PWS Encl 3 Tinker OK-AR Group ORC_ GFP_20200320_RSN.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) OK/AR Group
- Solicitation number
- W912BV20R0002
About this file
This document provides details regarding a federal contract opportunity for an Optimized Remediation Contract (ORC) OK/AR Group. The contract is a small business set aside to conduct environmental remediation activities at five Air Force installations in Oklahoma and Arkansas over a ten year period of performance. Required work includes investigation, design, remedial action, construction, and remediation services at 65 environmental restoration program sites, consisting of 64 installation restoration program sites and one military munitions restoration program site. Offerors must submit fixed price proposals by February 20, 2020, which will be evaluated using a best value tradeoff methodology. The Department of the Army Corps of Engineers Engineering District Tulsa will issue the solicitation on or around November 19, 2019 via the System for Award Management website. The North American Industry Classification code is 562910 and the small business size standard is $750,000. The incumbent will be selected to optimize cleanup and closure of sites in the most efficient and cost effective manner while meeting all federal, state, and local compliance requirements.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Altus AFB
| Installation | Site | Item Name | Item Description | Manufacturer | Model Number | Replacement Cost (est.) | Qty | Location |
| Altus AFB | SS017 | SS017 Bioreactor | Bioreactor cell | not brand specific | $450,000.00 | 1 | ||
| extraction wells (F1EW01R, F2EW01R) ($3,000 each) | not brand specific | $6,000.00 | 2 | South of former Bldg 502, southeast of bulk fuel storage, west of apron & parking rosette 33 | ||||
| Variable Performance submersible pumps, 1/2HP, 115 V | Grundfos RF3 | 10SEQE05-100NE | $1,500.00 | 2 | ||||
| Pressure Transducers & poly cable | Geotech | 82051000 | $125.00 | 2 | ||||
| 580 ft perforated 1-in diameter, Schedule 80 PVC piping ($575) | not brand specific | $575.00 | 580 ' | |||||
| 1-inch, 20-ft PVC monitoring well with 10-ft well screen ($1,000 each) | not brand specific | $2,000.00 | 2 | |||||
| 2-inch, 35-ft PVC monitoring well with 10-ft well screen ($3,000 each) | $6,000.00 | 2 | ||||||
| extraction pump controllers | Grunfos | CE300 | $700.00 | 2 | ||||
| electrical control panel w/ 230-volt, 100-amp service breaker w/outside cut-off switch, 3-pole disconnect ($500) | not brand specific | $500.00 | 1 | |||||
| 2 sets valve boxes containing in-line filters, flowmeters, pressure gages, flow control valves ($500 each set) | not brand specific | $1,000.00 | 2 |
| Altus AFB | LF004/LF003 | LF004/LF003 Bioreactor | Extraction well submersible pump | Grunfos | #96078029 11 SQF-2 | $1,500.00 | 1 | In airfield, east of Ordnance Road & Ozark 4.2 Lateral Irrigation Canal, west of Taxiway M, southest of end of abandoned taxiway #3 |
| Solar Panel (power source) | Sun-Belt GF50 Panels | $1,225.00 | 4 | |||||
| LF004/LF003 Biowall | 455-ft long, 1.5-ft wide, and 24-ft deep biowall | N/A | N/A | $25,500.00 | 1 | |||
| 2-inch groundwater monitoring wells, $3,000 each | not brand specific | $3,000.00 | 19 | |||||
| 0.5-inch soil vapor monitoring wells, $1,000 each | not brand specific | $4,000.00 | 4 |
| Altus AFB | SS017/SS018/SS023 | Biowall | Approximately 5,800-feet overlaying biowall segements (Sections A1, A2, A3, B, E, C1, C2, C3, D, F1, F2) installed to max depth 35-ft, 24-inch wide | not brand specific | N/A | $325,000.00 | 5800' | Sections A - D installed along southern installation boundary; Sections F1 & F2 installed east and south of SS017 bioreactor |
| 2-inch, 35-ft PVC monitoring wells with 10-ft well screen ($3,000 each) | not brand specific | $135,000.00 | 45 | |||||
| 6-inch, 50-ft PVC monitoring wells with 10-ft well screen ($7,500 each) | not brand specific | $75,000.00 | 10 |
Altus AFB SS017 Bldg 845 8-ft wide x 20-ft long x 8-ft high, metal building, concrete floor, metal roof N/A N/A $13,000.00 1 Inside fence behind Visitor's Center (Bldg
&"-,Bold"&14Government-Furnished Property (GFP) at Altus AFB
Tinker AFB
| Installation | Site | Item Name | Item Description | Manufacturer | Model Number | Replacement Cost (est.) | Qty | Location |
| Tinker AFB | CG038 | Southwest Treatment Plant | 20, 8 x 8 vaulted Extraction wells | not brand specific | N/A | $35,000.00 | 20 | CG038 Well Field |
