Amend 0006_02 82 00.pdf

PDF 753 KB Posted

Attached to
Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project
Solicitation number
W9128F25RA008
Issued by

About this file

This document is a detailed specification section for asbestos remediation at the PH1 Cubicle Room 15kV Switchgear Upgrade project located at Fort Peck Dam in Montana. The specification covers the comprehensive requirements for handling and removing asbestos-containing materials, including specific procedures for work practices, safety protocols, air sampling, personal protective equipment, and disposal.

The project involves removing several asbestos-containing materials, including cloth jacket wire with non-friable asbestos insulation, transite cable trays in the cable tunnel, a transite ceiling partition, and potentially asbestos-containing access panels and HVAC ducting insulation. Key requirements include establishing regulated work areas, using wet removal techniques, implementing negative pressure enclosures, conducting personal and area air sampling, using HEPA-filtered equipment, wearing appropriate protective clothing and respirators, and disposing of asbestos waste in EPA-approved landfills. The contractor must follow strict safety protocols, obtain necessary certifications and licenses, and comply with federal and state regulations throughout the asbestos remediation process.

View the file

Other files

File Type Posted
Amend 0007_W9128F25RA0080007 SF 30.pdf PDF
Amend 0007_ W9128F25RA0080007.pdf PDF
Amend 0007_Transformer KV7A Information.pdf PDF
Amend 0006_W9128F25RA008_Narrative.pdf PDF
Amend 0006_W9128F25RA0080006 SF 30.pdf PDF
Amend 0006_W9128F25RA0080006.pdf PDF
Amend 0005_Div 00 22 00_FP PH1 15kV Switchgear_(Clean).pdf PDF
Amend 0005_Solicitation Amendment_W9128F25RA0080005.pdf PDF
Amend 0005_Div 00 22 00_FP PH1 15kV Switchgear_(Redlined).pdf PDF
Amend 0005_Solicitation Amendment_W9128F25RA0080005 SF 30.pdf PDF
Amend 0004_E-601.pdf PDF
Amend 0004_E-501.pdf PDF
Amend 0004_E-103.pdf PDF
Amend 0004_W9128F25RA008_Narrative.pdf PDF
Amend 0004_26 25 00.00 26.pdf PDF
Amend 0004_W9128F25RA0080004 SF 30.pdf PDF
Amend 0004_W9128F25RA0080004.pdf PDF
Site Visit 2_KTR SignIn Sheet_9 Sep 2025_FP PH1 Cubile Room Swgr Upgrade.pdf PDF
Amend 0003_26 05 00.00 26.pdf PDF
Amend 0003_W9128F25RA0080003_FP PH1 Switchgear.pdf PDF
Amend 0003_W9128F25RA0080003- Narrative.pdf PDF
Amend 0003_W9128F25RA0080003 SF 30_FP PH1 Switchgear.pdf PDF
Amend 0002_W9128F25RA0080002 SF 30_FP PH1 Switchgear.pdf PDF
Amend 0002_W9128F25RA0080002_FP PH1 Switchgear.pdf PDF
Site Visit_KTR SignIn Sheet_5 Aug 2025_FP PH1 Cubile Room Switchgear.pdf PDF
Amend 0001_W9128F25RA0080001_FP PH1 Switchgear.pdf PDF
Amend 0001_Div 00 22 00_FP PH1 15kV Switchgear_(Redlined).pdf PDF
Amend 0001_W9128F25RA0080001 SF 30_FP PH1 Switchgear.pdf PDF
Amend 0001_Div 00 22 00_FP PH1 15kV Switchgear_(Clean).pdf PDF
02-Div 00 22 00_FP PH1 15kV Switchgear.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_5_of_5.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_2_of_5.pdf PDF
01-Solicitation - W9128F25RA008 FP PH1 15kV Switchgear Upgrade.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_4_of_5.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_3_of_5.pdf PDF
06- W9128F25RA008 FP PH1 Cubicle Room Switchgear Upgrade Specs.pdf PDF
02-Div 00 22 00_FP PH1 15kV Switchgear.pdf PDF
04- Fort Peck Cubicle Room 15kV Switchgear Reference Drawings_Final Submittal.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_1_of_5.pdf PDF
03- DBA WD MT20250076 18 July 2025.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PH1 Cubicle Room 15kV Switchgear Upgrade, Fort Peck Dam, MT FP66

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 82 00

ASBESTOS REMEDIATION

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 ACM

1.2.2 Amended Water

1.2.3 Area Sampling

1.2.4 Asbestos

1.2.5 Asbestos Control Area

1.2.6 Asbestos Fibers

1.2.7 Asbestos Permissible Exposure Limit

1.2.8 Authorized Person

1.2.9 Background

1.2.10 Competent Person (CP)

1.2.11 Contractor

1.2.12 Disposal Bag

1.2.13 Disturbance

1.2.14 Encapsulation

1.2.15 Friable Asbestos Material

1.2.16 Glovebag Technique

1.2.17 HEPA Filter Equipment

1.2.18 Model Accreditation Plan (MAP)

1.2.19 Negative Pressure Enclosure (NPE)

1.2.20 NESHAP

1.2.21 Nonfriable Asbestos Material

1.2.22 Permissible Exposure Limits (PELs)

1.2.22.1 PEL-Time Weighted Average(TWA)

1.2.22.2 PEL-Excursion Limit

1.2.23 Personal Sampling

1.2.24 Private Qualified Person (PQP)

1.2.25 Qualified Person (QP)

1.2.26 TEM

1.2.27 Time Weighted Average (TWA)

1.2.28 Transite

1.2.29 Wetting Agent

1.2.30 Worker

1.3 REQUIREMENTS

1.3.1 Description of Work

1.3.2 Unexpected Discovery of Asbestos

1.3.3 Medical Requirements

1.3.3.1 Medical Examinations

1.3.3.2 Medical Records

1.3.4 Employee Training

1.3.5 Permits and Notifications

1.3.6 Environment, Safety and Health Compliance

1.3.7 Respiratory Protection Program

SECTION 02 82 00 Page 1

Am-0006

1.3.7.1 Respirator Program Records

1.3.7.2 Respirator Fit Testing

1.3.7.3 Respirator Selection and Use Requirements

1.3.8 Asbestos Hazard Control Supervisor

1.3.9 Hazard Communication

1.3.10 Asbestos Hazard Abatement Plan

1.3.11 Testing Laboratory

1.3.12 Landfill Approval

1.3.13 Transporter Certification

1.3.14 Medical Certification

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

1.5.2 Designated Competent Person Documentation

1.5.3 Worker's Accreditation/License

1.5.4 Contractor's License

1.5.5 Air Sampling Results

1.5.6 Preconstruction Conference

1.6 SECURITY

1.7 EQUIPMENT

1.7.1 Rental Equipment

PART 2 PRODUCTS

2.1 DUCT TAPE

2.2 DISPOSAL CONTAINERS

2.3 SHEET PLASTIC

2.4 LEAK-TIGHT WRAPPING

2.5 WETTING AGENTS

PART 3 EXECUTION

3.1 EQUIPMENT

3.1.1 Air Monitoring Equipment

3.1.2 Respirators

3.1.2.1 Respirators for Handling Asbestos

3.1.3 Exterior Whole Body Protection

3.1.3.1 Outer Protective Clothing

3.1.3.2 Personal Decontamination Unit

3.1.3.3 Eye Protection

3.1.4 Regulated Areas

3.1.5 Load-out Unit

3.1.6 Warning Signs and Labels

3.1.6.1 Warning Sign

3.1.6.2 Warning Labels

3.1.7 Local Exhaust System

3.1.8 Tools

3.1.9 Rental Equipment

3.1.10 Single Stage Decontamination Area

3.1.11 Decontamination Area Exit Procedures

3.2 WORK PROCEDURE

3.2.1 Building Ventilation System and Critical Barriers

3.2.2 Protection of Existing Work to Remain

3.2.3 Asbestos Control Area Requirements

3.2.3.1 Negative Pressure Enclosure

3.2.3.2 Regulated Area for Class II Removal

3.2.4 Removal Procedures

3.2.5 Methods of Compliance

3.2.5.1 Mandated Practices

SECTION 02 82 00 Page 2

3.2.5.2 Control Methods

3.2.5.3 Unacceptable Practices

3.2.6 Class II Work Procedures

3.2.7 Specific Control Methods for Class II Work

3.2.7.1 Cementitious Materials

3.2.8 Air Sampling

3.2.8.1 Sampling During Asbestos Work

3.2.8.2 Final Clearance Requirements, NIOSH PCM Method

3.2.8.3 Sampling After Final Clean-Up (Clearance Sampling)

3.2.8.4 Air Clearance Failure

3.2.9 Site Inspection

3.3 CLEAN-UP AND DISPOSAL

3.3.1 Housekeeping

3.3.2 Responsibility for Materials

3.3.3 Disposal of Asbestos

3.3.3.1 Procedure for Disposal

-- End of Section Table of Contents --

SECTION 02 82 00 Page 3

SECTION 02 82 00

ASBESTOS REMEDIATION

PART 1 GENERAL

The following asbestos-containing materials are present in the project area and impacted by the project work. Remove, handle, and dispose of these materials as required by this specification section and applicable regulations.

Cloth jacket wire that is scheduled to be removed for this project should be assumed to be covered with non-friable asbestos-containing insulation. It is expected that the insulation is in good condition. It is not anticipated that the removal activities required for the project will cause the wire insulation to become friable, disrupt the matrix of the asbestos-containing material, or generate the release of asbestos fibers; however a negative exposure assessment for this work is not available.

Cable trays in the cable tunnel to switchyard 1 are assumed to consist of transite asbestos. These cable trays are scheduled to be removed and replaced as part of this project. See drawings ED102 and E-102 for location of the cable trays. In addition, the cable tray brackets are assumed to contain lead-based paint and are required to be removed as part of the project. See specification Section 02 83 00 LEAD IN CONSTRUCTION for handling requirements for the brackets.

A ceiling partition consisting of transite asbestos is present in the first part of the cable tunnel for KV7A's feed. See drawing ED102.

In switchyard 1, the Riser 1 access panels may contain asbestos. Assume that the panels contain asbestos unless they are tested and demonstrated to be asbestos-free.

In the cubicle room there is insulation around the HVAC ducting located on the ceiling that may contain asbestos. Work on the HVAC system is not included in this project although project tasks may require working in close proximity to the HVAC system and its insulation. This insulation is not scheduled for removal as part of this project. The Contractor shall take appropriate steps to prevent disturbing or damaging this material while performing the required project tasks.

If any other materials that must be disturbed or removed as part of the work appear suspect for asbestos, the Contractor shall consult with the KO, and sample the material as needed and have it analyzed using Polarized Light Microscopy (PLM) for asbestos content. The laboratory shall be accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP)and shall comply with all applicable Federal and Montana regulations for asbestos analysis. The Contractor shall utilize a third-party asbestos inspector trained and accredited in accordance with applicable Federal and State of Montana laws and regulations for all asbestos inspection and sampling activities. The accredited inspector shall comply with all applicable requirements of Montana rule 17.74 Subchapter 3. Work procedures and disposal of asbestos-containing materials shall be performed in accordance with this specification and applicable regulations.

SECTION 02 82 00 Page 4

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems

ASTM INTERNATIONAL (ASTM)

ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications

COMPRESSED GAS ASSOCIATION (CGA)

CGA G-7 (2014) Compressed Air for Human Respiration; 6th Edition

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

ANSI/ISEA Z87.1 (2020) Occupational and Educational Personal Eye and Face Protection Devices

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH NMAM (2016; 5th Ed) NIOSH Manual of Analytical Methods

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1926.59 Hazard Communication

29 CFR 1926.103 Respiratory Protection

29 CFR 1926.200 Accident Prevention Signs and Tags

29 CFR 1926.1101 Asbestos

40 CFR 61-SUBPART A General Provisions

SECTION 02 82 00 Page 5

40 CFR 61-SUBPART M National Emission Standard for Asbestos

40 CFR 763 Asbestos

42 CFR 84 Approval of Respiratory Protective Devices

UNDERWRITERS LABORATORIES (UL)

UL 586 (2009; Reprint Sep 2022) UL Standard for Safety High-Efficiency Particulate, Air Filter Units

1.2 DEFINITIONS

1.2.1 ACM

Asbestos Containing Materials.

1.2.2 Amended Water

Water containing a wetting agent or surfactant with a maximum surface tension of 0.00042 psi.

1.2.3 Area Sampling

Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.

1.2.4 Asbestos

The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be at least one percent.

1.2.5 Asbestos Control Area

That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris.

1.2.6 Asbestos Fibers

Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.

1.2.7 Asbestos Permissible Exposure Limit

0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other Federal legislation having legal jurisdiction for the protection of workers health.

1.2.8 Authorized Person

Any person authorized by the Contractor and required by work duties to be

SECTION 02 82 00 Page 6 present in the regulated areas.

1.2.9 Background

The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.

1.2.10 Competent Person (CP)

A person meeting the requirements for competent person as specified in 29 CFR 1926.1101 including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan ( 40 CFR 763 ) for project designer or supervisor, or its equivalent. The competent person must have a current State of Montana asbestos project contractors/supervisors license/accreditation.

1.2.11 Contractor

The Contractor is that individual, or entity under contract to perform the herein listed work.

1.2.12 Disposal Bag

A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101 , used for transporting asbestos waste from containment to disposal site.

1.2.13 Disturbance

Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in one standard sized glovebag or waste bag, not larger than 60 inches in length and width in order to access a building component.

1.2.14 Encapsulation

The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.

1.2.15 Friable Asbestos Material

A term defined in 40 CFR 61-SUBPART M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763 , Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

1.2.16 Glovebag Technique

Those asbestos removal and control techniques put forth in 29 CFR 1926.1101 .

SECTION 02 82 00 Page 7

1.2.17 HEPA Filter Equipment

High efficiency particulate air (HEPA) filtered vacuum and exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters must retain 99.97 percent of particles

0.3 microns or larger as indicated in UL 586 .

1.2.18 Model Accreditation Plan (MAP)

USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763 .

1.2.19 Negative Pressure Enclosure (NPE)

That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101 .

1.2.20 NESHAP

National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61-SUBPART M .

1.2.21 Nonfriable Asbestos Material

Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.

1.2.22 Permissible Exposure Limits (PELs)

1.2.22.1 PEL-Time Weighted Average(TWA)

Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8-hour time weighted average (TWA).

1.2.22.2 PEL-Excursion Limit

An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.

1.2.23 Personal Sampling

Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101 .

1.2.24 Private Qualified Person (PQP)

That qualified person hired by the Contractor to perform the herein listed tasks.

1.2.25 Qualified Person (QP)

A Registered Architect, Professional Engineer, Certified Industrial Hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State

SECTION 02 82 00 Page 8

Model Accreditation Plan as described in 40 CFR 763 as a Building Inspector, Contractor/Supervisor Abatement Worker, or Asbestos Project Designer; and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The QP must be appropriately licensed/accredited in the State of Montana.

1.2.26 TEM

Refers to Transmission Electron Microscopy.

1.2.27 Time Weighted Average (TWA)

The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.

1.2.28 Transite

A generic name for asbestos cement wallboard and pipe.

1.2.29 Wetting Agent

A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at most 0.00042 psi.

1.2.30 Worker

Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101 , to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation, if required by the OSHA Class of work to be performed or by the state where the work is to be performed. The worker must be appropriately licensed/accredited in the State of Montana.

1.3 REQUIREMENTS

1.3.1 Description of Work

*Am-6

The work covered by this section includes the handling and control of asbestos containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures must be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification. The asbestos work includes the disturbance and/or removal of materials determined to contain asbestos that are impacted by this project work. Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material may release airborne asbestos fibers during removal and therefore must be handled in accordance with the removal procedures as specified herein. Provide control techniques as outlined in this specification. The work area will be evacuated during the asbestos removal work. A competent person must supervise asbestos removal work as specified herein.

SECTION 02 82 00 Page 9

The work covered by this section includes the handling and control of asbestos-containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment, and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos-containing materials generated by the work. More specific operational procedures must be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification.

The asbestos work includes the disturbance and/or removal of materials determined to contain asbestos that are impacted by this project work, including the removal of transite asbestos cable trays at Fort Peck Dam, Montana. Services include supporting the cables that rest in the existing trays until new cable trays are installed, unbolting the transite asbestos trays from supports, removing the trays from the tunnel, transporting them through the service elevator to the transformer service bay, and preparing them for disposal at an approved landfill. Once the trays have been removed, the cables and remaining horizontal surfaces shall be wiped down and cleaned for asbestos-containing dust, with all waste properly disposed of.

Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material may release airborne asbestos fibers during removal and therefore must be handled in accordance with the removal procedures as specified herein. Provide negative pressure enclosure and other control techniques as outlined in this specification. The work area will be evacuated during the asbestos removal work. A competent person must supervise asbestos removal work as specified herein.

**Am-6

1.3.2 Unexpected Discovery of Asbestos

Notify the Contracting Officer if any previously untested building components suspected to contain asbestos are impacted by the work.

1.3.3 Medical Requirements

Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101 .

1.3.3.1 Medical Examinations

Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 or other pertinent State or local directives. This requirement must have been satisfied within the 12 months prior to the start of work on this contract.

1.3.3.2 Medical Records

Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of 50 years after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to:

The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician

SECTION 02 82 00 Page 10 upon the request of the employee or former employee.

1.3.4 Employee Training

Submit certificates, prior to the start of work indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with applicable regulations;

understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis. Train personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent. Document the training by providing: dates of training, training entity, and names of instructorsupon request by the Contracting Officer. Furnish each employee with respirator training and fit testing administered by the Contractor as required by 29 CFR 1926.1101 and 29 CFR 1926.103 . Asbestos workers must have a current State of Montana asbestos worker's license/accreditation.

1.3.5 Permits and Notifications

Prior to the start of work, obtain necessary permits in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities. Notify the State's environmental protection agency and the Contracting Officer in writing 10 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M and state regulations.

Submit copies of all Notifications to the Contracting Officer.

1.3.6 Environment, Safety and Health Compliance

In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of EM 385-1-1 , 29 CFR 1926.1101 , 40 CFR 61-SUBPART A , and 40 CFR 61-SUBPART M . Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government apply. The following laws, rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials apply:

MCA 75, Chapter 2 Air Quality, Part 5 Asbestos Control

Administrative Rules of Montana 17.74.Subchapters 3 and 4

1.3.7 Respiratory Protection Program

Establish and implement a respirator program as required by 29 CFR 1926.1101 , and 29 CFR 1926.103 . Submit a written description of the program to the Contracting Officer.

SECTION 02 82 00 Page 11

1.3.7.1 Respirator Program Records

Submit records of the respirator program as required by 29 CFR 1926.103 , and 29 CFR 1926.1101 .

1.3.7.2 Respirator Fit Testing

The Contractor must conduct a qualitative or quantitative fit test conforming to 29 CFR 1926.103 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test must be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that will affect the fit, a new fit test must be performed. Functional fit checks must be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.

1.3.7.3 Respirator Selection and Use Requirements

Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with CGA G-7 and the manufacturer's recommendations. Respirators must be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84 , for use in environments containing airborne asbestos fibers. For air-purifying respirators, the particulate filter must be high-efficiency particulate air (HEPA)/(N-,R-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type must be made by the Contractor's Designated IH based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.

1.3.8 Asbestos Hazard Control Supervisor

The Contractor must be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.

1.3.9 Hazard Communication

Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Safety Data Sheets (SDS) for all materials brought to the site.

1.3.10 Asbestos Hazard Abatement Plan

Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the removal of materials containing asbestos. The plan, not to be combined with other hazard abatement plans, must be prepared, signed, and sealed by the Contractor. The plan must include but not be limited to the precise personal protective equipment to be used , the location of asbestos control areas, removal interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan must also include (both fire and medical emergency) response plans and an Activity Hazard Analyses (AHAs) in accordance with EM 385-1-1 . The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos

SECTION 02 82 00 Page 12

Hazard Control Supervisor, CP and PQP must meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan must be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work.

1.3.11 Testing Laboratory

Submit the name, address, and telephone number of each testing laboratory selected for the analysis, and reporting of airborne concentrations of asbestos fibers along with certification that each laboratory is American Industrial Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis. The testing laboratory firm must be independent of the asbestos contractor and must have no employee or employer relationship which could constitute a conflict of interest.

1.3.12 Landfill Approval

Submit written evidence that the landfill is approved for asbestos disposal by the U.S. Environmental Protection Agency, and state regulatory agencies, as required. Within three working days after delivery, submit detailed delivery tickets, prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill. Submit a copy of the waste shipment records within three days of the shipment leaving the project site.

1.3.13 Transporter Certification

Submit written evidence that the transporter is approved to transport asbestos waste by possessing a Montana Asbestos Project Contractor/Supervisor License/Accreditation.

1.3.14 Medical Certification

Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR 1926.1101 and 29 CFR 1926.103 as prescribed by law.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SECTION 02 82 00 Page 13

SD-03 Product Data

Safety Data Sheets (SDS) for All Materials; G , PO

Respirators; G , PO

Local Exhaust Equipment; G , PO

Vacuums; G , PO

SD-06 Test Reports

Air Sampling Results; G , PO

Clearance Sampling; G , PO

SD-07 Certificates

Employee Training; G , PO

Notifications; G , PO

Respiratory Protection Program; G , PO

Asbestos Hazard Abatement Plan; G , PO

Testing Laboratory; G , PO

Landfill Approval; G , PO

Delivery Tickets; G , PO

Waste Shipment Records; G , PO

Medical Certification; G , PO

Private Qualified Person Documentation; G , PO

Designated Competent Person; G , PO

Worker's /Accreditation/License; G , PO

Contractor's License; G , PO

Ventilation Systems; G , PO

SD-11 Closeout Submittals

SECTION 02 82 00 Page 14

Permits; G , PO

Notifications; G , PO

Respirator Program Records; G , PO

Rental Equipment; G , PO

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to direct air monitoring, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, or Asbestos Project Designer as described by 40 CFR 763 and state of Montana regulations and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent.. The PQP and the asbestos contractor must not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP must be a first tier subcontractor.

1.5.2 Designated Competent Person Documentation

The Designated Competent Person must be experienced in the administration and supervision of asbestos abatement projects including exposure assessment and monitoring, work practices, abatement methods, protective measures for personnel, setting up and inspecting asbestos abatement work areas, evaluating the integrity of containment barriers, placement and operation of local exhaust systems, ACM generated waste containment and disposal procedures, decontamination units installation and maintenance requirements, site safety and health requirements, notification of other employees onsite. The Designated Competent Person must be on-site at all times when asbestos abatement activities are underway.Submit training certification and a current State of Montana Asbestos Project Contractor's/Supervisor's License. Submit evidence that the Designated Competent Person has a minimum of 2 years of on-the-job asbestos abatement experience relevant to OSHA designated competent person requirements.

1.5.3 Worker's Accreditation/License

Submit documentation that workers meet the requirements of 29 CFR 1926.1101 , 40 CFR 61-SUBPART M and have a current State of Montana Asbestos Workers Accreditation/License.

1.5.4 Contractor's License

Submit a copy of the asbestos contractor's license issued by the State of Montana. Submit the following certification along with the license: "I certify that the personnel I am responsible for during the course of this project fully understand the contents of 29 CFR 1926.1101 , 40 CFR 61-SUBPART M EM 385-1-1 , and the Federal, State and local requirements for those asbestos abatement activities that they will be involved in." This certification statement must be signed by the Company's President or Chief Executive.

SECTION 02 82 00 Page 15

1.5.5 Air Sampling Results

Complete fiber counting and provide results to the PQP for review within 16 hours of the "time off" of the sample pump. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits. Submit sampling results to the Contracting Officer and the affected Contractor employees where required by law within three working days, signed by the testing laboratory employee performing air sampling, the employee that analyzed the sample, and the PQP.

1.5.6 Preconstruction Conference

Conduct a safety preconstruction conference to discuss the details of the Asbestos Hazard Abatement Plan, and Accident Prevention Plan (APP) including the AHAs required in specification Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. The safety preconstruction conference must include the Contractor and their Designated Competent Person, Designated IH and Project Supervisor and the Contracting Officer. Deficiencies in the APP will be discussed. Onsite work must not begin until the APP has been accepted.

1.6 SECURITY

Barriers to prevent unauthorized entry must be provided for each regulated area. A log book must be kept documenting entry into and out of the regulated area. Entry into regulated areas must only be by personnel authorized by the Contractor and the Contracting Officer. Personnel authorized to enter regulated areas must be trained, medically evaluated, and wear the required personal protective equipment.

1.7 EQUIPMENT

1.7.1 Rental Equipment

Provide a copy of the written notification to the rental company concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.

PART 2 PRODUCTS 2.1 DUCT TAPE

Industrial grade duct tape of appropriate widths suitable for bonding sheet plastic and disposal container.

2.2 DISPOSAL CONTAINERS

Leak-tight (defined as solids, liquids, or dust that cannot escape or spill out) disposal containers must be provided for ACM wastes as required by 29 CFR 1926.1101 . Disposal containers can be in the form of:

a. Disposal Bags

b. Fiberboard Drums

c. Cardboard Boxes

2.3 SHEET PLASTIC

Sheet plastic must be polyethylene of 6 mil minimum thickness and must be provided in the largest sheet size necessary to minimize seams. Film must

SECTION 02 82 00 Page 16 conform to ASTM D4397

2.4 LEAK-TIGHT WRAPPING

Two layers of 6 mil minimum thick polyethylene sheet stock must be used for the containment of removed asbestos-containing components or materials such as large tanks, boilers, insulated pipe segments and other materials. Upon placement of the ACM component or material, each layer must be individually leak-tight sealed with duct tape.

2.5 WETTING AGENTS

Removal encapsulant (a penetrating encapsulant) must be provided when conducting removal abatement activities that require a longer removal time or are subject to rapid evaporation of amended water. The removal encapsulant must be capable of wetting the ACM and retarding fiber release during disturbance of the ACM greater than or equal to that provided by amended water.

PART 3 EXECUTION

3.1 EQUIPMENT

Provide the Contracting Officer or the Contracting Officer's Representative, with at least two complete sets of personal protective equipment as required for entry to and inspection of the asbestos control area. Provide equivalent training to the Contracting Officer or a designated representative as provided to Contractor employees in the use of the required personal protective equipment.

3.1.1 Air Monitoring Equipment

The Contractor's PQP must approve air monitoring equipment. The equipment must include, but must not be limited to:

a. High-volume sampling pumps that can be calibrated and operated at a constant airflow up to 16 liters per minute.

b. Low-volume, battery powered, body-attachable, portable personal pumps that can be calibrated to a constant airflow up to approximately 3.5 liters per minute, and a self-contained rechargeable power pack capable of sustaining the calibrated flow rate for a minimum of 10 hours. The pumps must also be equipped with an automatic flow control unit which must maintain a constant flow, even as filter resistance increases due to accumulation of fiber and debris on the filter surface.

c. Single use standard 25 mm diameter cassette, open face, 0.8 micron pore size, mixed cellulose ester membrane filters and cassettes with 50 mm electrically conductive extension cowl, and shrink bands for personal air sampling.

d. A flow calibrator capable of calibration to within plus or minus 2 percent of reading over a temperature range of minus 4 to plus 140 degrees F and traceable to a NIST primary standard.

3.1.2 Respirators

Select respirators from those approved by the National Institute for

SECTION 02 82 00 Page 17

Occupational Safety and Health (NIOSH), Department of Health and Human Services.

3.1.2.1 Respirators for Handling Asbestos

Provide personnel engaged in cleanup, handling, disturbance, removal or demolition of asbestos materials with respiratory protection as indicated in 29 CFR 1926.1101 and 29 CFR 1926.103 . Breathing air must comply with

CGA G-7.

3.1.3 Exterior Whole Body Protection

3.1.3.1 Outer Protective Clothing

Provide personnel exposed to asbestos with disposable "non-breathable," whole body outer protective clothing, head coverings, gloves, and foot coverings. Provide disposable plastic or rubber gloves to protect hands.

Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but must not be used alone. Make sleeves secure at the wrists, make foot coverings secure at the ankles, and make clothing secure at the neck by the use of tape.

3.1.3.2 Personal Decontamination Unit

Provide a decontamination unit that complies with applicable Federal and State of Montana regulations and the approved Asbestos Hazard Abatement Plan for personnel required to wear whole body protective clothing.

3.1.3.3 Eye Protection

Provide eye protection that complies with ANSI/ISEA Z87.1 when operations present a potential eye injury hazard. Provide goggles to personnel engaged in asbestos abatement operations when the use of a full face respirator is not required.

3.1.4 Regulated Areas

All Class I, II, and III asbestos work must be conducted within regulated areas. The regulated area must be demarcated to minimize the number of persons within the area and to protect persons outside the area from exposure to airborne asbestos. Control access to regulated areas, ensure that only authorized personnel enter, and verify that Contractor required medical surveillance, training and respiratory protection program requirements are met prior to allowing entrance.

3.1.5 Load-out Unit

As needed, provide a temporary load-out unit that is adjacent and connected to the regulated areaand access tunnel. Attach the load-out unit in a leak-tight manner to each regulated area.

3.1.6 Warning Signs and Labels

Provide warning signs at all approaches to asbestos control areas. Locate signs at such a distance that personnel may read the sign and take the necessary protective steps required before entering the area. Provide labels and affix to all asbestos materials, scrap, waste, debris, and other products contaminated with asbestos. Containers with preprinted warning labels conforming to the requirements are acceptable

SECTION 02 82 00 Page 18

3.1.6.1 Warning Sign

Provide vertical format conforming to 29 CFR 1926.200 , and 29 CFR 1926.1101 minimum 20 by 14 inches displaying the following legend in the lower panel:

Legend Notation

DANGER one inch Sans Serif Gothic or Block

ASBESTOS one inch Sans Serif Gothic or Block

MAY CAUSE CANCER one inch Sans Serif Gothic or Block

CAUSES DAMAGE TO LUNGS 1/4 inch Sans Serif Gothic or Block

AUTHORIZED PERSONNEL ONLY 1/4 inch Sans Serif Gothic or Block

[WEAR RESPIRATORY PROTECTION AND PROTECTIVE

CLOTHING IN THIS AREA]

1/4 inch Sans Serif Gothic or Block

Spacing between lines must be at least equal to the height of the upper of any two lines.

3.1.6.2 Warning Labels

Provide labels conforming to 29 CFR 1926.1101 of sufficient size to be clearly legible, displaying the following legend:

DANGER

CONTAINS ASBESTOS FIBERS

MAY CAUSE CANCER

CAUSES DAMAGE TO LUNGS

DO NOT BREATHE DUST AVOID CREATING DUST

3.1.7 Local Exhaust System

Where appropriate, provide a local exhaust system in the asbestos control area in accordance with ASSP Z9.2 and 29 CFR 1926.1101 that will provide at least four air changes per hour inside of the negative pressure enclosure. Local exhaust equipment must be operated 24-hours per day, until the asbestos control area is removed and must be leak proof to the filter and equipped with HEPA filters. Maintain a minimum pressure differential in the control area of minus 0.02 inch of water column

SECTION 02 82 00 Page 19 relative to adjacent, unsealed areas. Provide continuous 24-hour per day monitoring of the pressure differential with a pressure differential automatic recording instrument. The building ventilation system must not be used as the local exhaust system for the asbestos control area.

Filters on exhaust equipment must conform to ASSP Z9.2 and UL 586 .

Terminate the local exhaust system out of doors and remote from any public access or ventilation system intakes.

3.1.8 Tools

Vacuums must be leak proof to the filter and equipped with HEPA filters.

Filters on vacuums must conform to ASSP Z9.2 and UL 586 . Do not use power tools to remove asbestos containing materials unless the tool is equipped with effective, integral HEPA filtered exhaust ventilation systems.

Remove all residual asbestos from reusable tools prior to storage or reuse. Reusable tools must be thoroughly decontaminated prior to being removed from the regulated areas.

3.1.9 Rental Equipment

If rental equipment is to be used, furnish written notification to the rental agency concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.

3.1.10 Single Stage Decontamination Area

A decontamination area (equipment room/area) must be provided for Class I work involving less than 25 feet or 10 square feet of TSI or surfacing ACM, and for Class II and Class III asbestos work operations where exposures exceed the PELs or where there is no negative exposure assessment. The equipment room or area must be adjacent to the regulated area for the decontamination of employees, material, and their equipment which could be contaminated with asbestos. The area must be covered by an impermeable drop cloth on the floor or horizontal working surface. The area must be of sufficient size to accommodate cleaning of equipment and removing personal protective equipment without spreading contamination beyond the area.

3.1.11 Decontamination Area Exit Procedures

Ensure that the exit procedures identified in the approved Asbestos Hazard Abatement Plan are followed.:

3.2 WORK PROCEDURE

Perform asbestos related work in accordance with 29 CFR 1926.1101 , 40 CFR 61-SUBPART M , and as specified herein. Use wet procedures and control techniques as described in the approved Asbestos Hazard Abatement Plan. Wear and utilize protective clothing and equipment as specified herein. No eating, smoking, drinking, chewing gum, tobacco, or applying cosmetics is permitted in the asbestos work or control areas. Personnel of other trades not engaged in the removal of asbestos containing material must not be exposed at any time to airborne concentrations of asbestos unless all the personnel protection and training provisions of this specification are complied with by the trade personnel. Shut down the area heating, ventilating, and air conditioning system, cap the openings to the system, and provide temporary heating, and ventilation, and air conditioning as appropriate to the location prior to the

SECTION 02 82 00 Page 20 commencement of asbestos work. Power to the regulated area must be locked-out and tagged in accordance with 29 CFR 1910.147 . Disconnect electrical service when wet removal is performed and provide temporary electrical service with verifiable ground fault circuit interrupter (GFCI) protection prior to the use of any water. All electrical work must be performed by a licensed electrician. Stop abatement work in the regulated area immediately when the airborne total fiber concentration: (1) equals or exceeds 0.01 f/cc, or the pre-abatement concentration, whichever is greater, outside the regulated area; or (2) equals or exceeds 1.0 f/cc inside the regulated area. Correct the condition to the satisfaction of the Contracting Officer, including visual inspection and air sampling.

Work must resume only upon notification by the Contracting Officer.

Corrective actions must be documented. If an asbestos fiber release or spill occurs outside of the asbestos control area, stop work immediately, correct the condition to the satisfaction of the Contracting Officer including clearance sampling, prior to resumption of work.

3.2.1 Building Ventilation System and Critical Barriers

Building ventilation system supply and return air ducts in a regulated area must be isolated by airtight seals to prevent the spread of contamination throughout the system. The airtight seals must consist of [2 layers of polyethylene. Edges to wall, ceiling and floor surfaces must be sealed with industrial grade duct tape.

a. A Competent Person must supervise the work.

b. For indoor work, critical barriers must be placed over all openings to the regulated area.

c. Impermeable dropcloths must be placed on surfaces beneath all removal activity.

3.2.2 Protection of Existing Work to Remain

Perform work without damage or contamination of adjacent work. Where such work is damaged or contaminated as verified by the Contracting Officer using visual inspection or sample analysis, it must be restored to its original condition or decontaminated by the Contractor at no expense to the Government as deemed appropriate by the Contracting Officer. This includes inadvertent spill of dirt, dust, or debris in which it is reasonable to conclude that asbestos may exist. When these spills occur, stop work immediately. Then clean up the spill. When satisfactory visual inspection and air sampling results are obtained from the PQP work may proceed at the discretion of the Contracting Officer.

3.2.3 Asbestos Control Area Requirements

3.2.3.1 Negative Pressure Enclosure

If required, removal of ACM require the use of a negative pressure enclosure. Block and seal openings in areas where the release of airborne asbestos fibers can be expected. Establish an asbestos negative pressure enclosure with the use of curtains, portable partitions, or other enclosures in order to prevent the escape of asbestos fibers from the contaminated asbestos work area. Negative pressure enclosure development must include protective covering of uncontaminated walls, and ceilings with a continuous membrane of two layers of minimum 6-mil plastic sheet sealed with tape to prevent water or other damage. Provide two layers of

SECTION 02 82 00 Page 21

6-mil plastic sheet over floors and extend a minimum of 12 inches up walls. Seal all joints with tape. Provide local exhaust system in the asbestos control area. Openings will be allowed in enclosures of asbestos control areas for personnel and equipment entry and exit, the supply and exhaust of air for the local exhaust system and the removal of properly containerized asbestos containing materials. Replace local exhaust system filters as required to maintain the efficiency of the system.

3.2.3.2 Regulated Area for Class II Removal

Removal of asbestos cement materials are Class II removal activities.

Establish designated limits for the asbestos regulated work area with the use of red barrier tape; install critical barriers, splash guards and signs, and maintain all other requirements for asbestos control area except local exhaust. Place impermeable dropcloths on surfaces beneath removal activity extending out 3 feet in all directions. A detached decontamination system may be used. Conduct area monitoring of airborne fibers during the work shift at the designated limits of the asbestos work area and conduct personal samples of each worker engaged in the work. If the airborne fiber concentration of the workers or designated limits at any time exceeds background or 0.01 fibers per cubic centimeter, whichever is greater, stop work immediately and correct the situation.

3.2.4 Removal Procedures

Wet asbestos material with a fine spray of amended water during removal, cutting, or other handling so as to reduce the emission of airborne fibers. Remove material and immediately place in 6 mil plastic disposal bags or other appropriate disposal containers as described in the approved Asbestos Hazard Abatement Plan. Remove asbestos containing material in a gradual manner, with continuous application of the amended water or wetting agent in such a manner that no asbestos material is disturbed prior to being adequately wetted. Containerize asbestos containing material while wet. Do not allow asbestos material to accumulate or become dry. Lower and otherwise handle asbestos containing material as indicated in 40 CFR 61-SUBPART M .

3.2.5 Methods of Compliance

3.2.5.1 Mandated Practices

The specific abatement techniques and items identified must be detailed in the Contractor's AHAP. Use the following engineering controls and work practices in all operations, regardless of the levels of exposure:

a. Vacuum cleaners equipped with HEPA filters.

b. Wet methods or wetting agents except where it can be demonstrated that the use of wet methods is unfeasible due to the creation of electrical hazards, equipment malfunction, and in roofing.

c. Prompt clean-up and disposal.

d. Inspection and repair of polyethylene.

e. Cleaning of equipment and surfaces of containers prior to removing them from the equipment room or area.

SECTION 02 82 00 Page 22

3.2.5.2 Control Methods

Use the following control methods:

a. Local exhaust ventilation equipped with HEPA filter;

b. Enclosure or isolation of processes producing asbestos dust;

c. Where the feasible engineering and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .