Amd 0003 PWS Encl 2A JBSA FSH and Camp Bullis.xlsx
XLSX spreadsheet 134 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) TX/LA Group
- Solicitation number
- W912BV20R0003
About this file
This pre-solicitation notice announces a forthcoming small business set-aside solicitation for an Optimized Remediation Contract to conduct environmental remediation activities at nine Air Force installations in Texas and Louisiana.
The solicitation will require investigation, design, remedial action, remedial construction, and other remediation services to advance cleanup at 99 Environmental Restoration Program sites, including 81 Installation Restoration Program sites and 18 Military Munitions Restoration Program sites. The contract will have a period of performance of 10 years and utilize firm-fixed-price terms. The solicitation is expected to be issued on November 19, 2019 via beta.SAM, with proposals due on February 20, 2020 and contract award thereafter. The applicable NAICS code is 562910.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Export Worksheet
| Installation Name | AR File | Installation File | Document Date | Subject/Title | Author | Author Affiliation | Recipient | Recipient Affiliation | Site # | Rod # | Image Number | Modification Date | Modification By | |
| Fort Sam Houston, TX | 80538 | 891.0 | 13-JAN-93 | 1992 Annual Groundwater Monitoring Report For Building 2621 (Tank 45) | Robert P. Callegari | Engineering-Science | James R. Bard | Fort Sam Houston | 891.pdf | 15-APR-12 05.37.17.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80539 | 885.0 | 22-JAN-93 | 1992 Annual Groundwater Monitoring Report for Building 366 | Robert P. Callegari | Engineering-Science | James R. Bard | Texas Water Commission | Building 366 | 885.pdf | 15-APR-12 05.37.21.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80540 | 88.0 | 25-JAN-00 | 1999 Annual Report for Camp Bullis | US Dept of the Army/Fifth US Army | Fort Sam Houston | OBOD | 88.pdf | 15-APR-12 05.37.28.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80541 | 74.0 | 25-JAN-01 | 2000 Annual Report Camp Bullis Training Site - Environmental Division - Volume I | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 74.pdf | 15-APR-12 05.37.30.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80542 | 75.0 | 25-JAN-01 | 2000 Annual Report Camp Bullis Training Site - Environmental Division - Volume II | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 75.pdf | 15-APR-12 05.37.43.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80543 | 76.0 | 25-JAN-01 | 2000 Annual Report Camp Bullis Training Site - Environmental Division - Volume III | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 76.pdf | 15-APR-12 05.37.49.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80544 | 77.0 | 25-JAN-01 | 2000 Annual Report Camp Bullis Training Site - Environmental Division - Volume IV | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 77.pdf | 15-APR-12 05.37.54.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80545 | 70.0 | 25-JAN-02 | 2001 Annual Report Camp Bullis Training Site - Volume I | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 70.pdf | 15-APR-12 05.37.54.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80546 | 71.0 | 25-JAN-02 | 2001 Annual Report Camp Bullis Training Site - Volume II | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 71.pdf | 15-APR-12 05.38.11.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80547 | 72.0 | 25-JAN-02 | 2001 Annual Report Camp Bullis Training Site - Volume III | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 72.pdf | 15-APR-12 05.38.27.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80548 | 73.0 | 25-JAN-02 | 2001 Annual Report Camp Bullis Training Site - Volume IV | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 73.pdf | 15-APR-12 05.38.40.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80549 | 78.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume I | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 78.pdf | 15-APR-12 05.38.41.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80550 | 79.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume II Appendix B | US Army Medical Dept Ctr and School | OBOD | 79.pdf | 15-APR-12 05.38.50.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80551 | 80.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume III Appendix C | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 80.pdf | 15-APR-12 05.39.09.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80552 | 81.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume IV - Part 1 Appendix D | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 81.pdf | 15-APR-12 05.39.22.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80553 | 82.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume IV - Part 2 Appendix D | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 82.pdf | 15-APR-12 05.39.32.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80554 | 83.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume IV - Part 3 Appendix D | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 83.pdf | 15-APR-12 05.39.38.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80555 | 84.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume V - Part 1 Appendix E | US Army Medical Dept Ctr and School | Fort Sam Houston | OBOD | 84.pdf | 15-APR-12 05.39.49.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80556 | 85.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume V - Part 2 Appendix E | US Army Medical Dept Ctr and School | OBOD | 85.pdf | 15-APR-12 05.39.59.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80557 | 86.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume V - Part 3 Appendix E | US Army Medical Dept Ctr and School | OBOD | 86.pdf | 15-APR-12 05.40.10.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80558 | 87.0 | 05-FEB-03 | 2002 Annual Report Camp Bullis Training Site - Volume VI Part 1 of 2. | US Army Medical Dept Ctr and School | OBOD | 87.pdf | 06-AUG-12 01.49.39.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80559 | 41.0 | 25-JAN-04 | 2003 Annual Report For Camp Bullis Training Site Open Burn/Open Detonation Area - Fort Sam Houston, TX Part 1 of 2. | Garry F. Atkins | USAG | Katherine Nelson | TCEQ | OBOD | 41.pdf | 06-AUG-12 01.49.47.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80560 | 771.0 | 22-JUL-04 | 2003 Emissions Inventory for US Army - Camp Bullis, Texas | Dickson Consulting Group, LLC | Fort Sam Houston | Building 5132 | 771.pdf | 15-APR-12 05.40.11.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80561 | 1027.0 | 25-JAN-05 | 2004 Annual Report for Camp Bullis Training Site OBOD Area, Haz Waste Permit No. HW-50335 | Fort Sam Houston | OBOD | 1027.pdf | 15-APR-12 05.40.12.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80562 | 970.0 | 06-DEC-06 | 2006 Air Emissions Inventory Questionnaire - TCEQ EIQ Report | Fort Sam Houston | BW01 | 970.pdf | 15-APR-12 05.40.15.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80563 | 148.0 | 01-JAN-11 | 2006 TCEQ Air Emissions Inventory Account Information-Fort Sam Houston, TX | Not | |||||||||
| Listed | BW01 | 148.pdf | 15-APR-12 05.40.16.000000000 PM | ARSYSTEM | ||||||||||
| Fort Sam Houston, TX | 80564 | 4.0 | 25-JUL-08 | 2008 Semi-annual Report For Camp Bullis Training Site Jan-Jun 2008 Landfill 8 and The Open Burn/Open Detonation Unit | William Foss | |||||||||
| Russ Johnson | USAG | US Army Garrison | Landfill 8-CB|OBOD | 4.pdf | 15-APR-12 05.40.24.000000000 PM | ARSYSTEM | ||||||||
| Fort Sam Houston, TX | 80565 | 7.0 | 21-JAN-10 | 2009 Semi-annual Report For | ||||||||||
| Camp Bullis Training Site July-Dec 2009 Landfill 8 and The Open Burn/Open Detonation Unit | USAG | US Army Garrison | Landfill 8-CB|OBOD | 7.pdf | 15-APR-12 05.40.34.000000000 PM | ARSYSTEM | ||||||||
| Fort Sam Houston, TX | 80566 | 278.0 | 30-SEP-96 | 797th Ordance Company (EOD) Disposal Operation 9 April 2004 | Paul A. Kopelen | Fort Sam Houston | AFOD-BJ | BW01 | 278.pdf | 15-APR-12 05.40.35.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80567 | 518.0 | 31-MAR-06 | Abbreviated Work Plan Trash Removal Along Salado Creek | Shaw Env. | Fort Sam Houston | SALCRFTSH01 | 518.pdf | 15-APR-12 05.40.35.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80568 | 24.0 | 23-OCT-06 | Addendum 1 Response To TCEQ Comments Affected Property Assessment Report Camp Bullis SWMU No.10 Landfills 10, 12, and 13 Camp Bullis Training Site | Russ Johnson | Weston | Cliff Muray | US Army Corps of Engineers | Landfill 10-CB|Landfill 12-CB|Landfill 13-CB | 24.pdf | 15-APR-12 05.40.48.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80569 | 814.0 | 16-JUN-06 | Addendum 1 Response to TCEQ Comments Affected Property Assessment Report Fort Sam Houston Building 330 | Stephen J. Mitchell | Weston | Terry Murphee | USACE | Building 330 | 814.pdf | 15-APR-12 05.41.12.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80570 | 266.0 | 31-DEC-99 | Addendum RCRA Facility Investigation Report for the Texas Army National Guard Motor Pool Camp Bullis | Greg Dennis | Geo-Marine | Yvonne Tyler, David Carr | US Army Medical Command | TANGMP01 | 266.pdf | 15-APR-12 05.41.21.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80571 | 114.0 | 27-JAN-06 | Additional Investigation and TRRP Data Evaluation Bldg 3824 - Former Medical Waste Incinerator FSH | Stephen Mitchell | Weston | Terry Murphree | USACE | Building 3824 | 114.pdf | 15-APR-12 05.41.31.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80572 | 134.0 | 15-SEP-09 | Advance Information Packet Camp Bullis RCRA Facility Investigation | Brian Vanderglas | PARSONS | Bob Thurman | USACE | MS75|SMMS01 | 134.pdf | 15-APR-12 05.41.36.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80573 | 23.0 | 30-JUN-05 | Affected Property Assessment Report Camp Bullis SWMU No. 10 Landfills 10, 12, and 13 Camp Bullis Training Site - | ||||||||||
| Volume 2 of 2 Part 1 of 3. | Weston | US Army Corps of Engineers | Landfill 10-CB|Landfill 12-CB|Landfill 13-CB | 23.pdf | 06-AUG-12 01.49.56.000000000 PM | ARSYSTEM | ||||||||
| Fort Sam Houston, TX | 80574 | 842.0 | 31-AUG-05 | Affected Property Assessment Report Fort Sam Houston Building 330 Part 1 of 2. | Weston | Fort Sam Houston | Building 330 | 842.pdf | 21-AUG-12 01.00.04.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80575 | 52.0 | 30-JUN-08 | Affected Property Assessment Report Open Burn/Open Detonation Unit Camp Bullis/FSH - Volume I of III | Stephen Mitchell | Weston | James Graham | FSH Dept of Public Works Env Div | OBOD | 52.pdf | 15-APR-12 05.42.13.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80576 | 53.0 | 30-JUN-08 | Affected Property Assessment Report Open Burn/Open Detonation Unit Camp Bullis/FSH - Volume II of III | Weston | USACE | OBOD | 53.pdf | 15-APR-12 05.42.58.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80577 | 54.0 | 30-JUN-08 | Affected Property Assessment Report Open Burn/Open Detonation Unit Camp Bullis/FSH - Volume III of III Part 1 of 2. | Weston | USACE | OBOD | 54.pdf | 21-AUG-12 01.30.02.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80578 | 149.0 | 30-APR-02 | Affected Property Assessment Report SWMU #7 Hunting Headquarters Area | Weston | 149.pdf | 15-APR-12 05.43.13.000000000 PM | ARSYSTEM | ||||||
| Fort Sam Houston, TX | 80579 | 47.0 | 29-AUG-07 | Affected Property Model Revision 6 Open Burn/Open Detonation Unit Camp Bullis/FSH Part 1 of 2. | Russ Johnson | Weston | Bob Thurman | USACE | OBOD | 47.pdf | 21-AUG-12 01.45.02.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80580 | 809.0 | 30-AUG-04 | Air Emission Reduction Strategies for Fort Sam Houston | Dickson Consulting Group, LLC | Fort Sam Houston | BW01 | 809.pdf | 15-APR-12 05.43.13.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80581 | 689.0 | 31-OCT-97 | Archeological Survey and National Register Testing at 41 BX377, Camp Bullis | Paul Maslyk, Karl Kibler | Prewitt and Associates | Fort Sam Houston | BW01 | 689.pdf | 15-APR-12 05.43.24.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80582 | 764.0 | 07-JAN-99 | As-Built Diagram and Groundwater Analyses Data of the OBOD Area at the EOD Range | Joe Hight | Geo-Marine | Robert Rivera | Fort Sam Houston | EODR01|OBOD | 764.pdf | 15-APR-12 05.43.27.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80583 | 601.0 | 01-JAN-11 | Baseline Assessment Explosive Ordinance Disposal Range Camp Bullis | EA Engineering | Fort Sam Houston | EODR01 | 601.pdf | 15-APR-12 05.43.28.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80584 | 279.0 | 30-SEP-05 | Basic Combat Convoy Trainer (BC3) Construction Site Modification of a previously Approved Plan Contributing Zone Plan Application for Regulated Activities on the Contributing Zone to the Edwards Aquifer | Weston | AETC CONS/LGCU | BCCTS01 | 279.pdf | 15-APR-12 05.43.29.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80585 | 159.0 | 06-MAR-07 | BRAC FINAL Environmental Impact Statement, Fort Sam Houston | na | na | BW01 | 159.pdf | 15-APR-12 05.43.41.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80586 | 129.0 | 08-AUG-02 | Cambrian Ground Water Company Results of Ground Water Tracing - Camp Bullis Training Site | LEWISCR01 | 129.pdf | 15-APR-12 05.43.57.000000000 PM | ARSYSTEM | ||||||
| Fort Sam Houston, TX | 80587 | 190.0 | 19-SEP-05 | Camp Bullis 2004-2005 Geophysical Investigations Results Memorandum for Site 8 | Tony Magliocchino, Doug Oliver | MWH | Edward Mattioda, Terry Murphree | USACE | Landfill 8-CB | 190.pdf | 15-APR-12 05.44.11.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80588 | 145.0 | 19-AUG-05 | Camp Bullis Compliance Plan #50335 | Dept of The Army | OBOD | 145.pdf | 15-APR-12 05.44.11.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80589 | 255.0 | 30-JUN-95 | Camp Bullis EOD Range Report - Baseline Assessment Explosive Ordinance Disposal Range. Volume I and II | EA Engineering | Environmental And Natural Resources , Fort Sam Houston | EODR01 | 255.pdf | 15-APR-12 05.44.19.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80590 | 463.0 | 15-MAR-02 | Camp Bullis Groundwater Analyses Statistical Summary OBOD Site Nov 2000 - Nov 2001 | Mobile District Corps of Engineers | OBOD | 463.pdf | 15-APR-12 05.44.19.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80591 | 667.0 | 20-DEC-02 | Camp Bullis Groundwater Analyses Statistical Summary OBOD Site Nov 2000 - Oct 2002 | USACE | Fort Sam Houston | OBOD | 667.pdf | 15-APR-12 05.44.20.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80592 | 169.0 | 21-OCT-02 | Camp Bullis Groundwater Monitoring Report April 2002 Sampling Event | Clif Warren | USACE | David Carr | Dictorate of Safety | OBOD | 169.pdf | 15-APR-12 05.44.35.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80593 | 168.0 | 30-JUN-03 | Camp Bullis Groundwater Monitoring Report April 2003 Sampling Event | USACE | Fort Sam Hosuton | OBOD | 168.pdf | 15-APR-12 05.44.38.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80594 | 170.0 | 31-JAN-02 | Camp Bullis Groundwater Monitoring Report August 2001 Sampling Event | USACE | OBOD | 170.pdf | 15-APR-12 05.44.55.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80595 | 174.0 | 31-DEC-03 | Camp Bullis Groundwater Monitoring Report August 2003 Sampling Event | USACE | Fort Sam Houston | OBOD | 174.pdf | 15-APR-12 06.00.12.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80596 | 167.0 | 30-NOV-01 | Camp Bullis Groundwater Monitoring Report February 2001 Sampling Event | USACE | OBOD | 167.pdf | 15-APR-12 06.00.20.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80597 | 171.0 | 30-SEP-00 | Camp Bullis Groundwater Monitoring Report July 2000 Monitoring Report | Susan Trussell | US Army Engineer District | David Carr | Public Works Business Center | OBOD | 171.pdf | 15-APR-12 06.00.27.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80598 | 172.0 | 30-SEP-00 | Camp Bullis Groundwater Monitoring Report July 2000 Monitoring Report Vol II | Susan Trussell | USACE | David Carr | Public Works Business Center | OBOD | 172.pdf | 15-APR-12 06.00.47.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80599 | 164.0 | 31-OCT-02 | Camp Bullis Groundwater Monitoring Report July 2002 Appendix IX Sampling Volume 1 of 3 | USACE | OBOD | 164.pdf | 15-APR-12 06.00.49.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80600 | 165.0 | 31-OCT-02 | Camp Bullis Groundwater Monitoring Report July 2002 Appendix IX Sampling Volume 2 of 3 | General Engineering Laboratories | USACE | OBOD | 165.pdf | 15-APR-12 06.00.52.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80601 | 166.0 | 31-OCT-02 | Camp Bullis Groundwater Monitoring Report July 2002 Appendix IX Sampling Volume 3 of 3 | General Engineering Laboratories | USACE | OBOD | 166.pdf | 15-APR-12 06.00.53.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80602 | 173.0 | 31-DEC-01 | Camp Bullis Groundwater Monitoring Report May 2001 Sampling Event | USACE | OBOD | 173.pdf | 15-APR-12 06.01.01.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80603 | 161.0 | 31-OCT-02 | Camp Bullis Groundwater Monitoring Report May 2002 Appendix IX Sampling Volume 1 of 3 | USACE | OBOD | 161.pdf | 15-APR-12 06.01.03.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80604 | 162.0 | 31-OCT-02 | Camp Bullis Groundwater Monitoring Report May 2002 Appendix IX Sampling Volume 2 of 3 | General Engineering Laboratories | USACE | OBOD | 162.pdf | 15-APR-12 06.01.05.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80605 | 163.0 | 31-OCT-02 | Camp Bullis Groundwater Monitoring Report May 2002 Appendix IX Sampling Volume 3 of 3 | General Engineering Laboratories | USACE | OBOD | 163.pdf | 15-APR-12 06.01.09.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80606 | 176.0 | 16-JAN-01 | Camp Bullis Groundwater Monitoring Report November 2000 Sampling Event | Susan H. Trussell | USACE | David Carr | Fort Sam Houston | OBOD | 176.pdf | 15-APR-12 06.01.17.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80607 | 177.0 | 31-JAN-02 | Camp Bullis Groundwater Monitoring Report November 2001 Sampling Event | USACE | OBOD | 177.pdf | 15-APR-12 06.01.20.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80608 | 175.0 | 31-JAN-03 | Camp Bullis Groundwater Monitoring Report October 2002 Sampling Event | USACE | Fort Sam Houston | OBOD | 175.pdf | 15-APR-12 06.01.47.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80609 | 665.0 | 09-JAN-03 | Camp Bullis Meter II Hydraulic Fluid Release of July 18,2002 | Douglas A. Biggerstaff | Fort Sam Houston | Henry Karnei | TCEQ | M2BA01 | 665.pdf | 15-APR-12 06.01.59.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80610 | 300.0 | 20-FEB-08 | Camp Bullis Metes and Bounds Survey | Linda Foster | Office of the Staff Judge Advocate | Colin Meneilly | US Army AMEDDC and S and FSH | BW01 | 300.pdf | 15-APR-12 06.01.59.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80611 | 38.0 | 25-JUN-99 | Camp Bullis OB/OD GW Permit Requirements Appendix IX Sampling Report | J. Greg Dennis | Geo-Marine | Robert Rivera | AFZG-PW-ENR | OBOD | 38.pdf | 15-APR-12 06.02.01.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80612 | 581.0 | 25-JAN-99 | Camp Bullis OB/OD Permit Requirements Summary Report | Charysse Menig Knotts | Geo-Marine | Robert Rivera | Fort Sam Houston | OBOD | 581.pdf | 15-APR-12 06.02.02.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80613 | 269.0 | 30-APR-99 | Camp Bullis OB/OD Permit Requirements Supplemental Report | J. Greg Dennis | Geo-Marine | Robert Rivera | Fort Sam Houston | OBOD | 269.pdf | 15-APR-12 06.02.06.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80614 | 770.0 | 06-APR-99 | Camp Bullis OBOD Permit Requirements | J. Greg Dennis | Geo-Marine | Robert Rivera | Fort Sam Houston | OBOD | 770.pdf | 15-APR-12 06.02.10.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80615 | 786.0 | 30-APR-00 | Camp Bullis Open Burn/Open Detonation Area Ground Water Detection Monitoring Plan | Fort Sam Houston | TNRCC | OBOD | 786.pdf | 15-APR-12 06.02.11.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80616 | 214.0 | 07-OCT-09 | Camp Bullis RCRA Facility Investigation DRAFT Technical Project Planning Meeting Memorandum | Brian Vanderglas | PARSONS | Bob Thurman, Matt Dayoc | USACE | MS75|SMMS01 | 214.pdf | 15-APR-12 06.02.12.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80617 | 146.0 | 07-NOV-97 | Camp Bullis RCRA Part B Permit and TCEQ Compliance Plan | Dept of The Army | OBOD | 146.pdf | 15-APR-12 06.02.19.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80618 | 949.0 | 15-APR-97 | Camp Bullis Site 8 Limited Investigation Work Plan | Gary B. Enloe | MWH | Bill Goss | USACE | Landfill 8-CB | 949.pdf | 15-APR-12 06.02.25.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80619 | 490.0 | 08-APR-02 | Camp Bullis Well Plugging Reports by FWDENG | David L. Gregory | MWH | Dusty Bruns | Fort Sam Houston | BW02 | 490.pdf | 15-APR-12 06.02.26.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80620 | 1049.0 | 31-AUG-97 | Camp Bullis Well Report - Assessment of Drinking Water Wells | Parsons | Fort Sam Houston | BW01 | 1049.pdf | 15-APR-12 06.02.31.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80621 | 242.0 | 02-SEP-99 | Camp Bullis, Site 8 Limited Investigation Phase III Groundwater Characterization | Greg B. Enloe, David Nyquest | MWH | Victor Ramos | USACE | Landfill 8-CB | 242.pdf | 15-APR-12 06.02.32.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80622 | 768.0 | 30-SEP-04 | Certification of Delivery Consumer Confidence Report for Calendar Year 2003 | Mary G. Terrell | Fort Sam Houston | 768.pdf | 15-APR-12 06.02.32.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80623 | 60.0 | 21-NOV-08 | Class 3 Permit Modification and Compliance Plan Application Revision for The Open Burn/Open Detonation Unit-Camp Bullis, TX | Weston | USACE | OBOD | 60.pdf | 15-APR-12 06.02.39.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80624 | 203.0 | 04-DEC-07 | Class V Injection Well Inventory/Authorization Form Site, Landfill 8 Camp Bullis | William A Foss | Shaw Env. | TCEQ | Landfill 8-CB | 203.pdf | 15-APR-12 06.02.41.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80625 | 527.0 | 23-APR-03 | Compliance Plan Application OBOD Detonation Units | Michael D. Waldrop | Fort Sam Houston | Katherine Nelson | TCEQ | OBOD | 527.pdf | 15-APR-12 06.02.42.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80626 | 50.0 | 31-MAR-08 | Comprehensive GW Monitoring Event October 2007 Open Burn/Open Detonation Unit Camp Bullis/FSH | Weston | USACE | OBOD | 50.pdf | 15-APR-12 06.02.43.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80627 | 49.0 | 28-FEB-08 | Comprehensive GW Monitoring Open Burn/Open Detonation Unit Camp Bullis, FSH | Weston | OBOD | 49.pdf | 15-APR-12 06.02.57.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80628 | 807.0 | 08-SEP-93 | Concept Design Data Wastewater Treatment Plant and Utilities | James E. King | Thompson Engineering | Ron Carman | USACE | 807.pdf | 15-APR-12 06.02.59.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80629 | 237.0 | 14-MAR-05 | Conceptual Design of Landfill 8 Surface Water Diversion Structure - Memorandum | Anthony Magliocchino, Michael Gronseth | MWH | Terry Murphree, Eddie Mattioda | USACE | Landfill 8-CB | 237.pdf | 15-APR-12 06.02.59.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80630 | 873.0 | 16-DEC-92 | Contamination Assessment Study, Soil Remediation Facility Site B3824 | Engineering-Science | Billy H. Boggs | Texas Water Commission | Building 3824 | 873.pdf | 15-APR-12 06.03.09.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80631 | 510.0 | 31-DEC-07 | Contributing Zone Plan Application for Regulated Activities on the Contributing Zone to the Edwards Aquifer (Volume 1 of 2) | Michael Baker Jr., Inc. | USACE | BW01 | 510.pdf | 15-APR-12 06.03.16.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80632 | 511.0 | 31-DEC-07 | Contributing Zone Plan Application for Regulated Activities on the Contributing Zone to the Edwards Aquifer (Volume 2 of 2) | Michael Baker Jr., Inc. | USACE | BW01 | 511.pdf | 15-APR-12 06.03.21.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80633 | 299.0 | 03-MAR-06 | Correspondence Re, Finding of Suitability to Transfer (FOST) - Environmental Baseline Survey for Army Residential Communities Initiative Properties, dated October 2004 | Wendy L. Martinson | Fort Sam Houston | Maureen Hatfield | TCEQ | BW01 | 299.pdf | 15-APR-12 06.03.21.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80634 | 304.0 | 10-APR-06 | Correspondence Re, TCEQ Review of Semiannual Ground-Water Report dated 12 January 2006, Haz Waste Compliance Plan No. 50335 Notification that TCEQ is reviewing the 18 October 2005 APAR for Landfills 10,12 and 13. | Maureen Hatfield | TCEQ | Colonel Garry F. Atkins | Fort Sam Houston | Landfill 10-CB|Landfill 12-CB|Landfill 13-CB | 304.pdf | 15-APR-12 06.03.21.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80635 | 940.0 | 31-MAR-87 | Cultural Resources Survey in Connection with the Site of the Proposed Brooke Army Medical Center | Kathleen K. Gilmore, Leonard Allen | Alan Plummer and Associates, Inc. | USACE | BAMC01 | 940.pdf | 15-APR-12 06.03.22.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80636 | 934.0 | 31-MAY-00 | Cultural Resources Survey of 2,302 Acres at Camp Bullis Military Reservation | Gregg C. Cestaro, AnnM. Scott, Karl W. Kibler | Prewitt and Associates | USACE | BW01 | 934.pdf | 15-APR-12 06.03.23.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80637 | 939.0 | 31-JUL-00 | Cultural Resources Survey of 280 Acres Along Salado Creek Fort Sam Houston | Prewitt and Associates | USACE | SALCRFTSH01 | 939.pdf | 15-APR-12 06.03.26.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80638 | 944.0 | 30-APR-01 | Cultural Resources Survey of Selected Maneuver Areas at Camp Bullis, Bexar and Comal Counties, Texas, The archeology and History of 3,255 Acres along Cibolo Creek | Greg C. Cestaro, Martha Doty Feeman, Marie E. Blake, Ann M. Scott | Prewitt and Associates | Fort Sam Houston | BW02 | 944.pdf | 15-APR-12 06.03.32.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80639 | 505.0 | 13-JUL-10 | Data Submittal for RCRA Facility Investigation for Camp Bullis | Brian Venderglas | Parsons | Alberto Molina-Colon | Fort Sam Houston | BW02 | 505.pdf | 15-APR-12 06.03.55.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80640 | 1063.0 | 31-OCT-06 | Demolition Plan Fort Sam Houston Building 330 | J.C.s Environmental Technologies | Beverly Post | USACE | Building 330 | 1063.pdf | 15-APR-12 06.03.56.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80641 | 927.0 | 01-JAN-11 | Department of the Army Historic Family Housing Study/Survey Report | Thomas B. Muths, Gustavo F. Araoz | Mariani and Associates Architects | USACE | BW01 | 927.pdf | 15-APR-12 06.03.57.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80642 | 664.0 | 20-FEB-03 | DEPMEDS Diesel Spill Report for Release that occurred on January 16, 2003 | Douglas A. Biggerstaff | Fort Sam Houston | Kelly Crunk | TCEQ | DMSTA01 | 664.pdf | 15-APR-12 06.04.00.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80643 | 257.0 | 30-JUN-99 | Detection Monitoring Plan for Groundwater Contaminants at the EOD Range, Camp Bullis | George Veni and Associates | Garrison Public Works | EODR01 | 257.pdf | 15-APR-12 06.04.00.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80644 | 604.0 | 14-FEB-02 | Diesel Spill Report for Release Near Well #3, Camp Bullis, | Douglas A. Biggerstaff | Fort Sam Houston | Henry Karnei, Jr. | TNRCC | Building 6210-CB | 604.pdf | 15-APR-12 06.04.02.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80645 | 301.0 | 21-JUL-06 | DRAFT 2006 Semiannual Report for Camp Bullis January - June 2006 Landfill 8 and OBOD Detonation Unit | Landfill 8-CB | 301.pdf | 15-APR-12 06.04.09.000000000 PM | ARSYSTEM | ||||||
