EAFB B-21 FTD AM-0006 Dwgs_Vol2.pdf
PDF 6 MB Posted
- Attached to
- B-21 MPF/FTD Construction Federal contract opportunity
- Solicitation number
- W9128F21R0032
About this file
This solicitation is for the construction of a B-21 Mission Operations Planning Facility and a B-21 Field Detachment Training Facility on a combined site at Ellsworth Air Force Base in South Dakota. The projects include over 104,000 square feet of secure operations planning and maintenance training space to support the emerging B-21 airframe. Associated site work, utilities, and infrastructure are also required. The solicitation allows for bid options for fixtures, furnishings, equipment, security systems, and power supplies. Responses are due to the Army Corps of Engineers Engineering District Omaha.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIPING SYSTEMS
GENERAL SYMBOLS
CONNECT NEW TO
EXISTING AT THIS POINT
DEMOLISH TO THIS POINT
# KEYNOTE
EQUIPMENT DESIGNATIONDWH-1
PLUMBING FIXTURE
DESIGNATION
P-1
DOMESTIC HOT WATER 120F
SANITARY SEWER (ABOVE SLAB)
SANITARY VENT
SS
V
DOMESTIC HOT WATER (XXXF DENOTES TEMP)
DOMESTIC HOT WATER CIRCULATION
NATURAL GAS
REVERSE OSMOSISRO
DOMESTIC COLD WATER
XXXF
SANITARY SEWER (BELOW GROUND)SS
PIPING
FLOOR SINK
FLOOR DRAIN
ROOF DRAIN
HOSE BIBB AND WALL HYDRANT (PLAN)
LINE CLEANOUT
WALL CLEANOUT
VALVE, SEE
SPECIFICATIONS FOR VALVE
TYPE
CHECK VALVE
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
BALANCING VALVE
SOLENOID CONTROL VALVE
PRESSURE REDUCING VALVE
FLEXIBLE CONNECTION
TEST PLUG
PRESSURE GAUGE
MANUAL AIR VENT
PIPE BREAK
DIRECTION OF FLOW
PIPE UP
PIPE DOWN
PIPE T DOWN
PIPE T UP
PIPE CAP
UNION
REDUCER
PIPE ANCHOR
PIPE GUIDE
STRAINER
STRAINER WITH VALVE
AND HOSE CONNECTION
THERMOMETER OR SIGHT GLASS
PIPE SLOPE
BUTTERFLY VALVE
BALL VALVE
FLOOR, SURFACE & GROUND CLEANOUT
GAS PRESSURE REGULATING VALVE
GAS SHUTOFF VALVE
EARTHQUAKE VALVE
MUD VALVE
1. SOME ABBREVIATIONS AND SYMBOLS SHOWN ON THIS SHEET MAY NOT BE
USED IN THIS DRAWING SET.
2. ISOMETRIC DRAWINGS FOR DOMESTIC WATER AND SANITARY SEWER ARE
DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL
ARRANGEMENT ONLY. CONTRACTOR IS REPOSNIBLE FOR FIELD VERIFICATION,
FIELD ADJUSTMENTS AND COORDINATION WITH ALL OTHER DISCIPLINES. ALL
PIPING SHALL BE INSTALLED PER MANUFACTURERS’ RECOMMENDATIONS,
CONTRACT SPECIFICATIONS/DOCUMENTS, APPLICABLE CODES AND
REGULATIONS.
3. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND
ELEVATIONS OF ALL PLUMBING FIXTURES.
4. ALL PLUMBING WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 2021
INTERNATIONAL PLUMBING CODE WITH AMENDMENTS AND ALL APPLICABLE
LOCAL CODE AND ORDINANCES.
5. UNLESS OTHERWISE NOTED SANITARY AND DRAINAGE PIPING SHALL BE
SLOPED AT A MINIMUM OF 1% UNLESS OTHERWISE PREVENTED BY CODE.
6. TOPS OF ALL FLOOR FIXTURES AND CLEANOUTS SHALL BE SET FLUSH WITH
FINISHED FLOOR.
7. ROUTE ALL CONDENSATE DRAINS TO A FLOOR DRAINS. PROVIDE APPROVED AIR
GAP AND FOLLOW ALL REGULATIONS SET FORTH BY LOCAL CODE.
8. PROVIDE SHOCK ABSORBERS SIZED AND PLACED PER PDI SPECIFICATIONS ON
ALL DOMESTIC WATER LINES SERVING FIXTURES AND OTHER INSTALLATIONS
WITH QUICK CLOSING VALVES. INSTALL PER MANUFACTURER REQUIREMENTS.
9. CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND
REQUIREMENTS OF ALL PLUMBING EQUIPMENT WITH THE ELECTRICAL
DRAWINGS AND THE ELECTRICAL CONTRACTOR, AND SHALL FURNISH
EQUIPMENT WIRED FOR THE VOLTAGES SHOWN THEREIN.
10. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC. INSTALLED IN HVAC
PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND
COMBUSTIBILITY.
11. ALL PIPE PENETRATIONS OF FIRE AND/OR SMOKE RATED ASSEMBLIES SHALL
BE FIRE STOPPED AS REQUIRED TO RESTORE ASSEMBLY TO ORIGINAL
INTEGRITY. FIRE BARRIER PRODUCTS SHALL BE PER SPECIFICATIONS.
12. ALL PACKAGED AND SKID MOUNTED EQUIPMENT SHALL BE SUPPLIED AND
INSTALLED WITH THE NECESSARY TRIM, PIPING, VALVES AND FITTINGS, ETC TO
ENSURE PROPERLY FUNCTIONING EQUIPMENT. ANY DETAILS OR DRAWINGS OF
PACKAGED EQUIPMENT ARE SCHEMATIC AND PROVIDE INTENT FOR BIDDING
PURPOSES AND ARE NOT FULLY DETAILED MANUFACTURER DRAWINGS.
13. WHERE THE MANUFACTURER AND/OR MODEL NUMBER IS LISTED, IT IS
INTENDED TO INDICATE THE "BASIS OF DESIGN" ONLY. IT IS NOT INTENDED TO
LIMIT THE EQUIPMENT PROVIDED TO THAT INDICATED IN THE SCHEDULE. OTHER
MANUFACTURERS OR MODELS OF EQUIPMENT MAY BE PROVIDED. ALL
EQUIPMENT PROVIDED SHALL MEET THE REQUIREMENTS OF THE APPLICABLE
SCHEDULE AND SPECIFICATIONS.
14. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING SYSTEM
BRANCHES IN WHICH BRANCH PIPING SERVES TWO OR MORE FIXTURES.
15. PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE SYSTEMS AT ENDS
OF RUNS, AT CHANGES IN DIRECTION, NEAR THE BASE OF STACKS, EVERY 50
FEET IN HORIZONTAL RUNS AND ELSEWHERE AS INDICATED AND AS REQUIRED
BY INTERNATIONAL PLUMBING CODE.
16. ALL CLEANOUTS SHALL BE FULL SIZE OF PIPE FOR PIPE SIZES 4 INCHES AND
SMALLER AND SHALL BE A MINIMUM OF 4 INCHES FOR PIPE SIZES LARGER THAN
4 INCHES.
17. COORDINATE ALL FLOOR DRAIN AND FLOOR SINK LOCATION AND CLEARANCES
WITH MECHANICAL EQUIPMENT PROVIDED BY MECHANICAL CONTRACTOR
REGARDELSS OF LOCATION SHOWN ON DRAWINGS. THE BASIS OF DESIGN
EQUIPMENT IS NOT NECESSARILY THE EQUIPMENT PURCHASED.
18. ENSURE ALL PLUMBING PIPING IS ROUTED TO NOT GO THROUGH OR INTERFERE
WITH MECHANICAL DUCTWORK AND PIPING.
