Section J Draft MPS without Cost Template 23 Mar 2020 OK-AR Group ORC.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) OK/AR Group Federal contract opportunity
- Solicitation number
- W912BV20R0002
About this file
This document provides a draft milestone payment schedule template for a federal contract opportunity to conduct environmental remediation activities at five Air Force installations in Oklahoma and Arkansas.
The schedule outlines proposed milestones and payment structures for cleanup work at 65 sites across Air Force Plant 3, Altus Air Force Base, Little Rock Air Force Base, Tinker Air Force Base, and Vance Air Force Base. It includes sample milestones for developing quality program and monitoring plans, well abandonment, achieving response complete status, and maintaining compliance at remediation sites for up to 10 years. Offerors must complete tables for each installation using the provided template format.
The opportunity is a small business set-aside to be awarded as a firm-fixed-price contract by the Tulsa District of the U.S. Army Corps of Engineers. The pre-solicitation notice targets a February 2020 proposal due date and anticipated 10-year period of performance for optimized environmental remediation and engineering services valued at an estimated total.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plans, Schedules & Sampling
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Offeror:
Notes/Instructions:
1. This document is to be utilized during evaluation of the Offeror's proposal. The information provided on this document is identical to the Offeror's Milestone Payment Schedule With Cost, except columns F, G and H of that document are deleted. The most expedient method that will ensure integrity of the data is to create the Milestone Payment Schedule With Cost in its entirety, then delete columns F, G and H from each Tab. Otherwise, the Offeror must complete the required information for each Tab according to the following instructions.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
5. For each Milestone Payment, identify the Projected Completion Date in column F.
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITHOUT Cost is to be formatted; the sample Milestone Payments identfied are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided. These MUST be identical to those identified on the Milestone Payment Schedule WITH Cost.
| PLANS, SCHEDULES AND SAMPLING | |||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Projected Milestone Completion Date |
| TX/LA Group | N/A | 0001 | Complete Project Management Plan (PMP) | ||
| TX/LA Group | N/A | 0001AA | Complete PMP | ||
| TX/LA Group | N/A | 0001AA0001 | Air Force and USACE Approval of Final PMP | ||
| TX/LA Group | N/A | 0001AB | Update PMP | ||
| TX/LA Group | N/A | 0001AB0001 | Air Force and USACE Approval of Final PMP Update | ||
| TX/LA Group | N/A | 0001AC | Update PMP | ||
| TX/LA Group | N/A | 0001AC0001 | Air Force and USACE Approval of Final PMP Update | ||
| TX/LA Group | N/A | 0002 | Complete Quality Assurance Surveillance Plan (QASP) | ||
| TX/LA Group | N/A | 0002AA | Complete QASP | ||
| TX/LA Group | N/A | 0002AA0002 | Air Force and USACE Approval of Final QASP | ||
| TX/LA Group | N/A | 0002AB | Update QASP | ||
| TX/LA Group | N/A | 0002AB0002 | Air Force and USACE Approval of Final QASP Update | ||
| TX/LA Group | N/A | 0002AC | Update QASP | ||
| TX/LA Group | N/A | 0002AC0002 | Air Force and USACE Approval of Final QASP Update | ||
| [INSERT CLIN PER SECTION L-2] | |||||
| [INSERT Sub-CLIN PER SECTION L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] |
Milestone Payment Schedule
[INSERT INSTALLATION NAME]
Page &P of &N
Air Force Plant 3
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is to be utilized during evaluation of the Offeror's proposal. The information provided on this document is identical to the Offeror's Milestone Payment Schedule With Cost, except columns F, G and H of that document are deleted. The most expedient method that will ensure integrity of the data is to create the Milestone Payment Schedule With Cost in its entirety, then delete columns F, G and H from each Tab. Otherwise, the Offeror must complete the required information for each Tab according to the following instructions.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITHOUT Cost is to be formatted; the sample Milestone Payments identfied are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided. These MUST be identical to those identified on the Milestone Payment Schedule WITH Cost.
| AIR FORCE PLANT 3 | |||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Projected Milestone Completion Date |
| Air Force Plant 3 | 0016 | Complete a Basewide Quality Program Plan (QPP) | |||
| Air Force Plant 3 | N/A | 0016AA | Complete Basewide QPP | ||
| Air Force Plant 3 | N/A | 0016AA0001 | Air Force and USACE Approval of Final QPP | ||
| Air Force Plant 3 | N/A | 0016AB | Update 1-Basewide QPP | ||
| Air Force Plant 3 | N/A | 0016AB0001 | Air Force and USACE Approval of Final QPP Update | ||
| Air Force Plant 3 | N/A | 0016AC | Update 2-Basewide QPP | ||
| Air Force Plant 3 | N/A | 0016AC0001 | Air Force and USACE Approval of Final QPP Update | ||
| Air Force Plant 3 | LF006 | 0017 | Conduct LTM and Achieve Remedy in Place for VOCs and 1,4-Dioxane | ||
| Air Force Plant 3 | LF006 | 0017AA | Achieve the Corrective Measures Study for VOCs and 1,4-Dioxane | ||
| Air Force Plant 3 | LF006 | 0017AA0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017AB | Achieve the Statement of Basis Amendment for VOCs and 1,4-Dioxane | ||
| Air Force Plant 3 | LF006 | 0017AB0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017AC | Achieve Remedy in Place for VOCs and 1,4-Dioxane | ||
| Air Force Plant 3 | LF006 | 0017AC0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Air Force Plant 3 | LF006 | 0017CA0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Air Force Plant 3 | LF006 | 0017CB0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Air Force Plant 3 | LF006 | 0017CC0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Air Force Plant 3 | LF006 | 0017CD0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Air Force Plant 3 | LF006 | 0017CE0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Air Force Plant 3 | LF006 | 0017CF0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Air Force Plant 3 | LF006 | 0017CG0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Air Force Plant 3 | LF006 | 0017CH0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Air Force Plant 3 | LF006 | 0017CJ0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | LF006 | 0017CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Air Force Plant 3 | LF006 | 0017CK0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | 0018 | Conduct LTM and Achieve Remedy in Place for VOCs and 1,4-Dioxane | |||
| Air Force Plant 3 | OT010 | 0018AA | Achieve the Corrective Measures Study for VOCs and 1,4-Dioxane | ||
| Air Force Plant 3 | OT010 | 0018AA0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018AB | Achieve the Statement of Basis Amendment for VOCs and 1,4-Dioxane | ||
| Air Force Plant 3 | OT010 | 0018AB0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018AC | Achieve Remedy in Place for VOCs and 1,4-Dioxane | ||
| Air Force Plant 3 | OT010 | 0018AC0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Air Force Plant 3 | OT010 | 0018CA0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Air Force Plant 3 | OT010 | 0018CB0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Air Force Plant 3 | OT010 | 0018CC0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Air Force Plant 3 | OT010 | 0018CD0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Air Force Plant 3 | OT010 | 0018CE0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Air Force Plant 3 | OT010 | 0018CF0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Air Force Plant 3 | OT010 | 0018CG0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Air Force Plant 3 | OT010 | 0018CH0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Air Force Plant 3 | OT010 | 0018CJ0001 | Description of Milestone Payment | ||
| Air Force Plant 3 | OT010 | 0018CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Air Force Plant 3 | OT010 | 0018CK0001 | Description of Milestone Payment | ||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] |
Milestone Payment Schedule
[INSERT INSTALLATION NAME]
Altus AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is to be utilized during evaluation of the Offeror's proposal. The information provided on this document is identical to the Offeror's Milestone Payment Schedule With Cost, except columns F, G and H of that document are deleted. The most expedient method that will ensure integrity of the data is to create the Milestone Payment Schedule With Cost in its entirety, then delete columns F, G and H from each Tab. Otherwise, the Offeror must complete the required information for each Tab according to the following instructions.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITHOUT Cost is to be formatted; the sample Milestone Payments identfied are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided. These MUST be identical to those identified on the Milestone Payment Schedule WITH Cost.
| ALTUS AFB, OK | |||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Projected Milestone Completion Date |
| Altus AFB | 0019 | Complete a Basewide Quality Program Plan (QPP) | |||
| Altus AFB | N/A | 0019AA | Complete Basewide QPP | ||
| Altus AFB | N/A | 0019AA0001 | Air Force and USACE Approval of Final QPP | ||
| Altus AFB | N/A | 0019AB | Update 1-Basewide QPP | ||
| Altus AFB | N/A | 0019AB0001 | Air Force and USACE Approval of Final QPP Update | ||
| Altus AFB | N/A | 0019AC | Update 2-Basewide QPP | ||
| Altus AFB | N/A | 0019AC0001 | Air Force and USACE Approval of Final QPP Update | ||
| Altus AFB | All Sites | 0020 | Complete Well Abandonment | ||
| Altus AFB | All Sites | Each of 0020AA-0020AK | Abandon Up to 40 Wells | ||
| Altus AFB | All Sites | 0020AA0001 - 0020AK0001 | Description of Milestone Payment | ||
| Altus AFB | N/A | 0021 | Develop Basewide Monitoring Plan | ||
| Altus AFB | N/A | 0021 | Develop Basewide Monitoring Plan | ||
| Altus AFB | N/A | 002100001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022 | Conduct RA-O | ||
| Altus AFB | FT003 | 0022CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Altus AFB | FT003 | 0022CA0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Altus AFB | FT003 | 0022CB0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Altus AFB | FT003 | 0022CC0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Altus AFB | FT003 | 0022CD0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Altus AFB | FT003 | 0022CE0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Altus AFB | FT003 | 0022CF0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Altus AFB | FT003 | 0022CG0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Altus AFB | FT003 | 0022CH0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Altus AFB | FT003 | 0022CJ0001 | Description of Milestone Payment | ||
| Altus AFB | FT003 | 0022CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Altus AFB | FT003 | 0022CK0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023 | Conduct LTM | ||
| Altus AFB | FT005 | 0023CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Altus AFB | FT005 | 0023CA0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Altus AFB | FT005 | 0023CB0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Altus AFB | FT005 | 0023CC0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Altus AFB | FT005 | 0023CD0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Altus AFB | FT005 | 0023CE0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Altus AFB | FT005 | 0023CF0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Altus AFB | FT005 | 0023CG0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Altus AFB | FT005 | 0023CH0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Altus AFB | FT005 | 0023CJ0001 | Description of Milestone Payment | ||
| Altus AFB | FT005 | 0023CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Altus AFB | FT005 | 0023CK0001 | Description of Milestone Payment | ||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] |
Milestone Payment Schedule
[INSERT INSTALLATION NAME]
Little Rock AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is to be utilized during evaluation of the Offeror's proposal. The information provided on this document is identical to the Offeror's Milestone Payment Schedule With Cost, except columns F, G and H of that document are deleted. The most expedient method that will ensure integrity of the data is to create the Milestone Payment Schedule With Cost in its entirety, then delete columns F, G and H from each Tab. Otherwise, the Offeror must complete the required information for each Tab according to the following instructions.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITHOUT Cost is to be formatted; the sample Milestone Payments identfied are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided. These MUST be identical to those identified on the Milestone Payment Schedule WITH Cost.
| Little Rock AFB, AR | |||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Projected Milestone Completion Date |
| Little Rock AFB | 0040 | Complete a Basewide Quality Program Plan (QPP) | |||
| Little Rock AFB | N/A | 0040AA | Complete Basewide QPP | ||
| Little Rock AFB | N/A | 0040AA0001 | Air Force and USACE Approval of Final QPP | ||
| Little Rock AFB | N/A | 0040AB | Update 1-Basewide QPP | ||
| Little Rock AFB | N/A | 0040AB0001 | Air Force and USACE Approval of Final QPP Update | ||
| Little Rock AFB | N/A | 0040AC | Update 2-Basewide QPP | ||
| Little Rock AFB | N/A | 0040AC0001 | Air Force and USACE Approval of Final QPP Update | ||
| Little Rock AFB | All Sites | 0041 | Review and Complete Land Use Control Implementation Plan (LUCIP) Update | ||
| Little Rock AFB | DP051 | 0043CA | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 1
| Little Rock AFB | DP051 | 0041CA0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CB | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 2
| Little Rock AFB | DP051 | 0041CB0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CC | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 3
| Little Rock AFB | DP051 | 0041CC0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CD | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 4
| Little Rock AFB | DP051 | 0041CD0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CE | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 5
| Little Rock AFB | DP051 | 0041CE0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CF | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 6
| Little Rock AFB | DP051 | 0041CF0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CG | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 7
| Little Rock AFB | DP051 | 0041CG0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CH | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 8
| Little Rock AFB | DP051 | 0041CH0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CJ | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 9
| Little Rock AFB | DP051 | 0041CJ0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CK | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
-Year 10
| Little Rock AFB | DP051 | 0041CK0001 | Description of Milestone Payment | |
| Little Rock AFB | All Sites | 0042 | Update Community Involvement Plan | |
| Little Rock AFB | All Sites | 0042AA | Update Community Involvement Plan | |
| Little Rock AFB | All Sites | 0042AA0001 | Description of Milestone Payment | |
| Little Rock AFB | All Sites | 0042AB | Update Community Involvement Plan | |
| Little Rock AFB | All Sites | 0042AB0001 | Description of Milestone Payment | |
| Little Rock AFB | All Sites | 0042AC | Update Community Involvement Plan | |
| Little Rock AFB | All Sites | 0042AC0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043 | Conduct LTM | |
| Little Rock AFB | DP051 | 0043CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | |
| Little Rock AFB | DP051 | 0043CA0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | |
| Little Rock AFB | DP051 | 0043CB0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | |
| Little Rock AFB | DP051 | 0043CC0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | |
| Little Rock AFB | DP051 | 0043CD0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | |
| Little Rock AFB | DP051 | 0043CE0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | |
| Little Rock AFB | DP051 | 0043CF0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | |
| Little Rock AFB | DP051 | 0043CG0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | |
| Little Rock AFB | DP051 | 0043CH0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | |
| Little Rock AFB | DP051 | 0043CJ0001 | Description of Milestone Payment | |
| Little Rock AFB | DP051 | 0043CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | |
| Little Rock AFB | DP051 | 0043CK0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044 | Conduct LTM | |
| Little Rock AFB | LF007 | 0044CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | |
| Little Rock AFB | LF007 | 0044CA0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | |
| Little Rock AFB | LF007 | 0044CB0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | |
| Little Rock AFB | LF007 | 0044CC0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | |
| Little Rock AFB | LF007 | 0044CD0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | |
| Little Rock AFB | LF007 | 0044CE0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | |
| Little Rock AFB | LF007 | 0044CF0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | |
| Little Rock AFB | LF007 | 0044CG0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | |
| Little Rock AFB | LF007 | 0044CH0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | |
| Little Rock AFB | LF007 | 0044CJ0001 | Description of Milestone Payment | |
| Little Rock AFB | LF007 | 0044CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | |
| Little Rock AFB | LF007 | 0044CK0001 | Description of Milestone Payment | |
| [INSERT CLIN PER ATTACHMENT L-2] | ||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | ||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ||||
| [INSERT CLIN PER ATTACHMENT L-2] | ||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | ||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | ||||
| [INSERT CLIN PER ATTACHMENT L-2] | ||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | ||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] |
Milestone Payment Schedule
[INSERT INSTALLATION NAME]
Tinker AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is to be utilized during evaluation of the Offeror's proposal. The information provided on this document is identical to the Offeror's Milestone Payment Schedule With Cost, except columns F, G and H of that document are deleted. The most expedient method that will ensure integrity of the data is to create the Milestone Payment Schedule With Cost in its entirety, then delete columns F, G and H from each Tab. Otherwise, the Offeror must complete the required information for each Tab according to the following instructions.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITHOUT Cost is to be formatted; the sample Milestone Payments identfied are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided. These MUST be identical to those identified on the Milestone Payment Schedule WITH Cost.
| Tinker AFB, OK | |||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Projected Milestone Completion Date |
| Tinker AFB | 0052 | Complete a Basewide Quality Program Plan (QPP) | |||
| Tinker AFB | N/A | 0052AA | Complete Basewide QPP | ||
| Tinker AFB | N/A | 0052AA0001 | Air Force and USACE Approval of Final QPP | ||
| Tinker AFB | N/A | 0052AB | Update 1-Basewide QPP | ||
| Tinker AFB | N/A | 0052AB0001 | Air Force and USACE Approval of Final QPP Update | ||
| Tinker AFB | N/A | 0052AC | Update 2-Basewide QPP | ||
| Tinker AFB | N/A | 0052AC0001 | Air Force and USACE Approval of Final QPP Update | ||
| Tinker AFB | All Sites | 0053 | Land Use Control Implementation Plans (LUCIP) - NPL sites and non-NPL sites | ||
| Tinker AFB | All Sites | 0053AA | Complete two (2) Land Use Control Implementation Plans (LUCIP) - NPL sites and non-NPL sites | ||
| Tinker AFB | All Sites | 0053AA0001 | Description of Milestone Payment | ||
| Tinker AFB | All Sites | 0053AB | Update 1-LUCIP | ||
| Tinker AFB | All Sites | 0053AB0001 | Description of Milestone Payment | ||
| Tinker AFB | All Sites | 0053AC | Update 2-LUCIP | ||
| Tinker AFB | All Sites | 0053AC0001 | Description of Milestone Payment | ||
| Tinker AFB | All Sites | 0054 | Basewide Monitoring Plan | ||
| Tinker AFB | All Sites | 0054AA | Develop a Basewide Monitoring Plan | ||
| Tinker AFB | All Sites | 0054AA0001 | Description of Milestone Payment | ||
| Tinker AFB | All Sites | 0054AB | Update 1-Basewide Monitoring Plan | ||
| Tinker AFB | All Sites | 0054AB0001 | Description of Milestone Payment | ||
| Tinker AFB | All Sites | 0054AC | Update 2-Basewide Monitoring Plan | ||
| Tinker AFB | All Sites | 0054AC0001 | Description of Milestone Payment | ||
| Tinker AFB | All Sites | 0055 | Complete Well Abandonment | ||
| Tinker AFB | All Sites | Each of 0055AA - 0055AK | Abandon up to 25 Wells | ||
| Tinker AFB | All Sites | 0055AA0001- 0055AK0001 | Air Force and USACE Approval of Final QPP | ||
| Tinker AFB | All Sites | 0056 | Update Community Involvement Plan | ||
| Tinker AFB | All Sites | 0056AA | Update 1-Community Involvement Plan | ||
| Tinker AFB | All Sites | 0056AA0001 | Air Force and USACE Approval of Final QPP | ||
| Tinker AFB | All Sites | 0056AB | Update 2-Community Involvement Plan | ||
| Tinker AFB | All Sites | 0056AB0001 | Air Force and USACE Approval of Final QPP Update | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057 | Achieve Response Complete | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AA | Achieve Corrective Measures Study, Statement of Basis, and Permit Modification | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AA0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AB | Achieve Remedy in Place | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AB0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AC | Achieve Response Complete | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057AC0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CA0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CB0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CC0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CD0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CE0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CF0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CG0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CH0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CJ0001 | Description of Milestone Payment | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Tinker AFB | CG001 (CG041, AOC22) | 0057CK0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058 | Conduct RA-O and Reduce LCC and Decommission Vacuum Enhanced Pumping (VEP) System | ||
| Tinker AFB | CG037 | 0058AA | Decommission Vacuum Enhanced Pumping (VEP) System | ||
| Tinker AFB | CG037 | 0058AA0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CA | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 1 | ||
| Tinker AFB | CG037 | 0058CA0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CB | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 2 | ||
| Tinker AFB | CG037 | 0058CB0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CC | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 3 | ||
| Tinker AFB | CG037 | 0058CC0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CD | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 4 | ||
| Tinker AFB | CG037 | 0058CD0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CE | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 5 | ||
| Tinker AFB | CG037 | 0058CE0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CF | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 6 | ||
| Tinker AFB | CG037 | 0058CF0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CG | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 7 | ||
| Tinker AFB | CG037 | 0058CG0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CH | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 8 | ||
| Tinker AFB | CG037 | 0058CH0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CJ | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 9 | ||
| Tinker AFB | CG037 | 0058CJ0001 | Description of Milestone Payment | ||
| Tinker AFB | CG037 | 0058CK | Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC - Year 10 | ||
| Tinker AFB | CG037 | 0058CK0001 | Description of Milestone Payment | ||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] |
Milestone Payment Schedule
[INSERT INSTALLATION NAME]
Vance AFB
DRAFT MILESTONE PAYMENT SCHEDULE TEMPLATE
WITH COST
OPTIMIZED REMEDIATION CONTRACT (ORC)
OKLAHOMA/ARKANSAS (OK/AR) GROUP
Solicitation: W912BV-20-R-0002
23 March 2020
Notes/Instructions:
1. This document is to be utilized during evaluation of the Offeror's proposal. The information provided on this document is identical to the Offeror's Milestone Payment Schedule With Cost, except columns F, G and H of that document are deleted. The most expedient method that will ensure integrity of the data is to create the Milestone Payment Schedule With Cost in its entirety, then delete columns F, G and H from each Tab. Otherwise, the Offeror must complete the required information for each Tab according to the following instructions.
2. Identify ONLY those CLINs or Sub-CLINs for which more than one (1) milestone payment would be planned (number in column C and description in column E, must be as identified on Attachment L-2).
3. Then identify the anticipated Milestone Payment Identification Number by first utilizing the CLIN/Sub-CLIN number followed by '0001, 0002, 0003' etc. (in column D).
4. Identify in column E a description of the anticipated Milestone Payment such as Draft XXX, Final XXX, etc.
NOTE: Below is a brief snapshot of how the Draft Milestone Payment Schedule WITHOUT Cost is to be formatted; the sample Milestone Payments identfied are only examples and can be added to as needed. Add to the below table to the extent necessary to present the anticipated Milestone Payments. The Offeror shall complete one table for each installation on the separate tab provided. These MUST be identical to those identified on the Milestone Payment Schedule WITH Cost.
| Vance AFB, OK | |||||
| Installation Name | Site Number | CLIN/Sub-CLIN | Milestone Payment Identification Number | Sub-CLIN/Payment Milestone Description | Projected Milestone Completion Date |
| Vance AFB | 0083 | Complete a Basewide Quality Program Plan (QPP) | |||
| Vance AFB | N/A | 0083AA | Complete Basewide QPP | ||
| Vance AFB | N/A | 0083AA0001 | Air Force and USACE Approval of Final QPP | ||
| Vance AFB | N/A | 0083AB | Update 1-Basewide QPP | ||
| Vance AFB | N/A | 0083AB0001 | Air Force and USACE Approval of Final QPP Update | ||
| Vance AFB | N/A | 0083AC | Update 2-Basewide QPP | ||
| Vance AFB | N/A | 0083AC0001 | Air Force and USACE Approval of Final QPP Update | ||
| Vance AFB | DP005 | 0084 | Achieve Response Complete | ||
| Vance AFB | DP005 | 0084AA | Optimize in support of achievement of Response Complete | ||
| Vance AFB | DP005 | 0084AA0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084AB | Continue to optimize in support of achievement of Response Complete | ||
| Vance AFB | DP005 | 0084AB0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084AC | Continue to optimize in support of achievement of Response Complete | ||
| Vance AFB | DP005 | 0084AC0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084AD | Achieve Response Complete | ||
| Vance AFB | DP005 | 0084AD0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Vance AFB | DP005 | 0084CA0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Vance AFB | DP005 | 0084CB0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Vance AFB | DP005 | 0084CC0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Vance AFB | DP005 | 0084CD0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Vance AFB | DP005 | 0084CE0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Vance AFB | DP005 | 0084CF0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Vance AFB | DP005 | 0084CG0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Vance AFB | DP005 | 0084CH0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Vance AFB | DP005 | 0084CJ0001 | Description of Milestone Payment | ||
| Vance AFB | DP005 | 0084CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Vance AFB | DP005 | 0084CK0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085 | Conduct RA-O | ||
| Vance AFB | FT002 | 0085CA | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 1 | ||
| Vance AFB | FT002 | 0085CA0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CB | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 2 | ||
| Vance AFB | FT002 | 0085CB0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CC | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 3 | ||
| Vance AFB | FT002 | 0085CC0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CD | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 4 | ||
| Vance AFB | FT002 | 0085CD0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CE | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 5 | ||
| Vance AFB | FT002 | 0085CE0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CF | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 6 | ||
| Vance AFB | FT002 | 0085CF0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CG | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 7 | ||
| Vance AFB | FT002 | 0085CG0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CH | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 8 | ||
| Vance AFB | FT002 | 0085CH0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CJ | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 9 | ||
| Vance AFB | FT002 | 0085CJ0001 | Description of Milestone Payment | ||
| Vance AFB | FT002 | 0085CK | Maintain Compliance with Regulatory Requirements and Binding Agreements - Year 10 | ||
| Vance AFB | FT002 | 0085CK0001 | Description of Milestone Payment | ||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] | |||||
| [INSERT CLIN PER ATTACHMENT L-2] | |||||
| [INSERT Sub-CLIN PER ATTACHMENT L-2] | |||||
| [INSERT PROPOSED MILESTONE PER PWS and PMP GUIDANCE] |
Milestone Payment Schedule
[INSERT INSTALLATION NAME]