EAFB B-21 FTD AM-0008 Dwgs_Vol2.pdf

PDF 92 KB Posted

Attached to
B-21 MPF/FTD Construction Federal contract opportunity
Solicitation number
W9128F21R0032
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document provides details for a federal solicitation to construct facilities at Ellsworth Air Force Base in South Dakota. The solicitation requests the construction of a B-21 Mission Operations Planning Facility of approximately 47,113 square feet to provide secure operations planning space in support of B-21 operations. An additional B-21 Field Training Detachment Facility of approximately 57,328 square feet is required to provide secure maintenance training and classroom space for B-21 operations at Ellsworth Air Force Base and across the Air Force. Both facilities must meet secure area standards of Intelligence Community Directive 705. The project scope includes associated site work, utilities and infrastructure to support operations planning for the B-21 aircraft program. Optional bid items include fixtures, furnishings and equipment, intrusion detection systems, access control systems, and an uninterruptted power supply and closed-circuit television systems. The solicitation number is W9128F21R0032 and is issued by the Department of the Army Corps of Engineers Omaha District.

View the file

Other files for this federal contract opportunity

Other files attached to B-21 MPF/FTD Construction, newest first.
File Type Posted
Am_0012.pdf PDF
Am_0011.pdf PDF
Am_0010_Dwgs_FTD.pdf PDF
Am_0010.pdf PDF
Am_0010_Dwgs_MPF.pdf PDF
Am_0009.pdf PDF
Am_0009.pdf PDF
Am_0008.pdf PDF
EAFB B-21 MPF AM-0008 Dwgs_Vol2.pdf PDF
Am_0007.pdf PDF
EAFB B-21 FTD AM-0007 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0007 Dwgs_Vol1.pdf PDF
EAFB B-21 MPF AM-0007 Dwgs_Vol2.pdf PDF
Am_0006.pdf PDF
EAFB B-21 FTD AM-0006 Dwgs_Vol1.pdf PDF
EAFB B-21 FTD AM-0006 Dwgs_Vol2.pdf PDF
Am_0005-Vol II-FTD-DWG.pdf PDF
Am_0005.pdf PDF
Am_0005-Vol II-MPF-DWG.pdf PDF
Am_0004.pdf PDF
Am_0004-Vol II-MPF-DWG.pdf PDF
Am_0004-Vol II-FTD-DWG.pdf PDF
Am_0003.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
00 21 00 AT2 FTD Site Photo Survey (under separate cover_electronic only - 1 of 1).zip ZIP file
W9128F-21-R-0032_VOL1-Front End and Site Specs.pdf PDF
95-Percent_DWGS_VOL2_W9128F21R0080_B21-FTD.pdf PDF
W9128F-21-R-0032_VOL3 - FTD Only Specs.pdf PDF
95-Percent_DWGS_VOL1_W9128F21R0080_B21-FTD.pdf PDF
W9128F-21-R-0032_VOL2 - MPF Only Specs.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAM E01

CAM E02

CAM E03

CAM E04

CAM E05

CAM E06

CAM E07

CAM E08

CAM E09

CAM E10

EXTERIOR - MAIN ENTRY

EXTERIOR - NEAR DOOR 130B

NORTHWEST

EXTERIOR - NEAR DOOR 173A

NORTH

EXTERIOR - NEAR ELEC. RM 170

NORTHWEST

EXTERIOR - NEAR ELEC. RM. 170

NORTHWEST

EXTERIOR - NEAR DOOR 167B

NORTH

EXTERIOR - NEAR DOOR 159C

NORTHEAST

EXTERIOR - NEAR DOOR 154C

SOUTHEAST

EXTERIOR - NEAR DOOR 115A

SOUTH

EXTERIOR - NEAR DOOR 150A

EAST

PROVIDE CAT 6 STP 23 AWG COPPER

CABLE FROM EACH CAMERA TO

DEDICATED PATCH PANEL IN TELECOM.

EQUIPMENT RACK LOCATED IN MAIN

COMM. RM. 172. ROUTE EACH CABLE IN 1"

CONDUIT. ALL CONDUIT SHALL BE ROUTED

UNDERGROUND TO COMM. RM. 172. NO

CONDUIT SHALL BE ROUTED THROUGH

ANY SECURE AREAS. TERMINATE TO 16

PORT POE NETWORK SWITCH MOUNTED IN

RACK ADJACENT TO PATCH PANEL. REFER

TO TELECOM. RISER DIAGRAM T-601

PROVIDE SURGE SUPPRESSOR AT

EACH CAMERA LOCATION AND

GROUND TO BLDG. STEEL. (TYP)

CAM E11 EXTERIOR - NEAR DOOR 144B

SOUTH

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/24/2022 7:21:39 PM

TY604

FTD

C C

T V

S Y

S T

E M

R

IS

E R

D

IA

G R

A M

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

S W

IL

L

IA

M S

D E

L L E

D G

E

T L

/R A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

N.T.S.C3

CCTV SYSTEM RISER DIAGRAM

GENERAL SHEET NOTES

1. REFER TO PLANS FOR LOCATION OF EQUIPMENT.

2. THE CONTRACTOR SHALL PROVIDE RACEWAYS AND

BACK BOXES FOR THE CCTV SYSTEM AS A BASE BID.

THE CCTV EQUIPMENT, INCLUDING CAMERAS, 16

PORT POE NETWORK SWITCH, WIRING, AND

COMMISSIONING SHALL BE INCLUDED AS A BID

OPTION. CAMERAS SHALL BE POE TYPE CAMERAS,

COMPATIBLE WITH THE VICAD SYSTEM, AND ON THE

AIR FORCE APPROVED EQUIPMENT LIST.

3. CONTRACTOR INSTALLING THE SYSTEM SHALL HAVE

A MINIMUM OF 2 YEARS EXPERIENCE INSTALLING

AND MAINTAINING VICAD SYSTEMS AND HAVE

CERTIFIED VICADS TRAINING WITHIN THE LAST 2

YEARS.

4. CCTV SYSTEM SHALL BE MONITORED BY THE BASE

DEFENSE OPERATIONS CENTER (BDOC).

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

Sheets
TY604 - CCTV SYSTEM RISER DIAGRAM

File details come from the government source that posted it. Updated .