Section J Draft MPS with Cost Template 23 Mar 2020 OK-AR Group ORC.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) OK/AR Group Federal contract opportunity
- Solicitation number
- W912BV20R0002
About this file
This document provides details for a pre-solicitation notice and forthcoming solicitation for an Optimized Remediation Contract (ORC) for the Oklahoma/Arkansas Group. The contract will provide environmental remediation and engineering services at five Air Force installations: Air Force Plant 3 in Oklahoma, Altus Air Force Base in Oklahoma, Little Rock Air Force Base in Arkansas, Tinker Air Force Base in Oklahoma, and Vance Air Force Base in Oklahoma. Services include investigation, design, remedial action, construction, and remediation activities to advance or complete cleanup of 65 environmental restoration sites over a proposed ten-year period of performance. The solicitation will be issued through the System for Award Management and proposals are due on or about February 20, 2020, with contract award anticipated thereafter. The acquisition is set aside as a small business procurement for a firm-fixed-price contract to be awarded using best value tradeoff procedures.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plans, Schedules & Sampling
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Offeror:
Notes/Instructions:
1. This document is for the Offeror to provide their anticipated/draft Milestone Payments WITH Cost. This document will not be incorporated into any resulting contract; however, the successful awardee's Draft Milestone Payment Schedule may be utilized to negotiate the final Milestone Payment Schedule after contract award.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
5. Identify in column G the amount of the Milestone Payment. Remember, ONLY CLINs/sub-CLINs for which more than one (1) Milestone Payment is anticipated shall be listed on this form. The percentage will calculate automatically, although additionally rows and cell formulas must be added. The last Milestone Payment must be at least 20%.
6. For each Milestone Payment, identify the Projected Completion Date in column I.
7. Once all Milestone Payments for a CLIN/sub-CLIN have been identified, ensure the individual percentages total 100%, then place the total of the individual amounts in column F (this total amount MUST equal the amount identified for the respective CLIN/sub-CLIN on the Attachment L-2).
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITH Cost is to be formatted; the sample Milestone Payments identified are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided.
| PLANS, SCHEDULES AND SAMPLING | ||||||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Sub-CLIN Amount | Payment Milestone Amount | % of Sub-CLIN | Projected Milestone Completion Date |
| TX/LA Group | N/A | 0001 | Complete Project Management Plan (PMP) | |||||
| TX/LA Group | N/A | 0001AA | Complete PMP | |||||
| TX/LA Group | N/A | 0001AA0001 | Air Force and USACE Approval of Final PMP | ERROR:#DIV/0! | ||||
| TX/LA Group | N/A | 0001AB | Update PMP | |||||
| TX/LA Group | N/A | 0001AB0001 | Air Force and USACE Approval of Final PMP Update | ERROR:#DIV/0! | ||||
| TX/LA Group | N/A | 0001AC | Update PMP | |||||
| TX/LA Group | N/A | 0001AC0001 | Air Force and USACE Approval of Final PMP Update | ERROR:#DIV/0! | ||||
| TX/LA Group | N/A | 0002 | Complete Quality Assurance Surveillance Plan (QASP) | |||||
| TX/LA Group | N/A | 0002AA | Complete QASP | |||||
| TX/LA Group | N/A | 0002AA0002 | Air Force and USACE Approval of Final QASP | ERROR:#DIV/0! | ||||
| TX/LA Group | N/A | 0002AB | Update QASP | |||||
| TX/LA Group | N/A | 0002AB0002 | Air Force and USACE Approval of Final QASP Update | ERROR:#DIV/0! | ||||
| TX/LA Group | N/A | 0002AC | Update QASP | |||||
| TX/LA Group | N/A | 0002AC0002 | Air Force and USACE Approval of Final QASP Update | ERROR:#DIV/0! | ||||
| [INSERT CLIN PER SECTION L-2] | ||||||||
| [INSERT Sub-CLIN PER SECTION L-2] | ||||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! |
Milestone Payment Schedule
[INSERT INSTALLATION NAME]
Page &P of &N
Air Force Plant 3
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is for the Offeror to provide their anticipated/draft Milestone Payments WITH Cost. This document will not be incorporated into any resulting contract; however, the successful awardee's Draft Milestone Payment Schedule may be utilized to negotiate the final Milestone Payment Schedule after contract award.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
5. Identify in column G the amount of the Milestone Payment. Remember, ONLY CLINs/sub-CLINs for which more than one (1) Milestone Payment is anticipated shall be listed on this form. The percentage will calculate automatically, although additionally rows and cell formulas must be added. The last Milestone Payment must be at least 20%.
7. Once all Milestone Payments for a CLIN/sub-CLIN have been identified, ensure the individual percentages total 100%, then place the total of the individual amounts in column F (this total amount MUST equal the amount identified for the respective CLIN/sub-CLIN on the Attachment L-2).
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITH Cost is to be formatted; the sample Milestone Payments identified are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided.
| AIR FORCE PLANT 3 | |||||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Sub-CLIN Amount | ||
| (must match amount on Attachment L-2) | Payment Milestone Amount | % of Sub-CLIN | Projected Milestone Completion Date | ||||
| Air Force Plant 3 | 0016 | Complete a Basewide Quality Program Plan (QPP) | |||||
| Air Force Plant 3 | N/A | 0016AA | Complete Basewide QPP | ||||
| Air Force Plant 3 | N/A | 0016AA0001 | Air Force and USACE Approval of Final QPP | ERROR:#DIV/0! | |||
| Air Force Plant 3 | N/A | 0016AB | Update 1-Basewide QPP | ||||
| Air Force Plant 3 | N/A | 0016AB0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Air Force Plant 3 | N/A | 0016AC | Update 2-Basewide QPP | ||||
| Air Force Plant 3 | N/A | 0016AC0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017 | Conduct LTM and Achieve Remedy in Place for VOCs and 1,4-Dioxane | ||||
| Air Force Plant 3 | LF006 | 0017AA | Achieve the Corrective Measures Study for VOCs and 1,4-Dioxane | ||||
| Air Force Plant 3 | LF006 | 0017AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017AB | Achieve the Statement of Basis Amendment for VOCs and 1,4-Dioxane | ||||
| Air Force Plant 3 | LF006 | 0017AB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017AC | Achieve Remedy in Place for VOCs and 1,4-Dioxane | ||||
| Air Force Plant 3 | LF006 | 0017AC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||||
| Air Force Plant 3 | LF006 | 0017CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||||
| Air Force Plant 3 | LF006 | 0017CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||||
| Air Force Plant 3 | LF006 | 0017CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||||
| Air Force Plant 3 | LF006 | 0017CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||||
| Air Force Plant 3 | LF006 | 0017CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||||
| Air Force Plant 3 | LF006 | 0017CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||||
| Air Force Plant 3 | LF006 | 0017CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||||
| Air Force Plant 3 | LF006 | 0017CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||||
| Air Force Plant 3 | LF006 | 0017CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | LF006 | 0017CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||||
| Air Force Plant 3 | LF006 | 0017CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | 0018 | Conduct LTM and Achieve Remedy in Place for VOCs and 1,4-Dioxane | |||||
| Air Force Plant 3 | OT010 | 0018AA | Achieve the Corrective Measures Study for VOCs and 1,4-Dioxane | ||||
| Air Force Plant 3 | OT010 | 0018AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018AB | Achieve the Statement of Basis Amendment for VOCs and 1,4-Dioxane | ||||
| Air Force Plant 3 | OT010 | 0018AB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018AC | Achieve Remedy in Place for VOCs and 1,4-Dioxane | ||||
| Air Force Plant 3 | OT010 | 0018AC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||||
| Air Force Plant 3 | OT010 | 0018CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||||
| Air Force Plant 3 | OT010 | 0018CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||||
| Air Force Plant 3 | OT010 | 0018CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||||
| Air Force Plant 3 | OT010 | 0018CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||||
| Air Force Plant 3 | OT010 | 0018CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||||
| Air Force Plant 3 | OT010 | 0018CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||||
| Air Force Plant 3 | OT010 | 0018CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||||
| Air Force Plant 3 | OT010 | 0018CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||||
| Air Force Plant 3 | OT010 | 0018CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Air Force Plant 3 | OT010 | 0018CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||||
| Air Force Plant 3 | OT010 | 0018CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! |
[INSERT INSTALLATION NAME]
Altus AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is for the Offeror to provide their anticipated/draft Milestone Payments WITH Cost. This document will not be incorporated into any resulting contract; however, the successful awardee's Draft Milestone Payment Schedule may be utilized to negotiate the final Milestone Payment Schedule after contract award.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
5. Identify in column G the amount of the Milestone Payment. Remember, ONLY CLINs/sub-CLINs for which more than one (1) Milestone Payment is anticipated shall be listed on this form. The percentage will calculate automatically, although additionally rows and cell formulas must be added. The last Milestone Payment must be at least 20%.
7. Once all Milestone Payments for a CLIN/sub-CLIN have been identified, ensure the individual percentages total 100%, then place the total of the individual amounts in column F (this total amount MUST equal the amount identified for the respective CLIN/sub-CLIN on the Attachment L-2).
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITH Cost is to be formatted; the sample Milestone Payments identified are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided.
| ALTUS AFB, OK | |||||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Sub-CLIN Amount | ||
| (must match amount on Attachment L-2) | Payment Milestone Amount | % of Sub-CLIN | Projected Milestone Completion Date | ||||
| Altus AFB | 0019 | Complete a Basewide Quality Program Plan (QPP) | |||||
| Altus AFB | N/A | 0019AA | Complete Basewide QPP | ||||
| Altus AFB | N/A | 0019AA0001 | Air Force and USACE Approval of Final QPP | ERROR:#DIV/0! | |||
| Altus AFB | N/A | 0019AB | Update 1-Basewide QPP | ||||
| Altus AFB | N/A | 0019AB0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Altus AFB | N/A | 0019AC | Update 2-Basewide QPP | ||||
| Altus AFB | N/A | 0019AC0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Altus AFB | All Sites | 0020 | Complete Well Abandonment | ||||
| Altus AFB | All Sites | Each of 0020AA-0020AK | Abandon Up to 40 Wells | ||||
| Altus AFB | All Sites | 0020AA0001 - 0020AK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | N/A | 0021 | Develop Basewide Monitoring Plan | ||||
| Altus AFB | N/A | 0021 | Develop Basewide Monitoring Plan | ||||
| Altus AFB | N/A | 002100001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022 | Conduct RA-O | ||||
| Altus AFB | FT003 | 0022CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||||
| Altus AFB | FT003 | 0022CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||||
| Altus AFB | FT003 | 0022CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||||
| Altus AFB | FT003 | 0022CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||||
| Altus AFB | FT003 | 0022CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||||
| Altus AFB | FT003 | 0022CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||||
| Altus AFB | FT003 | 0022CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||||
| Altus AFB | FT003 | 0022CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||||
| Altus AFB | FT003 | 0022CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||||
| Altus AFB | FT003 | 0022CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT003 | 0022CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||||
| Altus AFB | FT003 | 0022CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023 | Conduct LTM | ||||
| Altus AFB | FT005 | 0023CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||||
| Altus AFB | FT005 | 0023CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||||
| Altus AFB | FT005 | 0023CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||||
| Altus AFB | FT005 | 0023CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||||
| Altus AFB | FT005 | 0023CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||||
| Altus AFB | FT005 | 0023CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||||
| Altus AFB | FT005 | 0023CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||||
| Altus AFB | FT005 | 0023CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||||
| Altus AFB | FT005 | 0023CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||||
| Altus AFB | FT005 | 0023CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Altus AFB | FT005 | 0023CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||||
| Altus AFB | FT005 | 0023CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! |
[INSERT INSTALLATION NAME]
Little Rock AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is for the Offeror to provide their anticipated/draft Milestone Payments WITH Cost. This document will not be incorporated into any resulting contract; however, the successful awardee's Draft Milestone Payment Schedule may be utilized to negotiate the final Milestone Payment Schedule after contract award.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
5. Identify in column G the amount of the Milestone Payment. Remember, ONLY CLINs/sub-CLINs for which more than one (1) Milestone Payment is anticipated shall be listed on this form. The percentage will calculate automatically, although additionally rows and cell formulas must be added. The last Milestone Payment must be at least 20%.
7. Once all Milestone Payments for a CLIN/sub-CLIN have been identified, ensure the individual percentages total 100%, then place the total of the individual amounts in column F (this total amount MUST equal the amount identified for the respective CLIN/sub-CLIN on the Attachment L-2).
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITH Cost is to be formatted; the sample Milestone Payments identified are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided.
| Little Rock AFB, AR | |||||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Sub-CLIN Amount | ||
| (must match amount on Attachment L-2) | Payment Milestone Amount | % of Sub-CLIN | Projected Milestone Completion Date | ||||
| Little Rock AFB | 0040 | Complete a Basewide Quality Program Plan (QPP) | |||||
| Little Rock AFB | N/A | 0040AA | Complete Basewide QPP | ||||
| Little Rock AFB | N/A | 0040AA0001 | Air Force and USACE Approval of Final QPP | ERROR:#DIV/0! | |||
| Little Rock AFB | N/A | 0040AB | Update 1-Basewide QPP | ||||
| Little Rock AFB | N/A | 0040AB0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Little Rock AFB | N/A | 0040AC | Update 2-Basewide QPP | ||||
| Little Rock AFB | N/A | 0040AC0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Little Rock AFB | All Sites | 0041 | Review and Complete Land Use Control Implementation Plan (LUCIP) Update | ||||
| Little Rock AFB | DP051 | 0043CA | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 1
| Little Rock AFB | DP051 | 0041CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CB | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 2
| Little Rock AFB | DP051 | 0041CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CC | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 3
| Little Rock AFB | DP051 | 0041CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CD | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 4
| Little Rock AFB | DP051 | 0041CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CE | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 5
| Little Rock AFB | DP051 | 0041CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CF | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 6
| Little Rock AFB | DP051 | 0041CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CG | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 7
| Little Rock AFB | DP051 | 0041CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CH | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 8
| Little Rock AFB | DP051 | 0041CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CJ | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 9
| Little Rock AFB | DP051 | 0041CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CK | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 10
| Little Rock AFB | DP051 | 0041CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | All Sites | 0042 | Update Community Involvement Plan | ||
| Little Rock AFB | All Sites | 0042AA | Update Community Involvement Plan | ||
| Little Rock AFB | All Sites | 0042AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | All Sites | 0042AB | Update Community Involvement Plan | ||
| Little Rock AFB | All Sites | 0042AB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | All Sites | 0042AC | Update Community Involvement Plan | ||
| Little Rock AFB | All Sites | 0042AC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043 | Conduct LTM | ||
| Little Rock AFB | DP051 | 0043CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Little Rock AFB | DP051 | 0043CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Little Rock AFB | DP051 | 0043CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Little Rock AFB | DP051 | 0043CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Little Rock AFB | DP051 | 0043CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Little Rock AFB | DP051 | 0043CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Little Rock AFB | DP051 | 0043CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Little Rock AFB | DP051 | 0043CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Little Rock AFB | DP051 | 0043CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Little Rock AFB | DP051 | 0043CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | DP051 | 0043CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Little Rock AFB | DP051 | 0043CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044 | Conduct LTM | ||
| Little Rock AFB | LF007 | 0044CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Little Rock AFB | LF007 | 0044CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Little Rock AFB | LF007 | 0044CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Little Rock AFB | LF007 | 0044CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Little Rock AFB | LF007 | 0044CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Little Rock AFB | LF007 | 0044CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Little Rock AFB | LF007 | 0044CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Little Rock AFB | LF007 | 0044CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Little Rock AFB | LF007 | 0044CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Little Rock AFB | LF007 | 0044CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| Little Rock AFB | LF007 | 0044CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Little Rock AFB | LF007 | 0044CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! |
[INSERT INSTALLATION NAME]
Tinker AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is for the Offeror to provide their anticipated/draft Milestone Payments WITH Cost. This document will not be incorporated into any resulting contract; however, the successful awardee's Draft Milestone Payment Schedule may be utilized to negotiate the final Milestone Payment Schedule after contract award.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
5. Identify in column G the amount of the Milestone Payment. Remember, ONLY CLINs/sub-CLINs for which more than one (1) Milestone Payment is anticipated shall be listed on this form. The percentage will calculate automatically, although additionally rows and cell formulas must be added. The last Milestone Payment must be at least 20%.
7. Once all Milestone Payments for a CLIN/sub-CLIN have been identified, ensure the individual percentages total 100%, then place the total of the individual amounts in column F (this total amount MUST equal the amount identified for the respective CLIN/sub-CLIN on the Attachment L-2).
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITH Cost is to be formatted; the sample Milestone Payments identified are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided.
| Tinker AFB, OK | |||||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Sub-CLIN Amount | ||
| (must match amount on Attachment L-2) | Payment Milestone Amount | % of Sub-CLIN | Projected Milestone Completion Date | ||||
| Tinker AFB | 0052 | Complete a Basewide Quality Program Plan (QPP) | |||||
| Tinker AFB | N/A | 0052AA | Complete Basewide QPP | ||||
| Tinker AFB | N/A | 0052AA0001 | Air Force and USACE Approval of Final QPP | ERROR:#DIV/0! | |||
| Tinker AFB | N/A | 0052AB | Update 1-Basewide QPP | ||||
| Tinker AFB | N/A | 0052AB0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Tinker AFB | N/A | 0052AC | Update 2-Basewide QPP | ||||
| Tinker AFB | N/A | 0052AC0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0053 | Land Use Control Implementation Plans (LUCIP) - NPL sites and non-NPL sites | ||||
| Tinker AFB | All Sites | 0053AA | Complete two (2) Land Use Control Implementation Plans (LUCIP) - NPL sites and non-NPL sites | ||||
| Tinker AFB | All Sites | 0053AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0053AB | Update 1-LUCIP | ||||
| Tinker AFB | All Sites | 0053AB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0053AC | Update 2-LUCIP | ||||
| Tinker AFB | All Sites | 0053AC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0054 | Basewide Monitoring Plan | ||||
| Tinker AFB | All Sites | 0054AA | Develop a Basewide Monitoring Plan | ||||
| Tinker AFB | All Sites | 0054AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0054AB | Update 1-Basewide Monitoring Plan | ||||
| Tinker AFB | All Sites | 0054AB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0054AC | Update 2-Basewide Monitoring Plan | ||||
| Tinker AFB | All Sites | 0054AC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0055 | Complete Well Abandonment | ||||
| Tinker AFB | All Sites | Each of 0055AA - 0055AK | Abandon up to 25 Wells | ||||
| Tinker AFB | All Sites | 0055AA0001- 0055AK0001 | Air Force and USACE Approval of Final QPP | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0056 | Update Community Involvement Plan | ||||
| Tinker AFB | All Sites | 0056AA | Update 1-Community Involvement Plan | ||||
| Tinker AFB | All Sites | 0056AA0001 | Air Force and USACE Approval of Final QPP | ERROR:#DIV/0! | |||
| Tinker AFB | All Sites | 0056AB | Update 2-Community Involvement Plan | ||||
| Tinker AFB | All Sites | 0056AB0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057 | Achieve Response Complete | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AA | Achieve Corrective Measures Study, Statement of Basis, and Permit Modification | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AB | Achieve Remedy in Place | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AC | Achieve Response Complete | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058 | Conduct RA-O and Reduce LCC and Decommission Vacuum Enhanced Pumping (VEP) System | ||||
| Tinker AFB | CG037 | 0058AA | Decommission Vacuum Enhanced Pumping (VEP) System | ||||
| Tinker AFB | CG037 | 0058AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CA | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 1 | ||||
| Tinker AFB | CG037 | 0058CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CB | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 2 | ||||
| Tinker AFB | CG037 | 0058CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CC | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 3 | ||||
| Tinker AFB | CG037 | 0058CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CD | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 4 | ||||
| Tinker AFB | CG037 | 0058CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CE | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 5 | ||||
| Tinker AFB | CG037 | 0058CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CF | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 6 | ||||
| Tinker AFB | CG037 | 0058CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CG | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 7 | ||||
| Tinker AFB | CG037 | 0058CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CH | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 8 | ||||
| Tinker AFB | CG037 | 0058CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CJ | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 9 | ||||
| Tinker AFB | CG037 | 0058CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Tinker AFB | CG037 | 0058CK | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 10 | ||||
| Tinker AFB | CG037 | 0058CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! |
[INSERT INSTALLATION NAME]
Vance AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is for the Offeror to provide their anticipated/draft Milestone Payments WITH Cost. This document will not be incorporated into any resulting contract; however, the successful awardee's Draft Milestone Payment Schedule may be utilized to negotiate the final Milestone Payment Schedule after contract award.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
5. Identify in column G the amount of the Milestone Payment. Remember, ONLY CLINs/sub-CLINs for which more than one (1) Milestone Payment is anticipated shall be listed on this form. The percentage will calculate automatically, although additionally rows and cell formulas must be added. The last Milestone Payment must be at least 20%.
7. Once all Milestone Payments for a CLIN/sub-CLIN have been identified, ensure the individual percentages total 100%, then place the total of the individual amounts in column F (this total amount MUST equal the amount identified for the respective CLIN/sub-CLIN on the Attachment L-2).
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITH Cost is to be formatted; the sample Milestone Payments identified are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided.
| Vance AFB, OK | |||||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Sub-CLIN Amount | ||
| (must match amount on Attachment L-2) | Payment Milestone Amount | % of Sub-CLIN | Projected Milestone Completion Date | ||||
| Vance AFB | 0083 | Complete a Basewide Quality Program Plan (QPP) | |||||
| Vance AFB | N/A | 0083AA | Complete Basewide QPP | ||||
| Vance AFB | N/A | 0083AA0001 | Air Force and USACE Approval of Final QPP | ERROR:#DIV/0! | |||
| Vance AFB | N/A | 0083AB | Update 1-Basewide QPP | ||||
| Vance AFB | N/A | 0083AB0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Vance AFB | N/A | 0083AC | Update 2-Basewide QPP | ||||
| Vance AFB | N/A | 0083AC0001 | Air Force and USACE Approval of Final QPP Update | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084 | Achieve Response Complete | ||||
| Vance AFB | DP005 | 0084AA | Optimize in support of achievement of Response Complete | ||||
| Vance AFB | DP005 | 0084AA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084AB | Continue to optimize in support of achievement of Response Complete | ||||
| Vance AFB | DP005 | 0084AB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084AC | Continue to optimize in support of achievement of Response Complete | ||||
| Vance AFB | DP005 | 0084AC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084AD | Achieve Response Complete | ||||
| Vance AFB | DP005 | 0084AD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||||
| Vance AFB | DP005 | 0084CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||||
| Vance AFB | DP005 | 0084CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||||
| Vance AFB | DP005 | 0084CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||||
| Vance AFB | DP005 | 0084CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||||
| Vance AFB | DP005 | 0084CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||||
| Vance AFB | DP005 | 0084CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||||
| Vance AFB | DP005 | 0084CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||||
| Vance AFB | DP005 | 0084CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||||
| Vance AFB | DP005 | 0084CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | DP005 | 0084CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||||
| Vance AFB | DP005 | 0084CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085 | Conduct RA-O | ||||
| Vance AFB | FT002 | 0085CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||||
| Vance AFB | FT002 | 0085CA0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||||
| Vance AFB | FT002 | 0085CB0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||||
| Vance AFB | FT002 | 0085CC0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||||
| Vance AFB | FT002 | 0085CD0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||||
| Vance AFB | FT002 | 0085CE0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||||
| Vance AFB | FT002 | 0085CF0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||||
| Vance AFB | FT002 | 0085CG0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||||
| Vance AFB | FT002 | 0085CH0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||||
| Vance AFB | FT002 | 0085CJ0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| Vance AFB | FT002 | 0085CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||||
| Vance AFB | FT002 | 0085CK0001 | Description of Milestone Payment | ERROR:#DIV/0! | |||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! | ||||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ERROR:#DIV/0! |
[INSERT INSTALLATION NAME]
File details come from the government source that posted it. Updated .