W9128F-21-R-0032_VOL2 - MPF Only Specs.pdf

PDF 24 MB Posted

Attached to
B-21 MPF/FTD Construction Federal contract opportunity
Solicitation number
W9128F21R0032
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document outlines a federal solicitation for construction services. The U.S. Army Corps of Engineers Engineering District Omaha is seeking to construct a B-21 Mission Operations Planning Facility and a B-21 Field Detachment Training Facility on a combined site at Ellsworth Air Force Base in South Dakota. The MPF will provide approximately 47,113 square feet of secure operations planning space, while the FTD will provide approximately 57,328 square feet of secure maintenance training and classroom space to support B-21 operations at EAFB and Air Force-wide. Both facilities will include multiple spaces constructed to secure Intelligence Community Directive/Intelligence Community Standard 705 standards. In addition to the core construction, the project may include options for fixtures, furnishings and equipment, intrusion detection systems, access control systems, uninterrupted power supply, and closed-circuit television systems. Interested parties can find more details by visiting the listed procurement website. The solicitation number is W9128F21R0032, with the U.S. Army Corps of Engineers Engineering District Omaha serving as the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to B-21 MPF/FTD Construction, newest first.
File Type Posted
Am_0012.pdf PDF
Am_0011.pdf PDF
Am_0010.pdf PDF
Am_0010_Dwgs_MPF.pdf PDF
Am_0010_Dwgs_FTD.pdf PDF
Am_0009.pdf PDF
Am_0009.pdf PDF
EAFB B-21 MPF AM-0008 Dwgs_Vol2.pdf PDF
Am_0008.pdf PDF
EAFB B-21 FTD AM-0008 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0007 Dwgs_Vol1.pdf PDF
EAFB B-21 MPF AM-0007 Dwgs_Vol2.pdf PDF
Am_0007.pdf PDF
EAFB B-21 FTD AM-0007 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0006 Dwgs_Vol1.pdf PDF
EAFB B-21 FTD AM-0006 Dwgs_Vol2.pdf PDF
Am_0006.pdf PDF
Am_0005.pdf PDF
Am_0005-Vol II-MPF-DWG.pdf PDF
Am_0005-Vol II-FTD-DWG.pdf PDF
Am_0004-Vol II-FTD-DWG.pdf PDF
Am_0004-Vol II-MPF-DWG.pdf PDF
Am_0004.pdf PDF
Am_0003.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
95-Percent_DWGS_VOL1_W9128F21R0080_B21-FTD.pdf PDF
95-Percent_DWGS_VOL2_W9128F21R0080_B21-FTD.pdf PDF
W9128F-21-R-0032_VOL3 - FTD Only Specs.pdf PDF
00 21 00 AT2 FTD Site Photo Survey (under separate cover_electronic only - 1 of 1).zip ZIP file
W9128F-21-R-0032_VOL1-Front End and Site Specs.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS FOR CONSTRUCTION

Solicitation No. W9128F-21-R-0032

Volume II – MPF Specifications

B-21: MISSION OPERATIONS PLANNING

FACILITY (MPF) & B-21: FIELD TRAINING

DETACHMENT FACILITY (FTD)

PN FXBM1088037 (MPF) & FXBM1088018 (FTD)

100% BACKCHECK DESIGN REVIEW

ELLSWORTH AFB, SOUTH DAKOTA

JULY 2021

US ARMY CORPS OF ENGINEERS

OMAHA DISTRICT

VOLUME II BACKCHECK REVIEW

This page was intentionally left blank for duplex printing.

VOLUME II

BACKCHECK REVIEW

00 01 00 - 1 PROJECT TABLE OF CONTENTS

SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF

B-21 MISSION OPERATIONS PLANNING FACILITY (MPF) PN FXBM1088037 AND

B-21 FIELD TRAINING DETACHMENT FACILITY (FTD), PN FXBM1088018 (FY22)

VOLUME II: MPF SPECIFICATIONS

PROJECT TABLE OF CONTENTS

NOTE: WHERE CONFLICTS EXIST WITHIN THESE SPECIFICATIONS, THE MORE STRINGENT

REQUIREMENTS GOVERN.

DIVISION 01 - GENERAL REQUIREMENTS

01 33 29 SUSTAINABILITY REPORTING

01 33 29 SUSTAINABILITY SCORESHEETS

01 91 00.15 10 TOTAL BUILDING COMMISSIONING

01 91 00.15 10AT EXAMPLE CHECKLIST AND PROCEDURES

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 11 13 BITUMINOUS DAMPPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

00 01 00 - 2 PROJECT TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION (CONTINUED)

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 36 13 SECTIONAL OVERHEAD DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 66 23 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 39 FOLDING PANEL PARTITIONS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION

12 50 00.13 10AT FF&E PACKAGE

12 59 00 SYSTEMS FURNITURE

DIVISION 13 - SPECIAL CONSTRUCTION

13 49 20.00 10 ELECTROMAGNETIC POWER FILTERS

13 49 21 RADIO FREQUENCY (RF) SHIELDING

00 01 00 - 3 PROJECT TABLE OF CONTENTS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED AND HEATING WATER PIPING SYSTEMS

23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

ENERGY MANAGEMENT CONTROL SYSTEM (EMCS) BUILDING

LEVEL ONLY

25 05 11.01AT EMCS CYBERSECURITY CONTROLS

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE

ALARM REPORTING SYSTEM/MASS NOTIFICATION SYSTEM

BUILDING LEVEL ONLY

25 05 11.02AT FARS CYBERSECURITY CONTROLS LIST

25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

CONFIGURABLE SYSTEMS BUILDING LEVEL ONLY

25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

ELECTRONIC SECURITY SYSTEMS (ESS) BUILDING LEVEL ONLY

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 13 00 HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

00 01 00 - 4 PROJECT TABLE OF CONTENTS

DIVISION 26 – ELECTRICAL (CONTINUED)

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH

AUXILIARIES

26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION

SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 41 00 AUDIO VISUAL SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 00 00AT MPF GEOTECHNICAL REPORT

31 63 26 DRILLED SHAFTS

-- End of Project Table of Contents --

(Mission) Operations Planning Facility (MPF) - Ellsworth AFB, SD EL92

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 29

SUSTAINABILITY REPORTING

02/17

PART 1 GENERAL

1.1 REFERENCES

1.2 SUMMARY

1.3 SUBMITTALS

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

1.4.1 Sustainability Action Plan

1.4.2 Costs

1.4.3 Calculations

1.4.4 Third Party Certification (TPC)

1.4.4.1 TPC Already Registered

1.4.4.2 TPC Management and Certification

1.5 SUSTAINABILITY SUBMITTALS

1.5.1 High Performance Sustainable Building (HPSB) Checklist

1.5.1.1 HPSB Checklist Submittals

1.5.2 Sustainability eNotebook

1.5.2.1 Sustainability eNotebook Submittal Schedule

1.6 DOCUMENTATION REQUIREMENTS

1.6.1 Commissioning

1.6.2 Energy Efficient Products

1.6.3 Indoor Water Use

1.6.4 Reduce Volatile Organic Compounds (VOC) (Low Emitting

Materials)

1.6.5 Indoor Air Quality During Construction

1.6.6 Recycled Content

1.6.7 Bio-Based Products

1.6.8 Waste Material Management (Recycling – Construction)

1.6.9 Additional Sustainability Requirements

1.6.9.1 Validation and Certification Restrictions

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

3.1.1 Coordinating Sustainability Documentation Progress

3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING

MATERIALS) REQUIREMENTS

-- End of Section Table of Contents --

SECTION 01 33 29 Page 1

SECTION 01 33 29

SUSTAINABILITY REPORTING

02/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 189.1 (2014) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings

COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)

HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings

U.S. DEPARTMENT OF AGRICULTURE (USDA)

FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA Biopreferred Program)

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-200-02 (2016, with Change 4, 2019) High Performance and Sustainable Building Requirements

U.S. DEPARTMENT OF ENERGY (DOE)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

U.S. GREEN BUILDING COUNCIL (USGBC)

GBCI GP Assessment (2016) Guiding Principles Assessment by GBCI (DOD Version)

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

1.2 SUMMARY

This specification includes general requirements and procedures for this project to be constructed and documented per the federally mandated High

SECTION 01 33 29 Page 2

Performance and Sustainable Building or HPSB Guiding Principles (GP), Third Party Certification (TPC) requirements, UFC 1-200-02 High Performance and Sustainable Building Requirements, and other requirements identified in this specification.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Preliminary High Performance and Sustainable Building Checklist; G

RO AE

Sustainability Action Plan; G RO AE

Preliminary Sustainability eNotebook; G RO AE

SD-11 Closeout Submittals

Final High Performance and Sustainable Building Checklist; G RO AE

Final Sustainability eNotebook; G RO AE

Amended Final Sustainability eNotebook; G RO AE

Amended Final High Performance and Sustainable Building Checklist;

G RO AE

Third Party Certification Certificate, Assessment, or Validation; G

RO AE

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

Provide construction related sustainability documentation to verify achievement of HPSB Guiding Principles Validation (GPV). Provide the following for GPV:

a. Refer to HPSB Checklist at the end of this specification section.

These requirements are based on legislative mandates that must be met by all projects. (Multiple checklists indicate multiple buildings that require HPSB tracking.)

b. No variations to the HPSB Checklist are allowed without written consent from the Contracting Officer. Immediately bring to the attention of the Contracting Officer any changes that impact meeting the approved HPSB Guiding Principles Requirements for this project.

c. All work required to incorporate the applicable HPSB Guiding Principles Requirements indicated on the HPSB Checklist and in this contract.

d. Sustainability Action Plan.

e. Construction related documentation for the project Sustainability eNotebook, and keep updated with regularly-scheduled construction

SECTION 01 33 29 Page 3 meetings. Include construction related documentation containing the following components:

(1) HPSB Checklist.

(2) Sustainability Action Plan.

(3) Documentation illustrating HPSB Guiding Principles Requirements compliance.

1.4.1 Sustainability Action Plan

Include the following information in the Sustainability Action Plan:

a. Planned method to achieve each construction related GP requirement.

b. For each designated construction related HPSB Guiding Principles Requirements that is applicable, as defined in UFC 1-200-02 , provide justification narrative explaining what precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply. Final Government-approved narrative(s) must be included with the HPSB Checklist submittal.

c. Name and contact information for: Point of Contact (POC) responsible for ensuring sustainability goals are accomplished and documentation is assembled.

d. Include the Indoor Air Quality plan with the Sustainability Action Plan.

1.4.2 Costs

Bear all costs associated with constructing, demonstrating, and documenting that project complies with approved HPSB Guiding Principles Requirements.

1.4.3 Calculations

Provide calculations, product data, labels and product certifications, required in this section to demonstrate compliance with the HPSB Guiding Principles Requirements.

1.4.4 Third Party Certification (TPC)

1.4.4.1 TPC Already Registered

Project is already registered with TPC organization to achieve level of GBCI GP Assessment . When applicable, request TPC online access turnover from Government. GBCI Project ID is 1000141936. Points of contact for the Government include: Mark Meissner (Mark.R.Meissner@usace.army.mil), Andy Temeyer (Andy.C.Temeyer@usace.army.mil), and Karen Jarvis (Karen.A.Jarvis@usace.army.mil). Manage and provide all documentation for requirements of TPC, and obtain Final Certification or validation. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation.

SECTION 01 33 29 Page 4

1.4.4.2 TPC Management and Certification

Execute the following TPC Certification, assessment, or validation requirements:

a. Refer to TPC Checklist at the end of this specification section.

(Multiple checklists indicate multiple buildings that require TPC.)

b. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved TPC Requirements for this project.

c. Complete all work required to incorporate the applicable TPC Requirements.

d. Maintain the construction related information, and provide replacement pages, in the Sustainability eNotebook pertaining to additions and changes to the approved sustainability requirements. Maintain the Sustainability eNotebook in electronic format. For more explanation, refer to paragraph SUSTAINABILITY eNOTEBOOK. Provide the following components in the Sustainability eNotebook, in addition to the GPV components above:

(1) TPC Checklist.

(2) Completed TPC Online forms for each identified requirements.

(3) Copy of all correspondence with the TPC organization including proof of TPC registration.

(4) Documentation illustrating compliance with TPC requirements and additional documentation as requested by the TPC.

(5) TPC Award Certificate, assessment, or validation.

e. Provide the following information in the Sustainability Action Plan.

Provide this TPC information in addition to the Sustainability Action Plan items above:

(1) Planned method to achieve each TPC requirement.

(2) For each TPC requirement that is attempted but not achieved, provide narrative explaining how mission or activity precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.

(3) Provide name and contact information for: Sustainability Point of Contact (POC) and other names of sustainability professionals responsible for ensuring TPC sustainability goals are accomplished and documentation is assembled. Sustainability POCs are also responsible for ensuring GPV required in paragraph GUIDING PRINCIPLES VALIDATION (GPV) above.

f. Bear all costs associated with constructing, demonstrating, and documenting that project complies with approved TPC requirements, including but not limited to:

(1) Final TPC review, certification, assessment, or validation fees.

SECTION 01 33 29 Page 5

(2) Online (or offline with secure facilities) TPC management and documentation.

(3) Obtaining TPC certification or validation based on Government-approved sustainability goals.

(4) Construction work required to incorporate TPC requirements.

(5) Submittals required to demonstrate compliance with Government approved TPC checklists.

g. Provide all calculations, product data, and certifications, assessments, or validations required in this specification to demonstrate compliance with the TPC Requirements.

h. Provide all online (or offline, with secure facilities) TPC management and documentation.

i. Provide all required responses to third party organization.

j. Provide TPC Certificate, assessment, or validation. Use format below to create the Plaque, Certificate, assessment, or validation and Letter of Congratulations (when provided). Forward to parties designated by Contracting Officer:

(1) Certificate, Assessment, or Validation:

Project Title, first line: P-(X); Form DD1391 Project Name).

Project Title, second line: UIC (Installation code).

(3) Letter Congratulations (when provided):

Address letter to Facility's Installation Commander Name. Address the letter to an individual person.

k. Once Final TPC is achieved, turn over Administrative rights to online TPC to the Department of Public Works, Public Works Office, Base Civil Engineer, or designee, provided by the Contracting Officer.

1.5 SUSTAINABILITY SUBMITTALS

Provide HPSB Checklist and other documentation in the Sustainability eNotebook to indicate compliance with the sustainability requirements of the project.

1.5.1 High Performance Sustainable Building (HPSB) Checklist

Provide construction documentation that provides proof of and supports compliance with the completed HPSB Checklist.

1.5.1.1 HPSB Checklist Submittals

Submit updated HPSB Checklist with each Sustainability eNotebook submittal. Attach final HPSB Checklist(s) to draft final DD1354 Real Property Record Submittal.

SECTION 01 33 29 Page 6

1.5.2 Sustainability eNotebook

The Sustainability eNotebook is an electronic organizational file that serves as a repository for all required sustainability submittals. To support documentation of compliance with an approved HPSB and TPC checklist, provide and maintain a comprehensive and current Sustainability eNotebook. Sustainability eNotebook must contain all required data to support full compliance with the HPSB Guiding Principles Requirements, including:

a. HPSB checklist.

b. Sustainable Action Plan.

c. Calculations.

d. Labels.

e. Product sustainability documentation.

f. Certifications, assessments, or validations.

g. TPC documentation required in paragraph THIRD PARTY CERTIFICATION (TPC) above.

Provide sustainability eNotebook in the form of an Adobe PDF file;

bookmark each HPSB Guiding Principles Requirement, TPC requirement, and sub-bookmark at each document. Match format to HPSB Guiding Principles numbering system indicated herein. Maintain up-to-date information, spreadsheets, templates, and other required documentation with each current submittal. For TPC projects, provide a second Table of contents using TPC numbering system, for maintaining documentation unique to TPC.

Contracting Officer may deduct from the monthly progress payment accordingly if Sustainability eNotebook information is not current, until information is updated and on track per project goals.

1.5.2.1 Sustainability eNotebook Submittal Schedule

Provide Sustainability eNotebook Submittals at the following milestones of the project:

a. Preliminary Sustainability eNotebook:

(1) Submit preliminary Sustainability eNotebook for approval at the Pre-construction conference. Include Preliminary High Performance and Sustainable Building Checklist and TPC checklist.

b. Construction Progress Meetings. Provide up-to-date GP and TPC documentation in the Sustainability eNotebook and TPC Online tool for each meeting.

c. Final Sustainability eNotebook:

(1) Provide up-to-date Sustainability eNotebook at the Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until final sustainability documentation is complete. Submit three electronic copies of the Final Sustainability eNotebook on DVDs to the Government. Include

SECTION 01 33 29 Page 7

Final High Performance and Sustainable Building Checklist.

d. Amended Final Sustainability eNotebook:

(1) Amend and resubmit the Final Sustainability eNotebook to include post-occupancy corrections, updates, and requirements. Include Amended Final High Performance and Sustainable Building Checklist.

Final progress payment retainage may be held by Contracting Officer until amended final sustainability documentation is complete. Submit three final electronic copies of the Amended Final Sustainability eNotebook Submittal on DVDs to the Government no longer than 30 days after the GP and TPC designated data collection period.

1.6 DOCUMENTATION REQUIREMENTS

a. Incorporate each of the following HPSB Guiding Principles Requirements into project construction; and provide documentation that proves compliance with each listed requirement. Items below are organized according to the HPSB Guiding Principles . For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.

b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.

1.6.1 Commissioning

Submit approved Final Commissioning Report required by Section 01 91 00.15 TOTAL BUILDING COMMISSIONING as proof of this tracking requirement.

1.6.2 Energy Efficient Products

Provide only energy-using products that are Energy Star rated, or have the Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide most efficient products that are life-cycle cost effective. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:

https://energy.gov/eere/femp/federal-energy-management-program and https://www.energystar.gov/ . Provide the following documentation:

Proof that products are labeled energy efficient and comply with the cited requirements.

1.6.3 Indoor Water Use

Provide only water-consuming products that are EPA WaterSense labeled, or the most efficient water fixtures available that meet the requirements of ASHRAE 189.1 Section 6.3.2, when EPA WaterSense products are not available. Provide the following documentation:

For products available with EPA WaterSense labeling, proof that fixtures are labeled EPA WaterSense or Energy Star ; for all other fixtures, proof they comply with the cited efficiency requirements.

SECTION 01 33 29 Page 8

1.6.4 Reduce Volatile Organic Compounds (VOC) (Low Emitting Materials)

Meet the requirements of Table 3-1 at the end of this specification.

Provide the following documentation:

Provide certifications or labels that demonstrate compliance with cited requirements.

1.6.5 Indoor Air Quality During Construction

Prior to construction, create indoor air quality (IAQ) plan. Develop and implement the IAQ construction management plan during construction and flush building air before occupancy.

For new construction and for renovation of unoccupied existing buildings, indoor air quality plan must meet the requirements of ASHRAE 189.1 Section

10.3.1.4. (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60 percent.

Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and building air was flushed out in accordance with the cited standard.

1.6.6 Recycled Content

Comply with 40 CFR 247 . Refer to https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247 . Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements. Provide the following documentation:

a. Manufacturers’ documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.

b. Substitutions: Submit for Government approval, proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.

c. In order to complete compliance with FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items, refer to submittal requirement for recycled/recovered material content in Section 01 62 35.

1.6.7 Bio-Based Products

Provide products and material composed of the highest percentage of biobased materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.

SECTION 01 33 29 Page 9

Comply with FSRIA 9002 USDA BioPreferred Program. Refer to https://www.biopreferred.gov/BioPreferred/ for the product categories and BioPreferred Catalog. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements. Provide the following documentation:

a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.

b. Document bio-based products in compliance with FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

1.6.8 Waste Material Management (Recycling – Construction)

Divert construction debris from landfill disposal where markets or on-site recycling exists, and provide documentation in accordance with Section

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.

1.6.9 Additional Sustainability Requirements

1.6.9.1 Validation and Certification Restrictions

Purchase of renewable energy certificates (RECs) specifically to meet project sustainability goals is prohibited.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

3.1.1 Coordinating Sustainability Documentation Progress

Provide sustainability focus and coordination at the following meetings to achieve sustainability goals. The designated TPC accredited sustainability professional responsible for GP and TPC documentation must participate in the following meetings to coordinate documentation completion.

a. Pre-Construction Conference: Discuss the following: TPC and HPSB Checklists, Sustainability Action Plan, Construction submittal requirements and schedule, individuals responsible for achieving each Guiding Principle Requirement.

b. Construction Progress Meetings: Review GP and TPC sustainability requirements with project team including Contractor and subcontractor representatives. Demonstrate GP and TPC documentation is being collected and updated to the Sustainability eNotebook and TPC Online tool.

(1) Facility Turnover Meetings: Review Sustainability eNotebook, and TPC Online submission for completeness and identify any outstanding issues relating to final documentation requirements.

(2) Final Sustainability eNotebook Review.

SECTION 01 33 29 Page 10

3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION

Finalize the sustainability certification or validation process and obtain the TPC Certificate, assessment, or validation, indicating completion of the projects sustainability goals.

Provide one original framed copy of the certificate, assessment, or validation, mounted in 1 inch deep metal frames, with double matt, and wire hangers, in location approved by Contracting Officer. Provide three copies of original certificate, assessment, or validation, and deliver to Contractor Officer, unless otherwise instructed.

SECTION 01 33 29 Page 11

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)

REQUIREMENTS

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Adhesives and Sealants

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring; panel;

primers) Sealants (acoustical;

firestop; HVAC Air duct; primers) Caulks

SCAQMD Rule 1168 (Use "other" category for HVAC duct sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)

Aerosol adhesives Section 3 of Green Seal Standard GS-36 (except:

cleaners, solvent cements, and primers used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the application space air temp is less than 40 F (4.5 C).

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Flat and nonflat topcoats, primers, undercoaters, and anti-corrosive coatings

Green Seal Standard GS-11

SECTION 01 33 29 Page 12

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Concrete/masonry sealers (waterproofing concrete/masonry sealers), concrete curing compounds, dry fog coatings, faux finishing coatings, fire resistive coatings, floor coatings, graphic arts (sign) coatings, industrial maintenance coatings, mastic texture coatings, metallic pigmented coatings, multicolor coatings, pretreatment wash primers, reactive penetrating sealers, recycled coatings, shellacs (clear and opaque), specialty primers, stains, wood coatings (clear wood finishes), wood preservatives, and zinc primers

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings or SCAQMD Rule 1113

SECTION 01 33 29 Page 13

Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Basement specialty coatings, high-temperature coatings, low solids coatings, stone consolidants, swimming-pool coatings, tub-and tile-refining coatings, and waterproofing membranes

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings

Floor Covering Materials

For carpet, all locations:

CDPH/EHLB/Standard Method V1.1 (California Section 01350) or label for Section 9 of CDPH/EHLB/Standard Method V1.1 (California Section 013 50) none none

SECTION 01 33 29 Page 14

Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Composite Wood, Wood Structural Panel, and Agrifib er Products particleboard medium density fiberboard (MDF) wheatboard strawboard panel substrates door cores no added urea-formaldehyde resins including laminating adhesives for composite wood and agrifiber assemblies

Third-party certification (approved by CARB) of California Air Resource Board's (CARB) regulation , Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products none none

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) (except:

Structural panel components such as plywood, particle board, wafer board, and oriented strand board identified as "EXPOSURE 1," "EXTERIOR," or "HUD-APPROVED" are considered acceptable for interior use.)

SECTION 01 33 29 Page 15

Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Office Furniture Systems and Seating installed prior to occupancy

ANSI/BIFMA X7.1

ANSI/BIFMA X7.1:

(95 percent of installed office furniture system workstations and seating units)

Section 7.6.2 of ANSI/BIFMA e3 (50 percent of office furniture system workstations and seating units) none none

Ceiling and Wall Systems ceiling and wall insulation acoustical ceiling panels tackable wall panels gypsum wall board and panels wall coverings

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none

-- End of Section --

SECTION 01 33 29 Page 16

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

General Information FXBM1088037 Project ID (e.g. ABCD12345) xxxxxxxxxxx1437736 Real Property Unique ID (RPUID) 7921 Facility Number B-21: Mission Operations Planning Facility (MPF)

Building Name

Ellsworth AFB Installation Rapid City City SD State Yes CONUS

ACC MAJCOM

USACE Construction Agent Womble, Paul AFCEC DM/CM (Last Name, First Name)

$36,000,000.00 PA

47,177 Building Size (SF) 2022 Program Year (FY####) Design Complete Project Phase 10/28/19 Design Started (MM/DD/YY)

12/31/23 BOD (MM/DD/YY)

USGBC GP Guiding Principles Compliance Certification Method

100% HPSB Compliant 33% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2013) 2017V1 Scoresheet version

Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required

90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1 Yes HPSB I.2 Commissioning 1

HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3) Total Points 5 Possible Points 5

Yes HPSB II.1 Energy Efficiency 1

Yes Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective

32.8% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)

85.3 Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

Yes Roof Attributes (Recommended) 0 Select roof types (Check below)

Energy Efficient Products 1 Yes

N/A HPSB II.2 On-site Renewable Energy 1

N/A Installed renewable energy elements or projects were not lifecycle cost effective Renewable energy types (check below)

0.0 Insert generation capacity (kW)

0.0% Insert percentage of total building

N/A HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1

N/A Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand

Yes HPSB II.4 Metering 1 Yes Electric Metering: Select N/A if no service Yes Natural Gas Metering: Select N/A if no service N/A Steam Metering: Select N/A if no service

Drop-Down Box

Federal Requirements

Complete

No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

Date Project Registered

Date Project Certified (MM/DD/YY)

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

6/16/2021 1

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4) Total Points 6 Possible Points 6

Yes HPSB III.1 Indoor Water 1 Yes Indoor Water Metering 1 Yes HPSB III.2 Outdoor Water 1 N/A Outdoor Water Metering 1 Yes HPSB III.3 Alternative Water 1 Yes HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1

111339.4 Change in Impervious Area (SF)

$0.00 Pre-Award Cost Estimate ($)

Yes Project addressed EISA 438 3 EISA Technical Constraints

0.0%

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)

Both LID Features Locations 3 Integrated Management Practices Employed

$0.00 Final LID Construction Cost ($) TBD Post Construction Analysis (Name of DOR)

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5) Total Points 8 Possible Points 8

Yes HPSB IV.1 Thermal Comfort 1 Yes HPSB IV.2 Ventilation 1 N/A HPSB IV.3 Daylighting 1 Yes HPSB IV.4 1 Yes HPSB IV.5 Low Emitting Materials 1 Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 Yes HPSB IV.7 Environmental Tobacco Smoke Control 1 Yes HPSB IV.8 Occupant Health and Wellness 1

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 5

Yes HPSB V.1 Recycled Content 1 Yes HPSB V.2 Biologically-based Products 1 Yes HPSB V.3 Ozone Depleting Substances 1 Yes HPSB V.4 Waste and Materials Management - Recycling 1 Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

Yes 60% or greater diverted 60.0% Insert percentage diverted from landfill

HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7) Total Points 1 Possible Points 1

N/A HPSB VI.1 Address Climate Change Risk 1 Possible Points 27

27 Federal Requirements - Yes or N/A 0 Federal Requirements - No

100% Percentage of Federal Requirements Met

Moisture Control

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water

Shallow bedrock, contaminated soil, high ground water table, Non-potable water demand to small

Structural, plumbing, and other mods not feasible

Soil infiltration capacity limited

State or local restrict use of green Other

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells

Inlet Pollution Removal Device

Permeable Pavement/Pa vers

Filter Strips Grassed Swells Rain Barrels/Cist erns

Tree Box Filters Vegetated Buffers Vege

Other

6/16/2021 2

Pr oj ec t N am e

O pe ra tio ns P la nn in g Fa ci lit y (M

PF

Pr oj ec t I D

Pr oj ec t C ity

Pr oj ec t S ta te

2‐ Em pl oy

In te gr at ed

D es ig n Pr in ci pl es

D P

P at h O ne

: S ta nd ar d

D P

P at h O ne

: S ta nd ar d

D P

S P at h O ne

: S ta nd

P at h O ne

: S ta nd

S P at h O ne

: S ta nd

C S

P P at h O ne

: S ta nd

2‐ O pt im iz e En er gy P er fo rm an ce

D P

P at h O ne

: S ta nd

P at h Tw o:

N ot a pp lic ab le

P at h Tw o:

N ot a pp lic

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h Th re e:

N ot a pp lic

P at h Tw o:

N ot a pp lic

P at h O ne

: S ta nd

Pr ot ec t a nd C on se rv e W at er

D P

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h Th re e:

N ot a pp lic

P at h O ne

: S ta nd

P at h O ne

: S ta nd

En ha nc e In do or E nv iro nm en ta l Q ua lit y

D P

P at h O ne

: S ta nd

P at h O ne

: S ta nd

S P at h Th re e:

N ot a pp lic

DO

CU

M

EN

TA

TI

O N P

AT

H:

St an da rd

LE

ED

c re di t( s)

N ot a pp lic ab le

(S ta rt w ith

P

IF

su m m ar y w or ks he et fie ld s w ill a ut o up da te

N O

TE

S

Ra pi d Ci ty

SD

G en er al In fo rm at io n

RE

SP

O N

SI

BL

E

PA

RT

Y

P:

P rim ar y

S:

S ec on da ry

SUBMISSION

D: Design C: Construction

A: Architect

MEP: Mech / Elect / Plumbing Engineer

C: Civil

CxA: Commissioning Authority

Pr oj ec t T ea m M an ag em en t

GC: General Contractor

2‐ 2.

In te gr at ed

D es ig n

2‐ 2.

1.

Ev al ua tio n fo r D es ig n St ra te gi es

2‐ 2.

1.

In te gr at iv e Pl an ni ng

2‐ 2.

1.

Ev al ua tio n of th e Si te

2‐ 2.

1.

Si te In te gr at io n an d De sig n of th e Bu ild in g

2‐ 2.

Co m m iss io ni ng

2‐ 3.

1.

Co m m er ci al a nd

M ul ti‐ Fa m ily H ig h‐ Ri se R es id en tia l B ui ld in g

2‐ 3.

1.

Lo w ‐R ise

R es id en tia l B ui ld in gs

2‐ 3.

1.

Re no va tio ns

2‐ 3.

1.

En er gy E ffi ci en t P ro du ct s

2‐ 4.

2.

O ut do or W at er M et er in g

2‐ 4.

Al te rn at e W at er

2‐ 4.

3.

St or m w at er M an ag em en t

2‐ 3.

1.

St an db y Po w er ed

D ev ic e

2‐ 3.

O n‐ Si te R en ew ab le E ne rg y

2‐ 3.

2.

So la r D om es tic

H ot W at er (S

DH

W

2‐ 3.

M et er in g

2‐ 4.

In do or W at er

2‐ 4.

2.

O ut do or W at er L an ds ca pi ng

U

FC

‐2

‐0 De c1 Ch an ge 1O ct

G ui di ng

P rin ci pl es A ss es sm en t, De pa rt m en t o f D ef en se b y G

BC

I ( v2 .1

2‐ 5.

Pa rt V en til at io n

2‐ 5.

Pa rt T he rm al C om fo rt

2‐ 5.

Da yl ig ht in g L ig ht in g Co nt ro ls

2‐ 4.

1.

In do or W at er M et er in g

G

PA

S co re sh ee t_ B2

1‐ M

PF

.x lsx

Te am

M an ag m en t of

Pr oj ec t N am e

O pe ra tio ns P la nn in g Fa ci lit y (M

PF

Pr oj ec t I D

Pr oj ec t C ity

Pr oj ec t S ta te

DO

CU

M

EN

TA

TI

O N P

AT

H:

St an da rd

LE

ED

c re di t( s)

N ot a pp lic ab le

(S ta rt w ith

P

IF

su m m ar y w or ks he et fie ld s w ill a ut o up da te

N O

TE

S

Ra pi d Ci ty

SD

G en er al In fo rm at io n

RE

SP

O N

SI

BL

E

PA

RT

Y

P:

P rim ar y

S:

S ec on da ry

SUBMISSION

D: Design C: Construction

A: Architect

MEP: Mech / Elect / Plumbing Engineer

C: Civil

CxA: Commissioning Authority

Pr oj ec t T ea m M an ag em en t

GC: General Contractor

U

FC

‐2

‐0 De c1 Ch an ge 1O ct

G ui di ng

P rin ci pl es A ss es sm en t, De pa rt m en t o f D ef en se b y G

BC

I ( v2 .1

C P

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h O ne

: S ta nd

Re du ce E nv iro nm en ta l I m pa ct o f M at er ia ls

C P

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h O ne

: S ta nd

P at h O ne

: S ta nd

Ad dr es s C lim at e Ch an ge

R is k

D P

P at h Tw o:

N ot a pp lic

6.

2.

St or ag e an d Co lle ct io n of R ec yc la bl es

2‐ 6.

2.

W as te D iv er sio n

2‐ Ad dr es s C lim at e Ch an ge R isk

2‐ 5.

3.

Pr ot ec t I nd oo r A ir Q ua lit y Du rin g Co ns tr uc tio n

2‐ 5.

O cc up an t H ea lth a nd

W el ln es s

2‐ 6.

1.

Re cy cl ed

C on te nt

2‐ 6.

1.

Bi ol og ic al ly ‐B as ed

P ro du ct s

2‐ 6.

1.

O zo ne

D ep le tin g Su bs ta nc es

2‐ 5.

3.

IA

Q M oi st ur e Co nt ro l

2‐ 5.

3.

Re du ce V O C Lo w ‐E m itt in g M at er ia ls

G

PA

S co re sh ee t_ B2

1‐ M

PF

.x lsx

Te am

M an ag m en t of

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 91 00.15 10

TOTAL BUILDING COMMISSIONING

05/19, CHG 2: 08/20

PART 1 GENERAL

1.1 SUMMARY

1.2 SYSTEMS TO BE COMMISSIONED

1.3 REFERENCES

1.4 COMMUNICATION WITH THE GOVERNMENT

1.5 SEQUENCING AND SCHEDULING

1.5.1 Sequencing

1.5.2 Project Schedule

1.6 SUBMITTALS

1.7 COMMISSIONING FIRM

1.7.1 Lead Commissioning Specialist

1.7.2 Technical Commissioning Specialists

1.7.3 Commissioning Standard

1.8 ISSUES LOG

1.9 CERTIFICATE OF READINESS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CONSTRUCTION PHASE

3.1.1 Construction Commissioning Coordination Meeting

3.1.2 Construction Phase Commissioning Plan

3.1.2.1 Final Construction Phase Commissioning Plan

3.1.2.1.1 Pre-Functional Checklists

3.1.2.1.2 Functional Performance Test Checklists

3.1.2.1.3 Integrated Systems Test Checklists

3.1.3 Construction Submittals

3.1.4 Inspection and Testing

3.1.4.1 Commissioning Team

3.1.4.1.1 Building Envelope Inspections Team

3.1.4.1.2 Mechanical System Pre-Functional Checks Team

3.1.4.1.3 Electrical System Pre-Functional Checks Team

3.1.4.1.4 Mechanical Systems Test Team

3.1.4.1.5 Electrical Systems Test Team

3.1.4.1.6 Other Pre-Functional and Functional Performance

Participants

3.1.4.2 Building Envelope Inspection

3.1.4.3 Pre-Functional Checks

3.1.4.4 Testing, Adjusting, and Balancing (TAB) Report and Field

Acceptance Testing

3.1.4.5 HVAC Controls Test Reports

3.1.4.6 Tests

3.1.4.6.1 Functional Performance and Integrated Systems Tests

SECTION 01 91 00.15 10 Page 1

3.1.4.6.1.1 Checklist

3.1.4.6.1.2 Acceptance

3.1.4.6.2 HVAC Test Methods

3.1.4.6.2.1 Prior to Testing

3.1.4.6.2.2 Simulating Conditions

3.1.4.6.2.3 Setup

3.1.4.6.3 Sample Strategy

3.1.4.6.4 Seasonal Tests

3.1.4.6.4.1 Initial Functional Performance Tests

3.1.4.6.4.2 Full-Load Conditions

3.1.4.6.4.3 System Acceptance

3.1.4.6.5 Aborted Tests and Re-Testing

3.1.4.6.5.1 100 Percent Sample

3.1.5 Training Plan

3.1.6 Systems Manual

3.1.7 Maintenance and Service Life Plans

3.1.7.1 Maintenance Plan

3.1.7.2 Service Life Plan

3.2 COMMISSIONING REPORT

3.3 POST-CONSTRUCTION SUPPORT

3.3.1 Post-Construction Site Visit

ATTACHMENTS:

APPENDIX A - SAMPLE PRE-FUNCTIONAL CHECKLISTS AND FUNCTIONAL TEST

PROCEDURES

-- End of Section Table of Contents --

SECTION 01 91 00.15 10 Page 2

SECTION 01 91 00.15 10

TOTAL BUILDING COMMISSIONING

05/19, CHG 2: 08/20

PART 1 GENERAL

1.1 SUMMARY

Commission the building systems listed herein. Employ the services of an independent Commissioning Firm. The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors. The Commissioning Firm must employ a Lead Commissioning Specialist that coordinates all aspects of the commissioning process. Conform to the commissioning procedures outlined in this specification.

1.2 SYSTEMS TO BE COMMISSIONED

At a minimumCommission the following systems:

HVAC SYSTEMS CxC Specification & Startup

Documentation Reviews (Sampling Rate)*

CxC Field Test Verification

(Sampling Rate)**

Notes

Air Handling Units (AHU's, DOAS)

100% 100% 1

Air Cooled Chillers 100% 100% 1

Hot Water Boilers 100% 100% 1

HVAC Pumps (chilled, hot water) 100% 100% 1

Exhaust Fans 100% 100% 1

Variable Air Volume Terminal Units

100% 100% 1

Unit Heaters & Cabinet Unit Heaters

100% 100% 1

Computer Room Air Conditioning Units

100% 100% 1

Test and Balance Verification 100% 20% 2

Energy and Water Utility Metering Systems and Sub-Meters

100% 100% 1

Energy Monitoring and Control System (EMCS) Front End

100% 100% 1

SECTION 01 91 00.15 10 Page 3

HVAC SYSTEMS CxC Specification & Startup

Documentation Reviews (Sampling Rate)*

CxC Field Test Verification

(Sampling Rate)**

Notes

Glycol Feed Skid 100% 100% 1

ELECTRICAL SYSTEMS

Lighting Schedules, Occupancy, and Control System

100% 100% 1

Automatic Transfer Switches 100% 100% 1

Electric Metering 100% 100% 1

Switchboards/Panelboards 50% 0% 2

Distribution Panel Circuit Breakers

50% 0% 2

Ground Fault Protection/Detection

50% 0% 2

PLUMBING SYSTEMS

Domestic Water Heater / Recirculating Pump / Mixing Valve

100% 100% 1

Water Softener 100% 100% 1

Backflow Preventors 100% 0% 2

BUILDING ENVELOPE

Contractor Performed Pressure Testing and Air Barrier System

100% 100% 2

Fluid Applied, Self Adhering, and Spray Foam Air Barriers

50% 10% 2

Fabricated Wall Panel Assemblies

50% 10% 2

Steel Standing Seam Roofing 50% 10% 2

Joint Sealants 50% 10% 2

SECTION 01 91 00.15 10 Page 4

HVAC SYSTEMS CxC Specification & Startup

Documentation Reviews (Sampling Rate)*

CxC Field Test Verification

(Sampling Rate)**

Notes

*Represents sampling percentage of Contractor provided documentation (specification testing, field reports, performance test reports, energization reports, startup reports, etc) that will be reviewed by the CxC.

**Represents sampling rate of system testing that CxC will witness on-site. This may be via execution of functional tests or witnessing Contractor performed testing (as outlined in the notes column).

Notes:

1. CxC creates PFCs and FPTs to document installation and functionality of these systems. Contractor executes PFCs and CxC will track their completion. FPTs are executed by the contractor, under the oversight and documentation of the CxC. CxC will review contractor provided startup, specification and energization reports associated with these systems.

2. PFCs, FPTs, specification testing, field tests and performance tests are developed and executed by contractor. Final acceptance by AHJ (per contract documents and/or local code) or installing vendor/manufacturer. CxC may witness a portion of the testing per Field Test Verification Sampling Rate.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 180 (2012) Standard Practice for Inspection and Maintenance of Commercial Building HVAC Systems

ASHRAE 202 (2018) Commissioning Process for Buildings and Systems

ASSOCIATED AIR BALANCE COUNCIL (AABC)

ACG Commissioning Guideline (2005) Commissioning Guideline

NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)

NEBB Commissioning Standard (2009) Procedural Standards for Whole Building Systems Commissioning of New Construction; 3rd Edition

SECTION 01 91 00.15 10 Page 5

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

ANSI/SMACNA 014 (2013) HVAC Systems Commissioning Manual, 2nd Edition

U.S. ARMY CORPS OF ENGINEERS (USACE)

ER 25-345-1 (2019) Systems Manual

1.4 COMMUNICATION WITH THE GOVERNMENT

The Lead Commissioning Specialist (CxC) must submit all plans, schedules, reports, and documentation directly to the Contracting Officer Representative concurrent with submission to the CQC System Manager. The Lead Commissioning Specialist must have direct communication with the Contracting Officer's Representative regarding all elements of the commissioning process; however, the Government has no direct contract authority with the Lead Commissioning Specialist.

1.5 SEQUENCING AND SCHEDULING

1.5.1 Sequencing

Complete the following prior to starting Functional Performance Tests of mechanical systems:

a. All equipment and systems have been completed, cleaned, flushed, disinfected, calibrated, tested, and operate in accordance with contract documents and construction plans and specifications.

b. Performance Verification Tests of the controls systems have been completed and the Performance Verification Test Report has been submitted and approved in accordance with Specification Section

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.

c. Testing, Adjusting, and Balancing has been completed and the Testing, Adjusting, and Balancing Report, has been submitted and approved in accordance with Specification Section 23 05 93 TESTING, ADJUSTING, AND

BALANCING FOR HVAC.

d. The building envelope is enclosed according to contract documents with final construction completed, the Air Barrier Pressure Tests have been completed and the Air Leakage Test Reports and Diagnostic Test Reports have been submitted and approved in accordance with Specification Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR

TIGHTNESS.

e. The Pre-Functional Checklists have been submitted and approved.

f. The Certificate of Readiness for mechanical systems has been submitted and approved.

Compl…

This is the start of the file's text. The full file is on GovTribe.