| 20, 8 x 8 Electrical vaults | not brand specific | $10,000.00 | 20 | South of former Bldg 502, southeast of bulk fuel storage, west of apron & parking rosette 33 | ||||
| 20 Grunfos Variable Performance submersible pumps, 1/2HP, 115 V | Grundfos RF3 | SQE-NE | $2,500.00 | 20 | ||||
| Pressure Transducers & comm. Cable | Solnist | $1,000.00 | 20 | |||||
| 6 Tray Air Stripper and turn-key Skid package with air stripper, transfer pumps, blower, piping, wiring, sensors, controls, 6 EXP motors | QED | E-Z Tray 12.6 MS | $150,000.00 | 1 | Building 61089 | |||
| Chemical Feed Cabinet/Controller/metering gauges | not brand specific | N/A | $15,000.00 | 1 | ||||
| 2 - 32,000 Gallon holding/transfer tanks and associated piping | not brand specific | $55,000.00 | 2 | |||||
| Building 61089 | N/A | $350,000.00 | 1 |
| Tinker AFB | LF012/LF014 | LF012/Sumps | Submersible extraction pump and float switches | Gould's | N/A | $4,000.00 | 1 | LF012/LF014 |
| Electrical Panel (power source) | not brand specific | $2,500.00 | 1 | |||||
| LF014/Sumps | Submersible extraction pump and float switches | Goulds | N/A | $4,000.00 | 1 | |||
| Electrical Panel (power source) | not brand specific | $2,500.00 | 1 |
Tinker AFB OT001 Admin SVE System SVE blower, flow controls, two vapor-phase granulated activated carbon (VGAC) filters, a dedicated electrical circuit with lockable disconnect, three existing SVE wells, and conveyance piping extending from the wellheads to the SVE blower and equipment, through the VGAC and from the VGAC to the discharge stack exiting the roof of B3001. not brand specific N/A $300,000 1 Building 3001
Main SVE System Three vertical SVE wells (B3001-SVE-1, B3001-SVE-2, and B3001-SVE-3) and three 24-inch square well vaults and conveyance piping from the wells to the SVE system enclosure. SVE blower, flow controls, two vapor-phase granulated activated carbon (VGAC) filters, a dedicated electrical circuit with lockable disconnect, three existing SVE wells, and conveyance piping extending from the wellheads to the SVE blower and equipment, through the VGAC and from the VGAC to the discharge stack not brand specific NA $500,000.00 1
Tinker AFB ST003 North Tank Area No 2 Fuel Oil Free Product Recovery System/Treatment Building with Vapor Extraction System consisting of 6 Recovery and 9 VEP wells/SVE blowers/oil-water separator/stripper/ 2 Womack holding tanks not brand specific N/A $250,000.00 1 North end of Building 3001
Tinker AFB CG040 Gator Groundwater Management Unit LSZ vaulted Extraction Well and conveyance piping to Treatment shed containing 5000 gallon holding tank/air stripper/metering valves/electrical control panel. 2 Bioreactor cells and recirculating pumps and piping. 2 French drains equipped with extraction pumps and electrical control panels. not brand specific N/A $425,000.00 1 Tinker Off Base Satellite Location, SE 59th and Post Road
Vance AFB
| Installation | Site | Item Name | Item Description | Manufacturer | Model Number | Serial Number | Qty | Location |
| Vance AFB | b.258 | Central Groundwater Treatment Facility | Air Stripper, bag filters, equalization tank, sludge tank, filter press, pH tanks, polymer tank, pumps, UVO, CATOX, sand filter, 2 ICTs, 22 extraction wells | Unknown | Unknown | Unknown | 1 | Building 258 |
| Vance AFB | LF003 | Free Product Recovery System | Three Recovery wells, small building, tank, compressor | Unknown | Unknown | Unknown | 1 | Near Site LF003 |
| Vance AFB | ST008 | Dual Phase Extraction System | 9 DPE wells (treatment unit is rented and not govt property) | Unknown | Unknown | Unknown | 1 | Near Site ST008 |
| Vance AFB | DP005 | Groundwater Treatment unit | Small Building, Air Stripper, Tank, Compressor, ICT, 3 extraction wells | Unknown | Unknown | Unknown | 1 | Site DP005 |
| Vance AFB | SS007 | Injection wells, biobarrier 2" wells | ERD Process | unknown | Unknown | Unknown | 83 | SS007 |
| Vance AFB | ST008 | DPE wells | Wells to extract groundwater and air for treatment | unknown | Unknown | Unknown | 9 | ST008 |
| Vance AFB | DP005 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 63 | DP005 |
| Vance AFB | ST012 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 23 | ST012 |
| Vance AFB | SS024 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 37 | SS024 |
| Vance AFB | SS025 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 63 | SS025 |
&"-,Bold"&14Government-Furnished Property (GFP) at Vance AFB
File details come from the government source that posted it. Updated .