EAFB B-21 FTD AM-0006 Dwgs_Vol2.pdf

PDF 6 MB Posted

Attached to
B-21 MPF/FTD Construction Federal contract opportunity
Solicitation number
W9128F21R0032
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This solicitation is for the construction of a B-21 Mission Operations Planning Facility and a B-21 Field Detachment Training Facility on a combined site at Ellsworth Air Force Base in South Dakota. The projects include over 104,000 square feet of secure operations planning and maintenance training space to support the emerging B-21 airframe. Associated site work, utilities, and infrastructure are also required. The solicitation allows for bid options for fixtures, furnishings, equipment, security systems, and power supplies. Responses are due to the Army Corps of Engineers Engineering District Omaha.

View the file

Other files for this federal contract opportunity

Other files attached to B-21 MPF/FTD Construction, newest first.
File Type Posted
Am_0012.pdf PDF
Am_0011.pdf PDF
Am_0010.pdf PDF
Am_0010_Dwgs_MPF.pdf PDF
Am_0010_Dwgs_FTD.pdf PDF
Am_0009.pdf PDF
Am_0009.pdf PDF
EAFB B-21 MPF AM-0008 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0008 Dwgs_Vol2.pdf PDF
Am_0008.pdf PDF
Am_0007.pdf PDF
EAFB B-21 FTD AM-0007 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0007 Dwgs_Vol1.pdf PDF
EAFB B-21 MPF AM-0007 Dwgs_Vol2.pdf PDF
EAFB B-21 FTD AM-0006 Dwgs_Vol1.pdf PDF
Am_0006.pdf PDF
Am_0005-Vol II-FTD-DWG.pdf PDF
Am_0005.pdf PDF
Am_0005-Vol II-MPF-DWG.pdf PDF
Am_0004.pdf PDF
Am_0004-Vol II-MPF-DWG.pdf PDF
Am_0004-Vol II-FTD-DWG.pdf PDF
Am_0003.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
00 21 00 AT2 FTD Site Photo Survey (under separate cover_electronic only - 1 of 1).zip ZIP file
W9128F-21-R-0032_VOL1-Front End and Site Specs.pdf PDF
95-Percent_DWGS_VOL2_W9128F21R0080_B21-FTD.pdf PDF
W9128F-21-R-0032_VOL3 - FTD Only Specs.pdf PDF
95-Percent_DWGS_VOL1_W9128F21R0080_B21-FTD.pdf PDF
W9128F-21-R-0032_VOL2 - MPF Only Specs.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIPING SYSTEMS

GENERAL SYMBOLS

CONNECT NEW TO

EXISTING AT THIS POINT

DEMOLISH TO THIS POINT

# KEYNOTE

EQUIPMENT DESIGNATIONDWH-1

PLUMBING FIXTURE

DESIGNATION

P-1

DOMESTIC HOT WATER 120F

SANITARY SEWER (ABOVE SLAB)

SANITARY VENT

SS

V

DOMESTIC HOT WATER (XXXF DENOTES TEMP)

DOMESTIC HOT WATER CIRCULATION

NATURAL GAS

REVERSE OSMOSISRO

DOMESTIC COLD WATER

XXXF

SANITARY SEWER (BELOW GROUND)SS

PIPING

FLOOR SINK

FLOOR DRAIN

ROOF DRAIN

HOSE BIBB AND WALL HYDRANT (PLAN)

LINE CLEANOUT

WALL CLEANOUT

VALVE, SEE

SPECIFICATIONS FOR VALVE

TYPE

CHECK VALVE

TWO WAY CONTROL VALVE

THREE WAY CONTROL VALVE

BALANCING VALVE

SOLENOID CONTROL VALVE

PRESSURE REDUCING VALVE

FLEXIBLE CONNECTION

TEST PLUG

PRESSURE GAUGE

MANUAL AIR VENT

PIPE BREAK

DIRECTION OF FLOW

PIPE UP

PIPE DOWN

PIPE T DOWN

PIPE T UP

PIPE CAP

UNION

REDUCER

PIPE ANCHOR

PIPE GUIDE

STRAINER

STRAINER WITH VALVE

AND HOSE CONNECTION

THERMOMETER OR SIGHT GLASS

PIPE SLOPE

BUTTERFLY VALVE

BALL VALVE

FLOOR, SURFACE & GROUND CLEANOUT

GAS PRESSURE REGULATING VALVE

GAS SHUTOFF VALVE

EARTHQUAKE VALVE

MUD VALVE

1. SOME ABBREVIATIONS AND SYMBOLS SHOWN ON THIS SHEET MAY NOT BE

USED IN THIS DRAWING SET.

2. ISOMETRIC DRAWINGS FOR DOMESTIC WATER AND SANITARY SEWER ARE

DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL

ARRANGEMENT ONLY. CONTRACTOR IS REPOSNIBLE FOR FIELD VERIFICATION,

FIELD ADJUSTMENTS AND COORDINATION WITH ALL OTHER DISCIPLINES. ALL

PIPING SHALL BE INSTALLED PER MANUFACTURERS’ RECOMMENDATIONS,

CONTRACT SPECIFICATIONS/DOCUMENTS, APPLICABLE CODES AND

REGULATIONS.

3. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND

ELEVATIONS OF ALL PLUMBING FIXTURES.

4. ALL PLUMBING WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 2021

INTERNATIONAL PLUMBING CODE WITH AMENDMENTS AND ALL APPLICABLE

LOCAL CODE AND ORDINANCES.

5. UNLESS OTHERWISE NOTED SANITARY AND DRAINAGE PIPING SHALL BE

SLOPED AT A MINIMUM OF 1% UNLESS OTHERWISE PREVENTED BY CODE.

6. TOPS OF ALL FLOOR FIXTURES AND CLEANOUTS SHALL BE SET FLUSH WITH

FINISHED FLOOR.

7. ROUTE ALL CONDENSATE DRAINS TO A FLOOR DRAINS. PROVIDE APPROVED AIR

GAP AND FOLLOW ALL REGULATIONS SET FORTH BY LOCAL CODE.

8. PROVIDE SHOCK ABSORBERS SIZED AND PLACED PER PDI SPECIFICATIONS ON

ALL DOMESTIC WATER LINES SERVING FIXTURES AND OTHER INSTALLATIONS

WITH QUICK CLOSING VALVES. INSTALL PER MANUFACTURER REQUIREMENTS.

9. CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND

REQUIREMENTS OF ALL PLUMBING EQUIPMENT WITH THE ELECTRICAL

DRAWINGS AND THE ELECTRICAL CONTRACTOR, AND SHALL FURNISH

EQUIPMENT WIRED FOR THE VOLTAGES SHOWN THEREIN.

10. ALL PLUMBING EQUIPMENT, PIPING, INSULATION, ETC. INSTALLED IN HVAC

PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND

COMBUSTIBILITY.

11. ALL PIPE PENETRATIONS OF FIRE AND/OR SMOKE RATED ASSEMBLIES SHALL

BE FIRE STOPPED AS REQUIRED TO RESTORE ASSEMBLY TO ORIGINAL

INTEGRITY. FIRE BARRIER PRODUCTS SHALL BE PER SPECIFICATIONS.

12. ALL PACKAGED AND SKID MOUNTED EQUIPMENT SHALL BE SUPPLIED AND

INSTALLED WITH THE NECESSARY TRIM, PIPING, VALVES AND FITTINGS, ETC TO

ENSURE PROPERLY FUNCTIONING EQUIPMENT. ANY DETAILS OR DRAWINGS OF

PACKAGED EQUIPMENT ARE SCHEMATIC AND PROVIDE INTENT FOR BIDDING

PURPOSES AND ARE NOT FULLY DETAILED MANUFACTURER DRAWINGS.

13. WHERE THE MANUFACTURER AND/OR MODEL NUMBER IS LISTED, IT IS

INTENDED TO INDICATE THE "BASIS OF DESIGN" ONLY. IT IS NOT INTENDED TO

LIMIT THE EQUIPMENT PROVIDED TO THAT INDICATED IN THE SCHEDULE. OTHER

MANUFACTURERS OR MODELS OF EQUIPMENT MAY BE PROVIDED. ALL

EQUIPMENT PROVIDED SHALL MEET THE REQUIREMENTS OF THE APPLICABLE

SCHEDULE AND SPECIFICATIONS.

14. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING SYSTEM

BRANCHES IN WHICH BRANCH PIPING SERVES TWO OR MORE FIXTURES.

15. PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE SYSTEMS AT ENDS

OF RUNS, AT CHANGES IN DIRECTION, NEAR THE BASE OF STACKS, EVERY 50

FEET IN HORIZONTAL RUNS AND ELSEWHERE AS INDICATED AND AS REQUIRED

BY INTERNATIONAL PLUMBING CODE.

16. ALL CLEANOUTS SHALL BE FULL SIZE OF PIPE FOR PIPE SIZES 4 INCHES AND

SMALLER AND SHALL BE A MINIMUM OF 4 INCHES FOR PIPE SIZES LARGER THAN

4 INCHES.

17. COORDINATE ALL FLOOR DRAIN AND FLOOR SINK LOCATION AND CLEARANCES

WITH MECHANICAL EQUIPMENT PROVIDED BY MECHANICAL CONTRACTOR

REGARDELSS OF LOCATION SHOWN ON DRAWINGS. THE BASIS OF DESIGN

EQUIPMENT IS NOT NECESSARILY THE EQUIPMENT PURCHASED.

18. ENSURE ALL PLUMBING PIPING IS ROUTED TO NOT GO THROUGH OR INTERFERE

WITH MECHANICAL DUCTWORK AND PIPING.

19. ALL PIPING (EXCEPT FOR NETWORKED PIPING WHERE THE TOTAL COMBINED

WEIGHT IS GREATER THAN 31 POUNDS), EQUIPMENT, DUCTWORK, AND

ACCESSORIES WEIGHING 31 POUNDS OR MORE SHALL BE BRACED BY EITHER

RIGID OR FLEXIBLE SYSTEMS TO RESIST FORCES OF 0.5 TIMES THE EQUIPMENT

WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE WEIGHT IN THE

DOWNWARD DIRECTION IN ACCORDANCE WITH UFC 4-010-01 AND

SPECIFICATION SECTION 23 05 48.00 40.

HOSE BIBB AND WALL HYDRANT (DIAGRAM)

DIELECTRIC UNION

FLANGE

BLIND FLANGE

HB

PLUMBING ABBREVIATIONS PLUMBING SYMBOLS

GAS METERM

GENERAL NOTES

kPA KILOPASCALS kW KILOWATT

LCO LINE CLEANOUT

MA MEDICAL AIR

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MCA MINIMUM CIRCUIT AMPACITY

