Amd 0003 PWS Encl 2A Sheppard.xlsx
XLSX spreadsheet 55 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) TX/LA Group Federal contract opportunity
- Solicitation number
- W912BV20R0003
About this file
This is a pre-solicitation notice for an Optimized Remediation Contract to conduct environmental remediation activities at nine Air Force installations in Texas and Louisiana. The scope includes investigation, design, remedial action, construction, and remediation support services at 99 environmental restoration sites, consisting of 81 IRP sites and 18 MMRP sites. The NAICS code is 562910 with a small business size standard of 750 employees. The contract is set aside for small business and estimated at $750 million for a ten-year period of performance. Proposals are due 20 February 2020 with contract award anticipated shortly after. The solicitation will be issued through beta.SAM and any amendments must be acknowledged. A pre-proposal conference will be included in the solicitation. The award will be made using best value tradeoff procedures to the responsible offeror providing the best overall value to the government.
View the file
Other files for this federal contract opportunity
Show all 50
Optimized Remediation Contract (ORC) TX/LA Group has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Export Worksheet
| Installation Name | AR File | Installation File | Document Date | Subject/Title | Author | Author Affiliation | Recipient | Recipient Affiliation | Site # | Rod # | Image Number | Modification Date | Modification By | |||
| Sheppard AFB, TX | 145631 | 200 | 18-FEB-04 | "DRAFT" DSMOA 2 Year Work Plan | Matt Marrs | Sheppard AFB | FT001|FT003|LF004|LF006|OT011|ST012|WP009|WP010 | 200.pdf | 04-APR-13 11.37.10.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145632 | 004 | 27-MAY-81 | "Superfund" Site Reporting Requirements, PL 96-510 | George B. Acton | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 004.pdf | 04-APR-13 11.37.16.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145633 | 176 | 24-JAN-03 | 2002 Annual Groundwater Monitoring Report for sites FT001, LF004, LF006, and WP009 | Greg Braddy | Weston Solutions, Inc. | Kirk Coulter | TNRCC | FT001|LF004|LF006|WP009 | 176.pdf | 04-APR-13 11.37.21.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145634 | 215 | 04-MAR-05 | 2004 Annual Groundwater Monitoring Report for IRP Sites LF004, LF006, WP009, and WP010 | Greg Braddy | Weston Solutions, Inc. | Chris Siegel | Texas Commission on Environmental Quality | LF004|LF006|WP009|WP010 | 215.pdf | 04-APR-13 11.37.30.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145635 | 223 | 31-AUG-05 | 2005 Community Relations Plan for the Sheppard AFB IRP | Public Affairs Office, Sheppard AFB | FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|ST017|ST018|WP009|WP010 | 223.pdf | 04-APR-13 11.37.38.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145636 | 247 | 31-JAN-07 | 2006 Annual Ground Water Monitoring Report for IRP Site WP010 | Weston Solutions, Inc. | Sheppard AFB | WP010 | 247.pdf | 04-APR-13 11.37.43.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145637 | 263 | 31-OCT-07 | 2007 Community Relations Plan for the Sheppard AFB IRP | Public Affairs, Sheppard AFB | FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|ST017|ST018|WP009|WP010 | 263.pdf | 04-APR-13 11.37.49.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145638 | 226 | 13-SEP-05 | 82d Training Wing Bulletin - IRP Records Available to the Public | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 226.pdf | 04-APR-13 11.37.54.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145639 | 073 | 31-OCT-91 | Addendum to Decision Document FT03 - Fire Protection Training Area, Sheppard AFB | William J. Pehlivanian | HQ ATC | Sheppard AFB | FT003 | ROD_073 | 073.pdf | 04-APR-13 11.38.00.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145640 | 220 | 10-JUL-05 | Affidavit of Publication for Public Notices - No Further Response Action Planned (NFRAP) Decision Document for FT001, ST012, and DP011 | Wichita Fall Times Record News | FT001|OT011|ST012 | 220.pdf | 04-APR-13 11.38.05.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145641 | 198 | 21-JAN-04 | Affidavit of Publication NRFAP for FT-03 | Times Record News | FT003 | 198.pdf | 04-APR-13 11.38.11.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145642 | 203 | 24-MAR-04 | Affidavit to Public, Field Notes for 5.305 Acre Tract For Site FT-03 | Arthur Rooney, Brigadier General | Sheppard AFB | FT003 | 203.pdf | 04-APR-13 11.38.16.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145643 | 265 | 06-NOV-07 | AFFIDAVIT TO THE PUBLIC - LF-04 Metes and Bounds Survey | Richard T. Deveraux, Brigadier General | Sheppard AFB | LF004 | 265.pdf | 04-APR-13 11.38.21.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145644 | 250 | 02-MAR-07 | Affidavit to the Public - LF-06 Metes and Bounds Survey | Richard T. Deveraux, Brigadier General | Sheppard AFB | LF006 | 250.pdf | 04-APR-13 11.38.27.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145645 | 228 | 05-DEC-05 | Affidavit to the Public - Metes and Bounds Surveys for DP-11, FT-01, and ST-12 | Wichita County Public Records | FT001|OT011|ST012 | 228.pdf | 04-APR-13 11.38.32.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145646 | 290 | 10-OCT-08 | Affidavit to the Public RE WP010 Parcel | O.G. Mannon, Brigadier General | Sheppard AFB | WP010 | 290.pdf | 04-APR-13 11.38.38.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145647 | 249 | 02-MAR-07 | Affidavit to the Public -WP-09 Metes and Bounds Survey | Richard T. Devereaux, Briagier General | Sheppard AFB | WP009 | 249.pdf | 04-APR-13 11.38.43.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145648 | 305 | 26-APR-11 | Air Force Cost to Complete Designation Memorandum | Daniel Medina, PG | AFCEE | HQ AFCEE | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 305.pdf | 04-APR-13 11.38.49.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145649 | 062 | 31-AUG-90 | Air Force IRP Decision Document, FT03 - Fire Protection Training Area 3, Sheppard AFB, TX | Douglas W. Hodson | NUS Corporation | Sheppard AFB | FT003 | ROD_062 | 062.pdf | 04-APR-13 11.38.54.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145650 | 186 | 09-JUN-03 | AOC/NE Sites MAJCOM Survey | Mark Ashton | AF/ILEVR | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 186.pdf | 04-APR-13 11.38.59.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145651 | 233 | 31-MAR-06 | Application of the Resource Capability to AETC Command, Sheppard AFB | Weston Solutions, Booz Allen and Hamilton, Inc. | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 233.pdf | 04-APR-13 11.39.05.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145652 | 046 | 15-DEC-88 | Audit Exit Meeting, Sheppard AFB, TX Attendance and Findings/Observations | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 046.pdf | 04-APR-13 11.39.10.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145653 | 142 | 29-OCT-01 | August 2001 Groundwater Monitoring Report (3rd Quarter), FT003 and ST012 | Greg Braddy | Weston Solutions, Inc. | Lloyd Lewis | US Army Corps of Engineers - Tulsa District | FT003|ST012 | 142.pdf | 04-APR-13 11.39.15.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145654 | 310 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB | Environmental Management Resources, Inc. | Sheppard AFB | 310.pdf | 04-APR-13 11.39.21.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145655 | 314 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 15, Bldg 2122) | Environmental Management Resources, Inc. | Sheppard AFB | 314.pdf | 04-APR-13 11.39.27.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145656 | 318 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 11, Bldg 1929) | Environmental Management Resources, Inc. | Sheppard AFB | 318.pdf | 04-APR-13 11.39.33.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145657 | 313 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 13, Bldg 2111) | Environmental Management Resources, Inc. | Sheppard AFB | ROD_313 | 313.pdf | 04-APR-13 11.39.38.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145658 | 317 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 16, Bldg 2023 North) | Environmental Management Resources, Inc. | Sheppard AFB | 317.pdf | 04-APR-13 11.39.44.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145659 | 316 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 28, Bldg 2536) | Environmental Management Resources, Inc. | Sheppard AFB | 316.pdf | 04-APR-13 11.39.50.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145660 | 312 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 9, Bldg 2009) | Environmental Management Resources, Inc. | Sheppard AFB | 312.pdf | 04-APR-13 11.39.56.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145661 | 311 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 93, Bldg 1956) | Environmental Management Resources, Inc. | Sheppard AFB | 311.pdf | 04-APR-13 11.40.02.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145662 | 315 | 31-AUG-11 | Closure Report for the Removal of O/W Separators, Phase 2, at Sheppard AFB (Oil/Water Separator Removal, Site 95, Bldg 2410) | Environmental Management Resources, Inc. | Sheppard AFB | 315.pdf | 04-APR-13 11.40.07.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145663 | 210 | 30-JUL-04 | Closure Verification Report for Former Fire Training Area No. 1 (FT001), Sheppard AFB | Greg Braddy | Weston Solutions, Inc. | US Army Corps of Engineers - Tulsa District | FT001 | 210.pdf | 04-APR-13 11.40.13.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145664 | 273 | 15-APR-08 | Closure Verification Report for Former Industrial Oil/Waste Pit (Site WP-10), Sheppard AFB | Greg Braddy | Weston Solutions, Inc. | Susan Trussell | US Army Corps of Engineers - Tulsa District | WP010 | 273.pdf | 04-APR-13 11.40.19.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145665 | 208 | 09-JUN-04 | Closure Verification Report for Former Pesticide Spray Area (DP011 | ), Sheppard AFB | Greg Braddy | Weston Solutions, Inc. | US Army Corps of Engineers - Tulsa District | OT011 | 208.pdf | 04-APR-13 11.40.25.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145666 | 114 | 20-AUG-99 | Comments on Draft Report for Nine Installation Restoration Program Sites (Partial Review) Fire Protection Training Area (FT-01), Landfill No.1 (LF-04), Landfill No.2 (LF-05), Landfill No.3 (LF-06) | Clint Simmons | TNRCC | Mark McBurnett | Sheppard AFB | FT001|LF004|LF005|LF006 | 114.pdf | 04-APR-13 11.40.31.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145667 | 178 | 14-FEB-03 | Copy of State Monitoring Well Plugging Report for FT00310306 at site FT003 | Greg Braddy | Weston Solutions, Inc. | Sheppard AFB | FT003 | 178.pdf | 04-APR-13 11.40.36.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145668 | 304 | 08-APR-11 | Corrective Action Measures/Feasibility Study, Remediation Investigation/Feasibility Study for Site ST-14 | Tom Coffey, PE | Weston Solutions, Inc. | David DeCamp | AFCEE | ST014 | 304.pdf | 04-APR-13 11.40.42.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145669 | 138 | 21-AUG-01 | Corrective Measures Study, Final, Former Industrial Oil/Waste Pit (Site WP010), Volume I and II | Greg Braddy | Weston Solutions, Inc. | Lloyd Lewis | US Army Corps of Engineers - Tulsa District | WP010 | 138.pdf | 04-APR-13 11.40.47.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145670 | 293 | 05-DEC-08 | Correspondence from TCEQ, RE Final Deed Certification and Closure Report Former Industrial Oil/Waste Pit (WP010), dated Nov 4, 2008 | Chris Siegel | Texas Commission on Environmental Quality | Richard Milhollon | Sheppard AFB | WP010 | 293.pdf | 04-APR-13 11.40.52.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145671 | 292 | 04-NOV-08 | Correspondence to TCEQ, RE Final Deed Certification and Closure Report for the Former Industrial Oil/Waste Pit (WP010) | Richard Milhollon | Sheppard AFB | Chris Siegel | Texas Commission on Environmental Quality | WP010 | 292.pdf | 04-APR-13 11.40.58.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145672 | 327 | 23-DEC-11 | Correspondence to TCEQ, RE Response to TCEQ Comments on Revision 2 to the Modified CSE Phase 1 Report (Attached Response to Comments and Corrected Report) | Judy Overbey | Dyess AFB | Maureen Hatfield | Texas Commission on Environmental Quality | LF006|MMRP Sites|TS013|TS014 | 327.pdf | 04-APR-13 11.41.10.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145673 | 137 | 27-AUG-01 | Correspondence, RE 2-year DSMOA/CA from 1 Jul 02 to 30 Jun 04 | Mark McBurnett | Sheppard AFB | Kirk Coulter | TNRCC | FT001|FT003|LF005|LF006|OT011|ST012|WP009|WP010 | 137.pdf | 04-APR-13 11.41.16.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145674 | 036 | 08-JUL-87 | Correspondence, RE Air Force Reply to USEPA Region VI Comments on IRP Report (Includes HQ ATC Correspondence, and USAF OEHL Correspondence) | 2LT Allen R. Naugle | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 036.pdf | 04-APR-13 11.41.21.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145675 | 049 | 02-MAY-89 | Correspondence, RE Decision Paper, IRP Site WP-01 (Includes TWC Response to Decision Paper IRP Site WP-01) | William L. Cox | Air Force Regional Civil Engineer Central Region | HQ ATC | WP009 | 049.pdf | 04-APR-13 11.41.26.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145676 | 109 | 29-SEP-98 | Correspondence, Re Draft No Further Response Action Planned (NFRAP) Decision Document FT-02 Fire Training Area Number 2, Approval - No Further Action Required | Clint Simmons | TNRCC | Mark McBurnett | Sheppard AFB | FT002 | 109.pdf | 04-APR-13 11.41.32.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145677 | 052 | 22-JUN-90 | Correspondence, RE DRAFT Technical Provisions for Removal and Disposal of Tank and Contaminated Soil, Sheppard AFB, TX | Travis W. Fowler | Sheppard AFB | Hal Capshaw | US Army Corps of Engineers - Tulsa District | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 052.pdf | 04-APR-13 11.41.37.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145678 | 037 | 22-JUL-87 | Correspondence, RE Dumping into Ditch behind Building 2013 | 2 LT Allen R. Naugle | Sheppard AFB | SSGT Todd | Building 2013 | 037.pdf | 04-APR-13 11.41.42.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145679 | 051 | 27-APR-90 | Correspondence, RE Environmental Tabs Depicting the Location of all IRP Sites | COL Howard E. Selheimer | Sheppard AFB | LT Weidmann | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 051.pdf | 04-APR-13 11.41.47.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145680 | 010 | 07-OCT-83 | Correspondence, RE EPC IRP Phase I | MSgt Willis W. Reese | Sheppard AFB | Mr. Smith | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 010.pdf | 04-APR-13 11.41.53.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145681 | 266 | 05-DEC-07 | Correspondence, RE Final Deed Certification and Closure Report for LF-04 | Mark McBurnett | Sheppard AFB | Chris Siegel | Texas Commission on Environmental Quality | LF004 | 266.pdf | 04-APR-13 11.41.59.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145682 | 264 | 31-OCT-07 | Correspondence, RE Final Deed Certification and Closure Report for LF-06 | Mark McBurnett | Sheppard AFB | Chris Siegel | Texas Commission on Environmental Quality | LF006 | 264.pdf | 04-APR-13 11.42.05.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145683 | 262 | 05-SEP-07 | Correspondence, RE Final Deed Certification and Closure Report for Former Solvent Waste Pits (WP-09 | ) | Mark McBurnett | Sheppard AFB | Chris Siegel | Texas Commission on Environmental Quality | WP009 | 262.pdf | 04-APR-13 11.42.10.000000000 AM | ARSYSTEM | |||
| Sheppard AFB, TX | 145684 | 291 | 03-NOV-08 | Correspondence, RE Final Deed Certification and Closure Report, Former Deed Certification and Closure Report (WP010) | Greg Braddy | Weston Solutions, Inc. | Rick Milhollon | Sheppard AFB | WP010 | 291.pdf | 04-APR-13 11.42.15.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145685 | 161 | 27-AUG-02 | Correspondence, RE Government Performance Results Act (GPRA), Sheppard AFB | Mark McBurnett | Sheppard AFB | Ata-ur-Rahman, Ph.D | TNRCC | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 161.pdf | 04-APR-13 11.42.21.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145686 | 012 | 19-OCT-83 | Correspondence, RE Installation Restoration Program | COL E. A. McLaughlin | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 012.pdf | 04-APR-13 11.42.26.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145687 | 025 | 04-MAR-85 | Correspondence, RE Installation Restoration Program, Sheppard AFB | LT COL Ronald L. Schiller | HQ ATC | Samuel L. Nott | USEPA Region VI | LF006 | 025.pdf | 04-APR-13 11.42.31.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145688 | 011 | 17-OCT-83 | Correspondence, RE IRP Phase I | LT COL John J. Clary III | Sheppard AFB | Mr. McCoy | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 011.pdf | 04-APR-13 11.42.37.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145689 | 014 | 10-JAN-84 | Correspondence, RE IRP Phase I Draft Report Reviews for Williams AFB and Sheppard AFB | Dee Ann Sanders | USAF OEHL | HQ ATC | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 014.pdf | 04-APR-13 11.42.42.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145690 | 030 | 15-MAY-87 | Correspondence, RE IRP Phase II / Phase IV and Meeting Minutes from Initial Coordination Meeting | COL Howard E. Selheimer | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 030.pdf | 04-APR-13 11.42.47.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145691 | 028 | 30-OCT-86 | Correspondence, RE IRP Phase II, Stage 2 IRP Work for Sheppard AFB TX (Includes Attachments 1. EPA Comments Stage I, 2. Selected TWC Comments) | MAJ Denton R. Crotchett | HQ ATC | CAPT Gibson | USAF OEHL | FT001|FT002|FT003|LF004|LF005|LF006|OT011|WP009|WP010 | 028.pdf | 04-APR-13 11.42.52.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145692 | 031 | 30-APR-87 | Correspondence, RE IRP Working Group Meeting | Jerry M. Morgan | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 031.pdf | 04-APR-13 11.42.58.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145693 | 040 | 04-DEC-87 | Correspondence, RE Monitoring for Surface Radioactivity at IRP Site RW-01 Low Level Radioactive Waste Disposal Site at WWTP | 2LT Allen R. Naugle | Sheppard AFB | HQ ATC | RW007 | 040.pdf | 04-APR-13 11.43.03.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145694 | 074 | 22-NOV-91 | Correspondence, RE Pre-Funding of Initial Site Assessment, Fire Protection Training Area 3, IRP | COL Thomas J. Black III | Sheppard AFB | FT003 | 074.pdf | 04-APR-13 11.43.08.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145695 | 041 | 05-APR-88 | Correspondence, RE RCRA Part "B" Permit | Douglas Jansing | Sheppard AFB | HQ ATC | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 041.pdf | 04-APR-13 11.43.13.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145696 | 072 | 12-DEC-90 | Correspondence, RE Record of Submission for Decision Documents that supplements the Remedial Investigation Report | William J. Pehlivanian | Sheppard AFB | Dan Eden | Texas Water Commission | FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|WP010 | 072.pdf | 04-APR-13 11.43.19.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145697 | 071 | 02-NOV-90 | Correspondence, RE Record of Submittal for Remedial Investigation Report under CERCLA | CAPT Frank M. Miles, JR. | Sheppard AFB | Dan Eden | Texas Water Commission | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 071.pdf | 04-APR-13 11.43.24.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145698 | 018 | 16-NOV-84 | Correspondence, RE Release of IRP Phase II Documents | MAJ GEN Murphy A. Chesney | HQ USAF | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 018.pdf | 04-APR-13 11.43.30.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145699 | 019 | 04-DEC-84 | Correspondence, RE Request for Additional Phase II Field Investigation Work - Sheppard AFB, TX | LT COL Ronald L. Schiller | HQ ATC | USAF OEHL | LF006|RW007|RW008 | 019.pdf | 04-APR-13 11.43.35.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145700 | 023 | 11-JAN-85 | Correspondence, RE Request for Additional Phase II Field Investigation Work - Sheppard AFB, TX | LT COL Ronald L. Schiller | HQ ATC | Sheppard AFB | LF006 | 023.pdf | 04-APR-13 11.43.41.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145701 | 050 | 04-APR-90 | Correspondence, RE Request for Environmental Tabs Depicting the Location of all IRP Sites | LT COL Ronald R. Voorhees | HQ ATC | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 050.pdf | 04-APR-13 11.43.46.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145702 | 209 | 09-JUL-04 | Correspondence, RE Request that Bldg 2115 at Sheppard AFB be designated an Area of Concern (AOC-01 | ) | Mark McBurnett | Sheppard AFB | Sylvia Crowell | HQ AETC | AOC 1 | 209.pdf | 04-APR-13 11.43.51.000000000 AM | ARSYSTEM | |||
| Sheppard AFB, TX | 145703 | 039 | 20-NOV-87 | Correspondence, RE Sheppard AFB Texas Geological Investigation | LT COL Jose L. Saenz | HQ ATC | USGS Water Resources Division | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 039.pdf | 04-APR-13 11.43.57.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145704 | 105 | 28-OCT-97 | Correspondence, RE Sheppard AFB, Recreational Annex - Lake Texoma, Former Disposal Site ( DP-18) | Paul Lewis | TNRCC | Mark McBurnett | Sheppard AFB | ST018 | 105.pdf | 04-APR-13 11.44.02.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145705 | 027 | 20-OCT-86 | Correspondence, RE Sheppard IRP Phase II Stage 1, 2nd Draft Report Comments | CAPT Susan Smits | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 027.pdf | 04-APR-13 11.44.07.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145706 | 026 | 08-APR-85 | Correspondence, RE Solid Waste Management Unites at Sheppard AFB | Jerry M. Morgan | Sheppard AFB | Hector M. Mendieta | Texas Department of Health | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 026.pdf | 04-APR-13 11.44.13.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145707 | 081 | 01-FEB-94 | Correspondence, RE Subsurface Diesel Contamination at Bldg 990 | Joe D. Woodard | TNRCC | Patty Taylor | HQ AETC | ST014 | 081.pdf | 04-APR-13 11.44.18.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145708 | 080 | 01-FEB-94 | Correspondence, RE Subsurface Gasoline and Diesel Contamination at ST-13, Ave D near Warehouse 6, Sheppard AFB | Joe D. Woodard, Director | TNRCC | Patty Taylor | HQ AETC | ST013 | 080.pdf | 04-APR-13 11.44.23.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145709 | 079 | 01-FEB-94 | Correspondence, RE Subsurface JP-4 and Diesel Contamination at Bldgs 2000 and 2003, Sheppard AFB | Joe D. Woodard, Director | TNRCC | Patty Taylor | HQ AETC | ST012 | 079.pdf | 04-APR-13 11.44.29.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145710 | 325 | 15-DEC-11 | Correspondence, RE TCEQ Petroleum Storage Tank (PST) Release Determination Report (RDR) for | ||||||||||||
| Underground Storage Tank (UST) Removal at Sheppard Air Force Base (AFB) | Matt Smith | Weston Solutions, Inc. | Texas Commission on Environmental Quality | ST016 | 325.pdf | 04-APR-13 11.44.34.000000000 AM | ARSYSTEM | |||||||||
| Sheppard AFB, TX | 145711 | 002 | 03-APR-81 | DEQPPM 80-6 Identification of DOD Hazardous Material Disposal Sites | COL Raymond E. McFarlane | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 002.pdf | 04-APR-13 11.44.39.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145712 | 005 | 17-JUN-81 | DEQPPM 80-6 Identification of DOD Hazardous Material Disposal Sites | LT COL Gerald T. Dantzler | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 005.pdf | 04-APR-13 11.44.45.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145713 | 181 | 25-APR-03 | DSMOA Two-Year Joint CA Execution Plan, Sheppard AFB | Matt Marrs | Sheppard AFB | Peggy Laird | FT001|FT003|LF004|LF006|OT011|ST012|WP009|WP010 | 181.pdf | 04-APR-13 11.44.50.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145714 | 267 | 18-DEC-07 | DSOMA Joint Execution Plan - 2008-2010 CA | Sheppard AFB | WP010 | 267.pdf | 04-APR-13 11.44.56.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145715 | 329 | 19-JAN-12 | Email Correspondence, RE E-SSS Public Notice and Formal Adjournment of Sheppard AFB RAB | Gina Menden | AETC | Richard Milhollon | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 329.pdf | 04-APR-13 11.45.01.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145716 | 013 | 24-OCT-83 | Engineering-Science Sheppard AFB, Phase I IRP - Interview Form | Engineering-Science | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 013.pdf | 04-APR-13 11.45.07.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145717 | 009 | 30-SEP-83 | Entomology Chemicals Used November 1976 - Present | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 009.pdf | 04-APR-13 11.45.12.000000000 AM | ARSYSTEM | ||||||||
| Sheppard AFB, TX | 145718 | 006 | 16-SEP-82 | EPA Notification of Hazardous Waste Sites Form, RE Sheppard Landfill | Sheppard AFB | LF006 | 006.pdf | 04-APR-13 11.45.18.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145719 | 279 | 28-FEB-08 | Final AETC Installation Restoration Program Site Evaluation Report | Science Applications International Corporation | AFCEE, AETC | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 279.pdf | 04-APR-13 11.45.23.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145720 | 087 | 03-JUN-95 | Final Closure Report, Waste Pit 10, Contract No. DACA56-92-D-0008, Delivery Order No. 0002 Part 1 of 3. | IT Corporation | US Army Corps of Engineers - Tulsa District | WP010 | 087.pdf | 18-APR-13 12.45.57.000000000 PM | CAROL.ANDERSON | ||||||
| Sheppard AFB, TX | 145721 | 321 | 31-OCT-11 | Final Comprehensive Site Evaluation, Phase II Work Plan, MMRP - Sheppard AFB | Sheppard AFB | TS013|TS014 | 321.pdf | 04-APR-13 11.45.32.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145722 | 202 | 24-MAR-04 | Final Deed Certification and Closure Package for FT-03 | Greg Braddy | Weston Solutions, Inc. | Peggy Laird | Texas Commission on Environmental Quality | FT003 | 202.pdf | 04-APR-13 11.45.38.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145723 | 212 | 30-NOV-04 | Final ERP Management Action Plan | URS Corporation, Inc. | Sheppard AFB | AOC 1|FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|ST017|ST018|WP009|WP010 | 212.pdf | 04-APR-13 11.45.44.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145724 | 296 | 31-AUG-09 | Final Evaluation Report - Volume 1 - Background (Air Force Compliance Clean-Up sites, Identification and Evaluation of Defense Environmental Restoration Account Eligibility for AFCEE, Multiple Locations) | URS Group | US Army Corps of Engineers - Tulsa District | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 296.pdf | 04-APR-13 11.45.49.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145725 | 297 | 31-AUG-09 | Final Evaluation Report - Volume 2 - Sheppard Air Force Base (Air Force Compliance Clean-Up sites, Identification and Evaluation of Defense Environmental Restoration Account Eligibility for AFCEE, Multiple Locations) | URS Group | US Army Corps of Engineers - Tulsa District | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 297.pdf | 04-APR-13 11.45.56.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145726 | 322 | 31-OCT-11 | Final FY 2011 CERCLA Five-Year Review for Sheppard AFB | Darryl W. Burke, Brigadier General | HydroGeoLogic, Inc. | AFCEE | FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|ST017|ST018|WP009|WP010 | 322.pdf | 04-APR-13 11.46.09.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145727 | 295 | 24-FEB-09 | FINAL Programmatic Work Plan - Modified Comprehensive Site Evaluation Phase I, Various Air Force Installations | US Army Corps of Engineers - Omaha District | USAF | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 295.pdf | 04-APR-13 11.46.16.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145728 | 319 | 31-AUG-11 | Final Qualitative Assessment Report - Munitions Constituent Migration on Air Education and Training Command Operations Ranges, Sheppard AFB | Weston Solutions, Inc. | AFCEE | GR|SAR | 319.pdf | 04-APR-13 11.46.23.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145729 | 147 | 31-JUL-02 | Final Record of Decision, No Further Response Action Planned (NFRAP), Former Landfill No. 2 (LF005) | Greg Braddy | Weston Solutions, Inc. | Sheppard AFB | LF005 | ROD_147 | 147.pdf | 04-APR-13 11.46.28.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145730 | 077 | 13-APR-92 | FINAL REPORT on the Findings of the Petrex Soil Gas Survey Performed at the Fire Training Area | Geoffrey S. Smith, Geologist | Northeast Research Institute, Inc. | US Army Corps of Engineers - Tulsa District | FT001|FT002|FT003 | 077.pdf | 04-APR-13 11.46.34.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145731 | 300 | 04-JAN-10 | Final Revision 1, Modified Comprehensive Site Evaluation, Phase I Report | John England, PE, PMP | Innovative Technical Solutions, Inc. | Richard Milhollon | Sheppard AFB | LF006|MMRP Sites|TS013|TS014 | 300.pdf | 04-APR-13 11.46.44.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145732 | 324 | 30-APR-12 | Final Site Visit Report for Investigation of Oil Water Separators to Determine Defense Environmental Restoration Account Eligibility at Sheppard AFB | AECOM Technical Services, Inc. | HQ AFCEE | OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B | 324.pdf | 04-APR-13 11.46.50.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145733 | 307 | 31-MAY-11 | Final Work Plan and Site Safety and Health Plan, FY 2011 CERCLA Five-Year Review for Sheppard AFB | AFCEE | FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|ST017|ST018|WP009|WP010 | 307.pdf | 04-APR-13 11.46.55.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145734 | 169 | 10-DEC-02 | First 2002 Semi-Annual Ground Water Monitoring Report for LF004, LF006, and WP009 | Greg Braddy | Weston Solutions, Inc. | Lloyd Lewis | US Army Corps of Engineers - Tulsa District | LF004|LF006|WP009 | 169.pdf | 04-APR-13 11.47.03.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145735 | 156 | 28-JUN-02 | First Semi-Annual Groundwater Monitoring Report, Sites LF004, LF006, and WP009 | Greg Braddy | Weston Solutions, Inc. | Lloyd Lewis | US Army Corps of Engineers - Tulsa District | LF004|LF006|WP009 | 156.pdf | 04-APR-13 11.47.09.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145736 | 224 | 31-AUG-05 | FY06 and Outyear Environmental Restoration Account (ERA) Funds Estimate Approval | Mark McBUrnett | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 224.pdf | 04-APR-13 11.47.14.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145737 | 038 | 09-NOV-87 | HQ ATC Correspondence, RE Monitoring for Radioactivity at IRP Site | LT COL Ronald L. Schiller | HQ ATC | USAF Regional Hopsital, Sheppard AFB | RW007 | 038.pdf | 04-APR-13 11.47.19.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145738 | 016 | 28-FEB-84 | IRP Phase I Records Search, Sheppard AFB | Engineering-Science | USAF | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 016.pdf | 04-APR-13 11.47.26.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145739 | 033 | 01-APR-87 | IRP Phase II - Confirmation Quantification Stage I - Final Report, Volume II Sheppard AFB, TX | Radian Corporation | Sheppard AFB | FT001|FT002|FT003|LF006|WP009|WP010 | 033.pdf | 04-APR-13 11.47.38.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145740 | 032 | 01-APR-87 | IRP Phase II - Confirmation/Quantification Stage I - Final Report, Volume I, Sheppard AFB, TX | Radian Corporation | Sheppard AFB | FT001|FT002|FT003|LF006|WP009|WP010 | 032.pdf | 04-APR-13 11.47.43.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145741 | 034 | 29-MAY-87 | IRP Site Investigation Work Final Draft - Permit for Municipal Hazardous Waste Management Site | Douglas Jansing | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 034.pdf | 04-APR-13 11.47.49.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145742 | 276 | 12-DEC-94 | IRP Site Map at Sheppard AFB | Sheppard AFB | FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|ST017|ST018|WP009|WP010|WP019 | 276.pdf | 04-APR-13 11.47.54.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145743 | 284 | 05-AUG-08 | IRP Technical Review Committee Meeting Sign-in Sheet and Agenda | Sheppard AFB | Technical Review Committee | FT001|FT002|FT003|LF004|LF005|LF006|OT011|RW007|RW008|ST012|ST013|ST014|ST015|ST016|ST017|ST018|WP009|WP010 | 284.pdf | 04-APR-13 11.47.59.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145744 | 134 | 01-JUN-01 | June 2001 Groundwater Monitoring Report (Site ST012) | Greg Braddy | Weston Solutions, Inc. | Lloyd Lewis | US Army Corps of Engineers - Tulsa District | ST012 | 134.pdf | 04-APR-13 11.48.05.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145745 | 116 | 31-OCT-99 | Landfill 06 Fill Area and Floodplain Map | Sheppard AFB | LF006 | 116.pdf | 04-APR-13 11.48.10.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145746 | 269 | 13-FEB-08 | LF-04 Metes and Bounds Survey | Sheppard AFB | LF004 | 269.pdf | 04-APR-13 11.48.16.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145747 | 286 | 12-AUG-08 | Limited Action Record of Decision for Former Industrial Oil/Waste Pit (Site WP010), Sheppard AFB | Greg Braddy | Weston Solutions, Inc. | Susan Trussell | US Army Corps of Engineers - Tulsa District | WP010 | ROD_286 | 286.pdf | 04-APR-13 11.48.24.000000000 AM | ARSYSTEM | |||
| Sheppard AFB, TX | 145748 | 288 | 31-AUG-08 | Limited Action Record of Decision for Former Industrial Oil/Waste Pit (WP010) | Sheppard AFB | WP010 | ROD_288 | 288.pdf | 04-APR-13 11.48.30.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145749 | 271 | 28-FEB-08 | Limited Action Record of Decision for Former Landfill No. 1 (LF004) | Weston Solutions, Inc. | Sheppard AFB | LF004 | ROD_271 | 271.pdf | 04-APR-13 11.48.37.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145750 | 255 | 31-MAY-07 | Limited Action Record of Decision for Former Pesticide Spray Area (DP-11), Sheppard AFB | Sheppard AFB | OT011 | ROD_255 | 255.pdf | 04-APR-13 11.48.43.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145751 | 257 | 30-JUN-07 | Limited Action Record of Decision for Former Solvent Waste Pits (WP009), Sheppard AFB | Sheppard AFB | WP009 | ROD_257 | 257.pdf | 04-APR-13 11.48.49.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145752 | 251 | 31-MAR-07 | Limited Action Record of Decision for Former UST Areas Near Bldgs 2010 and 2017 (ST012) | Sheppard AFB | ST012 | ROD_251 | 251.pdf | 04-APR-13 11.48.56.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145753 | 320 | 17-OCT-11 | Marked up version of Final Project Management Plan for the Performance-Based Remediation at Texas Bases Air Force Plan 4, Dyess AFB, Goodfellow AFB, Laughlin AFB, Randolph AFB, and Sheppard AFB | Lata-Kemron Remediation, LLC | AFCEE | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 320.pdf | 04-APR-13 11.49.04.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145754 | 299 | 16-DEC-09 | Meeting Minutes, MAJCOM Kickoff Telecon, CSE Phase II under the AF MMRP (Skeet Range 1 and Skeet Range 2) | Sheppard AFB | TS013|TS014 | 299.pdf | 04-APR-13 11.49.09.000000000 AM | ARSYSTEM | |||||||
| Sheppard AFB, TX | 145755 | 047 | 15-DEC-88 | Memo for the Record, RE Site Visit by Prime Contractor for IRP Work | CAPT Dennis McEleney | Sheppard AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 047.pdf | 04-APR-13 11.49.14.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145756 | 167 | 14-NOV-02 | Memorandum and Attachments, RE Record of Decision for IRP for NFRAP at LF005 | Kathleen Ferguson, PE | HQ USAF/ILEV | HQ AETC | LF005 | 167.pdf | 04-APR-13 11.49.20.000000000 AM | ARSYSTEM | |||||
| Sheppard AFB, TX | 145757 | 302 | 25-OCT-10 | Memorandum for Judy Overbey - Appointment of Sheppard AFB Remedial Project Manager (RPM) | Darryl W. Burke, Brigadier General | Sheppard AFB | Judy Oberbey | Dyess AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 302.pdf | 04-APR-13 11.49.26.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145758 | 332 | 02-MAR-12 | Memorandum for Record - Adjournment of Sheppard AFB Environmental Restoration Advisory Board | Judy Overbey | Dyess AFB | AOC 1|Building 2013|DP011|DP018|FT001|FT002|FT003|GR|LF004|LF005|LF006|MMRP Sites|OT011|OTC-500|OW-C501A|OW-C501B|OW-C502A|OW-C502B|OW-C502C|OW-C502D|OW-C503|OW-C504A|OW-C504B|OW-C505|OW-C506|OW-C507|OW-C508A|OW-C508B|OW-C509A|OW-C509B|OW-C510A|OW-C510B|OWS - Site 11|OWS - Site 13|OWS - Site 15|OWS - Site 16|OWS - Site 17|OWS - Site 28|OWS - Site 9|OWS - Site 93|OWS - Site 95|RW007|RW008|SAR|ST012|ST013|ST014|ST015|ST016|ST017|ST018|TS013|TS014|WP009|WP010|WP019 | 332.pdf | 04-APR-13 11.49.31.000000000 AM | ARSYSTEM | ||||||
| Sheppard AFB, TX | 145759 | 118 | 20-OCT-99 | Memorandum for TNRCC, RE Fill Material as an Interim Corrective Measure at Landfill 06 (LF-06) | LT COL William H. Martin, JR | Sheppard AFB | Roger Dockery | TNRCC | LF006 | 118.pdf | 04-APR-13 11.49.37.000000000 AM | ARSYSTEM | ||||
| Sheppard AFB, TX | 145760 | 111 | 11-DEC-98 | Memorandum for TNRCC, RE Site Closure Request for Lake Texoma Recreational Annex Former Disposal Pit (DP-18) | LT COL William H. Martin, Jr. | Sheppard AFB | Roger Dockery | TNRCC | ST018 | 111.pdf | 04-APR-13 11.49.42.000000000 AM | ARSYSTEM |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .