This document is an Amendment (No. 0003) to a solicitation for the Construction of Powerhouse 1 Cubicle Room 15KV Switchgear Upgrade at Fort Peck, Montana, issued by the U.S. Army Corps of Engineers, Omaha District. The amendment modifies specifications and drawings, with specific changes to specification page 26 05 00.00 26, which will be deleted and replaced with a revised version marked as "Am-0003".
Key details include Solicitation No. W9128F25RA008, with a date of issue on 21 JUL 2025 and proposal submission deadline of 07 OCT 2025 at 2:00 p.m. local time. Prospective offerors are required to provide a receipt acknowledgement with the SF1442 form and can submit electronic proposals as specified in Section 00 22 00. All other conditions and requirements of the original specifications remain unchanged.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Am #0003 - 2 (Continuation SF 30)
Solicitation No. W9128F25RA008
Date of Issue: 21 JUL 2025 Date of Receiving Proposals: 07 OCT 2025
SUBJECT: Amendment No. 0003 to specification and drawings for Construction of
POWERHOUSE 1 CUBICLE ROOM 15KV SWITCHGEAR UPGRADE, FORT PECK, MONTANA
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am-3” (underlining of added text and/or strikeout of deleted text).
Pages or Sections Deleted Pages or Sections Substituted or Added 26 05 00.00 26 26 05 00.00 26 Am-0003
2. This amendment is a part of the proposing documents, and a receipt acknowledgement shall be provided with the SF1442. All other conditions and requirements of the specifications remain unchanged.
3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.
4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 07 OCT 2025, as stated in the Request For Proposal.
Attachments:
Spec Pages listed in 1.a. above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
27 AUG 2025
JNS/2179