Amend 0006_W9128F25RA008_Narrative.pdf
PDF 68 KB Posted
- Solicitation number
- W9128F25RA008
About this file
This document is a contract amendment for the U.S. Army Corps of Engineers, Omaha District, concerning the Construction of Powerhouse 1 Cubicle Room 15KV Switchgear Upgrade at Fort Peck, Montana. Amendment No. 0006 to Solicitation No. W9128F25RA008 modifies the existing specifications and drawings, specifically updating specification section 02 82 00.
Key details include the date of issue as 21 JUL 2025, with proposals due on 21 OCT 2025 at 2:00 p.m. local time. Electronic proposals will be accepted according to Section 00 22 00, and offerors must provide a receipt acknowledgement with the SF1442. The amendment is part of the proposing documents, and all other conditions and requirements of the specifications remain unchanged.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Am #0006 - 2 (Continuation SF 30)
03 OCT 2025
Solicitation No. W9128F25RA008
Date of Issue: 21 JUL 2025 Date of Receiving Proposals: 21 OCT 2025
SUBJECT: Amendment No. 0006 to specification and drawings for Construction of
POWERHOUSE 1 CUBICLE ROOM 15KV SWITCHGEAR UPGRADE, FORT PECK, MONTANA
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am-6” (underlining of added text and/or strikeout of deleted text).
Pages or Sections Deleted Pages or Sections Substituted or Added 02 82 00 02 82 00 Am-0006
2. This amendment is a part of the proposing documents, and a receipt acknowledgement shall be provided with the SF1442. All other conditions and requirements of the specifications remain unchanged.
3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.
4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 21 OCT 2025, as stated in the Request For Proposal.
Attachments:
Spec Pages listed in 1.a. above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
03 OCT 2025
JNS/2179