 03.30.17.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 107121 | AR-502 | 31-JAN-98 | Closure Certification Report for Petroleum, Oil and Lubricant Area 3 | Woodward Clyde Consultants | Dyess AFB | WP009 | AR-502.pdf | 22-JUN-12 01.30.20.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 107122 | AR-501 | 31-JAN-98 | Closure Certification Report for Railroad Tank Car | Woodward Clyde Consultants | Dyess AFB | OT008 | AR-501.pdf | 22-JUN-12 01.45.12.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 107123 | AR-484 | 28-FEB-97 | Closure Plan Building 8018 Underground Storage Tank (SWMU 5) | Dyess AFB | ST010 | AR-484.pdf | 22-JUN-12 01.45.13.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107124 | AR-485 | 28-FEB-97 | Closure Plan Fire Protection Training Area 2 (SWMU 4) | Dyess AFB | FT003 | AR-485.pdf | 22-JUN-12 01.45.13.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107125 | AR-483 | 28-FEB-97 | Closure Plan POL Sludge Disposal Area 3 (SWMU 11) | Dyess AFB | WP009 | AR-483.pdf | 22-JUN-12 11.30.08.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 107126 | AR-482 | 28-FEB-97 | Closure Plan Railroad Tank Car (SWMU 8) | Dyess AFB | OT008 | AR-482.pdf | 22-JUN-12 01.45.14.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107127 | AR-041 | 11-DEC-87 | Closure Plan, Post Closure Plan (Live Fire Training Pit) | 96 CES/CE | FT001 | AR-041.pdf | 22-JUN-12 10.30.33.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 107128 | AR-100 | 30-SEP-90 | Closure/Postclosure Plan Fire Protection Training Area No. 2 | Dyess AFB | FT003 | AR-100.pdf | 22-JUN-12 11.30.08.000000000 AM | ARSYSTEM | ||||
| Dyess AFB, TX | 107129 | AR-251 | 28-JUN-94 | Comments and Responses RCRA FI Study Unit B Report Dated June 1993 | DP014 | AR-251.pdf | 22-JUN-12 11.30.08.000000000 AM | ARSYSTEM | |||||
| Dyess AFB, TX | 107130 | AR-053 | 20-JUL-93 | Comments on ST-40 and ST-41 Work Plan | Meyer, Anita | Pfeiffer, Michael | US Army Corps of Engineers - Omaha District | ST040 | AR-053.pdf | 22-JUN-12 11.00.32.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107131 | AR-430 | 04-JAN-96 | Community Relations Plan | Woodward-Clyde Federal Services | Dyess AFB | DP043 | AR-430.pdf | 22-JUN-12 01.45.14.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 107132 | AR-673 | 19-AUG-05 | Community Relations Plan | URS | Dyess AFB | AR-673.pdf | 22-JUN-12 04.15.06.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107133 | AR-645 | 02-APR-03 | Compliance Plan No. CP-50250-000 | Margaret Hoffman | Texas Commission on Environmental Quality | Clouse, Teresa A | 7 CES/CEV | FT003 | AR-645.pdf | 22-JUN-12 11.30.09.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107134 | AR-166 | 25-NOV-91 | Contractor Letter of Transmittal to Base Regarding Response to Texas Water Commission Comments on Woodard-Clyde Consultants RFI Workplan | Miller, R Clint | Woodward-Clyde Consultants | Combs, Johnny D | 96 CES/CEVR | DP014 | AR-166.pdf | 22-JUN-12 10.30.33.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107135 | AR-192 | 18-FEB-93 | Corp of Engineers Engineering Review Comments RFI Report (Interim) Vol 1 and 2 | Kachek, David | 96 CES/CEVR | Pfeiffer, Michael | US Army Corps of Engineers - Omaha District | DP014 | AR-192.pdf | 22-JUN-12 11.30.10.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107136 | AR-234 | 22-OCT-92 | Corps of Engineers Engineering Review Comments on Interim RFI Report (Draft) | Kachek, David | US Army Corps of Engineers - Omaha District | Pfeiffer, Michael | US Army Corps of Engineers - Omaha District | DP014 | AR-234.pdf | 22-JUN-12 01.45.15.000000000 PM | ARSYSTEM | |
| Dyess AFB, TX | 107137 | AR-693 | 02-SEP-08 | Correspondence to HydroGeoLogic, RE "Five Base Team" Congratulations and Thank you | Teresa A. Clouse | Dyess AFB | Dr. Peter Huyakorn | HydroGeoLogic, Inc. | DP014 | AR-693.pdf | 22-JUN-12 10.16.07.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107138 | AR-691 | 29-JUL-08 | Correspondence to TCEQ, RE Response to Technical Notice of Deficiency Dated 17 June 2008 | Teresa A. Clouse | Dyess AFB | Vaishali Tendolkar | TCEQ | AR-691.pdf | 22-JUN-12 11.00.32.000000000 AM | ARSYSTEM | ||
| Dyess AFB, TX | 107139 | AR-680 | 09-JAN-06 | Correspondence with TCEQ Transmitting Semi-Annual Groundwater Sampling Report | 7CES/CEV | TCEQ | AOC01|BNPB01|Building 5021|Building 9197|Building 9198|DP014|DP043|ED844|F1842|F1843|FOA01|FT001|FT002|FT003|FTA01|LF004|LF013|NSNAPR01|NSNBSF01|OT008|OT011|OT012|OT030|OT031|OT034|OT035|OT036|OT037|OT039|SD006|SD007|SD015|SD016|SD017|SD018|SD019|SD020|SD021|SD022|SD023|SD024|SD025|SD026|SD027|SD028|SD029|SD030|SS042|ST010|ST032|ST033|ST040|ST041|TS845|TS846|TS847|TS848|TSB01|WP005|WP009 | AR-680.pdf | 22-JUN-12 10.16.08.000000000 AM | ARSYSTEM | |||
| Dyess AFB, TX | 107140 | AR-204 | 29-JUL-92 | Discussion Comments from Scope of Work Review | Crowell, Sylvia D | 96 CES/CEVR | Pfeiffer, Michael | US Army Corps of Engineers - Omaha District | DP014 | AR-204.pdf | 22-JUN-12 10.30.34.000000000 AM | ARSYSTEM | |
| Dyess AFB, TX | 107141 | AR-307 | 30-NOV-93 | Draft Appendix F, Part I Quality Control Summary Report RCRA Facility Investigation Study Unit A | Dyess AFB | LF013 | AR-307.pdf | 22-JUN-12 04.30.05.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107142 | AR-308 | 30-NOV-93 | Draft Appendix F, Part II Quality Control Summary Report RCRA Facility Investigation Study Unit A | Dyess AFB | LF013 | AR-308.pdf | 22-JUN-12 06.30.04.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107143 | AR-050 | 30-SEP-88 | Draft Closure/Post-Closure Plan Buried Railroad Tank Car - Waste Storage Tank | Oak Ridge National Laboratory | 96 CES/DEEV | OT008 | AR-050.pdf | 22-JUN-12 03.30.18.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 107144 | AR-051 | 30-SEP-88 | Draft Closure/Post-Closure Plan Fire Protection Training Area No. 2 | Oak Ridge National Laboratory | 96 CES/DEEV | FT003 | AR-051.pdf | 22-JUN-12 03.45.06.000000000 PM | ARSYSTEM | |||
| Dyess AFB, TX | 107145 | AR-052 | 30-SEP-88 | Draft Closure/Post-Closure Plan Underground Storage Tank 8018 | Oak Ridge National Laboratory | ST010 | AR-052.pdf | 22-JUN-12 04.30.06.000000000 PM | ARSYSTEM | ||||
| Dyess AFB, TX | 107146 | AR-356 | 30-NOV-94 | Draft Dyess AFB Health and Safety Plan for Interim Monitoring | Fluor Daniel, Inc. | Dyess AFB | FT001 | AR-356.pdf | 22-JUN-12 01.45.15.000000000 PM | ARSYSTEM |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .