This document provides information on a federal contract opportunity for an Optimized Remediation Contract (ORC) for five Air Force installations in Oklahoma and Arkansas. The scope of work includes environmental remediation and engineering activities to investigate, design, and implement remedial actions and construction to support performance objectives for site cleanup and closure at 65 restoration program sites. The contract is estimated at $50 million for a ten-year period of performance.
The solicitation will be issued on or around November 19, 2019 via beta.SAM. Proposals will be due on or around February 20, 2020 and will be evaluated using best value tradeoff procedures. The contract type will be firm-fixed-price. The North American Industry Classification System code is 562910 and it is set aside for small businesses with less than 750 employees. Pre-proposal site visits and a conference will be outlined in the solicitation. The Army Corps of Engineers District in Tulsa intends to award by mid-2020.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7 – 9 January 2020 Virtual Site Tour Former Air Force Plant 3
Air Force Civil Engineer Center Battle Ready…Built Right!
Agenda Installation Background General Information Regulatory Authority/Requirements ORC Objectives Site-Specific Information
Location Mission – Former AFP 3 was used primarily for assembling bombers by Douglas Aircraft Company in 1942; manufacture B-47 Stratojets; and maintenance of aircraft Located on the northeastern side of City of Tulsa, Oklahoma Approximately 337 Acres Tulsa International Airport borders AFP 3 on the west, north, east and industrial buildings to the south
Include Site Map showing base location with the state. Briefly discuss background, size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Mission should be the installation’s mission.
CASH, CYNTHIA J GS-13 USAF AFMC AFCEC/CZR (CCJGUAA) - Should probably state this is a former AF facility currently operated by . . .
Former AFP 3 Map
Include Site Map showing base location with the state. Briefly discuss background, size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Mission should be the installation’s mission.
Background Government Owned, Contractor Operated Plant Built: 1942 Sold/Transfer Date: 1 December 1999 Owner/Operator: City of Tulsa/IC Bus, LLC & Spirit AeroSystems, Inc.
The 1999 quitclaim deed transferring interest in the property to City of Tulsa includes specific land use restrictions (non-residential, soil, gw, industrial use…) Cleanup under Resource Conservation and Recovery Act (RCRA) with regulatory oversight from the ODEQ
Include Site Map showing base location with the state. Briefly discuss background, size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Mission should be the installation’s mission.
AFP 3 IRP Sites Figure showing base land use
AFP 3 Land Use
Regulatory Authority/Requirements RCRA Permit Issued by ODEQ in 1992 Class 3 Modification to the RCRA Part B Permit issued in 1999 Permit Reporting Requirements:
Annual Compliance Monitoring Report for surface and groundwater Conduct five-year review to evaluate the groundwater monitoring program RCRA permit is expired and there are no plans for renewal
CASH, CYNTHIA J GS-13 USAF AFMC AFCEC/CZR (CCJGUAA) - too many "report" in this title. Should it be Compliance Monitoring Report, Performance Report, Montioring/Performance Report, or something else?
AFP 3 General Information Access for Spirit AeroSystems and IC Bus, LLC:
Contractor will sign the right of access agreement Access to all sites will require coordination with current tenants and City of Tulsa Type of credentials/identification required for AFP 3 site access is a valid driver’s license Access to Spirit AeroSystems property requires personnel to have a clean record and no foreign nationals are allowed Contractor responsible for contacting Tulsa Airport Authority (TAA), Federal Aviation Authority (FAA), and other tenant organizations for specific access restrictions and requirements
Briefly discuss background (when opened,), size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Discuss current use of the base. Identify frequency of RAB meetings or ID if there is no RAB.
AFP 3 General Information FAA and Airport may impose additional access restrictions No active Restoration Advisory Board
Briefly discuss background (when opened,), size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Discuss current use of the base. Identify frequency of RAB meetings or ID if there is no RAB.
Former AFP 3 Leases to Tulsa
Briefly discuss background (when opened,), size of base, what is located onbase (flight line, cantonment area, offices/warehouses, housing, etc. – whatever applies to your base. Discuss current use of the base. Identify frequency of RAB meetings or ID if there is no RAB.
CASH, CYNTHIA J GS-13 USAF AFMC AFCEC/CZR (CCJGUAA) - Add a legend for this map?
List of Sites for AFP 3
| Site ID | Site Name | Alternate Site ID |
| LF006 | Hardfill Area | SWMU 5 |
| OT010 | BLDG 3 Leaking Drain | SWMU 8 |
Site LF006/SWMU 5 Site ID: Site LF006/ SWMU 5, Hardfill Area Description: Located northeast corner of AFP 3, approximately 800’ in length and 200’ in width
Background:
Site was used as burning area; disposal for miscellaneous trash and incinerator ash in 1940s Used as disposal site for construction debris, fuel filters, incinerator ash, and sludge from cleaning of fuel tanks in the 1950s Surface impoundment was constructed and used for disposal of rinse water
Site LF006
Make the background very brief. Overflow to multiple slides as needed.
Site LF006/SWMU5 Impacted Media: Surface water and groundwater COCs: CVOCs and 1,4-dioxane Remedy Listed in ROD/DD / Permit: Remedy was shutdown in 1999 (per Class 3 Mod to the Permit). FYR and annual groundwater monitoring program established.
LUCs: Restrictions for soils, groundwater, and residential construction are documented in 1999 quitclaim deed; access to Mingo Creek area and impacted surface water is controlled.
Air Force Performance Objective: Long Term Management (LTM) in accordance with the RCRA Permit through POP; Remedy in Place (RIP) for volatile organic compounds (VOCs) and 1,4-dioxane
PFOS/PFOA: N/A
Site OT010/SWMU 8 Site ID: Site OT10/ SWMU 8, Building 3 Leaking Drain Description: Located in the north-central part of AFP 3; associated with the former floor drain system at Building 3
Site OT010 Background:
Building 3 was constructed in 1942 and has historically been used for painting, blasting, and stripping major aircraft parts Floor drain was installed in 1969 to collect paint, paint stripper wastes, and contaminated water During system integrity testing conducted in 1987, it was determined the lines beneath Building 3 leaked and joints had failed
Impacted Media: Soil and groundwater COCs: CVOCs and 1,4-dioxane Remedy Listed in ROD/DD / Permit: Remedy was shutdown in 1999 (per Class 3 Mod to the Permit). FYR and annual groundwater monitoring program established.
LUCs: Restrictions for soils, groundwater, and residential construction are documented in 1999 quitclaim deed; access to Mingo Creek area and impacted surface water is controlled.
Air Force Performance Objective: Long Term Management (LTM) in accordance with the RCRA Permit through POP; Remedy in Place (RIP) for volatile organic compounds (VOCs) and 1,4-dioxane
PFOS/PFOA: N/A
Site OT010/SWMU 8
Regulatory Review Times (Estimated) Documents only reviewed by ODEQ Review Priorities/Time:
High complexity documents : 1 – 3 months Low complexity documents (work plans/field activity): 1 – 2 months image3.jpeg image4.jpeg image6.emf image7.png image8.png image9.emf image10.png image1.jpeg image2.png