Section L Attach L-1 PS without Cost ORC OK-AR 20 Mar 2020.xlsx
XLSX spreadsheet 62 KB Posted
- Attached to
- Optimized Remediation Contract (ORC) OK/AR Group
- Solicitation number
- W912BV20R0002
About this file
This document is a pre-solicitation notification for solicitation number W912BV20R0002, issued by the Tulsa District of the U.S. Army Corps of Engineers. It provides notice of an upcoming small business set-aside procurement for environmental remediation services at five Air Force installations in Oklahoma and Arkansas, collectively known as the ORC OK/AR Group. Services will include investigation, design, remedial action, construction, and activities to advance site cleanup at 65 Environmental Restoration Program sites over a proposed 10-year contract period. The requirement is for a performance-based, firm-fixed-price C-type contract. The NAICS code is 562910 and size standard is $38.5M. The solicitation will be issued on beta.SAM on or about November 19th, with proposals due on or about February 20th. The best value source selection method will be used. General questions may be directed to the point of contact listed, while technical questions must be submitted through ProjNet/Bidder's Inquiry once the solicitation is released.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT L-1 |
| PRICING SCHEDULE WITHOUT COST |
| OPTIMIZED REMEDIATION CONTRACT (ORC) |
OKLAHOMA/ARKANSAS (OK/AR) GROUP
| Solicitation: W912BV-20-R-0002 | |
| Contract #TBD |
20 March 2020
Offeror:
CRITICAL NOTES:
1) Ensure the Offeror's name is provided in the yellow cell above.
2) This Attachment L-1 is for evaluation purposes and to establish the contract only, the MPS for payment purposes will be negotiated after award, based on the below, with the successful Offeror.
3) DO NOT make any changes to this document.
4) Offerors MAY NOT propose alternate Milestones to the CLINs/sub-CLINs identified below;
5) Enter the 'Projected Start' and 'Projected Completion' dates for each CLIN/sub-CLIN ONLY (green, purple, or bronze cells in columns F and G).
6) The performance period of any individual CLIN/sub-CLIN shall NOT be more than FIVE (5) years.
**Non-compliance with the above instructions will result in the assignment of a 'Deficiency' and the Offeror's proposal being removed from further consideration for contract award.
| Denotes Base Award Item |
| Denotes Base Year Option |
| Denotes Start of a New Site Number or "All Sites" at an Installation |
PLEASE NOTE: The "Expiration Date to Exercise Option" column shown as "FY29" for Sub-CLINs denoting performance activities as per Section 4.2 of the PWS represents the latest date an option can be awarded before it expires for obligation and does not necessarily represent the projected start date the Offeror should use when developing the schedule and duration of activities for such performance Sub-CLINs in their technical proposal.
| CLIN | CLIN/SUB-CLIN DESCRIPTION | INSTALLATION | SITE | Expiration Date to Exercise Option | Projected Start Date (MM/DD/YY) | Projected Completion Date (MM/DD/YY) | |
| PLANS, SCHEDULES AND SAMPLING | |||||||
| 0001 | Complete Project Management Plan (PMP) | N/A | N/A | ||||
| 0001AA | Complete PMP | N/A | N/A | At Award | |||
| 0001AB | |||||||
| Option | Update PMP | N/A | N/A | FY29 | Considered Option Tasks | ||
| 0001AC | |||||||
| Option | Update PMP | N/A | N/A | FY29 | |||
| 0002 | Complete Quality Assurance Surveillance Plan (QASP) | N/A | N/A | ||||
| 0002AA | Complete QASP | N/A | N/A | At Award | |||
| 0002AB | |||||||
| Option | Update QASP | N/A | N/A | FY29 | Considered Option Tasks | ||
| 0002AC | |||||||
| Option | Update QASP | N/A | N/A | FY29 | |||
| 0003 | Develop Integrated Master Schedule (IMS)/Milestone Payment Schedule (MPS) and Update Monthly | N/A | N/A | ||||
| 0003AA | Develop IMS/MPS and Update Monthly - Base Year | N/A | N/A | At Award | |||
| 0003AB | |||||||
| Option | Update IMS/MPS Monthly - Year 2 | N/A | N/A | FY21 | |||
| 0003AC | |||||||
| Option | Update IMS/MPS Monthly - Year 3 | N/A | N/A | FY22 | |||
| 0003AD | |||||||
| Option | Update IMS/MPS Monthly - Year 4 | N/A | N/A | FY23 | |||
| 0003AE | |||||||
| Option | Update IMS/MPS Monthly - Year 5 | N/A | N/A | FY24 | |||
| 0003AF | |||||||
| Option | Update IMS/MPS Monthly - Year 6 | N/A | N/A | FY25 | |||
| 0003AG | |||||||
| Option | Update IMS/MPS Monthly - Year 7 | N/A | N/A | FY26 | |||
| 0003AH | |||||||
| Option | Update IMS/MPS Monthly - Year 8 | N/A | N/A | FY27 | |||
| 0003AJ | |||||||
| Option | Update IMS/MPS Monthly - Year 9 | N/A | N/A | FY28 | |||
| 0003AK | |||||||
| Option | Update IMS/MPS Monthly - Year 10 | N/A | N/A | FY29 | |||
| 0004 | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2020 | N/A | N/A | At Award | ||||
| 0005 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2021 | N/A | N/A | FY21 | ||||
| 0006 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2022 | N/A | N/A | FY22 | ||||
| 0007 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2023 | N/A | N/A | FY23 | ||||
| 0008 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2024 | N/A | N/A | FY24 | ||||
| 0009 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2025 | N/A | N/A | FY25 | ||||
| 0010 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2026 | N/A | N/A | FY26 | ||||
| 0011 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2027 | N/A | N/A | FY27 | ||||
| 0012 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2028 | N/A | N/A | FY28 | ||||
| 0013 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2029 | N/A | N/A | FY29 | ||||
| 0014 | |||||||
| Option | Contractor Manpower Reporting- | ||||||
| Period Ending 30 Sep 2030 | N/A | N/A | FY29 | ||||
| 0015 | |||||||
| Option | Complete 1,4-Dioxane sampling in accordance with paragraph 8.1.1.f. of the PWS | N/A | N/A | FY29 | Considered Option Task |
| AIR FORCE PLANT 3 | ||||||
| 0016 | Complete Basewide Quality Program Plans (QPPs) | Air Force Plant (AFP) 3 | N/A | |||
| 0016AA | Complete Basewide QPP | Air Force Plant (AFP) 3 | N/A | At Award | ||
| 0016AB | ||||||
| Option | Update 1-Basewide QPP | Air Force Plant (AFP) 3 | N/A | FY29 | Considered Option Tasks | |
| 0016AC | ||||||
| Option | Update 2-Basewide QPP | Air Force Plant (AFP) 3 | N/A | FY29 | ||
| 0017 | Conduct LTM and Achieve Remedy in Place for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | LF006 | |||
| 0017AA | ||||||
| Option | Achieve the Corrective Measures Study for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | LF006 | FY25 | ||
| 0017AB | ||||||
| Option | Achieve the Statement of Basis Amendment for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | LF006 | 1 Year of Completion of 0017AA | Considered Option Tasks | |
| 0017AC | ||||||
| Option | Achieve Remedy in Place for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | LF006 | 1 Year of Completion of 0017AB | ||
| 0017CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Air Force Plant (AFP) 3 | LF006 | Base Year | ||
| 0017CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Air Force Plant (AFP) 3 | LF006 | FY21 | ||
| 0017CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Air Force Plant (AFP) 3 | LF006 | FY22 | ||
| 0017CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Air Force Plant (AFP) 3 | LF006 | FY23 | ||
| 0017CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Air Force Plant (AFP) 3 | LF006 | FY24 | ||
| 0017CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Air Force Plant (AFP) 3 | LF006 | FY25 | ||
| 0017CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Air Force Plant (AFP) 3 | LF006 | FY26 | ||
| 0017CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Air Force Plant (AFP) 3 | LF006 | FY27 | ||
| 0017CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Air Force Plant (AFP) 3 | LF006 | FY28 | ||
| 0017CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Air Force Plant (AFP) 3 | LF006 | FY29 | ||
| 0018 | Conduct LTM and Achieve Remedy in Place for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | OT010 | |||
| 0018AA | ||||||
| Option | Achieve the Corrective Measures Study for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | OT010 | FY25 | ||
| 0018AB | ||||||
| Option | Achieve the Statement of Basis Amendment for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | OT010 | 1 Year of Completion of 0018AA | Considered Option Tasks | |
| 0018AC | ||||||
| Option | Achieve Remedy in Place for VOCs and 1,4-Dioxane | Air Force Plant (AFP) 3 | OT010 | 1 Year of Completion of 0018AB | ||
| 0018CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Air Force Plant (AFP) 3 | OT010 | Base Year | ||
| 0018CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Air Force Plant (AFP) 3 | OT010 | FY21 | ||
| 0018CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Air Force Plant (AFP) 3 | OT010 | FY22 | ||
| 0018CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Air Force Plant (AFP) 3 | OT010 | FY23 | ||
| 0018CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Air Force Plant (AFP) 3 | OT010 | FY24 | ||
| 0018CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Air Force Plant (AFP) 3 | OT010 | FY25 | ||
| 0018CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Air Force Plant (AFP) 3 | OT010 | FY26 | ||
| 0018CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Air Force Plant (AFP) 3 | OT010 | FY27 | ||
| 0018CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Air Force Plant (AFP) 3 | OT010 | FY28 | ||
| 0018CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Air Force Plant (AFP) 3 | OT010 | FY29 |
| ALTUS AFB, OK | ||||||
| 0019 | Complete Basewide Quality Program Plans | Altus AFB | N/A | |||
| 0019AA | Complete Basewide QPP | Altus AFB | N/A | At Award | ||
| 0019AB | ||||||
| Option | Update 1-Basewide QPP | Altus AFB | N/A | FY29 | Considered Option Tasks | |
| 0019AC | ||||||
| Option | Update 2-Basewide QPP | Altus AFB | N/A | FY29 | ||
| 0020 | Complete Well Abandonment | Altus AFB | All Sites | |||
| 0020AA | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | Considered Option Tasks | |
| 0020AB | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AC | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AD | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AE | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AF | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AG | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AH | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AJ | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0020AK | ||||||
| Option | Abandon up to 40 wells | Altus AFB | All Sites | FY29 | ||
| 0021 | ||||||
| Option | Develop Basewide Monitoring Plan | Altus AFB | N/A | Base Year | ||
| 0022 | Conduct RA-O | Altus AFB | FT003 | |||
| 0022CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | FT003 | Base Year | ||
| 0022CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | FT003 | FY21 | ||
| 0022CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | FT003 | FY22 | ||
| 0022CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | FT003 | FY23 | ||
| 0022CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | FT003 | FY24 | ||
| 0022CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | FT003 | FY25 | ||
| 0022CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | FT003 | FY26 | ||
| 0022CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | FT003 | FY27 | ||
| 0022CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | FT003 | FY28 | ||
| 0022CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | FT003 | FY29 | ||
| 0023 | Conduct LTM | Altus AFB | FT005 | |||
| 0023CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | FT005 | Base Year | ||
| 0023CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | FT005 | FY21 | ||
| 0023CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | FT005 | FY22 | ||
| 0023CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | FT005 | FY23 | ||
| 0023CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | FT005 | FY24 | ||
| 0023CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | FT005 | FY25 | ||
| 0023CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | FT005 | FY26 | ||
| 0023CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | FT005 | FY27 | ||
| 0023CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | FT005 | FY28 | ||
| 0023CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | FT005 | FY29 | ||
| 0024 | Conduct LTM | Altus AFB | FT007 | |||
| 0024CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | FT007 | FY22 | ||
| 0024CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | FT007 | FY25 | ||
| 0024CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | FT007 | FY28 | ||
| 0025 | Conduct RA-O | Altus AFB | LF004 | |||
| 0025CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | LF004 | Base Year | ||
| 0025CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | LF004 | FY21 | ||
| 0025CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | LF004 | FY22 | ||
| 0025CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | LF004 | FY23 | ||
| 0025CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | LF004 | FY24 | ||
| 0025CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | LF004 | FY25 | ||
| 0025CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | LF004 | FY26 | ||
| 0025CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | LF004 | FY27 | ||
| 0025CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | LF004 | FY28 | ||
| 0025CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | LF004 | FY29 | ||
| 0026 | Conduct LTM | Altus AFB | LF008 | |||
| 0026CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | LF008 | FY22 | ||
| 0026CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | LF008 | FY25 | ||
| 0026CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | LF008 | FY28 | ||
| 0027 | Achieve Response Complete | Altus AFB | LF014 | |||
| 0027AA | ||||||
| Option | Optimize the site in support of achievement of Response Complete | Altus AFB | LF014 | FY25 | ||
| 0027AB | ||||||
| Option | Achieve Response Complete | Altus AFB | LF014 | 2 Years of Completion of 0027AA | Considered Option Task | |
| 0027CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | LF014 | Base Year | ||
| 0027CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | LF014 | FY21 | ||
| 0027CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | LF014 | FY22 | ||
| 0027CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | LF014 | FY23 | ||
| 0027CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | LF014 | FY24 | ||
| 0027CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | LF014 | FY25 | ||
| 0027CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | LF014 | FY26 | ||
| 0027CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | LF014 | FY27 | ||
| 0027CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | LF014 | FY28 | ||
| 0027CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | LF014 | FY29 | ||
| 0028 | Conduct LTM and Achieve Alternate Objectives | Altus AFB | SS010 | |||
| 0028AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | SS010 | FY29 | Considered Option Tasks | |
| 0028AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | SS010 | FY29 | ||
| 0028AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | SS010 | FY29 | ||
| 0028AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | SS010 | FY29 | ||
| 0028AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | SS010 | FY29 | ||
| 0028CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS010 | Base Year | ||
| 0028CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS010 | FY21 | ||
| 0028CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS010 | FY22 | ||
| 0028CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS010 | FY23 | ||
| 0028CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS010 | FY24 | ||
| 0028CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS010 | FY25 | ||
| 0028CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS010 | FY26 | ||
| 0028CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS010 | FY27 | ||
| 0028CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS010 | FY28 | ||
| 0028CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS010 | FY29 | ||
| 0029 | Conduct RA-O | Altus AFB | SS013 | |||
| 0029CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS013 | Base Year | ||
| 0029CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS013 | FY21 | ||
| 0029CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS013 | FY22 | ||
| 0029CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS013 | FY23 | ||
| 0029CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS013 | FY24 | ||
| 0029CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS013 | FY25 | ||
| 0029CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS013 | FY26 | ||
| 0029CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS013 | FY27 | ||
| 0029CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS013 | FY28 | ||
| 0029CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS013 | FY29 | ||
| 0030 | Conduct RA-O and Achieve Alternate Objectives | Altus AFB | SS016 | |||
| 0030AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | SS016 | FY29 | Considered Option Tasks | |
| 0030AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | SS016 | FY29 | ||
| 0030AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | SS016 | FY29 | ||
| 0030AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | SS016 | FY29 | ||
| 0030AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | SS016 | FY29 | ||
| 0030CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS016 | Base Year | ||
| 0030CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS016 | FY21 | ||
| 0030CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS016 | FY22 | ||
| 0030CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS016 | FY23 | ||
| 0030CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS016 | FY24 | ||
| 0030CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS016 | FY25 | ||
| 0030CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS016 | FY26 | ||
| 0030CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS016 | FY27 | ||
| 0030CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS016 | FY28 | ||
| 0030CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS016 | FY29 | ||
| 0031 | Conduct RA-O and Achieve Alternate Objectives | Altus AFB | SS017 | |||
| 0031AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | SS017 | FY29 | Considered Option Tasks | |
| 0031AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | SS017 | FY29 | ||
| 0031AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | SS017 | FY29 | ||
| 0031AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | SS017 | FY29 | ||
| 0031AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | SS017 | FY29 | ||
| 0031CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS017 | Base Year | ||
| 0031CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS017 | FY21 | ||
| 0031CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS017 | FY22 | ||
| 0031CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS017 | FY23 | ||
| 0031CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS017 | FY24 | ||
| 0031CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS017 | FY25 | ||
| 0031CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS017 | FY26 | ||
| 0031CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS017 | FY27 | ||
| 0031CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS017 | FY28 | ||
| 0031CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS017 | FY29 | ||
| 0032 | Conduct RA-O and Achieve Alternate Objectives | Altus AFB | SS018 | |||
| 0032AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | SS018 | FY29 | Considered Option Tasks | |
| 0032AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | SS018 | FY29 | ||
| 0032AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | SS018 | FY29 | ||
| 0032AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | SS018 | FY29 | ||
| 0032AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | SS018 | FY29 | ||
| 0032CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS018 | Base Year | ||
| 0032CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS018 | FY21 | ||
| 0032CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS018 | FY22 | ||
| 0032CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS018 | FY23 | ||
| 0032CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS018 | FY24 | ||
| 0032CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS018 | FY25 | ||
| 0032CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS018 | FY26 | ||
| 0032CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS018 | FY27 | ||
| 0032CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS018 | FY28 | ||
| 0032CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS018 | FY29 | ||
| 0033 | Conduct RA-O and Achieve Alternate Objectives | Altus AFB | SS022 | |||
| 0033AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | SS022 | FY29 | Considered Option Tasks | |
| 0033AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | SS022 | FY29 | ||
| 0033AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | SS022 | FY29 | ||
| 0033AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | SS022 | FY29 | ||
| 0033AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | SS022 | FY29 | ||
| 0033CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS022 | Base Year | ||
| 0033CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS022 | FY21 | ||
| 0033CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS022 | FY22 | ||
| 0033CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS022 | FY23 | ||
| 0033CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS022 | FY24 | ||
| 0033CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS022 | FY25 | ||
| 0033CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS022 | FY26 | ||
| 0033CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS022 | FY27 | ||
| 0033CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS022 | FY28 | ||
| 0033CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS022 | FY29 | ||
| 0034 | Conduct RA-O and Achieve Alternate Objectives | Altus AFB | SS023 | |||
| 0034AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | SS023 | FY29 | Considered Option Tasks | |
| 0034AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | SS023 | FY29 | ||
| 0034AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | SS023 | FY29 | ||
| 0034AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | SS023 | FY29 | ||
| 0034AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | SS023 | FY29 | ||
| 0034CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS023 | Base Year | ||
| 0034CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS023 | FY21 | ||
| 0034CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS023 | FY22 | ||
| 0034CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS023 | FY23 | ||
| 0034CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS023 | FY24 | ||
| 0034CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS023 | FY25 | ||
| 0034CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS023 | FY26 | ||
| 0034CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS023 | FY27 | ||
| 0034CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS023 | FY28 | ||
| 0034CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS023 | FY29 | ||
| 0035 | Conduct RA-O | Altus AFB | SS024 | |||
| 0035CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Altus AFB | SS024 | Base Year | ||
| 0035CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Altus AFB | SS024 | FY21 | ||
| 0035CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | SS024 | FY22 | ||
| 0035CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Altus AFB | SS024 | FY23 | ||
| 0035CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Altus AFB | SS024 | FY24 | ||
| 0035CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | SS024 | FY25 | ||
| 0035CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Altus AFB | SS024 | FY26 | ||
| 0035CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Altus AFB | SS024 | FY27 | ||
| 0035CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | SS024 | FY28 | ||
| 0035CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Altus AFB | SS024 | FY29 | ||
| 0036 | Conduct LTM and Achieve Alternate Objectives | Altus AFB | ST012 | |||
| 0036AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | ST012 | FY29 | Considered Option Tasks | |
| 0036AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | ST012 | FY29 | ||
| 0036AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | ST012 | FY29 | ||
| 0036AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | ST012 | FY29 | ||
| 0036AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | ST012 | FY29 | ||
| 0036CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | ST012 | FY22 | ||
| 0036CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | ST012 | FY25 | ||
| 0036CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | ST012 | FY28 | ||
| 0037 | Conduct LTM | Altus AFB | ST025 | |||
| 0037CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | ST025 | FY22 | ||
| 0037CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | ST025 | FY25 | ||
| 0037CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | ST025 | FY28 | ||
| 0038 | Conduct LTM | Altus AFB | WP001 | |||
| 0038CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | WP001 | FY22 | ||
| 0038CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | WP001 | FY25 | ||
| 0038CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | WP001 | FY28 | ||
| 0039 | Conduct LTM and Achieve Alternate Objectives | Altus AFB | WP002 | |||
| 0039AA | ||||||
| Option | Achieve Supplemental Site Investigation Work Plan | Altus AFB | WP002 | FY29 | Considered Option Tasks | |
| 0039AB | ||||||
| Option | Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program | Altus AFB | WP002 | FY29 | ||
| 0039AC | ||||||
| Option | Achieve Remedy Evaluation and Recommendation Report | Altus AFB | WP002 | FY29 | ||
| 0039AD | ||||||
| Option | Complete Pilot Study(ies)/Treatability Test(s) | Altus AFB | WP002 | FY29 | ||
| 0039AE | ||||||
| Option | Achieve RCRA CA Permit Modification | Altus AFB | WP002 | FY29 | ||
| 0039CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Altus AFB | WP002 | FY22 | ||
| 0039CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Altus AFB | WP002 | FY25 | ||
| 0039CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Altus AFB | WP002 | FY28 |
| LITTLE ROCK AFB, AR | ||||||
| 0040 | Complete Basewide Quality Program Plans | Little Rock AFB | N/A | |||
| 0040AA | Complete Basewide QPP | Little Rock AFB | N/A | At Award | ||
| 0040AB | ||||||
| Option | Update 1-Basewide QPP | Little Rock AFB | N/A | FY29 | Considered Option Tasks | |
| 0040AC | ||||||
| Option | Update 2-Basewide QPP | Little Rock AFB | N/A | FY29 | ||
| 0041 | Review and Complete Land Use Control Implementation Plan (LUCIP) Update | Little Rock AFB | All Sites | |||
| 0041AA | ||||||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 1 | Little Rock AFB | All Sites | Base Year |
| 0041AB | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 2 | Little Rock AFB | All Sites | FY21 |
| 0041AC | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 3 | Little Rock AFB | All Sites | FY22 |
| 0041AD | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 4 | Little Rock AFB | All Sites | FY23 |
| 0041AE | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 5 | Little Rock AFB | All Sites | FY24 |
| 0041AF | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 6 | Little Rock AFB | All Sites | FY25 |
| 0041AG | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 7 | Little Rock AFB | All Sites | FY26 |
| 0041AH | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 8 | Little Rock AFB | All Sites | FY27 |
| 0041AJ | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 9 | Little Rock AFB | All Sites | FY28 |
| 0041AK | |||
| Option | Annual LUCIP Review and Update |
(Update based on RADD amendments, new sites, change in remedy, etc.)
| -Year 10 | Little Rock AFB | All Sites | FY29 | ||
| 0042 | Update Community Involvement Plan | Little Rock AFB | All Sites | ||
| 0042AA | |||||
| Option | Update Community Involvement Plan | Little Rock AFB | All Sites | Base Year | |
| 0042AB | |||||
| Option | Update Community Involvement Plan | Little Rock AFB | All Sites | FY24 | |
| 0042AC | |||||
| Option | Update Community Involvement Plan | Little Rock AFB | All Sites | FY29 | Considered Option Task |
| 0043 | Conduct LTM | Little Rock AFB | DP051 | ||
| 0043CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | DP051 | Base Year | |
| 0043CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | DP051 | FY21 | |
| 0043CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | DP051 | FY22 | |
| 0043CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | DP051 | FY23 | |
| 0043CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | DP051 | FY24 | |
| 0043CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | DP051 | FY25 | |
| 0043CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | DP051 | FY26 | |
| 0043CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | DP051 | FY27 | |
| 0043CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | DP051 | FY28 | |
| 0043CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | DP051 | FY29 | |
| 0044 | Conduct LTM | Little Rock AFB | LF007 | ||
| 0044CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | LF007 | Base Year | |
| 0044CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | LF007 | FY21 | |
| 0044CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | LF007 | FY22 | |
| 0044CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | LF007 | FY23 | |
| 0044CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | LF007 | FY24 | |
| 0044CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | LF007 | FY25 | |
| 0044CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | LF007 | FY26 | |
| 0044CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | LF007 | FY27 | |
| 0044CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | LF007 | FY28 | |
| 0044CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | LF007 | FY29 | |
| 0045 | Conduct LTM | Little Rock AFB | LF008 | ||
| 0045CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | LF008 | Base Year | |
| 0045CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | LF008 | FY21 | |
| 0045CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | LF008 | FY22 | |
| 0045CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | LF008 | FY23 | |
| 0045CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | LF008 | FY24 | |
| 0045CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | LF008 | FY25 | |
| 0045CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | LF008 | FY26 | |
| 0045CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | LF008 | FY27 | |
| 0045CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | LF008 | FY28 | |
| 0045CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | LF008 | FY29 | |
| 0046 | Conduct LTM | Little Rock AFB | LF010 | ||
| 0046CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | LF010 | Base Year | |
| 0046CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | LF010 | FY21 | |
| 0046CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | LF010 | FY22 | |
| 0046CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | LF010 | FY23 | |
| 0046CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | LF010 | FY24 | |
| 0046CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | LF010 | FY25 | |
| 0046CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | LF010 | FY26 | |
| 0046CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | LF010 | FY27 | |
| 0046CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | LF010 | FY28 | |
| 0046CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | LF010 | FY29 | |
| 0047 | Conduct RA-O | Little Rock AFB | LF013 | ||
| 0047CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | LF013 | Base Year | |
| 0047CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | LF013 | FY21 | |
| 0047CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | LF013 | FY22 | |
| 0047CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | LF013 | FY23 | |
| 0047CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | LF013 | FY24 | |
| 0047CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | LF013 | FY25 | |
| 0047CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | LF013 | FY26 | |
| 0047CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | LF013 | FY27 | |
| 0047CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | LF013 | FY28 | |
| 0047CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | LF013 | FY29 | |
| 0048 | Conduct LTM | Little Rock AFB | LF030 | ||
| 0048CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | LF030 | Base Year | |
| 0048CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | LF030 | FY21 | |
| 0048CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | LF030 | FY22 | |
| 0048CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | LF030 | FY23 | |
| 0048CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | LF030 | FY24 | |
| 0048CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | LF030 | FY25 | |
| 0048CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | LF030 | FY26 | |
| 0048CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | LF030 | FY27 | |
| 0048CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | LF030 | FY28 | |
| 0048CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | LF030 | FY29 | |
| 0049 | Conduct LTM | Little Rock AFB | LF046 | ||
| 0049CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | LF046 | Base Year | |
| 0049CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | LF046 | FY21 | |
| 0049CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | LF046 | FY22 | |
| 0049CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | LF046 | FY23 | |
| 0049CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | LF046 | FY24 | |
| 0049CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | LF046 | FY25 | |
| 0049CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | LF046 | FY26 | |
| 0049CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | LF046 | FY27 | |
| 0049CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | LF046 | FY28 | |
| 0049CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | LF046 | FY29 | |
| 0050 | Conduct LTM | Little Rock AFB | ST006 | ||
| 0050CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | ST006 | Base Year | |
| 0050CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | ST006 | FY21 | |
| 0050CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | ST006 | FY22 | |
| 0050CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | ST006 | FY23 | |
| 0050CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | ST006 | FY24 | |
| 0050CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | ST006 | FY25 | |
| 0050CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | ST006 | FY26 | |
| 0050CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | ST006 | FY27 | |
| 0050CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | ST006 | FY28 | |
| 0050CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | ST006 | FY29 | |
| 0051 | Conduct RA-O | Little Rock AFB | ST025 | ||
| 0051CA | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Little Rock AFB | ST025 | Base Year | |
| 0051CB | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Little Rock AFB | ST025 | FY21 | |
| 0051CC | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Little Rock AFB | ST025 | FY22 | |
| 0051CD | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Little Rock AFB | ST025 | FY23 | |
| 0051CE | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Little Rock AFB | ST025 | FY24 | |
| 0051CF | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Little Rock AFB | ST025 | FY25 | |
| 0051CG | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Little Rock AFB | ST025 | FY26 | |
| 0051CH | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Little Rock AFB | ST025 | FY27 | |
| 0051CJ | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Little Rock AFB | ST025 | FY28 | |
| 0051CK | |||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Little Rock AFB | ST025 | FY29 |
| TINKER AFB, OK | ||||||
| 0052 | Complete Basewide Quality Program Plans | Tinker AFB | N/A | |||
| 0052AA | Complete Basewide QPP | Tinker AFB | N/A | At Award | ||
| 0052AB | ||||||
| Option | Update 1-Basewide QPP | Tinker AFB | N/A | FY29 | Considered Option Tasks | |
| 0052AC | ||||||
| Option | Update 2-Basewide QPP | Tinker AFB | N/A | FY29 | ||
| 0053 | Land Use Control Implementation Plans (LUCIP) - NPL sites and non-NPL sites | Tinker AFB | All Sites | |||
| 0053AA | ||||||
| Option | Complete two (2) Land Use Control Implementation Plans (LUCIP) - NPL sites and non-NPL sites | Tinker AFB | All Sites | FY23 | ||
| 0053AB | ||||||
| Option | Update 1-LUCIP | Tinker AFB | All Sites | FY29 | Considered Option Tasks | |
| 0053AC | ||||||
| Option | Update 2-LUCIP | Tinker AFB | All Sites | FY29 | ||
| 0054 | Basewide Monitoring Plan | Tinker AFB | All Sites | |||
| 0054AA | ||||||
| Option | Develop a Basewide Monitoring Plan | Tinker AFB | All Sites | Base Year | ||
| 0054AB | ||||||
| Option | Update 1-Basewide Monitoring Plan | Tinker AFB | All Sites | FY29 | Considered Option Tasks | |
| 0054AC | ||||||
| Option | Update 2-Basewide Monitoring Plan | Tinker AFB | All Sites | FY29 | ||
| 0055 | Complete Well Abandonment | Tinker AFB | All Sites | |||
| 0055AA | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | Considered Option Tasks | |
| 0055AB | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AC | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AD | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AE | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AF | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AG | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AH | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AJ | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0055AK | ||||||
| Option | Abandon up to 25 wells | Tinker AFB | All Sites | FY29 | ||
| 0056 | Update Community Involvement Plan | Tinker AFB | All Sites | |||
| 0056AA | ||||||
| Option | Update 1-Community Involvement Plan | Tinker AFB | All Sites | FY21 | ||
| 0056AB | ||||||
| Option | Update 2-Community Involvement Plan | Tinker AFB | All Sites | FY26 | ||
| 0057 | Achieve Response Complete | Tinker AFB | CG001 (CG041, AOC22) | |||
| 0057AA | ||||||
| Option | Achieve Corrective Measures Study, Statement of Basis, and Permit Modification | Tinker AFB | CG001 (CG041, AOC22) | Upon Completion of 0072AA | ||
| SS230 (OT062, AOC24-RFI) | Considered Option Tasks | |||||
| 0057AB | ||||||
| Option | Achieve Remedy in Place | Tinker AFB | CG001 (CG041, AOC22) | 1 Year of Completion of 0057AA | ||
| 0057AC | ||||||
| Option | Achieve Response Complete | Tinker AFB | CG001 (CG041, AOC22) | 1 Year of Completion of 0057AB | ||
| 0057CA | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 1 | Tinker AFB | CG001 (CG041, AOC22) | Base Year | ||
| 0057CB | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 2 | Tinker AFB | CG001 (CG041, AOC22) | FY21 | ||
| 0057CC | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 3 | Tinker AFB | CG001 (CG041, AOC22) | FY22 | ||
| 0057CD | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 4 | Tinker AFB | CG001 (CG041, AOC22) | FY23 | ||
| 0057CE | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 5 | Tinker AFB | CG001 (CG041, AOC22) | FY24 | ||
| 0057CF | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 6 | Tinker AFB | CG001 (CG041, AOC22) | FY25 | ||
| 0057CG | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 7 | Tinker AFB | CG001 (CG041, AOC22) | FY26 | ||
| 0057CH | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 8 | Tinker AFB | CG001 (CG041, AOC22) | FY27 | ||
| 0057CJ | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 9 | Tinker AFB | CG001 (CG041, AOC22) | FY28 | ||
| 0057CK | ||||||
| Option | Maintain compliance with regulatory requirements and binding agreements - Year 10 | Tinker AFB | CG001 (CG041, AOC22) | FY29 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .