Site Visit - Virtual Site Tour-VAFB.pptx

PPTX presentation 3 MB Posted

Attached to
Optimized Remediation Contract (ORC) OK/AR Group Federal contract opportunity
Solicitation number
W912BV20R0002
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

This pre-solicitation notice and related federal contract opportunity document outline requirements for an Optimized Remediation Contract to conduct environmental remediation activities at five Air Force installations in Oklahoma and Arkansas. The scope of work includes investigation, design, remedial action, construction, and optimization of restoration activities at 65 environmental sites over a ten-year period of performance. The solicitation will utilize best value tradeoff procedures and result in a firm-fixed-price contract award. Offerors must be registered in SAM and proposals are due February 20, 2020, with award anticipated shortly thereafter. The NAICS code is 562910 and it is set aside for small businesses with less than 750 employees. The Army Corps of Engineers Tulsa District will issue the solicitation on beta.SAM and administer the contract.

View the file

Other files for this federal contract opportunity

Other files attached to Optimized Remediation Contract (ORC) OK/AR Group, newest first.
File Type Posted
Amd 0003 Solicitation W912BV20R0002 OK-AR Group ORC.pdf PDF
Amd 0002 Corrected Attach L-2 PS with Cost ORC OK-AR 29 May 2020.xlsx XLSX spreadsheet
Amd 0002 Attach L-4 Supp Cost Info ORC OK-AR 29 May 2020.xlsx XLSX spreadsheet
Amd 0002 Solicitation W912BV20R0002 OK-AR Group ORC.pdf PDF
Amd 0002 Attach L-1 PS without Cost ORC OK-AR 29 May 2020.xlsx XLSX spreadsheet
Amd 0002 Attach L-2 PS with Cost ORC OK-AR 29 May 2020.xlsx XLSX spreadsheet
Amd 0001 Attach L-1 PS without Cost W912BV20R0002 ORC OK-AR 12 May 2020.xlsx XLSX spreadsheet
Amd 0001 Attach L-2 PS with Cost ORC W912BV20R0002 OK-AR 12 May 2020.xlsx XLSX spreadsheet
Amd 0001 Attach L-4 Supp Price Info W912BV20R0002 ORC OK-AR 12 May 2020.xlsx XLSX spreadsheet
Amd 0001 Solicitation W912BV20R0002 OK-AR Group ORC.pdf PDF
Section J Draft MPS with Cost Template 23 Mar 2020 OK-AR Group ORC.xlsx XLSX spreadsheet
Section L Attach L-4 Supplemental Cost Info ORC OK-AR 20 Mar 2020.xlsx XLSX spreadsheet
PWS Encl 3 Tinker OK-AR Group ORC_ GFP_20200320_RSN.xlsx XLSX spreadsheet
Solicitation W912BV20R0002 OK-AR Group ORC.pdf PDF
Section L Attach L-2 PS with Cost ORC OK-AR 20 Mar 2020.xlsx XLSX spreadsheet
PWS Encl 3 Altus AFB ORC GFP.xlsx XLSX spreadsheet
Section L Attach L-1 PS without Cost ORC OK-AR 20 Mar 2020.xlsx XLSX spreadsheet
Section J Draft MPS without Cost Template 23 Mar 2020 OK-AR Group ORC.xlsx XLSX spreadsheet
PWS Encl 3 Vance AFB ORC GFP.xlsx XLSX spreadsheet
PWS Encl 2A OK-AR Group ORC_AR GFI_20200306.xlsx XLSX spreadsheet
Site Visit - Little Rock AFB Site Visit ORC PP.pptx PPTX presentation
Site Visit - OK & AR ORC Site Visit - Altus AFB.pptx PPTX presentation
Site Visit - AFP3 ORC Virtual Site Visit_R1.pptx PPTX presentation
Site Visit - 2019 AltusAFB_MW_Status_36x48 (3rd v).pdf PDF
Site Visit - OK_AR Group ORC Site Visit Sign-In Record.pdf PDF
Site Visit - OK-AR Site Visit Tinker_v6.pptx PPTX presentation
Site Visit - 2019 - Plume Overlay Map.pdf PDF
Draft Attach L-1 PS without Cost dtd 22 Nov 2019 OK-AR Group ORC.xlsx XLSX spreadsheet
Draft MPS with Cost Template dtd 22 Nov 2019 OK-AR Group ORC.xlsx XLSX spreadsheet
Draft Section M dtd 3 Dec 2019 OK-AR Group ORC.pdf PDF
Draft PWS dtd 3 Dec 2019 - OK-AR Group ORC.pdf PDF
Draft MPS without Cost Template dtd 22 Nov 2019 OK-AR Group ORC.xlsx XLSX spreadsheet
Draft Attach L-2 PS with Cost dtd 22 Nov 2019 OK-AR Group ORC.xlsx XLSX spreadsheet
Draft Section L dtd 3 Dec 2019 OK-AR Group ORC.pdf PDF
Draft Attach L-4 Supplemental Cost Info dtd 22 Nov 2019 OK-AR Group ORC.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 January 2020 Virtual Site Tour Vance AFB

Air Force Civil Engineer Center Battle Ready…Built Right!

Agenda Installation Background General Information Regulatory Authority/Requirements ORC Objectives Site-Specific Information

Vance AFB Location Mission – Since 1941 basic flight training has been in continuous operation at Vance (except for a 12-month period) as either a basic or advanced flight training center. There is a flight line, hangars, runways, cantonment area, offices/warehouses recreational facilities and privatized housing. Today the mission is to develop professional airmen, deliver world class U.S. and allied pilots and deploy combat ready warriors.

Located in Enid, Oklahoma Approximately 2,122 Acres Surrounded mostly by agricultural land and a few residents Figure showing base boundary

Include Site Map showing base location with the state. Briefly discuss background, size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Mission should be the installation’s mission.

Vance AFB Land Use

Vance AFB Site Map

Regulatory Authority/Requirements RCRA Post-Closure Care Permit #4571524095-PC issued by ODEQ dated 30 September 2010 Permit expires 30 September 2020. Permit renewal application underway Permit Modification Approved July 2019 Clean-up levels for Vance sites – risk-based industrial worker as defined by state regulations/MCLs Permit Reporting Requirements:

Annual Groundwater Compliance Monitoring Report is due on 1 March each year Semiannual Corrective Action Report Quarterly Report of all Activities

Vance AFB General Information Base Access: Common Access Card required for working in restricted area/DBIDs card

RAB: Meets twice a year first Thursday of October/April

ORC Office and Field Support Space: One person office in Central Groundwater Treatment Facility

Briefly discuss background (when opened,), size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Discuss current use of the base. Identify frequency of RAB meetings or ID if there is no RAB.

List of Sites for Vance AFB

OSite NameAlternate Site ID
DP005Sludge Disposal AreaWP-02
FT002Fire Training AreaFT-01
ST012Paint Stripping Equalization TankSWMU 10
SS024Jet Engine Cleaning Shop
WP023Industrial Waste Pit
SS025COMBS WarehouseAOC7
SS028Intermediate Zone Solvent Spill
ST008UST No. 106 at Bldg 110AOC4, LU-01
ST011AQUA/AVGAS Storage and Distribution System Underground Storage TanksLU-02
SS026Jet Fuel Storage Area
LF003Tank Farm LandfillAOC3, LF-01
SS007Hazardous Waste Accumulation PointAOC1, OT-01

Site DP005, Vance AFB Site ID: Sludge Disposal Area Description: Resulted from a one-time disposal of approximately 1,000 gallons of fuel tank sludge Background: Multiple investigations to include an interceptor collection trench (ICT), large diameter vertical wells, water treatment with air stripping.

Remedy Listed in Permit: In 2014 the remedy was changed to Emulsified Vegetable Oil (EVO) injections to create conditions conducive to Enhanced Reductive Dechlorination (ERD) and to reduce contaminant mass. The existing groundwater extraction system was modified to a groundwater recirculation system where extracted groundwater is treated using Granular Activated Carbon (GAC) amended with lactate and reinjected immediately upgradient of the plume to dispense the carbon source throughout the plume. The groundwater extraction treatment is now turned off. A Soil Vapor Extraction (SVE) system was used to treat soils adjacent to the groundwater ICT. It was discontinued in 2015.

Impacted media: Soil and Groundwater COCs: VOCs, TPH, Arsenic, 1,4-Dioxane LUCs: No digging without RPM permission Air Force Performance Objective: RC PFOS/PFOA: Identified in groundwater, soil not tested

Site FT002, Vance AFB Site ID: Fire Training Area Description: Burn Pit Background: Area used for fire training exercises in the 1950’s until 2000 Original remedy for the site was monitoring.

Remedy listed in permit: In 2014 the remedy was changed to include EVO injections and SVE to create conditions conducive to ERD and to reduce contaminant mass. SVE was discontinued in 2016 due to low mass removal rates. The site is currently undergoing compliance monitoring.

Impacted Media: Soil and Groundwater COCs: VOCs, TPH, selenium LUCs: No digging without RPM permission Air Force Performance Objective: RA-O PFOS/PFOA: Identified in soil and groundwater

Site ST012, Vance AFB Site ID: Paint Stripping Equalization Tank Description: UST Background: Concrete vault to separate sludge and liquid during paint stripping operations. Original remedy was groundwater extraction for pump and treat.

Remedy Listed in Permit: In 2014 the remedy was changed to EVO to create conditions conducive to ERD and to reduce contaminant mass and SVE. Included in the remedy was a flow through biobarrier to treat the downgradient portions of the plume Impacted Media: Soil/Groundwater COCs: VOCs LUCs: No digging w/o permission from RPM Air Force Performance Objective: RC PFOS/PFOA: None

Site SS024, Vance AFB Site ID: Jet Engine Cleaning Shop Description: Transfers from vats inside the building by underground piping to a manhole outside was the source for contamination due to overflows of the manhole. Original remedy was groundwater extraction with air stripping and hydraulic containment.

Remedy Listed in Permit: In 2014, the PBR changed the remedy to EVO injections to create conditions conducive to ERD and to reduce contaminant mass. Included in the remedy was a flow through biobarrier to treat the downgradient portions of the plume. The existing groundwater extraction system was modified to an SVE system used to control methane concentrations.

Impacted Media: Soil and Groundwater COCs: VOCs and 1,4-Dioxane LUCs: No digging without RPM permission Air Force Performance Objective: RC

Site WP023, Vance AFB Site ID: Industrial Waste Pit Description: Past investigations found evidence of an impoundment 10x20 feet downgradient from Site ST012. It was believed to be abandoned in 1967 and subsequently covered with soil and grass in the early to mid 1970s. Multiple investigations at the site found the contamination to not be from historical activities at the site. All monitoring wells at this site are now associated with the site where they originated. Three wells originated at Site ST012 and one well originated at SS025 Impacted Media: Soil and Groundwater LUCS: No digging without RPM permission Air Force Performance Objective: RC

Site SS025, Vance AFB Site ID: COMBS Warehouse Description: Site SS025 was an outside washrack near the COMBS warehouse. It was suspected that the drain was used to dispose of solvents or spills that occurred in the area. The original remedy for the site was groundwater extraction and treatment at the Central Groundwater Treatment Facility.

Remedy Listed in Permit: In 2014 the remedy was changed to EVO injections to create conditions conducive to ERD and to reduce contaminant mass. Included in the remedy was a flow through biobarrier to treat the downgradient portions of the plume. The existing groundwater extraction system was modified to a SVE system used to control possible methane emissions. However, the SVE system was discontinued in 2016 due to low methane concentrations.

Impacted Media: Soil and Groundwater COCs: VOCs, 1, 4-Dioxane LUCs: No digging without RPM permission Air Force Performance Objective: RC

Site SS028, Vance AFB Site ID: Intermediate Zone Solvent Spill Site Description: SS028 was created as a result of the 2013 Predesign Investigation. Chlorinated volatile organic compounds were found in the intermediate zone at a Site ST008 monitoring well. Concentrations increased hydraulically upgradient. This was an unknown source not related to Site ST008. An RFI was conducted in 2018. However, a Supplemental RFI is now required to determine nature and extent. Additional monitoring wells and or borings may be required with a possible permit modification.

Remedy Listed in Permit: To be determined Impacted Media: Soil and Groundwater COCs: To be determined LUCs: No digging without RPM permission Air Force Performance Objective: RIP

Include photographs showing the site and any specific/unique characteristics (inside vaults, inside control rooms/panels, etc.). Can be multiple slides. Suggest showing landfills from all sides (definitely multiple pics).

Site ST008, Vance AFB Site ID: UST No. 106 at Building 110 Description: Former Underground Storage Tank Background: Original IRP Site for a mixed waste tank. Original remedy was pump and treat.

Impacted Media: Soil/Groundwater COCs: VOCs, TPH Remedy listed in permit: Dual Phase Extraction LUCs: Penetration of concrete cap requires approval from DEQ Air Force Performance Objective: RC

Make the background very brief. Overflow to multiple slides as needed.

Site ST011, Vance AFB Site ID: Former Aqua/Avgas Fuel Distribution System Description: The system consisted of 10 underground fuel tanks which were closed/removed in July 1990. The site was not listed on the original RCRA Post Closure Permit. The Oklahoma Corporation Commission had jurisdiction and they closed the site at a later date.

Remedy Listed in Permit: During a 2013 Predesign Investigation for nearby Site LF003, Benzene contamination was found. It was determined to not be from historical activities at the site. Benzene was assumed to have come from ST011 which was upgradient at that time. ST011 was reopened in 2016 and is now included in the RCRA Post Closure Permit. An RFI was conducted in 2018. However a Supplemental RFI is now required to determine nature and extent. Additional monitoring wells and or borings may be required with a possible permit modification.

Remedy listed in permit: To be determined Impacted Media: Soil and Groundwater COCs: To be determined LUCs: No digging without RPM permission Air Force Performance Objective: RIP

Site SS026, Vance AFB Site ID: Jet Fuel Storage Area Description: Contamination was discovered when it was learned that there were past practices of draining fuel and water from aboveground storage tank dikes onto the grass/ground. Original remedy removed contaminated soil and installed Oxygen Releasing Compound (ORC) in the monitoring wells. Also, a phytoremediation system was installed but was removed in 2017.

Remedy listed in permit: Air sparging at the site to enhance MNA Impacted Media: Soil and Groundwater COCs: VOCs, GRO LUCs: No digging without RPM permission Air Force Performance Objective: SC

Site LF003, Vance AFB Site ID: Tank Farm Landfill Description: Typical trench/fill landfill 15 feet deep Background: Three acres used from 1941 until 1952 for general refuse, containerized liquids and tank sludge. Free-product (gasoline) was found in 1997 and a recovery system was installed. Due to lack of volume, it was never turned on. During a 2013 Predesign Investigation, Benzene contamination was determined to not be from historical activities at the site and would be addressed under Site ST011.

Remedy listed by the permit: Compliance monitoring Impacted media; Soil and Groundwater COCs: BTEX, Arsenic, Lead LUCs: No digging without RPM permission Air Force Performance Objective: RIP

Site SS007, Vance AFB Site ID: Hazardous Waste Accumulation Point Description: Site consists of three different areas. The first area was used by DRMO for temporary storage of hazardous waste drums. The second area is the former BCE storage area where drums of new solvent were available for use. Third area or North Site SS007 was used for private agricultural purposes until the area was deeded to Vance. It was later discovered that that solvents had leaked from the first/second areas onto North Site 7. Interceptor collection trenches were installed downgradient from the first and second areas and later on North Site 7. A Central Groundwater Treatment Facility was constructed.

Remedy listed by the permit: In 2014 the remedy for SS007 was changed to EVO injections to create conditions conducive to ERD and to reduce contaminant mass in areas of elevated concentrations of COCs in the shallow zone. The existing groundwater extraction system as modified to a groundwater recirculation system where extracted groundwater is treated using GAC amended with lactate and reinjected upgradient and sidegradient of the plume to dispense the carbon source throughout the plume. As a result the groundwater extraction treatment system and ICT extraction wells in the southern portion of the site were turned off. The ICT extraction wells on the northern portion of the site remain operational. North Site SS007 requires mowing to BASH standards.

Impacted Media: Soil and Groundwater COCs: VOCs, Arsenic, Lead LUCs: No digging without RPM permission Air Force Performance Objective: RC

Regulatory Review Times (Estimated) Documents reviewed by ODEQ only Review Priorities/Time: It is DEQ policy to review all documents internally within 30 days Review times may vary with more complex documents and number of documents submitted image3.jpeg image4.jpeg image6.png image7.PNG image8.png image9.png image10.jpeg image1.jpeg image2.png