EAFB B-21 FTD AM-0007 Dwgs_Vol1.pdf

PDF 13 MB Posted

Attached to
B-21 MPF/FTD Construction Federal contract opportunity
Solicitation number
W9128F21R0032
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document provides details for a federal solicitation to construct facilities for the B-21 bomber program. The U.S. Army Corps of Engineers seeks to build a B-21 Mission Operations Planning Facility and Field Detachment Training Facility at Ellsworth Air Force Base in South Dakota. The facilities will include over 47,000 square feet of secure operations planning space and over 57,000 square feet of secure maintenance training and classroom space. Construction will adhere to Intelligence Community Directive/Intelligence Community Standard 705 for secure areas and include associated site development. The solicitation number is W9128F21R0032 and interested parties can obtain additional files by contacting the listed Contracting Officer and Contract Specialist. The project scope may also include optional fixtures, furnishings, equipment, security systems, and backup power supplies. More details are available by visiting the listed procurement website.

View the file

Other files for this federal contract opportunity

Other files attached to B-21 MPF/FTD Construction, newest first.
File Type Posted
Am_0012.pdf PDF
Am_0011.pdf PDF
Am_0010.pdf PDF
Am_0010_Dwgs_MPF.pdf PDF
Am_0010_Dwgs_FTD.pdf PDF
Am_0009.pdf PDF
Am_0009.pdf PDF
EAFB B-21 MPF AM-0008 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0008 Dwgs_Vol2.pdf PDF
Am_0008.pdf PDF
EAFB B-21 MPF AM-0007 Dwgs_Vol2.pdf PDF
Am_0007.pdf PDF
EAFB B-21 FTD AM-0007 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0006 Dwgs_Vol1.pdf PDF
EAFB B-21 FTD AM-0006 Dwgs_Vol2.pdf PDF
Am_0006.pdf PDF
Am_0005-Vol II-FTD-DWG.pdf PDF
Am_0005.pdf PDF
Am_0005-Vol II-MPF-DWG.pdf PDF
Am_0004-Vol II-FTD-DWG.pdf PDF
Am_0004.pdf PDF
Am_0004-Vol II-MPF-DWG.pdf PDF
Am_0003.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
95-Percent_DWGS_VOL1_W9128F21R0080_B21-FTD.pdf PDF
W9128F-21-R-0032_VOL2 - MPF Only Specs.pdf PDF
00 21 00 AT2 FTD Site Photo Survey (under separate cover_electronic only - 1 of 1).zip ZIP file
W9128F-21-R-0032_VOL1-Front End and Site Specs.pdf PDF
95-Percent_DWGS_VOL2_W9128F21R0080_B21-FTD.pdf PDF
W9128F-21-R-0032_VOL3 - FTD Only Specs.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

E

T

R

B

A

R

S

B

A

R

S

B

A

R

SIM FACILITY

ADDITION

FFE=3245.50

EXISTING

SIM FACILITY

FFE = 3243.5

S

S

OFFSITE

FTU AREA

H

Y

D

V

A

N

VAN

B8225

B8205

P

H

O W

E

S

T R

E E

T

SIM

SIM

ADDITION

A

R

A

M

I

N

TEMPORARY

SECURITY FENCE -

DETAIL A1/C-508

FUTURE SIM

PARKING LOT

FTDMPF

FUTURE FTU

PARKING LOT

X X

X X

X X

XXXXXXXXXXXXXXXXXXX

X

X

X

X

X

X

X

X X X X X X X X X X X X X X X X X X X X

BERGSTROM DRIVE

ACCESS GATE

CONTRACTOR'S

ACCESS

CONTROL

FACILITY

B8210

CONSTRUCTION

GATE 24FT WIDE

DOUBLE SWING

GATE

CONTRACTOR

STAGING AND

LAYDOWN AREA

(FTD AND MPF)

VISITORS AND

CONTRACTOR

PARKING (FTD

AND MPF)

FTU

RICKENBACKER COURT

M

C

C

O

N

N

E

L

B

V

D

SECONDARY

CONSTRUCTION GATE

24FT WIDE DOUBLE

SWING GATE

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

C

N

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

D

A

I N

I N

G

D

E T

A C

H M

E

F

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

U M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

LAYDOWN AND STAGING AREA PLAN

SCALE: 1" = 60'

0 60' 120'

GENERAL SHEET NOTES

SHEET LEGEND

1. REFER TO SHEET C-001 AND C-002 FOR GENERAL CIVIL

NOTES, LEGENDS, AND ABBREVIATIONS.

2. THE TEMPORARY SECURITY FENCE SHALL BE INSTALLED AT

THE APPROPRIATE TIME AS DEFINED BY SPECIFICATION 01 14

00, WORK RESTRICTIONS.

3. ALL SECURITY FENCES AND GATES SHALL BE REMOVED

FROM THE PROJECT SITE AT THE APPROPRIATE TIME AS

DIRECTED BY THE COR.

4. EMERGENCY ACCESS TO THE SITE MUST BE MAINTAINED AT

ALL TIMES.

5. THE CONTRACTOR AND GOVERNMENT SHALL CONTROL ALL

ACCESS WITHIN THE FACILITY CONSTRUCTION SECURITY

FENCE PER THE CONTRACT SPECIFICATIONS.

6. SECONDARY CONSTRUCTION GATE TO REMAIN LOCKED AT

ALL TIMES EXCEPT TO ALLOW LARGE DELIVERY TRUCKS TO

EXIT PROJECT SITE. ACCESS TO BE MAINTAINED BY SITE

SECURITY.

TEMPORARY SECURITY FENCE

CONTRACTOR STAGING AND LAYDOWN AREA

CONTRACTOR PARKING AREA

CONSTRUCTION ACCESS ROUTE

CONTRACTOR STAGING AREA FENCE

X

PLAN NORTH

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

L A

Y D

O W

N

A

A

G I N

G

A

R E

A

P

L A

N

G-101

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text

WV

P

P

P

R

C P

R

C P

A

I

R

I

M

I

N

V

I

N

V

AI

INV.NE=3221.30

INV.SW=3221.15

R C

P

R

C

P

R

C P

R

C P

R

C P

APPROX.-

UNABLE TO LOCATE

MH

RIM=3222.80

INV.W=3213.22

INV.E=3213.20

APPROX.-UNABLE TO LOCATE

12" R C

P

INV=3233.63

INV=3233.35

R

C P

R

C P

MH

RIM=3223.06

INV.N=3211.54

INV.E=3211.54

INV.S=3211.53

INV.W=3211.53

AI

RIM=3219.18

INV.W=3214.61

INV.SE=3214.53

T

D

T

D

T D

P

P

W

INV.NW=3235.15

INV.SE=3235.07

AI

RIM=3238.01

INV.NW=3234.18

INV.W=3234.14

DI

INV=

3222.44

MH

RIM=3223.33

INV.W=3213.99

INV.S=3213.96

24" RCP BURIED

3" WATER

8" WATER

12" WATER

R

I

G

W

A

T

E

R

A

P

P

R

O

X

AI

RIM=3226.57

INV.NE=3218.52

INV.SE=3218.43

P

G

V

L

V

E

CMH 7

CMH

461BD

12" RCP

P

R C

P

P

P

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

AI

RIM=3228.77

INV.E=3223.26

INV.S=3222.95

ST

P

P P

X

X

XX

X

X

X X

X X

X

X

X

X

X

X

X

X

B7520

B7274

BERGSTROM DR

MPF SITE

B8210

B7540

S T

S T

S T

S

T

S

T

S

T

S

T

S T

ST ST ST

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

C L

C/L

C/LC/LC/L

C

L

C/L

C

L

C

L

C L

C L

C L

C L

C L

C L

C L

C/L

C L

C L

C L

C/L C/L C/L C/L C/L C/L

C

L

C

L

C/L C/L C/L C/L C/L

C L

C/LC/LC/LC/L

C

L

C

L

C

L

C

L

C

L

C

L

C

L

C

L

C

L

C/L

C/L

C/L

C

L

C L

C

L

C/L

C/L

C/L

C/L

C

L

C

L

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S T

S T

S T

S

T

ST ST ST ST

ST

ST

ST

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

S

T

M

C

C

O

N

N

E

V

D

BERGSTROM DR

XX

W W

W W

X

X X

X

X

DS

DS

DS

DS DS

DS

DS

DS

DS

DS

DS

P P P

ST

P P P

P

S T

S T

S T

P

P

P P P

S

T

S

T

S

T

S

T

X

X X

X X

X

X

X

X

X

S

T

S

T

ST ST ST ST ST ST ST ST

S

T

S

T

S

T

H

YD

F

DC

H

Y D

H

Y

D

P

P P

P

P P

P

P P

P

P P

P

P P

P

T

FTD

S

T

S

T

FTU

DS

DS DS

X

X

X X

X X

X

X

XX

XX XX XX XX XX XX XX XX XX XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X

X

X

X

X X

X X

X X

X

X

X

X

X

X

X

X

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

OVERALL EROSION CONTROL PLAN

PLAN NORTH

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 60'

0 60' 120'

GENERAL SHEET NOTES

CE101 CE102

M A

T C

H

L

I N

E

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

O V

E R

A L

L

E

R O

S I O

N

C

O N

T R

A

N

CE100

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text H

AutoCAD SHX Text Y

P

R

C P

R

C P

R

C P

12" WATER

L

V

E

CMH 7

AI

RIM=3228.77

INV.E=3223.26

INV.S=3222.95

SS SS SS SS SS

MPF SITE

S T

S T

S

T

ST ST ST ST ST ST

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

C/L

C L

C L

C/L

C

LC/LC/LC/LC/LC/L

C

L

C L

C/LC/L

C L

C

L

C

L

C

L

C

L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C

L

C L

C

L

C/L

C/L

C L

C/L

C L

C/L

C L

C/L C/L C/L C/L C/L C/L

C

L

C/L

C

L

WM

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S T

S T

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

ST

ST

ST

S T

S T

S T

S T

S T

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

FTD

FFE=3229.60

B8306

UE

S S

P P P P P P

S T

S T

S T

S T

S T

S T

S T

S T

P

P P

P

S T

P P P P P P

OFFSITE

FTU AREA

H

Y

D

U C

U C

U C

U C

U C

U C

UTILITY

YARD

FFE 3229.0

BERGSTROM DR

XX

XX

XX

XX XX XX XX XX XX

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

EROSION CONTROL PLAN

PLAN NORTH

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. EROSION CONTROL ELEMENTS ARE SHOWN AT ALL

REQUIRED LOCATIONS. CONTRACTOR SHALL

IMPLEMENT CONTROLS AT THE CORRECT TIME

DURING CONSTRUCTION AND MODIFY OR ADD

CONTROLS AS THE NEED ARISES OR AS DIRECTED

BY THE COR. COORDINATE WITH SHEET C-002,

GENERAL EROSION CONTROL NOTES AND THE

CONTRACTOR DEVELOPED STORMWATER

POLLUTION PREVENTION PLAN (SWPPP).

2. TEMPORARY SEDIMENT TRAP - DETAIL A1/C-504

3. TEMPORARY SILT FENCE - DETAIL D6/C-504

4. TEMPORARY CONSTRUCTION ENTRANCE - DETAIL

D1/C-504

5. TEMPORARY CURB INLET GRAVEL FILTER - DETAIL

D3/C-504

6. LIMITS OF CONSTRUCTION

SCALE: 1" = 30'

0 30' 60'

SHEET KEYNOTES

GENERAL SHEET NOTES

M A

T C

H

L I N

E

S

E

F

N

T I N

U A

T I O

N

2 2

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

E R

O S

I O

N

C

O N

T R

O L

P

L A

N

CE101

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text H

AutoCAD SHX Text Y

APPROX.-

UNABLE TO LOCATE

APPROX.-UNABLE TO LOCATE

W

3" WATER

8" WATER

12" WATER

R

I

G

W

A

T

E

R

A

P

P

R

O

X

L

V

E

CMH 7

CMH

461BD

12" RCP

P

R C

P

P

P

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

ST

P

P P

X

X

XX

X

X

X X

X X

X

X

X

X

X

X

X

X

B7520

B7274

BERGSTROM DR

MPF SITE

B8210

B7540

P

S T

S T

S T

S

T

S

T

S

T

S

T

S T

ST ST ST

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S T

S T

S T

S

T

ST ST ST ST

ST

ST

ST

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

S

T

M

C

C

O

N

N

E

V

D

BERGSTROM DR

P P

P P

P P P P

P P

X

X X

X

X

DS

DS

DS

DS DS

DS

DS

DS

DS

DS

DS

P

P P P

ST

P P P

P

S T

S T

S T

P

P

P P P

S

T

S

T

S

T

S

T

S

T

S

T

ST ST ST ST ST ST ST ST

S

T

S

T

S

T

H

YD

F

DC

H

Y D

H

Y

D

FTD

S

T

S

T

FTU

DS

DS DS

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

OVERALL GRADING AND DRAINAGE PLAN

PLAN NORTH

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

GENERAL SHEET NOTES

SCALE: 1" = 60'

0 60' 120'

CG101 CG102

M A

T C

H

L

I N

E

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

O V

E R

A L

L

G

R A

D I N

G

A

A

I N

A G

E

P

L A

N

CG100

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text H

AutoCAD SHX Text Y

P

R

C P

R

C P

R

C P

12" WATER

L

V

E

CMH 7

AI

RIM=3228.77

INV.E=3223.26

INV.S=3222.95

MPF SITE

S T

S T

S

T

ST ST ST ST ST ST

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

WM

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S T

S T

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

ST

ST

ST

S T

S T

S T

S T

S T

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

FTD

FFE=3229.60

B8306

P P P P P P

S T

S T

S T

S T

S T

S T

S T

S T

P

P P

P

S T

P P P P P P

OFFSITE

FTU AREA

H

Y

D

UTILITY

YARD

FFE 3229.0

BERGSTROM DR

STDI-B7

STMH-B6

STCI-B5

STDI-B5.1.1

STDI-B5.1.2

STDI-B5.1.3

STCI-B5.2.1

STDI-B5.2.2

STCI-B4

STDI-B5.1.1.1

STCI-A2

STCI-A3

STCI-A4

STCI-A3.1

STCI-A3.2

STMH-C5

STMH-C6

CO INV=3226.0

CO INV=3227.0

CO INV=3227.0

CO INV=3226.5

CO INV=3225.8

CO INV=3226.0

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

GRADING AND DRAINAGE PLAN

PLAN NORTH

M A

T C

H

L I N

E

S

E

F

N

T I N

U A

T I O

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. CONTRACTOR SHALL COORDINATE ALL

CONSTRUCTION AT THE DEMARCATION LINE WITH

THE ADJACENT CONTRACTOR.

4. ALL SPOT ELEVATIONS ARE TRUNCATED TO SHOW

TWO DIGITS. DATUM START AT 3200.

5. SEE DETAILS FOR PIPE BEDDING REQUIREMENTS.

6. PERIMETER TRENCH DRAINS SHALL BE SLOPED AT

1% MINIMUM FROM THE STARTING POINT TO THE

CONNECTING MANHOLE OR INLET. PERFORATED

PIPE SHALL ONLY BE USED IN THE GRAVEL TRENCH

DRAIN. SOLID PIPE SHALL BE USED UNDER ALL HARD

SURFACES AND OUTSIDE THE GRAVEL TRENCH

DRAIN.

7. ALL PERIMETER DRAIN CLEANOUTS SHALL HAVE A

COLOR MATCHING 6-INCH PVC DRAIN GRATE IN LIEU

OF A CAP INSTALLED 2-INCHES ABOVE

SURROUNDING RIVER ROCK ELEVATION.

8. SDR-26 PVC STORM SEWER SHALL FOLLOW

SPECIFICATION 33 30 00.

9. SEE PROFILE FOR STORM SEWER PIPE SIZE AND

MATERIAL TYPE.

1. REINFORCED CONCRETE STORM SEWER PIPE

2. PRECAST CONCRETE MANHOLE - DETAIL D3/C-503

3. PRECAST CONCRETE DROP INLET - DETAIL D3/C-503

6. PERIMETER TRENCH DRAIN (SEE GENERAL SHEET

NOTE 7) - DETAIL F9/C-501

13. PRECAST CURB INLET - DETAIL D1/C-503

18. PROTECT UTILITY DURING GRADING OPERATION

19. LOWER GAS LINE AS NEEDED TO MAINTAIN 24" OF

COVER IN GRADED AREA

20. CLEANOUT - DETAIL D8/C-506

22. 10" PVC SDR-26 - PER SPECIFICATION 33 30 30 00

33. REMOVE RUBBLE, DEBRIS, AND SEDIMENT FROM 60"

STORM SEWER TO REMAIN TO BERGSTROM DRIVE

SHEET KEYNOTES

GENERAL SHEET NOTES

SCALE: 1" = 30'

0 30' 60'

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

G R

A D

I N

G

A

A

I N

A G

E

P

L A

N

CG101

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text H

AutoCAD SHX Text Y

X

X

XX

X

X

X X

X X

X

X

X

X

X

X

X

X

B7520

B7274

BERGSTROM DR

MPF SITE

MECH

COMM

ELEC

B8210

B7540

COMM

ELEC

MECH

WM

M

C

C

O

N

N

E

V

D

BERGSTROM DR

B8306

DS

DS

DS

DS DS

DS

DS

DS

DS

DS

DS

OFFSITE

FTU AREA

VAN

VAN

V A

N

UTILITY

YARD

FFE 3229.0

FTD

FTU

DS

DS DS

FTD

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

OVERALL SITE PLAN

PLAN NORTH

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

GENERAL SHEET NOTES

SCALE: 1" = 60'

0 60' 120'

CS101 CS102

M A

T C

H

L

I N

E

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

O V

E R

A L L

S

I T

E

P

L A

N

CS100

A M

S

I G

N

I S

S U

I C

I N

MPF SITE

WM

FTD

FFE=3229.60

B8306

OFFSITE

FTU AREA

VAN

UTILITY

YARD

FFE 3229.0

BERGSTROM DR

R

R

R

R

20'

TYP.

T Y

P

20' 26' 20' 20' 26'

30'

38'

R

R

2.5'

6'

R

R

R

N:675380.15

E:1244322.29

N:675362.32

E:1244301.06

N:675341.70

E:1244276.52

N:675196.97

E:1244104.25

N:675118.22

E:1243975.28

N:675033.91

E:1244013.07

N:674999.10

E:1244041.69

N:675016.65

E:1244062.31

N:675050.48

E:1244032.92

N:675245.52

E:1244435.39

N:675223.92

E:1244409.77

R

R

R

R

R

34.1'

N:675210.14

E:1244421.35

N:675170.75

E:1244452.04

N:675175.08

E:1244402.17

N:675120.25

E:1244253.28

N:675070.40

E:1244180.99

15.75'

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

SITE PLAN

PLAN NORTH

M A

T C

H

L I N

E

S

E

F

N

T I N

U A

T I O

N

TYP.

TYP.

TYP.

2. PORTLAND CEMENT CONCRETE PAVEMENT AND BASE

- DETAIL G1/C-501

3. ROAD BITUMINOUS PAVEMENT AND BASE - DETAIL

E4/C-501

4. 30" CONCRETE CURB AND GUTTER MODIFIED TYPE B-

DETAIL D6/C-502

5. 30" CONCRETE CURB AND GUTTER MODIFIED TYPE BL-

DETAIL D6/C-502

6. CONCRETE SIDEWALK - DETAIL F6/C-501

7. 4" PAINTED WHITE STRIPE

8. PAINTED UNIVERSAL ACCESSIBLE SYMBOL - DETAIL

A4/C-501

9. ACCESSIBLE PARKING MARKING AND SIGN - DETAIL

A1/C-501

10. 10" WHITE STOP BAR - DETAIL B8/C-501

11. R1-1 STOP SIGN AND POST - DETAIL B4/C-501

12. ROAD CROSSWALK MARKING - DETAIL A6/C-502

14. 33' UNOBSTRUCTED SPACE

15. EXISTING UTILITY WATER PUMP FACILITY

17. DUMPSTER ENCLOSURE - SEE ARCHITECTURAL PLAN

18. ACCESSIBLE RAMP - DETAIL D3/C-502

19. UTILITY YARD - SEE ARCHITECTURAL PLANS

21. SITE HEAVY DUTY BITUMINOUS PAVEMENT AND BASE -

DETAIL G4/C-501

22. RIVER ROCK AND TRENCH DRAIN BORDER - DETAIL

F9/C-501

23. CONCRETE STOOP - SEE STRUCTURAL PLAN

24. CONCRETE WHEEL STOP - DETAIL A6/C-501

25. CONCRETE STAIRS AND LANDING - SEE STRUCTURAL

PLAN

41. TIED CONTRACTION JOINT - DETAIL F1/C-505

44. THICKENED EDGE RIGID TO FLEXIBLE PAVEMENT

JOINT - DETAIL F6/C-505

47. STRIPED ISLAND - DETAIL C8/C-501

53. 6' CURB TAPER - DETAIL E9/C-501

54. EDGE OF PAVEMENT

58. 30" CONCRETE RIBBON CURB - DETAIL D9/C-501

62. BICYCLE RACK - DETAIL A8/C-502

65. THICKENED EDGE EXPANSION JOINT AT

STRUCTURE/BLDG - DETAIL F3/C-505

69 . BUILDING BOLLARD - SEE STRUCTURAL PLAN

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION

AT THE DEMARCATION/CONSTRUCTION LIMIT LINE WITH

THE ADJACENT CONTRACTOR - SEE SHEET CD101.

4. COORDINATES FOR THE BUILDING ARE LOCATED AT THE

OUTSIDE FACE OF WALL. COORDINATE BUILDING

LAYOUT WITH THE ARCHITECTURAL PLANS.

FTD PARKING (59 FTE) 41 POV SPACES @ 70%

FTD PARKING (101 STUDENT) 61 POV SPACES @ 60%

ACCESSIBLE PARKING 5 SPACES

TOTAL POV REQUIRED/PROVIDED 102/102 POV SPACES

TOTAL ACCESSIBLE PARKING

REQUIRED/PROVIDED 5/5 SPACES

SCALE: 1" = 30'

0 30' 60'

SHEET KEYNOTES

GENERAL SHEET NOTES

PARKING ANALYSIS

6 21

TYP.

TYP.

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

S I T

E

P

L A

N

CS101

A M

S

I G

N

I S

S U

I C

I N

APPROX.-UNABLE TO LOCATE

RICKENBACKER ST.

BERGSTROM DRIVE

BERGSTROM DRIVE BERGSTROM DRIVE

M c

C

O

N

N

E

V

D

S C

H I L L

I N

G

S

T R

E E

T

W

3" WATER

8" WATER

12" WATER

R

I

G

W

A

T

E

R

A

P

P

R

O

X

R

I C

K

E

N

B

A

C

K

R I C

K E

N B

A C

K E

R

S

T

L

V

E

CMH 7

CMH

461BD

12" RCP

P

R C

P

P

P

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

M c

C

O

N

N

E

V

D

SS SS

W W

W

W W

W

G G

W

FW

C S

C

R C

S C

R C

S C

R

CS-CR

C S

C

R C

S C

R C

S C

R

CS-CR

X

X

XX

X

X

X X

X X

X

X

X

X

X

X

X

X

W

SS SS SS

B7520

B7274

BERGSTROM DR

MPF SITE

MECH

COMM

ELEC

B8210

B7540

P

U P

U P

U P

U P

COMM

ELEC

MECH

WM

U

P

U

P

U

P

U

P

U

P

U

P

U

P

UP UP

UE

U

P

U

P

M

C

C

O

N

N

E

V

D

BERGSTROM DR

S S

S S

S S

S S

S S

B8306

S S

S S

S S

S S

S S

S S

S S

S S

S

S

S

S

S

S

SS

P P

P P

P P P P

P P

T

DS

DS

DS

DS DS

DS

DS

DS

DS

DS

DS

P

H

YD

WW

F W

W

H

YD

OFFSITE

FTU AREA

F

D C

H

YD

F

DC

H

Y D

H

Y

D

P

P P

P

P P

P

P P

P

P P

P

P P

P

EMH

G

U C

U C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U C

UC UC

U

C

U

C

U

C

U

C

U

C

C M

H

CMH

CMH

C M

H

C M

H

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

UTILITY

YARD

FFE 3229.0

T

W

CMH

E

M

H

EMH

C

M

H

C

M

H

CMH

FWFWFWFWFW

C M

H

EMH

UP

E

S

U C

U C

U C

U C

U

C

U

C

U

C

UC

U

C

FTD

UC UC UC UC UC

U C

U C

U C

U C

U C

U C

U C

UC UC UC UC UC UCCMH

FTU

DS

DS DS

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

OVERALL UTILITY PLAN

PLAN NORTH

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 60'

0 60' 120'

GENERAL SHEET NOTES

CU101 CU102

M A

T C

H

L

I N

E

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

O V

E R

A

I L

I T

Y

P

L A

N

CU100

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

12" WATER

L

V

E

CMH 7

SS SS SS SS SS

S S

W W

W W

W W

W

W W

W W

W W W

W

FW FW

C S

C

R C

S C

R C

S C

R C

S C

R C

S C

R

CS-CR CS-CR CS-CR

C S

C

R C

S C

R C

S C

R C

S C

R C

S C

R

CS-CR CS-CR CS-CR

SS SS SS SS SS SS SS

MPF SITE

S T

S

T

S T

ST ST ST ST ST ST

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

WM

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

UE

S

T

S

T

S T

S T

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

ST

ST

ST

S T

S T

S T

S T

S T

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

FTD

FFE=3229.60

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

B8306

S S

P P P P P P

S T

S T

S T

S T

S T

S T

S T

S T

P

P P

P

S T

P P P P P P

H

YD

WWWW

F W

F W

W

WW

W

H

YD

F

D C

U

C

U

C

U

C

U

C

U

C

UC UC UC UC UC

U

C

U

C

U

C

U

C

U

C

U

C

U

C

C M

H

UC

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

UTILITY

YARD

FFE 3229.0

W

W

CMH

FWFWFWFWFWFWFWFWFW

F

W

C M

H

BERGSTROM DR

UC UC UC UC UC UC UC UC UC UC

U

C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U

C

UC UC UC UC UC UC UC UC UC UC UC UC

CMH

SSMH X-3

SSMH X-2

SSMH X-1

BLDG. X-5

SSMH X-4

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

UTILITY PLAN

PLAN NORTH

M A

T C

H

L I N

E

S

E

F

N

T I N

U A

T I O

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. REFER TO ELECTRICAL SITE PLAN FOR SITE

LIGHTING CIRCUIT LAYOUT.

4. THE CONTRACTOR SHALL COORDINATE SANITARY

SEWER CONSTRUCTION AND TIMING ACROSS

BERGSTROM DRIVE AND CONNECTION TO SSMH X-2

WITH THE FTU PROJECT.

1. 8" WATER MAIN

3. 90° BEND WITH CONCRETE THRUST BLOCK - DETAIL

A7/C-506

4. 45° BEND WITH CONCRETE THRUST BLOCK - DETAIL

A7/C-506

6. 4" CHILLED WATER SUPPLY AND RETURN

8. FIRE HYDRANT ASSEMBLY - DETAIL D1/C-506

9. 6" SANITARY SEWER PIPE

10. PRECAST SANITARY SEWER MANHOLE - DETAIL

A1/C-502

12. UNDERGROUND COMMUNICATION CONCRETE DUCT

BANK - SEE ELECTRICAL PLANS

14. UTILITY YARD - SEE ARCHITECTURAL, MECHANICAL

AND STRUCTURAL PLANS

15. FIRE DEPARTMENT CONNECTION AND DRY WELL -

DETAIL D4/C-506

19. SITE LIGHTING - SEE ELECTRICAL PLANS

21. 8x6 TEE WITH CONCRETE THRUST BLOCK - DETAIL

A4/C-506

23. EXISTING UTILITY WATER PUMP FACILITY

24. 8" SANITARY SEWER PIPE

25. UNDERGROUND COMMUNICATION CONCRETE DUCT

BANK AND MANHOLES BUILT BY MPF

27. 10" WATER MAIN

28. 6" FIRE WATER SERVICE LINE

30. 6" WATER SERVICE LINE

31. 3" WATER SERVICE LINE

33. POST INDICATOR VALVE - DETAIL A1/C-506

34. 6X6 TEE WITH 6x3 REDUCER AND CONCRETE THRUST

BLOCK - DETAIL A4/C-506

36. UNDERGROUND COMMUNICATION CABLE REROUTE

INSIDE CONCRETE DUCT BANK BUILT BY MPF PROJECT

- SEE ELECTRICAL PLANS

44. SITE LIGHTING BY MPF

46. COMMUNICATION MANHOLE - SEE ELECTRICAL PLANS

49. 8" WATER VALVE

52. 3" WATER VALVE

64. CONNECT TO FTU SANITARY SEWER MANHOLE

72. FTU SANITARY SEWER LINE

SCALE: 1" = 30'

0 30' 60'

SHEET KEYNOTES

GENERAL SHEET NOTES

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

U T

I L

I T

Y

P

L A

N

CU101

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text H

AutoCAD SHX Text Y

MH

RIM=3222.80

INV.W=3213.22

INV.E=3213.20

APPROX.-UNABLE TO LOCATE

MH

RIM=3223.33

INV.W=3213.99

INV.S=3213.96

12" RCP

P

R C

P

P

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

ST ST

P

P P

P P

P P

G G

G G

W

FW FW FW

CS-CR CS-CR

CS-CR CS-CR

X

X

X

X

XXXX

X

X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

W

W

FTD

FFE=3229.60

U P

U P

U P

U P

U P

U P

U P

U P

COMM

ELEC

MECH

S T

S T

S T

S T

S T

S T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U

P

U P

UP UP UP UP UP

U E

UE

ST ST ST ST ST ST ST ST

ST

ST

ST

ST

ST

ST

U

P

U

P

U

P

U

P

U P

P P P P P P P

ST

ST

S

T

P P

P

P

P P

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

W

W

S

T

S

T

S

T

S

T

ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST

S

T

S

T

S

T

S

T

S

T

S

T

W

EMH

U C

U C

U C

U C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

UC UC

U

C

U

C

U

C

U

C

UC

CMH

CMH

T

W

E

M

H

EMH

C

M

H

C

M

H

CMH

FWFWFW

EMH

U

P

E

S

U C

U C

U C

U C

U C

U C

U C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

U

C

BERGSTROM DR

M

C

C

O

N

N

E

V

D

B7540

B8210

S

T

S

T

S

T

S

T

S

T

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

O C

T O

B E

R

B

F

I E

A

I N

I N

G

D

E T

A C

H M

E

T D

E L L S

W O

R T

H

A

R

S

E

S

O U

K

O

O

J E

M

B E

R

F

X B

M

W F

R

O M

A H

A

D

I S

T R

I C

T

C

A P

I T

A L

A

V E

N U

S

U I T

E

O M

A H

A

N

E B

R A

S K

A

M

Y

C

O R

E

N G

I N

E E

R S

FTD

ADVERTISEMENT - 100% DESIGN

A

M

S

I G

N

I S

S U

I C

I N

G

A1

UTILITY PLAN

PLAN NORTH

M A

T C

H

L I N

E

S

E

F

N

T I N

U A

T I O

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. REFER TO ELECTRICAL SITE PLAN FOR SITE

LIGHTING CIRCUIT LAYOUT.

3. 90° BEND WITH CONCRETE THRUST BLOCK - DETAIL

A7/C-506

4. 45° BEND WITH CONCRETE THRUST BLOCK - DETAIL

A7/C-506

6. 4" CHILLED WATER SUPPLY AND RETURN

11. UNDERGROUND ELECTRICAL CONCRETE DUCT BANK -

SEE ELECTRICAL PLANS

12. UNDERGROUND COMMUNICATION CONCRETE DUCT

BANK - SEE ELECTRICAL PLANS

13. TRANSFORMER AND CONCRETE PAD- SEE

ELECTRICAL PLANS

27. 10" WATER MAIN

28. 6" FIRE WATER SERVICE LINE

29. 10x10 TEE WITH 10x6 REDUCER AND WITH CONCRETE

THRUST BLOCK - DETAIL A4/C-506

30. 6" WATER SERVICE LINE

31. 3" WATER SERVICE LINE

46. COMMUNICATION MANHOLE - SEE ELECTRICAL PLANS

57. ELECTRICAL MANHOLE - SEE ELECTRICAL PLANS

65. ELECTRICAL MANHOLE BUILT BY FTU

66. COMMUNICATION MANHOLE BUILT BY FTU

67. ELECTRICAL SWITCH AND CONCRETE PAD - SEE

ELECTRICAL PLANS

68. 1 1/4" NATURAL GAS LINE

SCALE: 1" = 30'

0 30' 60'

SHEET KEYNOTES

GENERAL SHEET NOTES

67 12

D

E

L L E

D G

E

T B

E L

I A

K O

V A

L

T

A L

I A

F E

R R

O

J

H

A L

L

U T

I L

I T

Y

P

L A

N

CU102

A M

S

I G

N

I S

S U

I C

I N

G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NEWFTD

STC 7821

EXISTING

CIRCUIT 8

FEEDER

SW-SOBA1

NEW

EXISTING

TRANSFORMER TOA-L1

FEEDER

SW-S1A1

EXISTING

EXISTING

TRANSFORMER

FEEDER

EXISTING

TRANSFORMER

FEEDER

RETERMINATE

EXISTING

500KCMIL

NEW

EM7821A

EXISTING

EMH-1

T0B2-L2

EXISTING

480Y/277V

4/0

500KCMIL1

EXISTING

TRANSFORMER TOB2-L1

FEEDER

EXISTING

TRANSFORMER TOC-L2

FEEDEREXISTING

EM0C

EXISTING

EM0A

EXISTING

EM0B2

EXISTING

EM0B1

T-7821

1500KVA

480Y/277V

4/0

4/0

NEW

EM7821B

NEW

EM7821B

EXISTING

EM0B1

500KCMIL

EXISTING

EM0B1 4/01

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/17/2022 5:28:39 PM

ES601

FTD

E L

E C

T R

IC

A

L S

IT

E

P O

W E

R O

N E

-L

IN

E

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

S .W

IL

L

IA

M S

S W

IL

L

IA

M S

D E

L L E

D G

E

T L

/R A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

N.T.S.B1

ELECTRICAL SITE PRIMARY ONE-LINE DIAGRAM

GENERAL NOTES

1. REFER TO E-001 FOR LEGEND, ABBREVIATIONS, AND

GENERAL NOTES.

2. ALL SWITCHES ARE NORMALLY CLOSED UNLESS

NOTED OTHERWISE.

3. SWITCHGEAR AND FUSED SECTIONLIZIING CABINETS

HAVE BEEN DRAWN FOR CLARITY.

4. THE COMPARTMENT LOCATIONS WILL NOT ALWAYS

MATCH THE INSTALLED CONFIGURATION. VERIFY

EQUIPMENT PRIOR TO WORKING ON THE SPECIFIC

EQUIPMENT.

5. NOT ALL EQUIPMENT OR CIRCUITS HAVE BEEN

SHOWN. ONLY CIRCUITS AND EQUIPMENT THAT ARE

REQUIRED TO BE REMOVED OR MODIFED ARE

SHOWN.

6. POWER TO EXISTING BUILDINGS TO REMAIN SHALL BE

UNINTERUPTED DURING DEMOLITION AND

CONSTRUCTION. REROUTING OF PRIMARY FEEDERS

AND NEW DUCTBANK SHALL BE COMPLETED PRIOR TO

DEMOLITION OF EXISTING TO MINIMIZE DOWNTIME.

7. INSTALLATION OF NEW EQUIPMENT MUST BE

ACCOMPLISHED PRIOR TO DEMOLITION AND

REMOVAL.

8. COORDINATE REQUIRED POWER OUTAGES FOR

CHANGEOVERS WITH BASE.

9. COORDINATE DEMOLITION OF UTILITES WITH BASE PRIOR

TO COMMENCEMENT OF REQUIRED WORK.

10. ALL CABLING TO BE COPPER, REFER TO SPECIFICATIONS

FOR MORE INFORMATION.

11. CABLING SHALL BE PLACED IN DUCT BANKS SUCH THAT

THE PRIMARY FEEDER BETWEEN SWITCHES ARE IN ONE

DUCT AND ONE DUCT WILL HAVE THE RADIAL FEED TO

TRANSFORMERS ETC WITH OTHER DUCT(S) AS SPARE.

12. EXISTING EMOB1 SHOWN ON ONE-LINE MORE THAN

ONCE IS SHOWN TO SIGNIFY THAT MORE THAN ONE

FEEDER WILL BE ROUTING THRU THE SAME MANHOLE TO

NEW SWITCH SW-S0BA1 FOR CLARITY.

1. PROVIDE NEW CONDUCTORS AS INDICATED. REFER

TO SITE PLANS FOR DUCTBANK SIZE AND MORE

INFORMATION CONCERNING REROUTING AND

DEMOLITION. EXISTING CONDUCTORS MAY BE

REUSED IF LONG ENOUGH TO REACH NEW SW-S0BA1

LOCATION.

2. PROVIDE NEW TRANSFORMER. REFER TO SITE

PLANS FOR MORE INFORMATION.

3. PROVIDE NEW 12.47KV, 3-PHASE, SECTIONALIZING

TERMINATING CABINET. REFER TO SITE PLANS FOR

MORE INFORMATION.

4. PROVIDE NEW 6 WAY SF 6 SWITCH (2 THRU WAYS

AND 4 PROTECTED RADIAL WAYS). REFER TO SITE

PLANS AND SPECIFICATIONS FOR MORE

INFORMATION.

SHEET KEYNOTES

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

FILL WITH SEALANT

CREATE 1/8" WIDE GROOVE BY

TOOLING (OR SAW CUTTING

WITHIN 4 TO 6 HOURS AFTER

POUR) DURING FINISHING

OPERATIONS IN ACCORDANCE

WITH SPECIFICATIONS.

REINFORCED

CONCRETE SLAB. SEE

FOUNDATION PLAN

FOR THICKNESS.

CUT 50% OF REINF.

ACROSS JOINT. SEE

PLAN FOR REINF. SIZE.

VAPOR BARRIER

6" CAPILLARY

WATER BARRIER

COMPACTED SUBGRADE

PER FOUNDATION

GENERAL NOTES

4"

/4

O F

S L

P T

H

M

IN

12" GRANULAR FILL

REMOVE CAP

AND FILL WITH

SEALANT

STOP REINFORCING AT

JOINT. SEE FOUNDATION

PLAN FOR REINF SIZE.

REINFORCED CONCRETE

SLAB. SEE FOUNDATION

PLAN FOR THICKNESS.

VAPOR BARRIER

6" CAPILLARY

WATER BARRIER

COMPACTED SUBGRADE. SEE

FOUNDATION GENERAL NOTES

GALV. METAL FORM

WITH KEYWAY

12" GRANULAR FILL

2" C

LR

2" C

LR

ISOLATION JOINT PER

DETAIL E6/S-501

CONCRETE

STEM WALL

CONCRETE SLAB

(2) REENTRANT CORNER BARS

(SEE REINFORCED CONCRETE

AND FOUNDATION NOTE H ON

S-002 FOR SIZE AND LENGTH)

TYPICAL CONCRETE

SLAB OR WALL

REINFORCEMENT

ADDITIONAL OPENING REINF.:

USE SAME NUMBER OF LAYERS

AND SIZE AS REGULAR WALL OR

SLAB REINFORCING,AT SLABS

USE (2) #4 MIN.

RECTANGULAR OR ROUND

PENETRATION (OPENING)

6" TYP.

C L R

T

Y P

CONCRETECONC STEM WALL CONC STEM WALL

3" CLR.

COLUMN AND BASE PLATE

COLUMN ENCASEMENT. FILL

AROUND COLUMN WITH

CONCRETE AFTER SLAB AND

COLUMNS HAVE BEEN PLACED.

EDGE OF SLAB / ISOLATION

JOINT BETWEEN SLAB AND

FOUNDATION STEM WALL

ISOLATION JOINT

CONTRACTION JOINT, (TYP.)

NOTE:

CONTRACTION JOINTS WILL NOT LINE UP AT THE CORNER OF THE

DIAMOND AT ALL LOCATIONS. WHERE JOINTS DO NOT LINE UP TO THE

CORNERS, PROVIDE REENTRANT CORNER BARS PER DETAIL A1/S-501 AND

A7/S-501.

COLUMN AND BASE PLATE

ISOLATION JOINT

SEE E6/S-501

CONTRACTION /

CONSTRUCTINO

JOINT (TYP.)

CONTRACTION JOINT (TYP.)

COLUMN ENCASEMENT. FILL

AROUND COLUMN WITH

CONCRETE AFTER SLAB AND

COLUMNS HAVE BEEN

PLACED

3" M

IN.

NOTES:

1. CONTRACTION JOINTS MAY NOT LINE UP AT THE CORNER OF THE

DIAMOND AT ALL LOCATIONS. WHERE JOINTS DO NOT LINE UP TO THE

CORNERS, PROVIDE REETRANT CORNER BARS PER DETAIL A1/S-501

AND A7/S-501.

2. COLUMN ENCASEMENT SHALL BE POURED A MINIMUM OF 28 DAYS

AFTER SLAB IS POURED TO ALLOW FOR SHRINKAGE OF SLAB

CONCRETE.

(2) #4 REENTRANT CORNER

BARS. SEE SCHEDULE ON

S-602 FOR REQUIRED

DEVELOPMENT LENGTH)

REINFORCED

CONCRETE SLAB

FDN. WALL

CONCRETE

FDN. WALL

CONCRETE DOOR OPENING

ISOLATION JOINT

PER DETAIL E6/S-501

2" C

LR

"D d b

6db*O R3" M

IN

135° HOOK

BAR SIZE D'

1 1/2"

2"

2 1/2"

#3

#4

#5

"D" d b

90° HOOK

* PROVIDE 10db EXTENSIONS IN LIEU OF 6db AT ALL FRAME COLUMNS, GIRDERS, SHEAR WALLS AND SHEAR

WALL BOUNDARY MEMBERS.

TIES & STIRRUPS HOOKS ONLY TYPICAL COLUMN

BAR OFFSET

"D" d b d b

U .N

.O d b

OR 2 1/2"

STANDARD HOOKS

90° HOOK180° HOOK

40 DIA IN MASONRY

30 DIA. IN CONCRETE

2'-0" MIN. U.N.O.

TYP. COMPRESSION LAP SPLICE

BAR SIZE D'

6d

8d

10d

#3 THRU #8

#9 THRU #11

#14 THRU #18

NOTE:

FOR TENSION SPLICE

SEE S-602.

4db MIN.

"D

(2) #4x4'-0"

AT 4" OC AT

MID-DEPTH OF

SLAB (TYP.)

4 SETS OF #4x4'-0"

AT 4" OC AT MID-

DEPTH OF SLAB

(2) #4x4'-0" AT 4" OC

AT MID-DEPTH OF SLAB

WHERE STAGGERING JOINTS

CANNOT BE AVOIDED (TYP.)

S.J.

C .J.

ISOLATION

JOINTS (TYP.)

S.J.S.J.

(2) #4x4'-0" AT 4" OC

AT MID-DEPTH OF SLAB FOR

RE-ENTRANT CORNERS AND

12"x12" OPENING OR LARGER

C .J.

TOOL EDGE AND FILL

WITH SEALANT

SEE FOUNDATION

PLAN FOR SLAB SIZE

AND REINF SIZE.

VAPOR BARRIER

6" CAPILLARY WATER

BARRIER

COMPACTED

SUBGRADE SEE

FOUNDATION

GENERAL NOTES

1/2" THICK

PREFORMED JOINT

FILLER

FOUNDATION,

STEMWALL

(OR OTHER

STRUCTURE)

FIN.

GRADE

12" GRANULAR FILL

PERIMETER RIGID

INSULATION, SEE

ARCH.

6" 8" 6"

STOOP OR SIDEWALK. SEE

DETAIL F4/S-502 FOR STOOP,

SEE CIVIL FOR SIDEWALK, TYP

3/8" STEEL DIAMOND PLATE.

ATTACHMENT ASSEMBLY BY PLATE

MANUFACTURER. CUT 5"X7" OPENING

IN PLATE FOR DOWNSPOUT.

COORDINATE WITH ARCH.

#5 BARS, TYP

#5@12" O.C, TYP

SLOPE TRENCH AWAY

FROM BUILDING AT 1/4"

PER FOOT

3" 3"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

C:\Revit_Local_Files\8996-12-Ellsworth AFB B21 FTD_chau.tranV9ZEF.rvt

1/18/2022 4:18:16 PM

S-501

FTD

T Y

P

IC

A L C

O N

C R

E T

E D

E T

A

IL

S

S H

E E

T

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

C T

R A

N

T J O

H N

S O

N

D E

L L E

D G

E

P F

IN

L E

Y

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

N.T.S.E1

TYPICAL CONTRACTION JOINT

N.T.S.E3

TYPICAL CONSTRUCTION JOINT

N.T.S.A7

TYPICAL SLAB RE-ENTRANT CORNER BARS

N.T.S.C1

TYPICAL REINFORCED CONCRETE SLAB

N.T.S.C6

TYPICAL EXTERIOR COLUMN ISOLATION JOINT

N.T.S.C3

TYPICAL INTERIOR COLUMN ISOLATION JOINT

N.T.S.A3

TYPICAL SLAB REINFORCING AT DOOR OPENING

N.T.S.E8

TYPICAL REINFORCING BAR BENDS

N.T.S.A1

TYPICAL SLAB-ON-GRADE REINF. AT

OPENING AND BLOCKOUT DETAILS

N.T.S.E6

TYPICAL ISOLATION JOINT AT SLAB PERIMETER 3

A M

-0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

N.T.S.C8

TYPICAL TRENCH DETAIL

A1 A-005

A3 A-005

A7 A-005

A5 A-005

9 1

7'- 7"

9"

7'-7" 9"

9'-0 5/8"

9'- 0 5

/8"

STANDING SEAM METAL ROOF ON SLIP

SHEET, ON SELF ADHERING

UNDERLAYMENT, ON 1/2" HD POLYISO

6" CONTINUOUS RIGID

INSULATION

1 1/2" METAL DECK, RE:

STRUCTURAL

PREFINISHED METAL

FASCIA, TO MATCH SSMR

COMPOSITE METAL PANEL SOFFIT,

TO MATCH COMPOSITE METAL PANEL

COMPOSITE METAL PANEL

3" CONTINUOUS RIGID INSULATION

THRU WALL FLASHING AND METAL

DRIP EDGE

CAST STONE BAND

THRU WALL FLASHING AND METAL

DRIP EDGE

GROUT FILL

MORTAR NET

4" SPLIT FACE CMU VENEER

5/8" GLASS MAT SHEATHING

6" METAL STUD FRAMING

R-19 BATT INSULATION,

MECHANICALLY FASTENED TO STUDS

TWO LAYERS 5/8" GLASS MAT GYP

BOARD, STAGGER JOINTS

CAST STONE BAND

LIGHT GAUGE METAL TRUSS, RE:

STRUCTURAL FOR LOADING

CONCRETE SLAB, RE: STRUCTURAL

TRUE CEILING

6"X6" PREFINISHED

GUTTER

STANDING SEAM METAL ROOF ON SLIP SHEET,

ON SELF ADHERING UNDERLAYMENT, ON 1/2"

HD POLYISO

6" CONTINUOUS RIGID INSULATION

COMPOSITE METAL PANEL SOFFIT,

TO MATCH COMPOSITE METAL PANEL

PREFINISHED METAL

FASCIA, TO MATCH SSMR

COMPOSITE METAL PANEL

3" CONTINUOUS RIGID INSULATION

1 1/2" METAL DECK, RE: STRUCTURAL

FLUID APPLIED MEMBRANE AIR BARRIER

THRU WALL FLASHING AND METAL

DRIP EDGE

CAST STONE BAND

BOX BEAM HEADER

3'-0"X7'-0" INSULATED METAL DOOR

CMU VENEER JAMB (BEYOND)

CAST STONE BAND (BEYOND)

LIGHT GAUGE METAL TRUSS, RE: STRUCTURAL

FOR LOADING

TRUE CEILING

CONCRETE SLAB, RE: STRUCTURAL

A3 A-005

4'- 0"

4'- 0"

4'- 0"

8" 8"

A1 A-005

4'- 0"

4'- 0"

4'- 0"

8" 8"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/14/2022 3:04:22 PM

A-005

FTD

M O

C K

U P

PL

AN

S

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

G . U

EC

KE

R

D . E

LL

ED

G E

R . W

EN

TE

JA

N

U

AR

Y

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

1/2" = 1'-0"E7 MOCK UP PLAN

1/2" = 1'-0"A3 MOCK UP WALL SECTION

1/2" = 1'-0"A1 MOCK UP WALL SECTION

1/2" = 1'-0"A5 MOCK UP ELEVATION

1/2" = 1'-0"A7 MOCK UP ELEVATION

1 CONTRACTOR TO CONSTRUCT A FULL SCALE MOCK UP

IN ACCORDANCE WITH DRAWINGS AND

SPECIFICATIONS.

2 CONTRACTOR TO COORDINATE MOCK UP LOCATION

WITH COR AND SITE SECURITY MANAGER.

GENERAL NOTES

1 CMU-1, 4" SPLIT FACE CMU VENEER ON AIR SPACE, ON

3" CONTINUOUS RIGID INSULATION, FLUID APPLIED

MEMBRANE BARRIER ON 5/8" GLASS MAT SHEATHING

ON METAL STUD FRAMING

2 CMU-2, 4" SPLIT FACE CMU VENEER ON AIR SPACE, ON

3" CONTINUOUS RIGID INSULATION, FLUID APPLIED

MEMBRANE BARRIER ON 5/8" GLASS MAT SHEATHING

ON METAL STUD FRAMING

3 CAST STONE BAND

4 COMPOSITE METAL PANEL ON 3" CONTINUOUS

INSULATION, ON 5/8" GLASS MAT SHEATHING ON

METAL STUD FRAMING

5 STANDING SEAM METAL ROOF ON SLIP SHEET, ON SELF

ADHERING UNDERLAYMENT, ON 1/2" HD POLYISO, ON 6"

CONTINUOUS RIGID INSULATION, ON 1 1/2" METAL DECK

6 COMPOSITE METAL PANEL SOFFIT TO MATCH

COMPOSITE METAL PANEL

7 PREFINISHED METAL FASCIA TO MATCH STANDING

SEAM METAL ROOF

8 PREFINISHED METAL GUTTER TO MATCH STANDING

SEAM METAL ROOF

9 SECURE PERIMETER WALL

10 PREFINISHED FLAT SEAM METAL BAND

11 INSULATED METAL DOOR FRAME

12 INSULATED METAL DOOR

13 PREFINISHED METAL DOWNSPOUT

SHEET KEYNOTES

0 6" 1' 2' 4' 0 6" 1' 2' 4' 0 6" 1' 2' 4' 0 6" 1' 2' 4'

0 6" 1' 2' 4'

NORTH

DN

COMM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

CONFERENCE

7A

WOMEN

MEN

9A

6A

0A

228A

AETC

CHIEF

AETC

LEADERSHIP

ADMIN

AETC

INSTRUCTOR

OPEN

OFFICE

COMPUTER

SUPPORT

CS

STORAGE

TRAINING

SYSTEMS

SUPPORT

CENTER

7A

6A

225A

STORAGE

240A

238A

2A

243A

241A

9A

245A

2A

253A

251A

7A 23 3A23

1A

0A

2A

STAIR

160'-11"

'-9

1'-1" 22'-10" 2" 9'-6 5/8" 3 3/8"10'-0 3/8" 12'-7 5/8" 27'-5" 25'-10" 8'-11" 19'-3" 2'-5" 20'-5" 9"

1'-1" 23'-0" 5'-7" 4'-3" 22'-8" 27'-5" 10'-3" 15'-7" 3'-11" 24'-0" 3" 9'-7" 1'-6" 11'-10" 1'-3"

1'- 1"

4"

'-3

'-7

2"

8'- 1"

7'- 8"

7'- 7"

'-1

1" 1'-

1"

7'-

9'-

5"

'-0

5'- 3"

2"

7'-

'-1 0"

'-0

'-7

'-4

'-8

5'-

8"

2'-10"

2'-6" 3'-8"

1'-8" 2"

'-6

8'- 6"

'-2

5'-8"

2'- 9"

6'- 7"

'-4

2'- 6"

A2

AE302

D1

AE301A B C D E F G I

CO

RR

ID

OR

CORRIDOR

CORRIDOR

G1

C1

A4

C1 B5

B7

G1

C1 G1

G1

G1

G1

G1

A4

G1

G1

G1

G1

G1

C1 G1

G1

G1

G1G1 B2

G1

G1G1

G1

B1

G1 G1 G1

G1

G1

G1 G1

G1

B1B5

B7

B7

B7

G1

A3

AE403

MA

TC

HL

IN

E

AE

MA

TC

HL

IN

E

AE

WOMEN

VESTIBULE

MEN

VESTIBULE

AE401

A6

B2

G1

4" 15'-9" 7'-1"

4" 22'-10" 2"

160'-10"

32'-8" 18'-2" 9'-3" 10'-3" 15'-7" 3'-11" 5'-8" 18'-4" 3" 9'-7" 4'-8" 9'-9"

G1

1/2" / 12"

1" / 1

2"

D6

AE301

WSTA

WSTA

LCMS /

LMS

BACKUP

SERVER

8A

235B235A

SECURITY

VESTIBULE

AVIONICS

TRAINING

AREA

H

AE403

E1

AE504

C1

AE504

C4

G1

A4 A4 G1

G1

'-7

'-9

'-9

'-8

C1 G1

G1 G1

G1

G1

C2

B2

TYP

TYP

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:44:37 AM

AE106

FTD

SE

C

O N

D F

LO

O

R P

LA

N

AR

EA

A

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

G . U

EC

KE

R

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/8" = 1'-0"A2 SECOND FLOOR PLAN - AREA A

0' 2' 4' 8' 16'

NORTH

1 DUAL HEIGHT DRINKING FOUNTAIN, RE: PLUMBING

2 COMM RACKS, RE: TELECOMMUNICATIONS

3 EXPANSION JOINT

4 LCMS/LMS SERVER EQUIPMENT (NIC)

5 RECESSED FIRE EXTINGUISHER CABINET

1 ALL DIMENSIONS ARE TO FACE OF BLOCK OR FACE

OF STUD, UNLESS NOTED OTHERWISE.

2 ALL DOORS ARE 6" FROM ADJACENT WALL ON THE

HINGE SIDE UNLESS NOTED OTHERWISE

GENERAL NOTES

SHEET KEYNOTES

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

JAN

WSTA

BREAK

STAIR

210A

8A

COMM

3A

WSTA

WSTA

WSTA

WSTA

WSTA

204 MECH

4A

1A

2A

3A

4A

205A 204A

206A 215A

WSTA

CLASSROOM

216A20 2A

STAIR

96'-1" 9" 4" 20'-4" 4" 8'-7" 13'-0" 2'-9" 15'-10" 8'-9" 10'-6" 13'-10" 1'-1"

15'-0" 5'-8" 21'-7" 4" 6'-4" 12'-3" 7'-7" 6'-5" 19'-5"

1'- 1"

'-3

'-5

9'- 8"

'-5

9"

4" 8'- 3"

3"

'-6

'-6

6'- 6"

8'- 7"

'-6

'-6

6'- 6"

'-1

1"

'-1

0"

9" 4"

'-1

'-8

5'- 8" 2"

9" 4"

'-1 1"

7'-

5'-

2'- 6"

'-8

15'-0"

A1

AE301I J K L M N P

STOR

CORRIDOR

CORRIDOR

CORRIDOR

G1

G1 G1

G1 G1G1

C3A1

A1A2

A1

A1

A5

G1

G1

A4 A4

G1

A4 G1

G1

G1 G1

G1 G1

G1

G1

G1

G1

D4

C1

G1

G1

G1

MATCHLINE AE108

MA

TC

HL

IN

E

AE

AE401

E4

AE402

D4

A2

A5

7'-5" 12'-11" 4"

G1

9A

A1

AE303

CORRIDOR

AE405

D1

AE406

D1

TYP

D1

D1

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:44:45 AM

AE107

FTD

SE

C

O N

D F

LO

O

R P

LA

N

AR

EA

B

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

G . U

EC

KE

R

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/8" = 1'-0"A4 SECOND FLOOR PLAN - AREA B

NORTH

0' 2' 4' 8' 16'

1 CONVENIENCE STAIR, OPEN TO BELOW

2 COMM RACKS, RE: TELECOMMUNICATIONS

3 MECHANICAL EQUIPMENT, RE: MECHANICAL

4 RECESSED FIRE EXTINGUISHER CABINET

1 ALL DIMENSIONS ARE TO FACE OF BLOCK OR FACE

OF STUD, UNLESS NOTED OTHERWISE.

2 ALL DOORS ARE 6" FROM ADJACENT WALL ON THE

HINGE SIDE UNLESS NOTED OTHERWISE

GENERAL NOTES

SHEET KEYNOTES

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

0 0

0 0 0

0 0

0 0 0

0 0

0 0

0 0

00000

B

B B

B

B

B

B

B

B

BB

B B B B

B B

BB

B B B

B

B

B

B

B

B B

BB

B

B

B

B B

B

B

B

BB

B

B

B

0 0

A B C D E F G I J K L M N P Q R S

MATCHLINE AE115

MATCHLINE AE116

MA

TC

HL

IN

E

AE

MA

TC

HL

IN

E

AE

MA

TC

HL

IN

E

AE

ELEC

JAN

WSTA

COMM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

BREAK

CONFERENCE

COMM

STOR

STORAGE

WOMEN

MEN

ALCOVE

STAIR

STAIR

COMM

MECHANICAL

WSTA

WSTA

WSTA

WSTA

WSTA

MECH

WSTA

CLASSROOM

AETC

CHIEF

AETC

LEADERSHIP

ADMIN

AETC

INSTRUCTOR

OPEN

OFFICE

COMPUTER

SUPPORT

CS

STORAGE

TRAINING

SYSTEMS

SUPPORT

CENTER

STORAGE

STAIR

STAIR

STOR

3 2

3 2

3 2

H

CORRIDOR

CORRIDOR

EGRESS

TRAINER

ELEVATOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

WSTA

WSTA

LCMS / LMS

BACKUP

SERVER

AVIONICS

TRAINING

AREA

SECURITY

VESTIBULE

CORRIDOR

4 4 4

4 4

REFLECTED CEILING PLAN LEGEND

OPEN TO STRUCTURE

GYPSUM BOARD CEILING

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

2X2 ACOUSTICAL CEILING TILE

PENDANT LIGHT FIXTURE, RE: ELECTRICAL

CAN LIGHT FIXTURE, RE: ELECTRICAL

EXIT LIGHT, RE: ELECTRICAL

LAY IN LINEAR LIGHT FIXTURE, RE: ELECTRICAL

TRIPLE H HIGH BAY PENDANT MOUNT, RE: ELEC

HVAC RETURN GRILL, RE: MECHANICAL

HVAC SUPPLY DIFFUSER, RE: MECHANICAL

0 OCCUPANCY SENSOR, RE: ELECTRICAL

PREFINISHED METAL SOFFIT

EMERGENCY CAN LIGHT FIXTURE, RE: ELECTRICAL

SECURITY BEACON FIXTURE, RE: ELECTRICALB

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:45:08 AM

AE110

FTD

SE

C

O N

D F

LO

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N

O

VE

R

AL

L

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

G . U

EC

KE

R

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/16" = 1'-0"A1

SECOND FLOOR REFLECTED CEILING

PLAN - OVERALL

0' 4' 8' 16' 32'

NORTH

1 PERIMETER WALL TO ROOF DECK

2 COMPOSITE METAL PANEL SOFFIT, TO MATCH

COMPOSITE METAL PANEL

3 PREFINISHED GUTTER, TO MATCH STANDING SEAM

METAL ROOF

4 PREFINISHED METAL DOWNSPOUTS, TO MATCH

COMPOSITE METAL PANEL

5 CABLE TRAY, RE: TELECOMMUNICATIONS

1 ALL FINISHED CEILINGS TO BE 9'-0" ABOVE FINISHED

FLOOR, UNLESS OTHERWISE NOTED

2 RE: ROOM FINISH SCHEDULE FOR CEILING HEIGHTS

THROUGHOUT FACILITY

GENERAL NOTES

SHEET KEYNOTES

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

D

0 0 0 0 0

000 0

B B B

B

B

B

B

BB

B B B

B

B

B B

B

B

REFLECTED CEILING PLAN LEGEND

OPEN TO STRUCTURE

GYPSUM BOARD CEILING

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

2X2 ACOUSTICAL CEILING TILE

PENDANT LIGHT FIXTURE, RE: ELECTRICAL

CAN LIGHT FIXTURE, RE: ELECTRICAL

EXIT LIGHT, RE: ELECTRICAL

LAY IN LINEAR LIGHT FIXTURE, RE: ELECTRICAL

TRIPLE H HIGH BAY PENDANT MOUNT, RE: ELEC

HVAC RETURN GRILL, RE: MECHANICAL

HVAC SUPPLY DIFFUSER, RE: MECHANICAL

0 OCCUPANCY SENSOR, RE: ELECTRICAL

PREFINISHED METAL SOFFIT

EMERGENCY CAN LIGHT FIXTURE, RE: ELECTRICAL

SECURITY BEACON FIXTURE, RE: ELECTRICALB

A B C D E F G I

MA

TC

HL

IN

E

AE

MA

TC

HL

IN

E

AE

COMM

VESTIBULE

LOBBY

SECURE

PERSONNEL

VESTIBULE

LACTATION

ROOM

FACILITY

STORAGE

DE-ICING

TRAINER

CORRIDOR

STAIR

129 CLASSROOM

CLASSROOM

MASS

BRIEFING

ROOM

TESTING

MEN

WOMEN

BREAK

ROOM

CONFERENCE

MEETING

COMPUTER

LAB

JAN

STORAGE

MTF

CHIEF

MTF

NCOIC/DOI

MTF

INSTRUCTORS

AND

MANAGERS

WOMEN

MEN

WOMEN

VESTIBULE

MEN

VESTIBULE

CORRIDOR

WOMEN

VESTIBULE

MEN

VESTIBULE

SECURITY

VESTIBULE

H

10'-0"

10'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0" 9'-0"

9'-0"9'-0"

8'-0"

9'-0"

8'-0"

12'-0" 9'-0" 9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

8'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0" 9'-0"9'-0"

9'-0" 9'-0"

10'-0"

9'-0"

9'-0" 9'-0"

10'-0"

WSTA

CORRIDOR

8'-6"

8'-6"

8'-0"

8'-0"

8'-0"

ALCOVE

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:45:24 AM

AE111

FTD

FI

R

ST

F

LO

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N

AR

EA

A

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

M . R

O

BI

N

SO

N

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/8" = 1'-0"A1

FIRST FLOOR REFLECTED CEILING

PLAN - AREA A

0 4' 8' 16' 32'

NORTH

1 COMPOSITE METAL PANEL SOFFIT, TO MATCH

COMPOSITE METAL PANEL

2 GYPSUM BOARD BULKHEAD

3 EXPANSION JOINT AT SLAB ABOVE

4 ACT CEILING EXPANSION JOINT, TYP.

5 CABLE TRAY, RE: TELECOMMUNICATIONS

GENERAL NOTES

SHEET KEYNOTES

1 ALL FINISHED CEILINGS TO BE 9'-0" ABOVE FINISHED

FLOOR, UNLESS OTHERWISE NOTED

2 RE: ROOM FINISH SCHEDULE FOR CEILING HEIGHTS

THROUGHOUT FACILITY

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

0 0

0 0

0 0

B

B B

B

B

B

B

B

B

BB

B

B

B

B

BB

B

B

B

B B

BB

B

0 0

REFLECTED CEILING PLAN LEGEND

OPEN TO STRUCTURE

GYPSUM BOARD CEILING

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

2X2 ACOUSTICAL CEILING TILE

PENDANT LIGHT FIXTURE, RE: ELECTRICAL

CAN LIGHT FIXTURE, RE: ELECTRICAL

EXIT LIGHT, RE: ELECTRICAL

LAY IN LINEAR LIGHT FIXTURE, RE: ELECTRICAL

TRIPLE H HIGH BAY PENDANT MOUNT, RE: ELEC

HVAC RETURN GRILL, RE: MECHANICAL

HVAC SUPPLY DIFFUSER, RE: MECHANICAL

0 OCCUPANCY SENSOR, RE: ELECTRICAL

PREFINISHED METAL SOFFIT

EMERGENCY CAN LIGHT FIXTURE, RE: ELECTRICAL

SECURITY BEACON FIXTURE, RE: ELECTRICALB

A B C D E F G I

MA

TC

HL

IN

E

AE

MA

TC

HL

IN

E

AE

COMM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

AETC

CLASSROOM

CONFERENCE

STOR

WOMEN

MEN

COMM

AETC

CHIEF

AETC

LEADERSHIP

ADMIN

AETC

INSTRUCTOR

OPEN

OFFICE

COMPUTER

SUPPORT

CS

STORAGE

TRAINING

SYSTEMS

SUPPORT

CENTER

STORAGE

STAIR

WOMEN

VESTIBULE

MEN

VESTIBULE

COMM

1 2

WSTA

WSTA

LCMS /

LMS

BACKUP

SERVER

AVIONICS

TRAINING

AREA

H

14'-6 1/2"

14'-6 1/2"

9'-0"

9'-0" 9'-0"

8'-0"

9'-0"

8'-0"

14'-6 1/2"

9'-0"

9'-0"

10'-0"

9'-0"

8'-0"

9'-0"

9'-0"

9'-0"

8'-0"

14'-6 1/2"

10'-0"

9'-0"

9'-0"

9'-0" 9'-0"

9'-0"

8'-0"

9'-0"

9'-0"

8'-0"

9'-0"

9'-0"

9'-0"

8'-0"

9'-0" 9'-0"

9'-0" 9'-0"

9'-0"

3 1 2 3 3

14'-6 1/2"

4 4

4 4

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:45:37 AM

AE114

FTD

SE

C

O N

D F

LO

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N

AR

EA

A

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

M . R

O

BI

N

SO

N

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/8" = 1'-0"A1

SECOND FLOOR REFLECTED CEILING

PLAN - AREA A

NORTH

0 2' 4' 8' 16'

1 PREFINISHED GUTTER TO MATCH STANDING SEAM

METAL ROOF

2 COMPOSITE METAL PANEL SOFFIT TO MATCH

COMPOSITE METAL PANEL

3 PREFINISHED DOWNSPOUT TO MATCH COMPOSITE

METAL PANEL

4 GYPSUM BOARD BULKHEAD

5 EXPANSION JOINT AT TRUE CEILING ABOVE

6 ACT CEILING EXPANSION JOINT, TYP.

7 CABLE TRAY, RE: TELECOMMUNICATIONS

GENERAL NOTES

SHEET KEYNOTES

1 ALL FINISHED CEILINGS TO BE 9'-0" ABOVE FINISHED

FLOOR, UNLESS OTHERWISE NOTED

2 RE: ROOM FINISH SCHEDULE FOR CEILING HEIGHTS

THROUGHOUT FACILITY

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

0 0 0

0 0

B B B

B B

BB

B B B

B

B

B

B

B

B

REFLECTED CEILING PLAN LEGEND

OPEN TO STRUCTURE

GYPSUM BOARD CEILING

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

2X2 ACOUSTICAL CEILING TILE

PENDANT LIGHT FIXTURE, RE: ELECTRICAL

CAN LIGHT FIXTURE, RE: ELECTRICAL

EXIT LIGHT, RE: ELECTRICAL

LAY IN LINEAR LIGHT FIXTURE, RE: ELECTRICAL

TRIPLE H HIGH BAY PENDANT MOUNT, RE: ELEC

HVAC RETURN GRILL, RE: MECHANICAL

HVAC SUPPLY DIFFUSER, RE: MECHANICAL

0 OCCUPANCY SENSOR, RE: ELECTRICAL

PREFINISHED METAL SOFFIT

EMERGENCY CAN LIGHT FIXTURE, RE: ELECTRICAL

SECURITY BEACON FIXTURE, RE: ELECTRICALB

I J K L M N P Q R S

MATCHLINE AE116

MA

TC

HL

IN

E

AE

JAN

WSTA

BREAK

STAIR

COMM

WSTA

WSTA

WSTA

WSTA

WSTA

MECH

WSTA

CLASSROOM

STAIR

STOR

14'-6 1/2"

9'-0" 9'-0"

9'-0"

9'-0"

9'-0"

14'-6 1/2"

9'-0"

8'-0"

9'-0"

8'-0"

9'-0"

9'-0"

9'-0" 9'-0" 9'-0"

9'-0"

14'-6 1/2"

8'-0"

8'-0"

6 6

9'-0"

14'-6 1/2"

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:45:59 AM

AE115

FTD

SE

C

O N

D F

LO

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N

AR

EA

B

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

M . R

O

BI

N

SO

N

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/8" = 1'-0"A1

SECOND FLOOR REFLECTED CEILING

PLAN - AREA B

0 2' 4' 8' 16'

NORTH

GENERAL NOTES

SHEET KEYNOTES

1 ALL FINISHED CEILINGS TO BE 9'-0" ABOVE FINISHED

FLOOR, UNLESS OTHERWISE NOTED

2 RE: ROOM FINISH SCHEDULE FOR CEILING HEIGHTS

THROUGHOUT FACILITY

1 PREFINISHED GUTTER TO MATCH STANDING SEAM

METAL ROOF

2 COMPOSITE METAL PANEL SOFFIT TO MATCH

COMPOSITE METAL PANEL

3 PREFINISHED DOWNSPOUT

4 SPECIAL CEILING OUTLET RE: ELECTRICAL

5 CABLE TRAY RE: TELECOMMUNICATIONS

6 GYPSUM BOARD BULKHEAD

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

B

B B B

B

B

B

REFLECTED CEILING PLAN LEGEND

OPEN TO STRUCTURE

GYPSUM BOARD CEILING

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

RECESSED MOUNTED LIGHT, RE: ELECTRICAL

EMERGENCY RECESSED MOUNTED LIGHT, RE: ELEC

2X2 ACOUSTICAL CEILING TILE

PENDANT LIGHT FIXTURE, RE: ELECTRICAL

CAN LIGHT FIXTURE, RE: ELECTRICAL

EXIT LIGHT, RE: ELECTRICAL

LAY IN LINEAR LIGHT FIXTURE, RE: ELECTRICAL

TRIPLE H HIGH BAY PENDANT MOUNT, RE: ELEC

HVAC RETURN GRILL, RE: MECHANICAL

HVAC SUPPLY DIFFUSER, RE: MECHANICAL

0 OCCUPANCY SENSOR, RE: ELECTRICAL

PREFINISHED METAL SOFFIT

EMERGENCY CAN LIGHT FIXTURE, RE: ELECTRICAL

SECURITY BEACON FIXTURE, RE: ELECTRICALB

I J K L M N P Q R S

MA

TC

HL

IN

E

AE

MATCHLINE AE115

ELEC

COMM

STOR

STORAGE

ALCOVE

STAIR

MECHANICAL

ELEVATOR

CORRIDOR

1 2

9'-0" 14'-6 1/2"

29'-6 1/2"

29'-6 1/2"

29'-6 1/2"

29'-6 1/2"

29'-6 1/2"

14'-6 1/2"

14'-6 1/2"14'-6 1/2"

14'-6 1/2"

9'-0"

14'-6 1/2"

231 3 21

14'-6 1/2"

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:46:26 AM

AE116

FTD

SE

C

O N

D F

LO

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N

AR

EA

C

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

M . R

O

BI

N

SO

N

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/8" = 1'-0"A1

SECOND FLOOR REFLECTED CEILING

PLAN - AREA C

NORTH

0 2' 4' 8' 16'

GENERAL NOTES

SHEET KEYNOTES

1 ALL FINISHED CEILINGS TO BE 9'-0" ABOVE FINISHED

FLOOR, UNLESS OTHERWISE NOTED

2 RE: ROOM FINISH SCHEDULE FOR CEILING HEIGHTS

THROUGHOUT FACILITY

1 PREFINISHED GUTTER TO MATCH STANDING SEAM

METAL ROOF

2 COMPOSITE METAL PANEL SOFFIT TO MATCH

COMPOSITE METAL PANEL

3 PREFINISHED DOWNSPOUT

4 GYPSUM BOARD BULKHEAD

5 CABLE TRAY, RE: TELECOMMUNICATIONS

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

A2

AE302

CORRIDOR

COCKPIT

PART TASK

TRAINER

LANDING

GEAR

TRAINER

AE304

A1

11 13

123456789 A1

AE303

D6

AE301

EGRESS

TRAINER

WSTA

CORRIDOR

COMM

CLS PARTS

STORAGE

15 15

22 24

TYP

6 7

4 4

3" / 12" 3" / 12"

EL. 100'-0"

FIRST FLOOR

EL. 115'-0"

SECOND FLOOR

EL. 130'-0"

HIGH BAY BEARING

A2

AE302

CONFERENCE

COMM

CORRIDOR

COMPUTER

SUPPORT

MASS

BRIEFING

ROOM

LOBBY

VESTIBULE

AE304

A5

AE305

A6

11 13

D6

AE301

AE502

A7

SECURITY

VESTIBULE

17 TYP

3" / 12" 3" / 12"

D1

AE301

A B C

FACILITY

STORAGE

AE305

A1

1/2" / 12"

AE501

A7

BEYOND

TYP

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/FXBM1088018 Field Training Detachment FTD_A19.rvt

1/13/2022 11:46:44 AM

AE301

FTD

BU

IL

D

IN

G S

EC

TI

O N

S

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

D . R

EM

Y

K.

G

O O

D

SO

N

D . E

LL

ED

G E

R . W

EN

TE

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

1/8" = 1'-0"A1 BUILDING SECTION

0' 2' 4' 8' 16'1/8" = 1'-0"D1 BUILDING SECTION

0' 2' 4' 8' 16'

1 4" SPLIT FACE CMU VENEER (CMU-1)

2 COMPOSITE METAL PANEL

3 STANDING SEAM METAL ROOF (SSMR-1)

4 SOLID CORE WOOD DOOR

5 INSULATED COILING OVERHEAD DOOR

6 MECHANICAL EQUIPMENT, RE: MECHANICAL

7 LIGHT FIXTURE, RE: ELECTRICAL

8 CEILING, RE: ROOM FINISH SCHEDULE

9 LIGHT GAUGE METAL TRUSS, RE: STRUCTURAL FOR

LOADING

10 6" INTERIOR METAL STUD WALL

11 3 5/8" INTERIOR METAL STUD WALL

12 CONCRETE SLAB ON METAL DECK, RE: STRUCTURAL

13 COMPOSITE METAL PANEL SOFFIT TO MATCH

COMPOSITE METAL PANEL

14 ALUMINIUM STOREFRONT ENTRY SYSTEM

15 GYPSUM BOARD BULKHEAD

16 CAST STONE ACCENT BAND

17 LIGHTNING PROTECTION TERMINAL, RE: ELECTRICAL

18 PREFINISHED METAL GUTTER TO MATCH STANDING

SEAM METAL ROOF

19 PREFINISHED METAL DOWNSPOUT TO MATCH SSMR-1

20 STANDING SEAM METAL ROOF (SSMR-2)

21 4" SPLIT FACE CMU VENEER (CMU-2)

22 RECESSED FIRE EXTINGUISHER CABINET

23 RAISED FLOORING

24 EMERGENCY EYEWASH STATION, RE: PLUMBING

25 1 1/2" PIPE HANDRAIL SYSTEM, PAINT

26 CONCRETE STEPS/STOOPS, RE: STRUCTURAL

27 STEEL PAN AND CONCRETE STAIR

SHEET KEYNOTES

1/8" = 1'-0"D6 BUILDING SECTION

0' 2' 4' 8' 16'

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

7:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

1 ALL PREFINISHED METAL DOWNSPOUTS ARE TO MATCH

SSMR-1 UNLESS OTHERWISE NOTED

2 ALL MASONRY MORTAR TO MATCH THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .