Amend 0004_E-103.pdf

PDF 435 KB Posted

Attached to
Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project
Solicitation number
W9128F25RA008
Issued by

About this file

This is a technical drawing (E-103) from the U.S. Army Corps of Engineers Omaha District for a Powerhouse 1 Cubicle Room Switchgear Upgrade at Fort Peck Dam in Missouri River. The document details a comprehensive electrical infrastructure modification, including replacing existing lighting panelboards, installing new 15kV circuit breakers and cable buses, reconnecting transformers, and upgrading switchyard connections. Specific technical tasks include installing a new 15kV, 4000A bus connection between switchgear rooms, routing feeder cables through cable tunnels, disconnecting and reconnecting various transformers (KW6A, KY4A, KZ2A), and implementing new medium-voltage aluminum bus structures and support systems.

The project is scheduled for June 2025, with a solicitation number W9128F25RA008, and involves precise electrical infrastructure modifications in the powerhouse switchyard. Key technical specifications include installing new underground conduits, connecting new structures to the existing ground grid, verifying field locations and dimensions, and implementing Kirk key interlocks between 15kV disconnect switches. The drawing provides a detailed plan view of transformer locations, equipment positioning, and cable routing, with red markings indicating new equipment to be installed, emphasizing the comprehensive nature of the electrical system upgrade.

View the file

Other files

File Type Posted
Amend 0007_ W9128F25RA0080007.pdf PDF
Amend 0007_W9128F25RA0080007 SF 30.pdf PDF
Amend 0007_Transformer KV7A Information.pdf PDF
Amend 0006_W9128F25RA008_Narrative.pdf PDF
Amend 0006_W9128F25RA0080006 SF 30.pdf PDF
Amend 0006_W9128F25RA0080006.pdf PDF
Amend 0006_02 82 00.pdf PDF
Amend 0005_Div 00 22 00_FP PH1 15kV Switchgear_(Clean).pdf PDF
Amend 0005_Solicitation Amendment_W9128F25RA0080005.pdf PDF
Amend 0005_Div 00 22 00_FP PH1 15kV Switchgear_(Redlined).pdf PDF
Amend 0005_Solicitation Amendment_W9128F25RA0080005 SF 30.pdf PDF
Amend 0004_26 25 00.00 26.pdf PDF
Amend 0004_W9128F25RA0080004 SF 30.pdf PDF
Amend 0004_E-601.pdf PDF
Amend 0004_E-501.pdf PDF
Amend 0004_W9128F25RA008_Narrative.pdf PDF
Amend 0004_W9128F25RA0080004.pdf PDF
Site Visit 2_KTR SignIn Sheet_9 Sep 2025_FP PH1 Cubile Room Swgr Upgrade.pdf PDF
Amend 0003_26 05 00.00 26.pdf PDF
Amend 0003_W9128F25RA0080003_FP PH1 Switchgear.pdf PDF
Amend 0003_W9128F25RA0080003- Narrative.pdf PDF
Amend 0003_W9128F25RA0080003 SF 30_FP PH1 Switchgear.pdf PDF
Amend 0002_W9128F25RA0080002 SF 30_FP PH1 Switchgear.pdf PDF
Amend 0002_W9128F25RA0080002_FP PH1 Switchgear.pdf PDF
Site Visit_KTR SignIn Sheet_5 Aug 2025_FP PH1 Cubile Room Switchgear.pdf PDF
Amend 0001_W9128F25RA0080001_FP PH1 Switchgear.pdf PDF
Amend 0001_Div 00 22 00_FP PH1 15kV Switchgear_(Redlined).pdf PDF
Amend 0001_W9128F25RA0080001 SF 30_FP PH1 Switchgear.pdf PDF
Amend 0001_Div 00 22 00_FP PH1 15kV Switchgear_(Clean).pdf PDF
02-Div 00 22 00_FP PH1 15kV Switchgear.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_4_of_5.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_3_of_5.pdf PDF
06- W9128F25RA008 FP PH1 Cubicle Room Switchgear Upgrade Specs.pdf PDF
02-Div 00 22 00_FP PH1 15kV Switchgear.pdf PDF
04- Fort Peck Cubicle Room 15kV Switchgear Reference Drawings_Final Submittal.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_5_of_5.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_2_of_5.pdf PDF
01-Solicitation - W9128F25RA008 FP PH1 15kV Switchgear Upgrade.pdf PDF
05- FP Cubicle Room 15kV Switchgear Contract Drawings_Final_1_of_5.pdf PDF
03- DBA WD MT20250076 18 July 2025.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMKIGDCBA F

EC

NK LJH

KV7A

TRANSFORMER

GCB762

G C

B

G C

B

G C

B

G C

B

G C

B

G C

B

GCB1142

RICHARDSON

COULEE LINE

WHATELY LINE

TRANSFORMER BAY 3 TRANSFORMER BAY 4TRANSFORMER BAY 2

300KW GEN

CONDUIT

CONTROL

CONDUIT

CONTROL

624 824A 824B 1024 724 1124

SHUNT REACTOR

KW8A

SHUNT REACTOR

KW8B

W O

L F

P O

IN

T

L

IN

E N

O

W O

L F

P O

IN

T

L

IN

E N

O

.5 K

V L

IN

E

7'-6"

TYP

4'-0"24'-9"

6'-10"

SEE NOTE 2

SEE NOTE 3

NOTE 8

CONDUIT TO KX5A (T5)

FEEDER CABLE AND

NEW UNDERGROUND

SEE NOTE 9

KX5A

(T5)

AND SUPPORT STRUCTURE. SEE NOTE 5

15KV ALUMINUM BUS SYSTEM

SEE NOTE 4

13.8KV LINE

SEE NOTE 10

SEE NOTE 11

APPROXIMATE LOCATION

LIGHTING PANELS PP7 & PP7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S I

D

P O

W E

R H

O U

S E

C

U B

IC

L

E R

O O

M S

W

IT

C H

G E

A R

U P

G R

A D

E

P O

W E

R H

O U

S E

M

IS

S O

U R

I R

IV

E

R

F O

R T

P E

C K

D A

M

W F

R

A

J U

N E

M

A H

A

N E

B R

A S

K A

C

A P

IT

O

L A

V E

S

T E

O M

A H

A D

IS

T

R

IC

T

P O

R T

L A

N D

O

R E

G O

N

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D

R A

W

IN

G N

U M

B E

R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

IN

S

T A

L L

P L

A N

V

IE

W

S W

IT

C

H Y

A R

D

L O

W E

R L

E V

E L

B U

S E

S

E-103

J R

A E

T Z

P

K E

L L

E R

P

.E

S E

P T

C

R R

E C

T E

D B

R E

A K

E R

D E

S

IG

N A

T

IO

N

F P

E

-1 .d g nF P

P -1

-6 -1

A /6

L

A B

A C

IO

A

E I

1. BOLD/ RED INDICATE EQUIPMENT TO BE INSTALLED

MFP-OPN93E211.3, AND MFP-OPN93E530.1

DRAWINGS ED-646 AND E-646 AND REFERENCE DRAWINGS MFP-OPN83E201.3,

TRANSFORMERS T7 AND T8 WITH NEW EQUIPMENT. SEE CONTRACT

REPLACE EXISTING LIGHTING PANELBOARDS PP7 AND LP7 AND

AND 15KV CIRCUIT BREAKERS 124 AND 1224.

12. PROVIDE KIRK KEY INTERLOCK BETWEEN 15KV DISCONNECT SWITCH 1223

FOR DETAILS.

11.

ROUTED THROUGH CABLE TUNNEL AND RISER 1.

ROOM AND THE 15KV OUTDOOR CIRCUIT BREAKERS IN SWITCHGEARD

10. NEW 15KV, 4000A BUS CONNECTION BETWEEN 15KV SWITCHGEAR IN CUBICLE

TO TRANSFORMER KZ2A.

9. INSTALL NEW 15KV, 2000A CABLE BUS FROM THE NEW 15KV BREAKER 1124

TRANSFORMER KX5A.

TRAY IN THE CABLE TUNNEL AND THEN IN UNDERGROUND CONDUIT TO

TUNNEL AND FOLLOW THE SAME ROUTING AS EXISTING, PARTIALLY IN CABLE

8. FEEDER CABLE FOR KX5A FROM BREAKER 1024 TO RUN BACK TO THE CABLE

LOCATIONS AND DIMENSIONS IN THE FIELD.

ROUTING OF THE FEEDERS TO THE LOADS. CONTRACTOR TO VERIFY ALL

7. DRAWING SHOWS GENERAL LOCATION OF EQUIPMENT AND PROPOSED

GRID. SEE SECTION 26 05 26.00 26 FOR ADDITIONAL DETAILS.

6. CONNECT NEW STRUCTURES AND EQUIPMENT TO THE EXISTING GROUND

STRUCTURES, FOUNDATIONS AND CONNECTIONS.

5. DESIGN AND INSTALL NEW MEDIUM-VOLTAGE ALUMINUM BUS, SUPPORT

SWITCHYARD TO SS TRANSFORMER A.

SWITCHYARD TO BE REUSED TO CONNECT THE THE 15KV BREAKER IN THE

EXISTING SWITCHGEAR AND PULL IT FROM CUBICLE ROOM TO THE

4. DISCONNECT EXISTING SS TRANSFORMER KW6A FEEDER FROM THE

TO TRANSFORMER KY4A

3. INSTALL NEW 15KV, 4000A CABLE BUS FROM THE NEW 15KV BREAKER 924

15KV SWITCHGEAR BUS 3 TO THE 15KV BREAKER 924 IN THE SWITCHYARD.

2. EXISTING TRANSFORMER KY4A FEEDER SHALL BE REUSED TO CONNECT THE

GENERAL NOTES

RESOURCE DRAWINGS

POWER PLANT 1 GEN. & CONTROL ROOM FLOOPLAN

SWITCHYARD 1 CONDUIT AND GROUNDING - SHEET 1MFP-OPN93E530.1

SWITCHYARD 1 LIGHTING PARTIAL PLAN - SHEET 1MFP-OPN93E211.3

LIGHTING RISER DIAGRAM PLANT 1MFP-OPN83E201.3

FP81_FPP-1.004_G-001

A1

PLAN VIEW TRANSFORMER LOCATIONS

SCALE: 1" = 20'

GSU TRANSFORMER KZ2A

P L

A N

T N

O

WORK AREA

FLOW

K1

KEY PLAN

SCALE: NTS

NORTHNORTH

20' 40'0

KW6A

KY4A

KZ2A

E-205

H1

E-205

B-2

E-205

B-15

E-205

B-8

E-205

H-16

S-501

E-6

S-501

E-10

E-205A

A-7

File details come from the government source that posted it. Updated .