| Fort Sam Houston, TX | 80646 | 320.0 | 21-JUL-07 | DRAFT 2007 Semiannual Report for Camp Bullis January-June 2007. Landfill 8 and OBOD Detonation Unit | Landfill 8-CB|OBOD | 320.pdf | 15-APR-12 06.04.12.000000000 PM | ARSYSTEM | ||||||
| Fort Sam Houston, TX | 80647 | 5.0 | 21-JAN-09 | DRAFT 2008 Semi-annual Report For Camp Bullis Training Site July-Dec 2008 Landfill 8 and The Open Burn/Open Detonation Unit | William Foss | |||||||||
| Russ Johnson | USAG | Landfill 8-CB|OBOD | 5.pdf | 15-APR-12 06.04.13.000000000 PM | ARSYSTEM | |||||||||
| Fort Sam Houston, TX | 80648 | 513.0 | 09-JUL-10 | Draft Addendum 1 - Affected Property Assessment Report Evaluation Monitoring Well Sampling OBOD Unit | Russ Johnson, Brent Ferry | Weston | Bob Thurman, Matt Dayoc | USACE | OBOD | 513.pdf | 15-APR-12 06.04.18.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80649 | 21.0 | 31-JUL-05 | DRAFT Affected Property Assessment Report Camp Bullis SWMU No. 10 Landfills 10, 12, and 13 Camp Bullis Training Site - | ||||||||||
| Volume I of II | Weston | Landfill 10-CB|Landfill 12-CB | 21.pdf | 15-APR-12 06.04.56.000000000 PM | ARSYSTEM | |||||||||
| Fort Sam Houston, TX | 80650 | 910.0 | 31-DEC-00 | Draft Affected Property Assessment Report Landfill 8B (EOD Area) | Fort Sam Houston | Landfill 8B-FTSH | 910.pdf | 15-APR-12 06.05.27.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80651 | 662.0 | 31-OCT-00 | Draft Biological Assessment of Interim Stabilization Measures at Landfill Number 8, Camp Bullis | Jerry Thompson | Fort Sam Houston | Landfill 8-CB | 662.pdf | 15-APR-12 06.05.28.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80652 | 661.0 | 22-JUN-01 | Draft Biological Opinion on Landfill Number 8 on Camp Bullis | David C. Frederick | Fish and Wildlife Service | Douglas A. Biggerstaff | Fort Sam Houston | Landfill 8-CB | 661.pdf | 15-APR-12 06.05.29.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80653 | 666.0 | 01-JAN-11 | Draft Camp Bullis Community Relations Plan for Remediation of Site 8 | Fort Sam Houston | Landfill 8-CB | 666.pdf | 15-APR-12 06.05.29.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80654 | 502.0 | 09-JUN-10 | Draft Camp Bullis Compliance Plan Modification Request | David Cobb | Shaw Env. | Matt Dayoc | Fort Sam Houston | Landfill 8-CB | 502.pdf | 15-APR-12 06.05.31.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80655 | 187.0 | 31-AUG-05 | DRAFT Camp Bullis Site 8 Landfill Perimeter Soil Sampling Results and Preliminary Screening Level Ecological Risk Asessment Report | MWH | USACE | Landfill 8-CB | 187.pdf | 15-APR-12 06.05.38.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80656 | 426.0 | 13-AUG-04 | DRAFT Class 3 Modification Comments Response OBOD | Stephen J. Mitchell | Weston | Susan Trussell | USACE | OBOD | 426.pdf | 15-APR-12 06.05.39.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80657 | 909.0 | 30-NOV-93 | Draft Environmental Drinking Water Report Camp Bullis | Engineering-Science | Fort Sam Houston | BW01 | 909.pdf | 15-APR-12 06.05.39.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80658 | 63.0 | 17-NOV-00 | DRAFT Exploratory Investigations Summary Report Landfills 2, 3, 4A, 4B, 5, 6, 7, and 8A FSH - Volume I of II | IT CORP | USACE | Landfill 2-FTSH|Landfill 8A-FTSH | 63.pdf | 15-APR-12 06.05.42.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80659 | 64.0 | 17-NOV-00 | DRAFT Exploratory Investigations Summary Report Landfills 2, 3, 4A, 4B, 5, 6, 7, and 8A FSH - Volume IIA | IT CORP | USACE | Landfill 2-FTSH|Landfill 8A-FTSH | 64.pdf | 15-APR-12 06.05.50.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80660 | 65.0 | 17-NOV-00 | DRAFT Exploratory Investigations Summary Report Landfills 2, 3, 4A, 4B, 5, 6, 7, and 8A FSH - Volume IIB Part 1 of 3. | IT CORP | Landfill 2-FTSH|Landfill 8A-FTSH | 65.pdf | 21-AUG-12 03.00.03.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80661 | 66.0 | 17-NOV-00 | DRAFT Exploratory Investigations Summary Report Landfills 2, 3, 4A, 4B, 5, 6, 7, and 8A FSH - Volume IIC | IT CORP | Landfill 2-FTSH|Landfill 8A-FTSH | 66.pdf | 15-APR-12 06.06.01.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80662 | 1067.0 | 30-JUL-99 | Draft Exploratotry Investigation Work Plan Landfill 10 Remediation | IT/OHM | USACE | Landfill 10-FTSH | 1067.pdf | 15-APR-12 06.06.02.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80663 | 901.0 | 30-APR-00 | Draft Final - Site 8 Management Plan Camp Bullis Training Site | Montgomery Watson | USACE | Landfill 8-CB | 901.pdf | 15-APR-12 06.06.20.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80664 | 205.0 | 25-AUG-06 | DRAFT FINAL Abbreviated Work Plan Interim Stabilization Measures Site 8, Landfill 8 Camp Bullis | Shaw Env. | USACE | Landfill 8-CB | 205.pdf | 15-APR-12 06.06.21.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80665 | 6.0 | 18-FEB-05 | DRAFT FINAL Affected Property Assessment Report for Landfill 12 | Shaw | Fort Sam Houston | Landfill 12-FTSH | 6.pdf | 15-APR-12 06.06.28.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80666 | 219.0 | 18-FEB-05 | DRAFT FINAL Affected Property Assessment Report Landfill 10 | Shaw Env. | Landfill 10-FTSH | 219.pdf | 15-APR-12 06.06.35.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80667 | 218.0 | 06-MAY-05 | DRAFT FINAL Affected Property Assessment Report Landfills 2, 3, 4A, 4B, 5, 6, 7, 8B, Fort Sam Houston, TX | Shaw Env. | Landfill 2-FTSH|Landfill 3-FTSH|Landfill 4A-FTSH|Landfill 4B-FTSH|Landfill 5-FTSH|Landfill 6-FTSH|Landfill 7-FTSH|Landfill 8B-FTSH | 218.pdf | 15-APR-12 06.06.37.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80668 | 907.0 | 24-AUG-07 | Draft Final Affected Property Assessment Report Site 8, Landfill 8, Volume I of II | Shaw Env. | USACE | Landfill 8-CB | 907.pdf | 15-APR-12 06.06.54.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80669 | 908.0 | 24-AUG-07 | Draft Final Affected Property Assessment Report Site 8, Landfill 8, Volume II of II. Part 1 of 7. | Shaw Env. | USACE | Landfill 8-CB | 908.pdf | 04-JUN-12 01.00.02.000000000 PM | CAROL.ANDERSON | ||||
| Fort Sam Houston, TX | 80670 | 519.0 | 16-JUN-06 | Draft Final Completion Report Trash Removal Along Selected Landfills and Salado Creek | Shaw Env. | Fort Sam Houston | GOLF01|Landfill 2-FTSH|Landfill 3-FTSH|Landfill 4B-FTSH|Landfill 5-FTSH|SALCRFTSH01 | 519.pdf | 15-APR-12 06.07.04.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80671 | 208.0 | 31-JUL-05 | DRAFT FINAL Expanded Tier I Ecological Risk Assessment Report For Site 8 | MWH | Landfill 8-CB | 208.pdf | 15-APR-12 06.07.06.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80672 | 19.0 | 28-JAN-05 | DRAFT FINAL Post-Wide Metals Background Study Report - Fort Sam Houston, Texas | Christopher Long | Shaw Env. | Roberto Rivera | HQ Camp Bullis Training Site | BW01 | 19.pdf | 15-APR-12 06.07.07.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80673 | 69.0 | 23-MAY-08 | DRAFT FINAL Response Action Completion Report Landfills 2, 3, 4A, 4B, 5, 6, 7, and 8B FSH | David P. Cobb | Shaw Env. | Bob Thurman | USACE | Landfill 2-FTSH|Landfill 8B-FTSH | 69.pdf | 15-APR-12 06.07.08.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80674 | 220.0 | 31-MAY-07 | DRAFT FINAL Response Action Plan Fort Sam Houston Building 330 | Quintin McNulty | |||||||||
| Russ Johnson | Weston | USACE | Building 330 | 220.pdf | 15-APR-12 06.07.15.000000000 PM | ARSYSTEM | ||||||||
| Fort Sam Houston, TX | 80675 | 141.0 | 26-APR-10 | DRAFT FINAL TCEQ Class 1 Modification - Transfer of Permit Request - Camp Bullis Training Site, Fort Sam Houston, Texas | Michael J. Grizer | Dept of The Army | OBOD | 141.pdf | 15-APR-12 06.07.22.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80676 | 2.0 | 28-FEB-97 | DRAFT Fort Sam and Camp Bullis, Texas GW Monitoring Results 2nd Qtr Report - Volume 1 | Dave Wineman | Earth | ||||||||
| Tech | Armstrong Laboratory | EODR01|Landfill 1-CB|Landfill 10-CB|Landfill 10-FTSH|Landfill 12-CB|Landfill 12-FTSH|Landfill 13-CB|Landfill 2-FTSH|Landfill 3-FTSH|Landfill 4-FTSH|Landfill 5-FTSH|Landfill 6-FTSH|Landfill 7-FTSH|Landfill 8-FTSH|SALCRCB01|SALCRFTSH01 | 2.pdf | 15-APR-12 06.07.23.000000000 PM | ARSYSTEM | |||||||||
| Fort Sam Houston, TX | 80677 | 1068.0 | 31-MAR-99 | Draft Geophysical Survey Report Explosives and Ordnance Disposal Area Pershing Firing Range | USACE | PFR01 | 1068.pdf | 15-APR-12 06.07.24.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80678 | 800.0 | 30-APR-00 | Draft Groundwater Monitoring Results for December 1999 | Earth Tech, Inc | Brooks Air Force Base | Landfill 1-CB|Landfill 10-CB|Landfill 12-CB|Landfill 13-CB|SALCRCB01 | 800.pdf | 15-APR-12 06.07.24.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80679 | 521.0 | 25-JAN-07 | Draft Interim Holding Facility Closure Work Plan | Tony Magliocchino, Doug Oliver | MWH | Robert Thurman, Cliff Murray | Fort Sam Houston | IHF01 | 521.pdf | 15-APR-12 06.07.30.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80680 | 132.0 | 04-NOV-96 | DRAFT Limited Site Investigation Site 8 Groundwater Characterization (Non-Intrusive) | Donald Caldwell | MWH | USACE | Landfill 8-CB | 132.pdf | 15-APR-12 06.07.45.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80681 | 501.0 | 21-NOV-08 | Draft Memorandum Re, Well Abandonment - Fort Sam Houston Landfills 2,3,4B, and 5, 4A,6 and 7, and 8B | Chris Long | Shaw Env. | Roberto Rivera | Fort Sam Houston | Landfill 3-FTSH|Landfill 4A-FTSH|Landfill 4B-FTSH|Landfill 5-FTSH|Landfill 6-FTSH|Landfill 7-FTSH|Landfill 8B-FTSH | 501.pdf | 15-APR-12 06.07.46.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80682 | 10.0 | 30-JUN-10 | DRAFT Preliminary Assessment/Site Inspection, Area of Concern 01 (AOC 01) | Nanda Nanjundappa | CH2M | Matt Dayoc | US Army Corps of Engineers | 10.pdf | 15-APR-12 06.07.47.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80683 | 101.0 | 30-NOV-93 | DRAFT RCRA Facility Assessment Report Camp Bullis, TX - Zone III Regions 5, 6, and 7 | PRC Environmental | US Environmental Protection Agency | AOC 01TSA | 101.pdf | 15-APR-12 06.07.49.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80684 | 118.0 | 07-SEP-10 | DRAFT Report RCRA Facility Investigation Stokes Mortar Munitions Site and 75 mm Munitions Site Camp Bullis | Brian Vanderglas | PARSONS | Robert Thurman | USACE | MS75|SMMS01 | 118.pdf | 15-APR-12 06.07.51.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80685 | 68.0 | 23-FEB-07 | DRAFT Response Action Implementation Report Landfills 2, 3, 4A, 4B, 5, 6, 7, and 8B FSH | David P. Cobb | Shaw Env. | Bob Thurman | USACE | Landfill 2-FTSH|Landfill 8B-FTSH | 68.pdf | 15-APR-12 06.07.59.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80686 | 207.0 | 30-JUN-08 | DRAFT Response Action Implementation Report Site 8, Landfill 8 Camp Bullis | David P. Cobb | Shaw Env. | Bob Thurman | USACE | Landfill 8-CB | 207.pdf | 15-APR-12 06.08.06.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80687 | 512.0 | 30-APR-10 | Draft Response Action Plan OB/OD Unit | Brent Ferry | Weston | Matt Dayoc | USACE | OBOD | 512.pdf | 15-APR-12 06.08.21.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80688 | 130.0 | 03-OCT-05 | DRAFT Site 8 Work Plan Camp Bullis Ecological Risk Assessment Field Sampling Plan Addendum | Anthony Magliocchino | MWH | Terry Murphree | USACE | Landfill 8-CB | 130.pdf | 15-APR-12 06.08.22.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80689 | 911.0 | 05-MAY-00 | Draft Site Characterization Work Plan Landfill 8B | IT/OHM | USACE | Landfill 8B-FTSH | 911.pdf | 15-APR-12 06.08.25.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80690 | 32.0 | 12-JUN-09 | DRAFT Technical Memorandum April 2009 Semi-Annual GW Monitoring, Camp Bullis OB/OD Unit | Russ Johnson, Brent Ferry | Weston | Bob Thurman | |||||||
| Matt Dayoc | USACE | OBOD | 32.pdf | 15-APR-12 06.08.26.000000000 PM | ARSYSTEM | |||||||||
| Fort Sam Houston, TX | 80691 | 217.0 | 30-APR-10 | DRAFT Technical Memorandum April 2010 Semiannual Groundwater Sampling Open Burn/Open Detonation Unit | CH2M Hill | Matt Dayoc | USACE | OBOD | 217.pdf | 15-APR-12 06.08.27.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80692 | 15.0 | 30-JUN-04 | DRAFT Technical Memorandum Interim Investigation Report Camp Bullis SWMU No. 10 Landfill Sites Part 1 of 2. | Weston | US Army Corps of Engineers | Landfill 1-CB|Landfill 10-CB|Landfill 12-CB|Landfill 13-CB | 15.pdf | 21-AUG-12 03.30.04.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80693 | 17.0 | 30-JUN-05 | DRAFT Tier 2 Screening Level Ecological Risk Assessment Camp Bullis SWMU No. 10 Landfills 10, 12 and 13, Camp Bullis Training Site | Weston | US Army Corps of Engineers | Landfill 10-CB|Landfill 12-CB|Landfill 13-CB | 17.pdf | 15-APR-12 06.08.28.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80694 | 59.0 | 26-MAR-10 | DRAFT Work Plan for OB/OD Semiannual GW Sampling and Semiannual Reporting Camp Bullis, TX | Nanda Nanjundappa | CH2M | Matt Dayoc | USACE | OBOD | 59.pdf | 15-APR-12 06.08.40.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80695 | 155.0 | 28-JUL-10 | DRAFT/FINAL PA/SI Report for AOC 01 at Fort Sam Houston, TX | Nanda Nanjundappa | CH2M | Bob Thurman | US Army Corps of Engineers | 155.pdf | 15-APR-12 06.08.45.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80696 | 991.0 | 15-JUN-99 | Drilling Logs for EOD Range | Associated Environmental Industries, Corp | Fort Sam Houston | EODR01 | 991.pdf | 15-APR-12 06.08.46.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80697 | 523.0 | 12-MAY-00 | Electrical Resistivity Survey Report Landfill 8B Explosive and Ordnance Disposal Area | IT Corporation | USACE | Landfill 8B-FTSH | 523.pdf | 15-APR-12 06.08.48.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80698 | 1028.0 | 23-OCT-06 | Email from TCEQ Re, Review of the Stormwater Pollution Prevention Plan, Camp Bullis and the Draft Final Abbreviated Work Plan Interim Stabilization Meastures, Site 8 | Maureen Hatfield | TCEQ | Christopher Long | Fort Sam Houston | Landfill 8-CB | 1028.pdf | 15-APR-12 06.08.48.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80699 | 525.0 | 06-DEC-01 | EMFLUX Passive, Non-Intrusive Soil-Gas Investigation Site 8 | Beacon Environmental | USACE | Landfill 8-CB | 525.pdf | 15-APR-12 06.08.49.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80700 | 1077.0 | 20-MAR-03 | Engineering Survey Report for The Service Station - Building 2610 and the Shoppette Gas Station - Building 331 | Robert D. Binovi | Mactec | Fort Sam Hosuton | Building 2610|Building 331 | 1077.pdf | 15-APR-12 06.08.50.000000000 PM | ARSYSTEM | |||
| Fort Sam Houston, TX | 80701 | 240.0 | 31-DEC-02 | Environmental Assessment /Finding of No Significant Impact for the Investigation and Removal Action at Site 8 | Gary B. Enloe | MWH | Greg Gervais | USACE | Landfill 8-CB | 240.pdf | 15-APR-12 06.08.54.000000000 PM | ARSYSTEM | ||
| Fort Sam Houston, TX | 80702 | 947.0 | 31-DEC-95 | Environmental Assessment for Construction of Army Travel Camp at Meade Field Fort Sam Houston, Texas | US Army Center for Health and Promotion and Preventive Medicine | US Army Medical Department Center and School and Fort Sam Houston | MEADEF01 | 947.pdf | 15-APR-12 06.08.54.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80703 | 1043.0 | 31-MAY-04 | Environmental Assessment for Proposed Access Control Measures at Fort Sam Houtson and Camp Bullis, Texas Part 1 of 2. | Fort Sam Houston | GAA01 | 1043.pdf | 21-AUG-12 04.00.04.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80704 | 275.0 | 30-NOV-04 | Environmental Assessment for the Construction of a Medical Modified Urban Assault Course (MAUC) Facility on Camp Bullis | Directorate of Safety, Environment and Fire | Camp Bullis Military Reservation | BW01 | 275.pdf | 15-APR-12 06.08.55.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80705 | 530.0 | 30-NOV-04 | Environmental Assessment for the Implementation of a Basic Combat Convoy Course (BC3) and Basic Combat Convoy Course with Lifesaving (BC3+) on Camp Bullis | Environmental Division, Fort Sam Houston | Lackland Air Force Base | BCCTS01 | 530.pdf | 15-APR-12 06.08.55.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80706 | 818.0 | 30-APR-02 | Environmental Assessment for the Implementation of an Integrated Cultural Resources Management Plan at Fort Sam Houston, Texas | USACE | BW01 | 818.pdf | 15-APR-12 06.08.56.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80707 | 277.0 | 31-OCT-99 | Environmental Assessment for the Privatization of Water Utilities at Camp Bullis | Integrated Training and Area Management | US Army Medical Command | BW01 | 277.pdf | 15-APR-12 06.08.56.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80708 | 274.0 | 30-JUN-02 | Environmental Assessment for the Upgrade of a Machine Gun Range to Army Standard on Camp Bullis | Directorate of Safety, Environment and Fire | Camp Bullis Training Site | BW01 | 274.pdf | 15-APR-12 06.08.57.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80709 | 108.0 | 13-AUG-93 | Environmental Assessment of the Camp Bullis Waste Water Treatment Facility | USACE | Fort Sam Houston | WTF01 | 108.pdf | 15-APR-12 06.08.58.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80710 | 912.0 | 31-JAN-95 | Environmental Assessment on Proposed US Army Medical Department Center and School Training Parks at Camp Bullis | USACE | USACE | AMDCS01 | 912.pdf | 15-APR-12 06.09.00.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80711 | 1048.0 | 07-NOV-97 | Environmental Baseline Survey Land for U-Store-It | Fort Sam Houston | MPVIL01 | 1048.pdf | 15-APR-12 06.09.00.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80712 | 1119.0 | 19-JAN-00 | Environmental Baseline Survey .36 Acres of Land NW Military Highway Entrance Camp Bullis | Fort Sam Houston | NWMIL01 | 1119.pdf | 15-APR-12 06.09.00.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80713 | 1075.0 | 05-AUG-99 | Environmental Baseline Survey 1.5 Acres of Land | Fort Sam Houston | FTSCM01|SALCRFTSH01 | 1075.pdf | 15-APR-12 06.09.00.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80714 | 1070.0 | 14-JAN-98 | Environmental Baseline Survey 2.042 Acres for Air Base Ground Defense Camp Bullis | Fort Sam Houston | MF01 | 1070.pdf | 15-APR-12 06.09.01.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80715 | 1090.0 | 30-NOV-00 | Environmental Baseline Survey 566 Utility Poles and Above and Underground Cable Fort Sam Houston | Fort Sam Houston | GARDEN01|SCHOFIELD01|SCOTT01|WILSON01 | 1090.pdf | 15-APR-12 06.09.01.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80716 | 1047.0 | 23-APR-98 | Environmental Baseline Survey Automatic Teller Machines | Fort Sam Houston | SACUTM01 | 1047.pdf | 15-APR-12 06.09.01.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80717 | 1032.0 | 29-APR-98 | Environmental Baseline Survey Building 0044 Fort Sam Houston | Fort Sam Houston | Fort Sam Houston | Building 0044 | 1032.pdf | 15-APR-12 06.09.01.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80718 | 1123.0 | 20-NOV-97 | Environmental Baseline Survey Building 0044B | Fort Sam Houston | Building 0044B | 1123.pdf | 15-APR-12 06.09.02.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80719 | 1064.0 | 06-NOV-97 | Environmental Baseline Survey Building 0238 | Fort Sam Houston | Building 0238 | 1064.pdf | 15-APR-12 06.09.02.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80720 | 1161.0 | 24-NOV-99 | Environmental Baseline Survey Building 1000 and Surrounding Property | Pacific Environmental Services | Fort Sam Hosuton | Building 1000|Building 1044|Building 1088|Building 1092 | 1161.pdf | 15-APR-12 06.09.02.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80721 | 1178.0 | 06-MAR-00 | Environmental Baseline Survey Building 1000 and Surrounding Property | Pacific Environmental Services | Fort Sam Houston | Building 1000 | 1178.pdf | 15-APR-12 06.09.03.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80722 | 1053.0 | 31-MAR-99 | Environmental Baseline Survey Building 1001 3rd Floor | Fort Sam Houston | Building 1001 | 1053.pdf | 15-APR-12 06.09.03.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80723 | 1168.0 | 31-JAN-00 | Environmental Baseline Survey Building 1046 Medical Museum | Fort Sam Houston | Building 1046 | 1168.pdf | 15-APR-12 06.09.03.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80724 | 1065.0 | 01-DEC-98 | Environmental Baseline Survey Building 128 | Fort Sam Houston | Building 128 | 1065.pdf | 15-APR-12 06.09.04.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80725 | 1158.0 | 03-AUG-98 | Environmental Baseline Survey Building 1980, 1981, 5.2 Acres Mars Station | Fort Sam Houston | Building 1980|Building 1981|MARSS01 | 1158.pdf | 15-APR-12 06.09.04.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80726 | 1128.0 | 15-JAN-98 | Environmental Baseline Survey Building 2003 | Fort Sam Houston | Building 2003 | 1128.pdf | 15-APR-12 06.09.04.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80727 | 1044.0 | 27-JAN-98 | Environmental Baseline Survey Building 2059, Basement Fort Sam Houston | Fort Sam Houston | Building 2059 | 1044.pdf | 15-APR-12 06.09.04.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80728 | 1129.0 | 15-OCT-96 | Environmental Baseline Survey Building 2186 | Fort Sam Houston | Building 2186 | 1129.pdf | 15-APR-12 06.09.05.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80729 | 1130.0 | 29-JUN-98 | Environmental Baseline Survey Building 2195 | Fort Sam Houston | Building 2195 | 1130.pdf | 15-APR-12 06.09.05.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80730 | 1131.0 | 28-FEB-00 | Environmental Baseline Survey Building 2264 | Fort Sam Houston | Building 2264 | 1131.pdf | 15-APR-12 06.09.05.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80731 | 1087.0 | 31-MAR-00 | Environmental Baseline Survey Building 2264 Department of Veterans Affairs Fort Sam Houston | Fort Sam Houston | Fort Sam Houston | Building 2264 | 1087.pdf | 15-APR-12 06.09.06.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80732 | 1166.0 | 18-JUN-01 | Environmental Baseline Survey Building 2265 Kitchen Area | Fort Sam Houston | Fort Sam Houston | Building 2265 | 1166.pdf | 15-APR-12 06.09.06.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80733 | 1066.0 | 03-DEC-98 | Environmental Baseline Survey Building 2271 | Fort Sam Houston | Building 2271 | 1066.pdf | 15-APR-12 06.09.07.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80734 | 1124.0 | 13-APR-98 | Environmental Baseline Survey Building 230 | Fort Sam Houston | Building 230 | 1124.pdf | 15-APR-12 06.09.07.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80735 | 1125.0 | 05-MAR-98 | Environmental Baseline Survey Building 250 | Fort Sam Houston | Building 250 | 1125.pdf | 15-APR-12 06.09.07.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80736 | 1126.0 | 22-APR-98 | Environmental Baseline Survey Building 331 | Fort Sam Houston | Building 331 | 1126.pdf | 15-APR-12 06.09.07.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80737 | 1076.0 | 10-JAN-98 | Environmental Baseline Survey Building 4019 | Fort Sam Houston | Building 4019 | 1076.pdf | 15-APR-12 06.09.08.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80738 | 1127.0 | 23-APR-98 | Environmental Baseline Survey Building 407, Building 1395, Building 1387, Building 3600 | Fort Sam Houston | Building 1387|Building 1395|Building 3600|Building 407 | 1127.pdf | 15-APR-12 06.09.08.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80739 | 1171.0 | 31-JAN-00 | Environmental Baseline Survey Building 4196 | Fort Sam Houston | Building 4196 | 1171.pdf | 15-APR-12 06.09.09.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80740 | 1100.0 | 15-FEB-00 | Environmental Baseline Survey Building 4207 | Fort Sam Houston | Building 4207 | 1100.pdf | 15-APR-12 06.09.09.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80741 | 1141.0 | 11-FEB-98 | Environmental Baseline Survey Building 4208 | Fort Sam Houston | Building 4208 | 1141.pdf | 15-APR-12 06.09.09.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80742 | 1143.0 | 12-AUG-98 | Environmental Baseline Survey Building 5126 | Fort Sam Houston | Building 5126 | 1143.pdf | 15-APR-12 06.09.14.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80743 | 1045.0 | 06-NOV-97 | Environmental Baseline Survey Building 5128, Basement Fort Sam Houston | Fort Sam Houston | Building 5128 | 1045.pdf | 15-APR-12 06.09.14.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80744 | 1046.0 | 06-NOV-97 | Environmental Baseline Survey Building 6315 | Fort Sam Houston | Building 6315 | 1046.pdf | 15-APR-12 06.09.15.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80745 | 1120.0 | 31-MAR-00 | Environmental Baseline Survey Building Building 2265 (1st Floor) | Fort Sam Houston | Building 2265 | 1120.pdf | 15-APR-12 06.09.15.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80746 | 1160.0 | 24-NOV-99 | Environmental Baseline Survey Buildings 2014-2017 | Pacific Environmental Services | Fort Sam Hosuton | Building 2014|Building 2015|Building 2016|Building 2017 | 1160.pdf | 15-APR-12 06.09.15.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80747 | 1175.0 | 21-MAR-01 | Environmental Baseline Survey Demolition Properties Building 376 and 4115 | Fort Sam Houston | Fort Sam Houston | Building 376|Building 4115 | 1175.pdf | 15-APR-12 06.09.16.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80748 | 788.0 | 01-JAN-01 | Environmental Baseline Survey Demolition Properties, 3800 Area | Fort Sam Houston | Building 3896|Building 3897|Building 3898|Building 3899 | 788.pdf | 15-APR-12 06.09.16.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80749 | 1085.0 | 31-JUL-01 | Environmental Baseline Survey Demolition Properties, Bldgs 1610, 1611 and 1699 Fort Sam Houston | Fort Sam Houston | Fort Sam Houston | Building 1610|Building 1611 | 1085.pdf | 15-APR-12 06.09.16.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80750 | 1173.0 | 10-AUG-01 | Environmental Baseline Survey Demolition Property for Building 2660 | Fort Sam Houston | Building 2660 | 1173.pdf | 15-APR-12 06.09.17.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80751 | 1078.0 | 07-FEB-01 | Environmental Baseline Survey Demolition Prpoerties, 1400 Area Fort Sam Houston | Fort Sam Houston | Fort Sam Hosuton | Building 1440|Building 1441|Building 1442|Building 1443|Building 1444|Building 1445|Building 1449|Building 1450|Building 1451|Building 1452 | 1078.pdf | 15-APR-12 06.09.17.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80752 | 1169.0 | 17-MAY-01 | Environmental Baseline Survey Demolition Prpoerty for Building 2657 | Fort Sam Houston | Fort Sam Houston | Building 2657 | 1169.pdf | 15-APR-12 06.09.17.000000000 PM | ARSYSTEM | ||||
| Fort Sam Houston, TX | 80753 | 1170.0 | 11-MAY-00 | Environmental Baseline Survey Demolition/Disposal of Building 3550 | Fort Sam Houston | Building 3550 | 1170.pdf | 15-APR-12 06.09.18.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80754 | 1122.0 | 08-SEP-98 | Environmental Baseline Survey Demolition/Disposal of Building 8161, 8115, 8156, 8128 Harris Heights | Fort Sam Houston | Building 8115|Building 8128|Building 8156|Building 8161 | 1122.pdf | 15-APR-12 06.09.18.000000000 PM | ARSYSTEM | |||||
| Fort Sam Houston, TX | 80755 | 1072.0 | 10-NOV-99 | Environmental Baseline Survey Demolition/Disposal of Building 8234 in Harris Heights | Fort Sam Houston | Building 8234 | 1072.pdf | 15-APR-12 06.09.19.000000000 PM | ARSYSTEM |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .