EAFB B-21 FTD AM-0008 Dwgs_Vol2.pdf
PDF 92 KB Posted
- Attached to
- B-21 MPF/FTD Construction Federal contract opportunity
- Solicitation number
- W9128F21R0032
About this file
This document provides details for a federal solicitation to construct facilities at Ellsworth Air Force Base in South Dakota. The solicitation requests the construction of a B-21 Mission Operations Planning Facility of approximately 47,113 square feet to provide secure operations planning space in support of B-21 operations. An additional B-21 Field Training Detachment Facility of approximately 57,328 square feet is required to provide secure maintenance training and classroom space for B-21 operations at Ellsworth Air Force Base and across the Air Force. Both facilities must meet secure area standards of Intelligence Community Directive 705. The project scope includes associated site work, utilities and infrastructure to support operations planning for the B-21 aircraft program. Optional bid items include fixtures, furnishings and equipment, intrusion detection systems, access control systems, and an uninterruptted power supply and closed-circuit television systems. The solicitation number is W9128F21R0032 and is issued by the Department of the Army Corps of Engineers Omaha District.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAM E01
CAM E02
CAM E03
CAM E04
CAM E05
CAM E06
CAM E07
CAM E08
CAM E09
CAM E10
EXTERIOR - MAIN ENTRY
EXTERIOR - NEAR DOOR 130B
NORTHWEST
EXTERIOR - NEAR DOOR 173A
NORTH
EXTERIOR - NEAR ELEC. RM 170
NORTHWEST
EXTERIOR - NEAR ELEC. RM. 170
NORTHWEST
EXTERIOR - NEAR DOOR 167B
NORTH
EXTERIOR - NEAR DOOR 159C
NORTHEAST
EXTERIOR - NEAR DOOR 154C
SOUTHEAST
EXTERIOR - NEAR DOOR 115A
SOUTH
EXTERIOR - NEAR DOOR 150A
EAST
PROVIDE CAT 6 STP 23 AWG COPPER
CABLE FROM EACH CAMERA TO
DEDICATED PATCH PANEL IN TELECOM.
EQUIPMENT RACK LOCATED IN MAIN
COMM. RM. 172. ROUTE EACH CABLE IN 1"
CONDUIT. ALL CONDUIT SHALL BE ROUTED
UNDERGROUND TO COMM. RM. 172. NO
CONDUIT SHALL BE ROUTED THROUGH
ANY SECURE AREAS. TERMINATE TO 16
PORT POE NETWORK SWITCH MOUNTED IN
RACK ADJACENT TO PATCH PANEL. REFER
TO TELECOM. RISER DIAGRAM T-601
PROVIDE SURGE SUPPRESSOR AT
EACH CAMERA LOCATION AND
GROUND TO BLDG. STEEL. (TYP)
CAM E11 EXTERIOR - NEAR DOOR 144B
SOUTH
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/24/2022 7:21:39 PM
TY604
FTD
C C
T V
S Y
S T
E M
R
IS
E R
D
IA
G R
A M
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
S W
IL
L
IA
M S
D E
L L E
D G
E
T L
/R A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
N.T.S.C3
CCTV SYSTEM RISER DIAGRAM
GENERAL SHEET NOTES
1. REFER TO PLANS FOR LOCATION OF EQUIPMENT.
2. THE CONTRACTOR SHALL PROVIDE RACEWAYS AND
BACK BOXES FOR THE CCTV SYSTEM AS A BASE BID.
THE CCTV EQUIPMENT, INCLUDING CAMERAS, 16
PORT POE NETWORK SWITCH, WIRING, AND
COMMISSIONING SHALL BE INCLUDED AS A BID
OPTION. CAMERAS SHALL BE POE TYPE CAMERAS,
COMPATIBLE WITH THE VICAD SYSTEM, AND ON THE
AIR FORCE APPROVED EQUIPMENT LIST.
3. CONTRACTOR INSTALLING THE SYSTEM SHALL HAVE
A MINIMUM OF 2 YEARS EXPERIENCE INSTALLING
AND MAINTAINING VICAD SYSTEMS AND HAVE
CERTIFIED VICADS TRAINING WITHIN THE LAST 2
YEARS.
4. CCTV SYSTEM SHALL BE MONITORED BY THE BASE
DEFENSE OPERATIONS CENTER (BDOC).
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
| Sheets |
| TY604 - CCTV SYSTEM RISER DIAGRAM |
File details come from the government source that posted it. Updated .