19. ALL PIPING (EXCEPT FOR NETWORKED PIPING WHERE THE TOTAL COMBINED
WEIGHT IS GREATER THAN 31 POUNDS), EQUIPMENT, DUCTWORK, AND
ACCESSORIES WEIGHING 31 POUNDS OR MORE SHALL BE BRACED BY EITHER
RIGID OR FLEXIBLE SYSTEMS TO RESIST FORCES OF 0.5 TIMES THE EQUIPMENT
WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE WEIGHT IN THE
DOWNWARD DIRECTION IN ACCORDANCE WITH UFC 4-010-01 AND
SPECIFICATION SECTION 23 05 48.00 40.
HOSE BIBB AND WALL HYDRANT (DIAGRAM)
DIELECTRIC UNION
FLANGE
BLIND FLANGE
HB
PLUMBING ABBREVIATIONS PLUMBING SYMBOLS
GAS METERM
GENERAL NOTES
kPA KILOPASCALS kW KILOWATT
LCO LINE CLEANOUT
MA MEDICAL AIR
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MCA MINIMUM CIRCUIT AMPACITY
MIN MINIMUM
N NITROGEN
NC NORMALLY CLOSED
NO NORMALLY OPEN
NTS NOT TO SCALE
O2 OXYGEN
OD OVER FLOW DRAIN
P PUMP
PD PRESSURE DROP
PH PHASE
PRV PRESSURE REDUCING VALVE
PSI POUND PER SQUARE INCH
RD ROOF DRAIN
RH RADIANT HEAT
RO REVERSE OSMOSIS
RPBFP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM REVOLUTIONS PER MINUTE
S.P. STATIC PRESSURE
SD STORM DRAIN
SP SUMP PUMP
SS SANITARY SEWER
ST STORAGE TANK
STD STANDARD
SW SOFT WATER
SBV SEWER BACKWATER VALVE
TDH TOTAL DYNAMIC HEAD
TP TRAP PRIMER
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V VOLTS
V SANITARY VENT
VA VACUUM
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
W WASTE
WB WATER BOX
WC WATER COLUMN
WCO WALL CLEANOUT
WG WATER GUAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AMPS AMPERES
AS AIR SEPARATOR
AWS AUTOMATIC WATER SOFTENER
B BOILER
B.O.P. BOTTOM OF PIPE
BB BASEBOARD
BD BUILDING DRAIN
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
C COMMON
CA COMPRESSED AIR
CA (OF) COMPRESSED AIR OIL FREE
CD CONDENSATE DRAIN
CF CARBON FILTER
CIRC CIRCULATING
CO CLEANOUT
CP CIRCULATING PUMP
CW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROL
DEG DEGREES
DEG F DEGREES FAHRENHEIT
DF DIESEL FUEL
DHW DOMESTIC HOT WATER
DI DIONIZED WATER
DN DOWN
DWH DOMESTIC HOT WATER HEATER
DXE DOMESTIC HOT WATER HEAT
EXCHANGER
EA EACH
EQV EARTHQUAKE VALVE
ET EXPANSION TANK
EWS EMERGENCY EYE WASH STATION
F FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FFD FUNNEL FLOOR DRAIN
FPM FEET PER MINUTE
G NATURAL GAS
GA GAUGE
GAS GASOLINE
GCO GRADE CLEANOUT
GM GAS METER
GPF GALLONS PER FLUSH
GPM GALLONS PER MINUTE
GPRV NATURAL GAS PRESSURE
REDUCING VALVE
GR GREASE WASTE
HB HOSE BIBB
HD HUB DRAIN
HW DOMESTIC HOT WATER
HWC DOMESTIC HOT WATER,
CIRCULATING
Hz HERTZ
I.E. INVERT ELEVATION
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_P19.rvt
1/6/2022 10:30:39 AM
P-001
FTD
PL
U
M
BI
N G
L
EG
EN
D
A
BB
R
EV
IA
TI
O
N S
B-
: F
IE
LD
T
R
AI
N
IN
G D
ET
AC
H M
EN
T
(F
TD
O
M
AH
A D
IS
TR
IC
T
C
AP
IT
O
L
AV
EN
U
E, S
U
IT
E
O
M
AH
A, N
EB
R
AS
KA
K.
M cG
LO
TH
LI
N
M . T
AY
LO
R
D . E
LL
ED
G E
F.
G
O M
EZ
N O
VE
M
BE
R
W
F2
1R
ADVERTISEMENT - 100% DESIGN
EL
LS
W O
R
TH
A
IR
F O
R C
E
BA
SE
, S
O U
TH
D
AK
O
TA
PR
O
JE
C T
N U
M
BE
R : F
XB
M
AM
- 0
3:
0 0
D
ES
IG
N
IS
S U
ED
F
O R
P R
IC
IN
G
/2
AM
- 0
6:
0 0
D
ES
IG
N
IS
S U
ED
F O
R P
R
IC
IN
G
/2
1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT TO THE
CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE. ADDITIONAL
LEGENDS AND/OR OTHER LEGENDS MAY APPEAR IN THIS SET OF DRAWINGS TO INDICATE
SPECIFIC CONDITIONS IN LIEU OF SYMBOLS SHOWN.
2. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE
DRAWINGS, AS SPECIFIED AND AS REQUIRED BY APPLICABLE CODES AND REGULATIONS.
3. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE
PROTECTION) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL
ARRANGEMENT ONLY. THE DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED
DUCT, PIPE, OFFSET, FITTING, TRANSITION, ETC. REGARDLESS HOW INDICATED, THE
CONTRACTOR SHALL COORDINATE THE PIPING, DUCTWORK AND EQUIPMENT LOCATIONS
AND ROUTES IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS
REQUIRED TO PROVIDE SERVICE AND MAINTENANCE CLEARANCE. PROVIDE ITEMS NOT
SPECIFICALLY MENTIONED IN SPECIFICATIONS OR NOTED ON THE DRAWINGS, BUT WHICH
ARE NECESSARY TO MAKE A COMPLETE AND OPERATIONAL WORKING INSTALLATION.
PROVIDE ALTERNATE PIPING ROUTES, DUCTWORK ROUTES, ADDITIONAL OFFSETS AND/OR
FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING.
4. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT.
5. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE
CODES AND REGULATIONS. PROVIDE PROPER UTILITIES AND FINAL CONNECTIONS PER
MANUFACTURER'S RECOMMENDATIONS. FINAL CONNECTION SHALL INCLUDE ANY
ADAPTERS, NIPPLES, SHUTOFF VALVES, PRESSURE REGULATING VALVES, DIRT LEGS,
SHOCK ABSORBERS, BACKFLOW PREVENTION DEVICES, ETC., AS REQUIRED TO PROVIDE
A FULLY OPERATIONAL SYSTEM. CONNECT ALL EQUIPMENT DRAINS FULL SIZE TO HUB
AND/OR FLOOR DRAIN WITH MINIMUM 1 INCH GAP FOR INDIRECT CONNECTION, UNLESS
OTHERWISE NOTED.
6. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE. PROVIDE VIBRATION ISOLATORS
FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50 FEET OF ISOLATED
EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS) THROUGHOUT
MECHANICAL EQUIPMENT ROOMS.
7. THE LOCATION OF EXISTING UTILITIES SHOWN IS AN APPROXIMATION ONLY. THE
CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES
BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PAY FOR AND REPAIR ALL
DAMAGES CAUSED BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL
UTILITIES UNLESS OTHERWISE INDICATED. IF IT BECOMES NECESSARY DURING
DEMOLITION TO TEMPORARILY REMOVE ANY EQUIPMENT, PIPING, ETC. WHICH IS NOT
SPECIFICALLY NOTED TO BE REMOVED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT
FOR FUTURE USE), REINSTALL SAID SYSTEMS TO FULLY OPERABLE CONDITION IN THEIR
ORIGINAL LOCATIONS.
8. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, FIRE PROTECTION, ETC.) IS
SUBCONTRACTED, IT SHALL BE THE GENERAL CONTRACTOR’S RESPONSIBILITY TO
COORDINATE SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN
DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR
ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL
CONNECTIONS FOR A PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE
BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR, WHOSE DECISION SHALL
BE FINAL.
9. MECHANICAL PLANS INDICATE ONLY THE APPROXIMATE LOCATION OF ARCHITECTURAL,
INTERIOR, FURNISHINGS, ELECTRICAL, MECHANICAL AND OTHER EQUIPMENT, AS WELL AS
THE RELATED MECHANICAL REQUIREMENTS NECESSARY TO SUPPORT AND ACCESS SUCH
EQUIPMENT. THE FINAL POSITIONING OF THESE ITEMS IS DEPENDENT UPON THE
EQUIPMENT PROVIDED BY CONTRACTOR IN ACCORDANCE WITH ALL RELEVANT BUILDING
CODES AND MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK BETWEEN
SUBCONTRACTORS AND CRAFTS IN THIS REGARD, AND PROVIDING NECESSARY SPACE
ALLOCATION AND DIMENSIONS IN A TIMELY MANNER TO ALL PARTIES INVOLVED TO
ENSURE PROPER COORDINATION.
10. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT
DRAWINGS.
11. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING
INSULATION IS APPLIED.
12. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP- AND DOWNSTREAM AS
RECOMMENDED BY THE MANUFACTURER. EXTEND PROBES AND SENSING APPARATUS AS
NEEDED TO ACCOMMODATE PIPE AND DUCT INSULATION AND/OR COVERING.
13. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED
AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU
(NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN ACCORDANCE
WITH THE AABC OR NEBB STANDARDS.
14. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE
PRODUCT OF ONE MANUFACTURER SHALL BE USED, UNLESS SPECIFICALLY NOTED ON
DRAWINGS SCHEDULES.
15. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE
FABRICATION.
16. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND
LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS
SHALL BE 6 INCHES. PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 6 INCHES
ON EACH SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL
CONTRACTOR. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
COORDINATE SIZE AND LOCATION OF CONCRETE HOUSEKEEPING PADS WITH GENERAL
CONTRACTOR.
17. REFER TO STRUCTURAL DRAWINGS FOR INFORMATION ON EXTERIOR CONCRETE
HOUSEKEEPING PADS.
18. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL
CONTRACTOR SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
ROOF CURBS SHALL HAVE A MINIMUM HEIGHT ABOVE ROOF OF 14”, UNLESS OTHERWISE
NOTED.
19. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS
SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE
NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
20. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL
BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM
CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE
PERMITTED.
21. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES INVOLVED. IT IS REQUIRED THAT THE
CONTRACTOR PHYSICALLY MEASURE ALL EXISTING OPENINGS AND DIMENSIONS BEFORE
ORDERING ANY EQUIPMENT.
22. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE
STOPPED WITH A PRODUCT SIMILAR TO 3M FIRE BARRIER SEALANT CP 25WB OR
APPROVED EQUAL. ALL OPENINGS ON FIRE WALLS SHALL BE PROVIDED WITH FIRE
DAMPER SUITABLE FOR THE WALL RATING AS REQUIRED BY INTERNATIONAL MECHANICAL
CODE AND NFPA 90A.
23. ALL STRUCTURAL PENETRATIONS (SLEEVES, BLOCKOUTS, ETC.) ARE TO BE LOCATED AND
COORDINATED IN THE FIELD IN RELATION TO THE REQUIREMENTS OF FINAL EQUIPMENT
AND FIXTURES SELECTED.
24. INTERIOR DUCT DIMENSIONS ARE SHOWN. EXTERIOR DUCT DIMENSIONS SHALL BE
LARGER TO ACCOMMODATE ACOUSTICAL DUCT LINER AS NEEDED.
25. ALL FLEXIBLE DUCT RUN-OUTS SHALL BE FACTORY PRE-INSULATED, NO LONGER THAN
5'-0".
26. ALL MITERED SHEET METAL ELBOWS IN SUPPLY DUCTWORK SHALL BE CONSTRUCTED
WITH AIRFOIL TURNING VANES.
27. ROUND DUCT SIZES TO DIFFUSERS SHALL BE THE SAME SIZE AS THE DIFFUSER NECK.
28. ACCESS DOORS SHALL BE PROVIDED IN THE DUCTWORK AT ALL AIR FLOW MEASURING
DEVICES, AUTOMATIC DAMPERS, FIRE DAMPERS, COILS, THERMOSTATS AND ANY OTHER
APPARATUS REQUIRING SERVICE AND INSPECTION. ENSURE ACCESS DOORS CAN BE
FULLY OPENED WITHOUT CONFLICTS AND ARE LARGE ENOUGH TO SERVICE THE ITEMS
BEHIND THE DOOR.
29. ALL MANUAL VOLUME CONTROL DAMPERS LOCATED ABOVE GYPBOARD CEILING OR
GYPBOARD CORRIDOR CAP SHALL INCLUDE RACK AND PINION CABLE CONTROL
ADJUSTMENT SYSTEM SO AS TO BE ADJUSTABLE WITH A SOCKET WRENCH FROM BELOW.
COORDINATE CEILING LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.
30. ALL MECHANICAL EQUIPMENT REQUIRING MAINTENANCE ACCESS SHALL BE PROVIDED
WITH MEANS OF ACCESS AS REQUIRED BY INTERNATIONAL MECHANICAL CODE, WHETHER
OR NOT SUCH PROVISION (SUCH AS AN ACCESS PANEL) IS SHOWN ON THE DRAWINGS. IN
ADDITION, VERIFY MANUFACTURER REQUIRED CLEARANCES ARE MAINTAINED.
COORDINATE WITH ARCHITECTURAL DISCIPLINE AS REQUIRED.
31. ALL EQUIPMENT, VALVES, FANS AND DAMPERS INSTALL ABOVE CEILINGS SHALL BE
ACCESSIBLE AND MEET MANUFACTURER'S CLEARANCE REQUIREMENTS FOR SERVICE AND
COIL PULL. COORDINATE ALL ACCESS PANELS IN CEILINGS OR WALLS WITH
ARCHITECTURAL DRAWINGS FOR PROPER INSTALLATION.
32. SEE PLUMBING PLANS FOR CONDENSATE DRAIN PIPING. COORDINATE SIZE AND ROUTING
WITH EQUIPMENT INSTALLED.
33. COORDINATE FINAL GRILLE, REGISTER AND DIFFUSER LAYOUT WITH ARCHITECTURAL
REFLECTED CEILING PLANS.
34. ALL PIPING, EQUIPMENT OR PORTIONS OF DUCTWORK VISIBLE THROUGH CEILING SLOTS,
GRILLES OR DIFFUSERS IN FINISHED AREAS SHALL BE PAINTED FLAT BLACK.
35. ALL DIFFUSERS INSTALLED IN LAY-IN CEILINGS SHALL BE FOUR-WAY PATTERN UNLESS
NOTED OTHERWISE. IN ALL CEILING DIFFUSERS IN CORRIDOR CEILINGS PROVIDE TWO-
WAY DIFFUSERS WITH BLOW PARALLEL TO WALL SURFACE. FOR CEILING DIFFUSERS
WITHIN THREE FEET OF THE WALL, OMIT FLOW VANES DISCHARGING TOWARDS THE
WALL(S).
36. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE
AND DIVISION 26 OF THE SPECIFICATIONS.
37. ALL WIRING INSTALLED IN RETURN AIR PLENUMS SHALL BE PLENUM RATED CABLE PER
NFPA-70 OR SHALL BE INSTALLED IN METALLIC CONDUIT.
38. COORDINATE VOLTAGE AND PHASE OF ALL MECHANICAL EQUIPMENT WITH ELECTRICAL,
THE ELECTRICAL CONTRACTOR AND THE ELECTRICAL CONTRACT DOCUMENTS PRIOR TO
PURCHASE OF ANY EQUIPMENT.
39. DO NOT RUN PIPING THROUGH THE COMMUNICATIONS ROOM OR OVER ELECTRICAL
GEAR.
40. COORDINATE LOCATIONS OF ALL VARIABLE FREQUENCY DRIVES WITH ELECTRICAL
CONTRACTOR.
41. ALL VFD MOTORS SHALL HAVE FACTORY INSTALLED SHAFT GROUNDING RINGS, IF
FACTORY INSTALLATION IS NOT AN OPTION THEN SHAFT GROUNDING RINGS SHALL BE
PROVIDED AND FIELD INSTALLED.
42. PROVIDE SHUT-OFF AND BALANCING VALVES FOR ALL PIECES OF EQUIPMENT. PROVIDE
SHUT-OFF VALVES AT BRANCHES AND EQUIPMENT.
43. PROVIDE BALANCING DAMPERS AT ALL BRANCHES AND EACH INLET/OUTLET FOR ALL
SUPPLY AND EXHAUST DUCT SYSTEMS, EXCEPT AS NOTED OR PROHIBITED BY THE
INTERNATIONAL MECHANICAL CODE.
44. ALL ELEVATION CHANGES IN HYDRONIC PIPING WILL REQUIRE AIR VENTS, EVEN IF THEY
ARE NOT SHOWN IN SECTION VIEWS.
45. ALLOW FOR EXPANSION/CONTRACTION OF PIPING IN INSTALLATION. PROVIDE EXPANSION
LOOPS AS NEEDED. PIPE CONNECTIONS SHALL BE BY FLANGES OR UNIONS. PIPING TO
VIBRATING EQUIPMENT SHALL HAVE A FLEXIBLE CONNECTOR. PROVIDE EXPANSION
LOOPS WHERE PIPING PASSES ACROSS BUILDING EXPANSION JOINTS.
46. UNLESS OTHERWISE NOTED, HYDRONIC BRANCHES TO EQUIPMENT SHALL BE SIZED TO
MATCH THE EQUIPMENT CONNECTION SIZE OR A MINIMUM 3/4", WHICHEVER IS LARGER.
47. ANY GLYCOL TO BE USED SHALL BE OF FOOD GRADE OR BETTER.
48. ALL PIPING (EXCEPT FOR NETWORKED PIPING WHERE THE TOTAL COMBINED WEIGHT IS
GREATER THAN 31 POUNDS), EQUIPMENT, DUCTWORK, AND ACCESSORIES WEIGHING 31
POUNDS OR MORE SHALL BE BRACED BY EITHER RIGID OR FLEXIBLE SYSTEMS TO RESIST
FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5
TIMES THE WEIGHT IN THE DOWNWARD DIRECTION IN ACCORDANCE WITH UFC 4-010-01
AND SPECIFICATION SECTION 23 05 48.00 40.
GENERAL MECHANICAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_M19.rvt
1/6/2022 10:31:07 AM
M-003
FTD
M
EC
H
AN
IC
AL
G
EN
ER
AL
N O
TE
S
B-
: F
IE
LD
T
R
AI
N
IN
G D
ET
AC
H M
EN
T
(F
TD
O
M
AH
A D
IS
TR
IC
T
C
AP
IT
O
L
AV
EN
U
E, S
U
IT
E
O
M
AH
A, N
EB
R
AS
KA
M . B
U
SB
Y
D . W
H
IT
AK
ER
D . E
LL
ED
G E
K.
B
R
ES
LI
N
N O
VE
M
BE
R
W
F2
1R
ADVERTISEMENT - 100% DESIGN
EL
LS
W O
R
TH
A
IR
F O
R C
E
BA
SE
, S
O U
TH
D
AK
O
TA
PR
O
JE
C T
N U
M
BE
R : F
XB
M
AM
- 0
3:
0 0
D
ES
IG
N
IS
S U
ED
F
O R
P R
IC
IN
G
/2
AM
- 0
4:
0 0
D
ES
IG
N
IS
S U
ED
F O
R P
R
IC
IN
G
/2
C
C
C C
C
C C
C C
C
C C
C C
C C
C
C
C
C C
C
C
C
C
C
C
C
C
C
JJ
J
JJ
C C
C
C
C
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
JJ
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
CB
C C
J
J J J
J J
J
J
C
J
T-TR3
TR3
WP
A B
GFEDC
WSTA
EP403
E3
DE-ICING TRAINER
MTF INSTRUCTORS
AND MANAGERS
WOMEN VESTIBULE
MEN VESTIBULE
LOBBY
VESTIBULE
STORAGE
WOMEN
MEN
WOMEN VESTIBULE
MEN VESTIBULE
COMM
COMPUTER LAB
MASS BRIEFING
ROOM
STAIR
CLASSROOM
CLASSROOM
L2- 22
L4A- 13
L4A- 12
L4A- 9
L4A- 7
L4A- 10
L4A- 9 L4A- 10 L4A- 11
L4A- 14L4A- 14
L4A- 8
L4A- 7
L4A- 8
L4A- 4
L4A- 4
L4A- 6
L4A- 2
L4A- 3
L4A- 3 L4A- 1
L2- 22
L2- 22
L4A- 16
L4A- 16
L4- 3
L2- 22
L4- 18 L4A- 16
L4A- 16
L4- 1 L4- 29L4- 29
L4- 2
L4- 1
L4- 3
L4- 5
L4- 6 L4- 10 L4- 8
L4- 7L4- 6L4- 10
L4- 4
L4- 7 L4- 8 L4- 9
L4- 9
L4- 5
L4- 4 L4- 11
L4- 12
L4- 14 L4- 17
L4- 13 L4- 14 L4- 15
L4- 11
L4- 12
L4- 16L4- 15
L4- 16 L4- 17 L4- 13
L4- 19
L4- 22 L4- 23 L4- 24 L4- 25
L4- 25L4- 23
L4- 3L4- 19
L4- 22
L4- 26 L4- 27
L4- 26
L4- 28
3+1 CKT
L4A- 27,29,31
L4A- 33
2 CKT
L2- 26,28
3+1 CKT
L2- 19,21,23
L2- 25
L1- 15
L4A- 22
L4A- 21
L4A- 20
L4A- 23
L4A- 25 L4A- 22
L4A- 21
L2- 17
L2- 14
L2- 13
L2- 13
L2- 13
L2- 6
L4- 3
L2- 10
L2- 10
L2- 12
L4A- 24
WP
L4- 18
L4- 24
L4- 27
L2- 16
L2- 15
L2- 16
L4A- 26
L4- 3
L4A- 1
L4A- 11 L4A- 12
L4A- 2
L2- 14
L4A- 18
M A
T C
H L
IN
E E
P
M A
T C
H L
IN
E E
P
VAV-1N-5
VAV-1S-5
VAV-1S-7
VAV-1S-4
VAV-1S-3
VAV-1S-1
MTF CHIEF
CORRIDOR
TESTING
MTF NCOIC/DOI
VAV-1N-4VAV-1N-3VAV-1N-2
VAV-1N-1
L2- 18
L2- 18
L2- 18
L2- 18
L2- 18
L2- 18
L2- 18
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L2- 20
L1- 12 L1- 12
L1- 12
L1- 12
L1- 12
L1- 12
L1- 12 L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
L1- 10
VAV-1S-2
VAV-1N-6
JAN
MEN
WOMEN
CONFERENCE
MEETING
116 CORRIDOR
JAN
BREAK ROOM
CORRIDOR
SECURE
PERSONNEL
VESTIBULE
L4- 2
L4- 1
L4A- 17
L4A- 19 L1- 25
L1- 23
L1- 27 L1- 29
L1- 26 L1- 28
L1- 24
L1- 22
1 1
LACTATION ROOM
MACHINE ROOM
FCU-2
DCU-3
DCU-8
TR3A
VAV-1S-6
L4- 18
L2- 24
L2- 6
L4A- 13
L4A- 5
+65" L4A- 15
L2- 18
L4A- 30
L4A- 32
L4A- 28
+84"
+89"
+89"
L4A- 34
L4A- 34
L4A- 35
+60" +60"
+60" +60"
L4- 30 L4- 32
+84" +84"
+60"
+84"
L4- 31
L4- 31
+89"
+89"
+60"+60" L4A- 5
L4A- 6
+60" L2- 24
ALCOVE
107 SECURITY
VESTIBULE
L4A- 36
L4A- 36
UH-7 UH-8
4 4
4 4 4
4 4 4
L2- 32
L2- 30
UH-12
4 4
L4- 7 L4- 10 L4- 6 L4- 15 L4- 16 L4- 17 L4- 19
L4- 21
L4- 21
L4- 21
2'-7" AFF2'-7" AFF
+84"
L2- 22
A
KEY PLAN
B
C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:25
EP101
FTD
E L E
C T
R
IC
A L P
O W
E R
F
IR
S T
F L O
O R
P L A
N
A R
E A
A
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
J O
A K
E S
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
NORTH
0 2' 4' 8' 16'1/8" = 1'-0"A1
ELECTRICAL POWER FIRST FLOOR PLAN - AREA A
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD 705.
7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF
SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER
TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER
ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS
PENETRATING THESE PERIMETER WALLS. CONCEAL
RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE
PURPOSE OF ROUTING UTILITIES.
8. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION
AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED
WITH OTHER TRADES.
11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND
CABLING REQUIREMENTS.
1. JUNCTION BOX FOR POWER TO SOLENOID FOR
PLUMBING FIXTURE.
2. JUNCTION BOX FOR POWER TO HAND DRYER,
COORDINATE MOUNTING HEIGHT WITH EQUIPMENT.
3. POWER CONNECTION FOR ADA MOTORIZED DOOR
OPERATOR.
4. RECEPTACLES MOUNTED IN ONE SIDE OF FIRE-RATED
FLOOR BOX, FSR CAT. NO. FL-200-3 WITH FL-200-BSQ-C
U-ACCESS COVER, OR APPROVED EQUAL.
SHEET KEYNOTES
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
C
J
C
C
C
C C
C
C
C
J
T
C B
J
C
J
CB
C B
MD
MD
J J
L3
T-TR2
TR6
3+1 CKT
WP
WP
PNMLKJI
CLS PARTS
STORAGE
SECURITY SUITE
PRIVATE OFFICE
STAIR
COCKPIT PART
TASK TRAINER
CPTT SERVER
ROOM
TOOL CRIB
COMM
CORRIDOR
EP403
E1
RCP-1
L3- 15
L3- 17
L1- 37 L3- 12
L1- 11
L3- 12
L3- 8
L3- 9
L1- 11
L2- 8
L3- 15
L3- 8 L3- 8
L3- 10
L1- 15
L3- 13L3- 17
TR5
T-TR5
L2- 4
L2- 4
L2- 8
L2- 4
L2- 10
L3- 1,3,5 L3- 7
L2- 8
TR2
L1- 15
M A
T C
H L
IN
E E
P
MATCHLINE EP103
M A
T C
H L
IN
E E
P
MATCHLINE EP103
VAV-1S-9
CRAC-2
CRAC-1
VAV-1S-8
VAV-1S-10
JAN
SECURE CLOSET
CORRIDOR
DSS-1
COMM
TR2A
EP403
B1
L3- 11
L3- 13
SECURITY SUITE
OPEN OFFICE
3 CKT
L3- 9
L3- 10
L3- 2,4,6
CCU-1 CCU-2
WP
L1- 15
2 3
EP402
E1
UH-13
STAIR
139 CORRIDOR
CORRIDOR
CLS PARTS
STORAGE
CORRIDOR
SECURITY
VESTIBULE
SECURITY
VESTIBULE
T-TR6
T-L3
L1A- 20
L1A- 20
L1A- 20
DCU-1
+60"
DCU-2
DCU-4
DC-1
CH-1
NOTE: REFER TO
SITE PLAN FOR EXACT
LOCATION WITH
RESPECT TO
BUILDING.
A
KEY PLAN
B
C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:26
EP102
FTD
E L E
C T
R
IC
A L P
O W
E R
F
IR
S T
F L O
O R
P L A
N
A R
E A
B
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
J O
A K
E S
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
1/8" = 1'-0"A2
ELECTRICAL POWER FIRST FLOOR PLAN - AREA B
NORTH
0 2' 4' 8' 16'
1/8" = 1'-0"F1
ENLARGED MECH EQUIPMENT PLAN
NORTH
0 2' 4' 8' 16'
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD 705.
7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF
SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER
TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER
ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS
PENETRATING THESE PERIMETER WALLS. CONCEAL
RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE
PURPOSE OF ROUTING UTILITIES.
8. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION
AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED
WITH OTHER TRADES.
11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND
CABLING REQUIREMENTS.
C7
EP402
SHEET KEYNOTES
1. POWER FOR EYEWASH/ALARM.
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
C C
C
CC
C C
C C
C C
CC
C
C
C
C C
CC
C
C
C
C
C
T
CB
CB
J
J
C
J
JJ
CBF
J
J
J
J
J
J
J
J
C B
H3
H1
L1
H2
L2
MDSB
TR1
T-TR1
T-L4
L4
H5
T-L5
L5
WP
EP401
B1
EP402
A1
SRQPNMLKJI
VIRTUAL
MAINTENANCE
TRAINER
MECHANICAL
T-TR4
L5- 1 L5- 3 L5- 1
L5- 9
L5- 8
L5- 2
L5- 4L5- 5
L5- 4
L5- 5
L3- 10
L5- 9 L5- 8
L5- 7
L5- 6
L5- 7L5- 6
L1- 9
L5- 10 L1- 1 L1- 2
L1- 1
L1- 5
L1- 3
L1- 19
L1- 4
L1- 1
L1- 2
L1- 6
L1- 5
L1- 7
L1- 6
L1- 8
L1- 8
WP
WP
L1- 19
L1- 21
L1- 20
EP403
E7
L1- 21
L5- 2
M A
T C
H L
IN
E E
P
MATCHLINE EP102
MATCHLINE EP102
TR4
TR4A
JAN
CORRIDOR
COMM
CORRIDOR
MACHINE ROOM
148 ELEVATOR
MAIN COMM
CORRIDOR
ELEC
EGRESS TRAINER
STAIR
ELEC
ENGINE PART TASK
TRAINER
LANDING GEAR
TRAINER
VAV-2E-2
LCP1
RCP2
RCP1
L1- 14
L3- 11
L4A
L1- 3
L1- 6
+60"
+60"
+60" L5- 2
L5- 1
L5- 8
+60"
L1- 14
L5- 11L5- 11
MPC FP
FCU-1
2 3
CORRIDOR
SECURITY
VESTIBULE
L1A
L1- 19 +60"
A
KEY PLAN
B
C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:28
EP103
FTD
E L E
C T
R
IC
A L P
O W
E R
F
IR
S T
F L O
O R
P L A
N
A R
E A
C
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
J O
A K
E S
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
1/8" = 1'-0"A1
ELECTRICAL POWER FIRST FLOOR PLAN - AREA C
NORTH
0 2' 4' 8' 16'
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD 705.
7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF
SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER
TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER
ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS
PENETRATING THESE PERIMETER WALLS. CONCEAL
RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE
PURPOSE OF ROUTING UTILITIES.
8. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION
AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED
WITH OTHER TRADES.
11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND
CABLING REQUIREMENTS.
SHEET KEYNOTES
1. POWER FOR EYEWASH/ALARM.
2. SAFETY SWITCH FOR ELEVATOR CAB FAN AND LIGHTING.
3. ENCLOSED SHUNT TRIP CIRCUIT BREAKER FOR
ELEVATOR CONTROLLER.
4. CONNECT SUMP PUMP TO THIS RECEPTACLE.
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
C
C
C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
JJ J
J JJ J
J
JJ
C
C
J
J
C
J
JJ
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
T
T
C B
J J
J
J
C
C
C
C C
C
L9
COMPUTER
SUPPORT
AETC INSTRUCTOR
OPEN OFFICE
AETC CLASSROOM
227 AETC CLASSROOM
AETC CLASSROOM
MEN
CORRIDOR
AETC CLASSROOM
AETC LEADERSHIP
ADMIN
AETC CLASSROOM
A B
GFEDC
3+1 CKT
3 CKT
L9A- 24
L9A- 18,20,22
L9A- 12,14,16
3+1 CKT3+1 CKT
L9A- 25 L9A- 33
L9A- 27,29,31 L9A- 19,21,23
3 CKT
L9A- 26,28,30
3+1 CKT
L9A- 7 L9A- 1,3,5
L7- 28
L7- 28
L7- 27 L7- 27
L9- 9
L9- 30 L9- 26 L9- 28
L7- 28
L8- 26
L7- 26
L7- 26 L7- 25
L7- 26
L7- 24L7- 20 L7- 21
L7- 19 L7- 19
L7- 21
L7- 21
L7- 24
L7- 23
L7- 23 L7- 22
L7- 24
L7- 26
L8- 6
L8- 3
L8- 3
L8- 3
L9A- 34
L9- 21
L9- 22
L9- 20
L9A- 36
L9- 31 L9- 33 L9- 35
L9- 29
L9- 30
L9- 32
L9- 16
L9- 17
L9- 19
L9- 14
L9- 14
L9- 10
L9- 11
L9- 15
L9- 8
L9- 6L9- 5
L9- 7
L9- 6 L9- 5
L9- 3
L9- 4
L9- 3
L9- 1 L9- 2
L9- 2
CORRIDOR
L9A- 9
L9- 9
L9A- 10
L9A- 17
L9- 9L9A- 13
L9A- 9
L9A- 15
L9A- 17
L9A- 10
L9A- 2,4
L9A- 6,8
TR7
L9- 9
CS STORAGE
L7- 20 L7- 22
L9- 10
WOMEN
WOMEN VESTIBULE
MEN VESTIBULE
EP403
B3
L7- 28
L7- 25
L9A- 10
STORAGE
TRAINING SYSTEMS
SUPPORT CENTER
COMM
CONFERENCE
STAIR
AETC CHIEF
VAV-2S-1
VAV-2S-2
VAV-2S-4
VAV-2S-3
VAV-2S-6
VAV-2N-1 VAV-2N-2
VAV-2N-3
VAV-2N-4
VAV-2N-5
L8- 27
L8- 27
L8- 27
L8- 27
L8- 27
L8- 27
L8- 27
L8- 29
L8- 29
L8- 29
L8- 29
L8- 29
L8- 29
L8- 29 L8- 29
L8- 29
L8- 29
L8- 29
L8- 29
L8- 4 L8- 2 L8- 1
L8- 5
TR7A
AVIONICS TRAINING
AREA
WSTA
WSTA
LCMS / LMS BACKUP
SERVER
L9A- 13
L9A
RCP5
2 CKT
2 CKT
L9A- 11
L9A- 11
L9A- 15
L9- 1
L9- 4
+60"
L9- 8
L9- 13 L9- 11 L9- 13
L9- 15 L9A- 32
L9- 20
L9- 21
L9- 24
L9- 23
L9- 32
L9- 29
L9- 29
+60"
+60"
+60"
+60"
+60"
+60" +60"
+60"
EF-7
3 3 3 3
UH-14
EP402
A6
CORRIDOR
CORRIDOR
AETC CLASSROOM
+60"
L9- 8
+60"
LV-8
A
KEY PLAN
B
C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:31
EP104
FTD
E L E
C T
R
IC
A L P
O W
E R
S E
C O
N D
F L O
O R
P L A
N
A R
E A
A
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
K U
R E
N D
A
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
NORTH
0 2' 4' 8' 16'1/8" = 1'-0"B1
ELECTRICAL POWER SECOND FLOOR PLAN - AREA A
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD 705.
7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF
SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER
TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER
ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS
PENETRATING THESE PERIMETER WALLS. CONCEAL
RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE
PURPOSE OF ROUTING UTILITIES.
8. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION
AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED
WITH OTHER TRADES.
11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND
CABLING REQUIREMENTS.
1. JUNCTION BOX FOR POWER TO SOLENOID FOR
PLUMBING FIXTURE.
2. JUNCTION BOX FOR POWER TO HAND DRYER,
COORDINATE MOUNTING HEIGHT WITH EQUIPMENT.
3. RECEPTACLES MOUNTED IN ONE SIDE OF FIRE-
RATED FLOOR BOX, FSR CAT. NO. FL-200-3 WITH
FL-200-BSQ-C U-ACCESS COVER, OR APPROVED
EQUAL.
SHEET KEYNOTES
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
6 6 6 6 6
CC
CC
C
C
C C
C
C C
C C
C
CC
C
C
C C
C C
C
J
T
T C B
C
C
J J
J
COMM
WSTA
WSTA
WSTA
WSTA
WSTA
WSTA
MECH
STAIR
CLASSROOM
STAIR
JAN
STOR
STORAGE
EP401
B4
PNMLKJI
L8- 3
L6- 9
L6- 11
L6- 14
L6- 15 L6- 16
L6- 16
L6- 16
L7- 1
L6- 4 L6- 10
L6- 4
L6- 10
L6- 4L6- 2L6- 2
L6- 10
L6- 8 L6- 12
L6- 8
L6- 12
L6- 6 L6- 6L6- 8
L6- 12
CORRIDOR
CORRIDOR
L7- 3 L7- 4
L7- 4
L7- 2 L7- 2L7- 3
L7- 4
L7- 3 L7- 6
L7- 7
L7- 1
L7- 6
L7- 7
L7- 1
L7- 13
L7- 12
L7- 10
L7- 9
L7- 10
L7- 9 L7- 8 L7- 8
L7- 10
L7- 9
L7- 13
L7- 12
L7- 13
L7- 12
L7- 11
L7- 11
L7- 15
L7- 16
L7- 1
L7- 15 L7- 16
L7- 14
L7- 14
L7- 16
L7- 1
L7- 15
EP403
B6
CORRIDOR
L6- 13
MATCHLINE EP106
MATCHLINE EP106
M A
T C
H L
IN
E E
P
VAV-2S-8
VAV-2S-7
VAV-2S-9
VAV-2S-10
VAV-2S-12
VAV-2S-11
L7- 7
L7- 31 L7- 6 L7- 31
L8- 29 +89"
L6- 17
L6- 17
+89"
BREAK
+60"
+60"
+60"
+60"
+60"
+60"+60"+60"
L7- 36 L7- 34
L7- 32
L7- 32
L7- 36
L7- 34
1 1 1
UH-15
CORRIDOR
WSTA
A
KEY PLAN
B
C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:33
EP105
FTD
E L E
C T
R
IC
A L P
O W
E R
S E
C O
N D
F L O
O R
P L A
N
A R
E A
B
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
K U
R E
N D
A
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
NORTH
0 2' 4' 8' 16'1/8" = 1'-0"B2
ELECTRICAL POWER SECOND FLOOR PLAN - AREA B
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD 705.
7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF
SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER
TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER
ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS
PENETRATING THESE PERIMETER WALLS. CONCEAL
RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE
PURPOSE OF ROUTING UTILITIES.
8. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION
AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED
WITH OTHER TRADES.
11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND
CABLING REQUIREMENTS.
1. RECEPTACLES MOUNTED IN ONE SIDE OF FIRE-RATED
FLOOR BOX, FSR CAT. NO. FL-200-3 WITH FL-200-BSQ-C
U-ACCESS COVER, OR APPROVED EQUAL.
SHEET KEYNOTES
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
6 6 6 6
B
C B
J
J
J
J
ELEC
MECHANICAL
STOR
COMM
H7
T-L7
L7
H8
T-L8
L8
T-L9
T-L6
EP402
A4
STAIR
STORAGE
ALCOVE
EP401
B7
SRQPNMLKJI
H6
L7- 18
L7- 18
L7- 18
CORRIDOR
L8- 26
L8- 26 L7- 1
L7- 1
EP403
B8
L6
M A
T C
H L
IN
E E
P
M A
T C
H L
IN
E E
P
MATCHLINE EP105
MATCHLINE EP105
VAV-2S-7
VAV-2E-1D
VAV-2E-1C
VAV-2E-1B
VAV-2E-1A
VAV-2E-4
VAV-2E-3
VAV-2E-5D
VAV-2E-5C
VAV-2E-5B
VAV-2E-5A
VAV-2N-6
T-L1
T-L2
RCP3
RCP4
LCP2
L7- 18
UH-16
CORRIDOR
A
KEY PLAN
B
C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:34
EP106
FTD
E L E
C T
R
IC
A L P
O W
E R
S E
C O
N D
F L O
O R
P L A
N
A R
E A
C
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
K U
R E
N D
A
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
NORTH
0 2' 4' 8' 16'1/8" = 1'-0"A1
ELECTRICAL POWER SECOND FLOOR PLAN - AREA C
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD 705.
7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF
SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER
TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER
ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS
PENETRATING THESE PERIMETER WALLS. CONCEAL
RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE
PURPOSE OF ROUTING UTILITIES.
8. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION
AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED
WITH OTHER TRADES.
11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND
CABLING REQUIREMENTS.
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
6 6 6 6
6 6
6 6 6 6
6 6
J
J
J
J
J
J
J
J
C B
J
J
J
J
J
J
J
MECHANICAL
TR1T-TR1
JI
TR1- 5
TR1- 4
TR1- 2
TR1- 3TR1- 1
TR1- 6,8
TR1- 7,9
TR1- 10,12 TR1- 15,17
L1- 18
L1- 17
L1- 18
L1- 17
TR1- 14,16
TR1- 11,13
DCU-7
DCU-6
DCU-5
EF-1
HWP-1
HWP-2
CHWP-2
CHWP-1
B-2
B-1
AHU-1N
AHU-1S
UH-2
DSS-7
MAIN COMM
TR1- 18
TR1- 23
TR1- 20
TR1- 24
TR1- 22
TR1- 25
UH-1
1 4
L1A- 3 L1A- 1
L1A- 4
L1A- 2
L1A- 6
L1A- 8
L1A- 5
L1A- 7
LV-1
MECH
PN
L7- 29
L7- 29
L7- 29
L7- 29
UH-6
DOAS-1
AHU-2S
UH-5
EF-3
RO-1
L1A- 14
L1A- 12
L1A- 13
LV-7
LV-6
MECHANICAL
JI
L6- 3
L6- 1
L6- 3
L6- 1
UH-4
AHU-2E
EF-2
UH-3
AHU-2N
L1A- 16
L1A- 18
L1A- 19
L1A- 17
LV-4
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:35
EP401
FTD
E L E
C T
R
IC
A L P
O W
E R
E N
L A
R G
E D
P L A
N S
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
K U
R E
N D
A
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
1/4" = 1'-0"B1
ENLARGED MECHANICAL RM 173
AND COMM RM 172
NORTH
0 1' 2' 4' 8' 1/4" = 1'-0"B4
ENLARGED MECHANICAL RM 216
1/4" = 1'-0"B7
ENLARGED MECHANICAL RM 221
NORTH NORTH
0 1' 2' 4' 8' 0 1' 2' 4' 8'
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD705.
7. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
8. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
9. TRANSFORMERS INSTALLED IN TELECOMMUNICATIONS
ROOMS SHALL BE INSTALLED SO AS TO MAINTAIN A
MINIMUM DISTANCE OF 4'-0" FROM
TELECOMMUNICATIONS CABLING AND
TELECOMMUNICATIONS RACKS.
1. MOUNT DOUBLE DUPLEX ABOVE RACK. COORDINATE
INSTALLATION WITH CABLE TRAY. REFER TO
TELECOMM PLANS AND DETAILS.
2. NEMA L6-30R MOUNTED ABOVE RACK. COORDINATE
INSTALLATION WITH CABLE TRAY. REFER TO
TELECOMM PLANS AND DETAILS.
3. JUNCTION BOX FOR CONTROL PANEL POWER.
4. JUNCTION BOX FOR HVAC EQUIPMENT CONTROL
POWER.
5. TRANSFORMER SUSPENDED FROM STRUCTURE AT
10'-6" MINIMUM TO BOTTOM. REFER TO DETAIL D1/EP503.
SHEET KEYNOTES
1 TYP
2 TYP
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
6 6
CB
B
J J
CB
ELEC
ELEC
T-L4
MDSB
I
UH-10
EF-5
EF-4
UH-9
L1
L4
L4A
LCP1
RCP2
RCP1
H1
H2
H3
L2
MPC FP
L1- 36
L1- 36
L1- 36
L1A
LV-3
LV-2
ELEC
T-L9 T-L7 H7
L7
H8
T-L8
L8
I
L7- 17
L7- 17
L7- 17
L7- 17
L6
T-L6
H6
T-L1
T-L2
LCP2
RCP4
RCP3
UH-11
EF-6
LV-5
DC-1
CH-1
L1A- 9 L1A- 10 L1A- 11
WP
LK
CPTT SERVER
ROOM
CRAC-1
TR6
TR6- 2
TR6- 1
TR6- 2
TR6- 3
TR6- 1
TR6- 13,15
TR6- 21
TR6- 12,14
TR6- 20
TR6- 9,11
TR6- 19
TR6- 8,10
TR6- 18
TR6- 17
TR6- 4,6
TR6- 16
TR6- 5,7
TR6- 3
T-TR6
FE
LCMS / LMS BACKUP
SERVER
T R
A
T R
,3
T R
A
T R
,3
T R
A
T R
,3
T R
A
T R
A
,1
T R
A
T R
A
,1
T R
A
T R
A
,1
23456
L9- 25 L9- 18
L9- 25
L9- 27
L9- 18
L9- 27
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 12:33:36
EP402
FTD
E L E
C T
R
IC
A L P
O W
E R
E N
L A
R G
E D
P L A
N S
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
K U
R E
N D
A
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
GENERAL NOTES
1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,
ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.
2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.
3. REFER TO EP604 AND EP605 FOR MECHANICAL
EQUIPMENT CONNECTION SCHEDULE.
4. REFER TO EP606 THROUGH EP612 FOR PANEL
SCHEDULES.
5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,
LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE
ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED
FOR A "CONTINUOUS OPERATION" CLASSIFICATION.
COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.
6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS
WITH PHYSICAL SECURITY OFFICER (PSO) AND
CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL
SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO
THE REQUIREMENTS OF ICD705.
7. PROVIDE PROPER NUMBER OF CONDUCTORS TO
ACHIEVE CIRCUITING AS SHOWN.
8. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.
CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.
TO PANEL SHALL BE #8 AWG.
9. TRANSFORMERS INSTALLED IN TELECOMMUNICATIONS
ROOMS SHALL BE INSTALLED SO AS TO MAINTAIN A
MINIMUM DISTANCE OF 4'-0" FROM
TELECOMMUNICATIONS CABLING AND
TELECOMMUNICATIONS RACKS.
1/4" = 1'-0"A1
ENLARGED ELECTRICAL
RMS 170 & 171
1/4" = 1'-0"A4
ENLARGED ELECTRICAL RM 219
1/4" = 1'-0"D6
ENLARGED CH-1 AND DC-1
NORTH
0 1' 2' 4' 8'
NORTH
0 1' 2' 4' 8'
NORTH
0 1' 2' 4' 8'
1/4" = 1'-0"E1
ENLARGED CPTT SERVER RM 155
1/4" = 1'-0"A6
ENLARGED BACKUP SERVER RM 250
NORTH
0 1' 2' 4' 8'
1. MOUNT DOUBLE DUPLEX ABOVE RACK. COORDINATE
INSTALLATION WITH CABLE TRAY. REFER TO
TELECOMM PLANS AND DETAILS.
2. NEMA L6-30R MOUNTED ABOVE RACK. COORDINATE
INSTALLATION WITH CABLE TRAY. REFER TO
TELECOMM PLANS AND DETAILS.
3. JUNCTION BOX FOR CONTROL PANEL POWER.
4. JUNCTION BOX FOR HVAC EQUIPMENT CONTROL
POWER.
5. TRANSFORMER SUSPENDED FROM STRUCTURE AT 7'-6"
MINIMUM TO BOTTOM. REFER TO DETAIL D1/EP503.
6. MOUNT ALL WALL MTD. RECEPTACLES IN THIS ROOM AT
42" AFF TO ACCOUNT FOR 24" RAISED FLOOR.
7. MOUNT PANELBOARD AT A HEIGHT TO ACCOUNT FOR
24" RAISED FLOOR.
SHEET KEYNOTES
2TYP
TYP
2TYP
TYP
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
PROVIDE
CIRCUMFERENTIAL
CAULKING AROUND
ENTIRE CONDUIT ON
BOTH SIDE OF WALL (TYP)
SECURENON-SECURE
SECURE SPACE
PERIMETER WALL
SCHEDULE 40 PVC
(DIELECTRIC BREAK)
COUPLINGCOUPLING
METALLIC
CONDUIT OR PIPE
METALLIC
CONDUIT OR PIPE
WALL INSULATION
FLOOR
CEILING
ELEC. FITTING
TYP.
SURFACE MOUNTED
ELEC/COMM BOX
CONDUIT (ROUTED DOWN
WALL) STANDOFF PER ICD 705
CEILING ACCESS
PANEL (AS REQ'D)
RF SHIELDED WALL
J-BOX (AS REQ'D)
VOID AS APPLICABLE
SECURE SIDE
INTERIOR FACE
NONSECURE
SIDE
PIPE SLEEVE
SET IN GROUT
MASONRY WALL
OUTSIDE FACE
WALL INTERIOR
FACE
FLANGE AROUND SLEEVE
SCREWED THROUGH WALL FOIL
RIGID METAL
CONDUIT SLEEVE
PVC FEMALE
COUPLING (TYP)
CONTINUOUS WELD
AROUND SLEEVE
FIRE STOPPING AROUND
CONDUIT INSTALLED PER MFR'S
RECOMMENDATIONS (TYP)
EMT
STEEL EMT
CONNECTOR
WITH SET
SCREW (TYP)
FLANGE
SLEEVE
SCREWS FRONT
VIEW
SIDE
VIEW
PROVIDE
CIRCUMFERENTIAL FIRE
STOP CAULKING AROUND
ENTIRE CONDUIT OR PIPE
ON BOTH SIDES OF WALL
(TYP)
SECURENON-SECURE
SECURE SPACE
PERIMETER WALL
METALLIC
CONDUIT OR PIPE
GROUND PENETRATING CONDUIT
WITHIN 6" OF WALL. PROVIDE #4
CU GROUND WIRE TO BUILDING
GROUNDING SYSTEM.
COUPLINGCOUPLING
METALLIC
CONDUIT OR PIPE
METALLIC
CONDUIT OR PIPE
CONDUIT GROUNDING CLAMP
WALL INSULATION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt
1/7/2022 13:23:52
EP501
FTD
E L E
C T
R
IC
A L P
O W
E R
D E
T A
IL
S
B -2
F
IE
L D
T R
A
IN
IN
G
D E
T A
C H
M E
N T
F
T D
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E S
U
IT
E
O M
A H
A N
E B
R A
S K
A
J O
A K
E S
K U
R E
N D
A
D E
L L E
D G
E
T L /R
A
N O
V E
M B
E R
W F
R
ADVERTISEMENT - 100% DESIGN
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
O U
T H
D A
K O
T A
P R
O J E
C T
N U
M B
E R
F
X B
M
N.T.S.E1
SECURE AREA BOUNDARY PENETRATION DETAIL W/ DIELECTRIC BREAK
N.T.S.B1
SURFACE MOUNTING DETAIL ON SECURE PERIMETER WALL
N.T.S.E6
CONDUIT WALL PENETRATION FOR EMI/RFI PROTECTION
N.T.S.B6
SECURE AREA BOUNDARY PENETRATION DETAIL W/O DIELECTRIC BREAK
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
A
M -0
D E
S
IG
N I
S S
U E
D F
O R
P R
IC
IN
G
/2
NOTE:
DO NOT USE THIS DETAIL FOR
PENETRATIONS THROUGH RATED
ASSEMBLIES (FIRE WALLS).
INSTEAD, REFER TO DETAIL B6 ON
THIS SHEET.
MAIN DISTRIBUTION SWITCHBOARD "MDSB"
2000AMP BUS WITH 100% NEUTRAL,
THREE SECTION, 480Y/277, 3PH, 4W, NEMA 1
SERVICE ENTRANCE RATED, 65KAIC
200S
SERVICE ENTRANCE
SECTION
DIGITAL
POWER
MONITOR
CTs
PTs
A-BUS
A-M1
2000AF
2000AT
LSIG & ARC
REDUCTION
G
N
REFER TO ELECTRICAL SITE
PLANS FOR PRIMARY
FEEDER
60A CLF
1" CONDUIT
M
PROVIDE BLDG.
AMRS/UFGS COMPLIANT
SMART METER. METER
SHALL BE EIG NEXUS
1262/1272
METER PRDUCT SERIES
OR EQUAL AND SHALL
BE SOCKETED AS A
SEPERATE ENCLOSURE
AND LOCATED
ADJACENT TO MDP AND
FIRE PUMP
CONTROLLER
COMPLETE WITH ALL
INSTRUMENT CT'S AND
PT'S FOR A COMPLETE
AND OPERATIONAL
SYSTEM.
SPD
208Y/120V
T-TR5
"TR5"
PANEL
225A
"TR4"
PANEL
225A
"TR3"
PANEL
225A
"TR2"
PANEL
225A
30V
208Y/120V
T-TR4
208Y/120V
T-TR3
208Y/120V
T-TR2
75KVA 112.5KVA 112.5KVA
XFMR: SIM
100AF
60AT
480Y/277V
1500KVA
12.47KV
600A 3P
600A 3P
"TR1"
PANEL
225A
208Y/120V
T-TR1
75KVA75KVA
17602230
A-F3 A-F2 A-F1
400AF
400AT
400AF
225AT
25Y22Y
"H2"
PANEL
225A "H1"
PANEL
225A
"L2"
PANEL
225A "L1"
PANEL
225A
208Y/120V
T-L2 208Y/120V
T-L1
75KVA
SPD SPD
400AF
225AT
22Y
"H3"
PANEL
225A
"L3"
PANEL
100A
20…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .