PWS Encl 3 Altus AFB ORC GFP.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) OK/AR Group Federal contract opportunity
- Solicitation number
- W912BV20R0002
About this file
This document provides details for the Optimized Remediation Contract (ORC) OK/AR Group federal contract opportunity. The Department of the Army Corps of Engineers Engineering District Tulsa seeks to award a firm-fixed-price small business set-aside contract for environmental remediation and engineering services at five Air Force installations in Oklahoma and Arkansas. The scope includes investigation, design, remedial action, construction, and other activities to advance site cleanup at 65 restoration sites during the 10-year period of performance. Services are required for sites at Air Force Plant 3 in Oklahoma, Altus Air Force Base in Oklahoma, Little Rock Air Force Base in Arkansas, Tinker Air Force Base in Oklahoma, and Vance Air Force Base in Oklahoma. The pre-proposal conference will be outlined in the solicitation to be issued on or around November 19, 2019, with proposals due on or around February 20, 2020 and contract award anticipated shortly thereafter.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Altus AFB
| Installation | Site | Item Name | Item Description | Manufacturer | Model Number | Replacement Cost (est.) | Qty | Location |
| Altus AFB | SS017 | SS017 Bioreactor | Bioreactor cell | not brand specific | $450,000.00 | 1 | ||
| extraction wells (F1EW01R, F2EW01R) ($3,000 each) | not brand specific | $6,000.00 | 2 | South of former Bldg 502, southeast of bulk fuel storage, west of apron & parking rosette 33 | ||||
| Variable Performance submersible pumps, 1/2HP, 115 V | Grundfos RF3 | 10SEQE05-100NE | $1,500.00 | 2 | ||||
| Pressure Transducers & poly cable | Geotech | 82051000 | $125.00 | 2 | ||||
| 580 ft perforated 1-in diameter, Schedule 80 PVC piping ($575) | not brand specific | $575.00 | 580 ' | |||||
| 1-inch, 20-ft PVC monitoring well with 10-ft well screen ($1,000 each) | not brand specific | $2,000.00 | 2 | |||||
| 2-inch, 35-ft PVC monitoring well with 10-ft well screen ($3,000 each) | $6,000.00 | 2 | ||||||
| extraction pump controllers | Grunfos | CE300 | $700.00 | 2 | ||||
| electrical control panel w/ 230-volt, 100-amp service breaker w/outside cut-off switch, 3-pole disconnect ($500) | not brand specific | $500.00 | 1 | |||||
| 2 sets valve boxes containing in-line filters, flowmeters, pressure gages, flow control valves ($500 each set) | not brand specific | $1,000.00 | 2 |
| Altus AFB | LF004/LF003 | LF004/LF003 Bioreactor | Extraction well submersible pump | Grunfos | #96078029 11 SQF-2 | $1,500.00 | 1 | In airfield, east of Ordnance Road & Ozark 4.2 Lateral Irrigation Canal, west of Taxiway M, southest of end of abandoned taxiway #3 |
| Solar Panel (power source) | Sun-Belt GF50 Panels | $1,225.00 | 4 | |||||
| LF004/LF003 Biowall | 455-ft long, 1.5-ft wide, and 24-ft deep biowall | N/A | N/A | $25,500.00 | 1 | |||
| 2-inch groundwater monitoring wells, $3,000 each | not brand specific | $3,000.00 | 19 | |||||
| 0.5-inch soil vapor monitoring wells, $1,000 each | not brand specific | $4,000.00 | 4 |
| Altus AFB | SS017/SS018/SS023 | Biowall | Approximately 5,800-feet overlaying biowall segements (Sections A1, A2, A3, B, E, C1, C2, C3, D, F1, F2) installed to max depth 35-ft, 24-inch wide | not brand specific | N/A | $325,000.00 | 5800' | Sections A - D installed along southern installation boundary; Sections F1 & F2 installed east and south of SS017 bioreactor |
| 2-inch, 35-ft PVC monitoring wells with 10-ft well screen ($3,000 each) | not brand specific | $135,000.00 | 45 | |||||
| 6-inch, 50-ft PVC monitoring wells with 10-ft well screen ($7,500 each) | not brand specific | $75,000.00 | 10 |
Altus AFB SS017 Bldg 845 8-ft wide x 20-ft long x 8-ft high, metal building, concrete floor, metal roof N/A N/A $13,000.00 1 Inside fence behind Visitor's Center (Bldg
&"-,Bold"&14Government-Furnished Property (GFP) at Altus AFB
Tinker AFB
| Installation | Site | Item Name | Item Description | Manufacturer | Model Number | Serial Number | Qty | Location |
| Tinker AFB | CG038 | Southwest Treatment Plant Groundwater Extraction System (Real Property Bldg. #61089) | 20, 8 x 8 vaulted (10") wells each equipped with a Grundfos Redi-flo 3 extraction pump, pressure tranducers and associated conveyance piping and valves. 2, 31,000 gallon holding tanks, air stripper, chemical feed cabinets and associated conveyance piping nad valves. | Unknown | Unknown | Unknown | 1 | Building # 61089 |
| Tinker AFB | OT001 | Admin Area SVE System | SVE blower, flow controls, two vapor-phase granulated activated carbon (VGAC) filters, a dedicated electrical circuit with lockable disconnect, three existing SVE wells, and conveyance piping extending from the wellheads to the SVE blower and equipment, through the VGAC and from the VGAC to the discharge stack exiting the roof of B3001. | Unknown | Unknown | Unknown | 1 | Building # 3001 |
| Tinker AFB | OT001 | SVE System | Three vertical SVE wells (B3001-SVE-1, B3001-SVE-2, and B3001-SVE-3) and three 24-inch square well vaults and conveyance piping from the wells to the SVE system enclosure. | Unknown | Unknown | Unknown | 1 | Building # 3001 |
| Tinker AFB | ST007 | VEP System | VEP System | Unknown | Unknown | Unknown | 1 | ST007 |
at Tinker AFB
Vance AFB
| Installation | Site | Item Name | Item Description | Manufacturer | Model Number | Serial Number | Qty | Location |
| Vance AFB | b.258 | Central Groundwater Treatment Facility | Air Stripper, bag filters, equalization tank, sludge tank, filter press, pH tanks, polymer tank, pumps, UVO, CATOX, sand filter, 2 ICTs, 22 extraction wells | Unknown | Unknown | Unknown | 1 | Building 258 |
| Vance AFB | LF003 | Free Product Recovery System | Three Recovery wells, small building, tank, compressor | Unknown | Unknown | Unknown | 1 | Near Site LF003 |
| Vance AFB | ST008 | Dual Phase Extraction System | 9 DPE wells (treatment unit is rented and not govt property) | Unknown | Unknown | Unknown | 1 | Near Site ST008 |
| Vance AFB | DP005 | Groundwater Treatment unit | Small Building, Air Stripper, Tank, Compressor, ICT, 3 extraction wells | Unknown | Unknown | Unknown | 1 | Site DP005 |
| Vance AFB | SS007 | Injection wells, biobarrier 2" wells | ERD Process | unknown | Unknown | Unknown | 83 | SS007 |
| Vance AFB | ST008 | DPE wells | Wells to extract groundwater and air for treatment | unknown | Unknown | Unknown | 9 | ST008 |
| Vance AFB | DP005 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 63 | DP005 |
| Vance AFB | ST012 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 23 | ST012 |
| Vance AFB | SS024 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 37 | SS024 |
| Vance AFB | SS025 | Injection Wells, biobarrier 2" wells | ERD Process | Unknown | Unknown | Unknown | 63 | SS025 |
at Vance AFB
File details come from the government source that posted it. Updated .