MIN MINIMUM

N NITROGEN

NC NORMALLY CLOSED

NO NORMALLY OPEN

NTS NOT TO SCALE

O2 OXYGEN

OD OVER FLOW DRAIN

P PUMP

PD PRESSURE DROP

PH PHASE

PRV PRESSURE REDUCING VALVE

PSI POUND PER SQUARE INCH

RD ROOF DRAIN

RH RADIANT HEAT

RO REVERSE OSMOSIS

RPBFP REDUCED PRESSURE BACKFLOW

PREVENTER

RPM REVOLUTIONS PER MINUTE

S.P. STATIC PRESSURE

SD STORM DRAIN

SP SUMP PUMP

SS SANITARY SEWER

ST STORAGE TANK

STD STANDARD

SW SOFT WATER

SBV SEWER BACKWATER VALVE

TDH TOTAL DYNAMIC HEAD

TP TRAP PRIMER

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

V VOLTS

V SANITARY VENT

VA VACUUM

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

W WASTE

WB WATER BOX

WC WATER COLUMN

WCO WALL CLEANOUT

WG WATER GUAGE

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AMPS AMPERES

AS AIR SEPARATOR

AWS AUTOMATIC WATER SOFTENER

B BOILER

B.O.P. BOTTOM OF PIPE

BB BASEBOARD

BD BUILDING DRAIN

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

C COMMON

CA COMPRESSED AIR

CA (OF) COMPRESSED AIR OIL FREE

CD CONDENSATE DRAIN

CF CARBON FILTER

CIRC CIRCULATING

CO CLEANOUT

CP CIRCULATING PUMP

CW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROL

DEG DEGREES

DEG F DEGREES FAHRENHEIT

DF DIESEL FUEL

DHW DOMESTIC HOT WATER

DI DIONIZED WATER

DN DOWN

DWH DOMESTIC HOT WATER HEATER

DXE DOMESTIC HOT WATER HEAT

EXCHANGER

EA EACH

EQV EARTHQUAKE VALVE

ET EXPANSION TANK

EWS EMERGENCY EYE WASH STATION

F FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FFD FUNNEL FLOOR DRAIN

FPM FEET PER MINUTE

G NATURAL GAS

GA GAUGE

GAS GASOLINE

GCO GRADE CLEANOUT

GM GAS METER

GPF GALLONS PER FLUSH

GPM GALLONS PER MINUTE

GPRV NATURAL GAS PRESSURE

REDUCING VALVE

GR GREASE WASTE

HB HOSE BIBB

HD HUB DRAIN

HW DOMESTIC HOT WATER

HWC DOMESTIC HOT WATER,

CIRCULATING

Hz HERTZ

I.E. INVERT ELEVATION

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_P19.rvt

1/6/2022 10:30:39 AM

P-001

FTD

PL

U

M

BI

N G

L

EG

EN

D

A

BB

R

EV

IA

TI

O

N S

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

K.

M cG

LO

TH

LI

N

M . T

AY

LO

R

D . E

LL

ED

G E

F.

G

O M

EZ

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

6:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT TO THE

CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE. ADDITIONAL

LEGENDS AND/OR OTHER LEGENDS MAY APPEAR IN THIS SET OF DRAWINGS TO INDICATE

SPECIFIC CONDITIONS IN LIEU OF SYMBOLS SHOWN.

2. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE

DRAWINGS, AS SPECIFIED AND AS REQUIRED BY APPLICABLE CODES AND REGULATIONS.

3. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE

PROTECTION) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL

ARRANGEMENT ONLY. THE DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED

DUCT, PIPE, OFFSET, FITTING, TRANSITION, ETC. REGARDLESS HOW INDICATED, THE

CONTRACTOR SHALL COORDINATE THE PIPING, DUCTWORK AND EQUIPMENT LOCATIONS

AND ROUTES IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS

REQUIRED TO PROVIDE SERVICE AND MAINTENANCE CLEARANCE. PROVIDE ITEMS NOT

SPECIFICALLY MENTIONED IN SPECIFICATIONS OR NOTED ON THE DRAWINGS, BUT WHICH

ARE NECESSARY TO MAKE A COMPLETE AND OPERATIONAL WORKING INSTALLATION.

PROVIDE ALTERNATE PIPING ROUTES, DUCTWORK ROUTES, ADDITIONAL OFFSETS AND/OR

FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING.

4. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED

DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED

FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT.

5. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE

CODES AND REGULATIONS. PROVIDE PROPER UTILITIES AND FINAL CONNECTIONS PER

MANUFACTURER'S RECOMMENDATIONS. FINAL CONNECTION SHALL INCLUDE ANY

ADAPTERS, NIPPLES, SHUTOFF VALVES, PRESSURE REGULATING VALVES, DIRT LEGS,

SHOCK ABSORBERS, BACKFLOW PREVENTION DEVICES, ETC., AS REQUIRED TO PROVIDE

A FULLY OPERATIONAL SYSTEM. CONNECT ALL EQUIPMENT DRAINS FULL SIZE TO HUB

AND/OR FLOOR DRAIN WITH MINIMUM 1 INCH GAP FOR INDIRECT CONNECTION, UNLESS

OTHERWISE NOTED.

6. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT

TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE. PROVIDE VIBRATION ISOLATORS

FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50 FEET OF ISOLATED

EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS) THROUGHOUT

MECHANICAL EQUIPMENT ROOMS.

7. THE LOCATION OF EXISTING UTILITIES SHOWN IS AN APPROXIMATION ONLY. THE

CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES

BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PAY FOR AND REPAIR ALL

DAMAGES CAUSED BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL

UTILITIES UNLESS OTHERWISE INDICATED. IF IT BECOMES NECESSARY DURING

DEMOLITION TO TEMPORARILY REMOVE ANY EQUIPMENT, PIPING, ETC. WHICH IS NOT

SPECIFICALLY NOTED TO BE REMOVED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT

FOR FUTURE USE), REINSTALL SAID SYSTEMS TO FULLY OPERABLE CONDITION IN THEIR

ORIGINAL LOCATIONS.

8. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, FIRE PROTECTION, ETC.) IS

SUBCONTRACTED, IT SHALL BE THE GENERAL CONTRACTOR’S RESPONSIBILITY TO

COORDINATE SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN

DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR

ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL

CONNECTIONS FOR A PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE

BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR, WHOSE DECISION SHALL

BE FINAL.

9. MECHANICAL PLANS INDICATE ONLY THE APPROXIMATE LOCATION OF ARCHITECTURAL,

INTERIOR, FURNISHINGS, ELECTRICAL, MECHANICAL AND OTHER EQUIPMENT, AS WELL AS

THE RELATED MECHANICAL REQUIREMENTS NECESSARY TO SUPPORT AND ACCESS SUCH

EQUIPMENT. THE FINAL POSITIONING OF THESE ITEMS IS DEPENDENT UPON THE

EQUIPMENT PROVIDED BY CONTRACTOR IN ACCORDANCE WITH ALL RELEVANT BUILDING

CODES AND MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK BETWEEN

SUBCONTRACTORS AND CRAFTS IN THIS REGARD, AND PROVIDING NECESSARY SPACE

ALLOCATION AND DIMENSIONS IN A TIMELY MANNER TO ALL PARTIES INVOLVED TO

ENSURE PROPER COORDINATION.

10. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,

STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT

DRAWINGS.

11. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING

INSULATION IS APPLIED.

12. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP- AND DOWNSTREAM AS

RECOMMENDED BY THE MANUFACTURER. EXTEND PROBES AND SENSING APPARATUS AS

NEEDED TO ACCOMMODATE PIPE AND DUCT INSULATION AND/OR COVERING.

13. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED

AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU

(NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN ACCORDANCE

WITH THE AABC OR NEBB STANDARDS.

14. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE

PRODUCT OF ONE MANUFACTURER SHALL BE USED, UNLESS SPECIFICALLY NOTED ON

DRAWINGS SCHEDULES.

15. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE

FABRICATION.

16. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND

LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS

SHALL BE 6 INCHES. PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 6 INCHES

ON EACH SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL

CONTRACTOR. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO

COORDINATE SIZE AND LOCATION OF CONCRETE HOUSEKEEPING PADS WITH GENERAL

CONTRACTOR.

17. REFER TO STRUCTURAL DRAWINGS FOR INFORMATION ON EXTERIOR CONCRETE

HOUSEKEEPING PADS.

18. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL

CONTRACTOR SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.

ROOF CURBS SHALL HAVE A MINIMUM HEIGHT ABOVE ROOF OF 14”, UNLESS OTHERWISE

NOTED.

19. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS

SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE

NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.

20. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL

BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR

JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM

CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE

PERMITTED.

21. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE

COORDINATED WITH ALL OTHER TRADES INVOLVED. IT IS REQUIRED THAT THE

CONTRACTOR PHYSICALLY MEASURE ALL EXISTING OPENINGS AND DIMENSIONS BEFORE

ORDERING ANY EQUIPMENT.

22. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE

STOPPED WITH A PRODUCT SIMILAR TO 3M FIRE BARRIER SEALANT CP 25WB OR

APPROVED EQUAL. ALL OPENINGS ON FIRE WALLS SHALL BE PROVIDED WITH FIRE

DAMPER SUITABLE FOR THE WALL RATING AS REQUIRED BY INTERNATIONAL MECHANICAL

CODE AND NFPA 90A.

23. ALL STRUCTURAL PENETRATIONS (SLEEVES, BLOCKOUTS, ETC.) ARE TO BE LOCATED AND

COORDINATED IN THE FIELD IN RELATION TO THE REQUIREMENTS OF FINAL EQUIPMENT

AND FIXTURES SELECTED.

24. INTERIOR DUCT DIMENSIONS ARE SHOWN. EXTERIOR DUCT DIMENSIONS SHALL BE

LARGER TO ACCOMMODATE ACOUSTICAL DUCT LINER AS NEEDED.

25. ALL FLEXIBLE DUCT RUN-OUTS SHALL BE FACTORY PRE-INSULATED, NO LONGER THAN

5'-0".

26. ALL MITERED SHEET METAL ELBOWS IN SUPPLY DUCTWORK SHALL BE CONSTRUCTED

WITH AIRFOIL TURNING VANES.

27. ROUND DUCT SIZES TO DIFFUSERS SHALL BE THE SAME SIZE AS THE DIFFUSER NECK.

28. ACCESS DOORS SHALL BE PROVIDED IN THE DUCTWORK AT ALL AIR FLOW MEASURING

DEVICES, AUTOMATIC DAMPERS, FIRE DAMPERS, COILS, THERMOSTATS AND ANY OTHER

APPARATUS REQUIRING SERVICE AND INSPECTION. ENSURE ACCESS DOORS CAN BE

FULLY OPENED WITHOUT CONFLICTS AND ARE LARGE ENOUGH TO SERVICE THE ITEMS

BEHIND THE DOOR.

29. ALL MANUAL VOLUME CONTROL DAMPERS LOCATED ABOVE GYPBOARD CEILING OR

GYPBOARD CORRIDOR CAP SHALL INCLUDE RACK AND PINION CABLE CONTROL

ADJUSTMENT SYSTEM SO AS TO BE ADJUSTABLE WITH A SOCKET WRENCH FROM BELOW.

COORDINATE CEILING LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

30. ALL MECHANICAL EQUIPMENT REQUIRING MAINTENANCE ACCESS SHALL BE PROVIDED

WITH MEANS OF ACCESS AS REQUIRED BY INTERNATIONAL MECHANICAL CODE, WHETHER

OR NOT SUCH PROVISION (SUCH AS AN ACCESS PANEL) IS SHOWN ON THE DRAWINGS. IN

ADDITION, VERIFY MANUFACTURER REQUIRED CLEARANCES ARE MAINTAINED.

COORDINATE WITH ARCHITECTURAL DISCIPLINE AS REQUIRED.

31. ALL EQUIPMENT, VALVES, FANS AND DAMPERS INSTALL ABOVE CEILINGS SHALL BE

ACCESSIBLE AND MEET MANUFACTURER'S CLEARANCE REQUIREMENTS FOR SERVICE AND

COIL PULL. COORDINATE ALL ACCESS PANELS IN CEILINGS OR WALLS WITH

ARCHITECTURAL DRAWINGS FOR PROPER INSTALLATION.

32. SEE PLUMBING PLANS FOR CONDENSATE DRAIN PIPING. COORDINATE SIZE AND ROUTING

WITH EQUIPMENT INSTALLED.

33. COORDINATE FINAL GRILLE, REGISTER AND DIFFUSER LAYOUT WITH ARCHITECTURAL

REFLECTED CEILING PLANS.

34. ALL PIPING, EQUIPMENT OR PORTIONS OF DUCTWORK VISIBLE THROUGH CEILING SLOTS,

GRILLES OR DIFFUSERS IN FINISHED AREAS SHALL BE PAINTED FLAT BLACK.

35. ALL DIFFUSERS INSTALLED IN LAY-IN CEILINGS SHALL BE FOUR-WAY PATTERN UNLESS

NOTED OTHERWISE. IN ALL CEILING DIFFUSERS IN CORRIDOR CEILINGS PROVIDE TWO-

WAY DIFFUSERS WITH BLOW PARALLEL TO WALL SURFACE. FOR CEILING DIFFUSERS

WITHIN THREE FEET OF THE WALL, OMIT FLOW VANES DISCHARGING TOWARDS THE

WALL(S).

36. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE

AND DIVISION 26 OF THE SPECIFICATIONS.

37. ALL WIRING INSTALLED IN RETURN AIR PLENUMS SHALL BE PLENUM RATED CABLE PER

NFPA-70 OR SHALL BE INSTALLED IN METALLIC CONDUIT.

38. COORDINATE VOLTAGE AND PHASE OF ALL MECHANICAL EQUIPMENT WITH ELECTRICAL,

THE ELECTRICAL CONTRACTOR AND THE ELECTRICAL CONTRACT DOCUMENTS PRIOR TO

PURCHASE OF ANY EQUIPMENT.

39. DO NOT RUN PIPING THROUGH THE COMMUNICATIONS ROOM OR OVER ELECTRICAL

GEAR.

40. COORDINATE LOCATIONS OF ALL VARIABLE FREQUENCY DRIVES WITH ELECTRICAL

CONTRACTOR.

41. ALL VFD MOTORS SHALL HAVE FACTORY INSTALLED SHAFT GROUNDING RINGS, IF

FACTORY INSTALLATION IS NOT AN OPTION THEN SHAFT GROUNDING RINGS SHALL BE

PROVIDED AND FIELD INSTALLED.

42. PROVIDE SHUT-OFF AND BALANCING VALVES FOR ALL PIECES OF EQUIPMENT. PROVIDE

SHUT-OFF VALVES AT BRANCHES AND EQUIPMENT.

43. PROVIDE BALANCING DAMPERS AT ALL BRANCHES AND EACH INLET/OUTLET FOR ALL

SUPPLY AND EXHAUST DUCT SYSTEMS, EXCEPT AS NOTED OR PROHIBITED BY THE

INTERNATIONAL MECHANICAL CODE.

44. ALL ELEVATION CHANGES IN HYDRONIC PIPING WILL REQUIRE AIR VENTS, EVEN IF THEY

ARE NOT SHOWN IN SECTION VIEWS.

45. ALLOW FOR EXPANSION/CONTRACTION OF PIPING IN INSTALLATION. PROVIDE EXPANSION

LOOPS AS NEEDED. PIPE CONNECTIONS SHALL BE BY FLANGES OR UNIONS. PIPING TO

VIBRATING EQUIPMENT SHALL HAVE A FLEXIBLE CONNECTOR. PROVIDE EXPANSION

LOOPS WHERE PIPING PASSES ACROSS BUILDING EXPANSION JOINTS.

46. UNLESS OTHERWISE NOTED, HYDRONIC BRANCHES TO EQUIPMENT SHALL BE SIZED TO

MATCH THE EQUIPMENT CONNECTION SIZE OR A MINIMUM 3/4", WHICHEVER IS LARGER.

47. ANY GLYCOL TO BE USED SHALL BE OF FOOD GRADE OR BETTER.

48. ALL PIPING (EXCEPT FOR NETWORKED PIPING WHERE THE TOTAL COMBINED WEIGHT IS

GREATER THAN 31 POUNDS), EQUIPMENT, DUCTWORK, AND ACCESSORIES WEIGHING 31

POUNDS OR MORE SHALL BE BRACED BY EITHER RIGID OR FLEXIBLE SYSTEMS TO RESIST

FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5

TIMES THE WEIGHT IN THE DOWNWARD DIRECTION IN ACCORDANCE WITH UFC 4-010-01

AND SPECIFICATION SECTION 23 05 48.00 40.

GENERAL MECHANICAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_M19.rvt

1/6/2022 10:31:07 AM

M-003

FTD

M

EC

H

AN

IC

AL

G

EN

ER

AL

N O

TE

S

B-

: F

IE

LD

T

R

AI

N

IN

G D

ET

AC

H M

EN

T

(F

TD

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

EN

U

E, S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

M . B

U

SB

Y

D . W

H

IT

AK

ER

D . E

LL

ED

G E

K.

B

R

ES

LI

N

N O

VE

M

BE

R

W

F2

1R

ADVERTISEMENT - 100% DESIGN

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

PR

O

JE

C T

N U

M

BE

R : F

XB

M

AM

- 0

3:

0 0

D

ES

IG

N

IS

S U

ED

F

O R

P R

IC

IN

G

/2

AM

- 0

4:

0 0

D

ES

IG

N

IS

S U

ED

F O

R P

R

IC

IN

G

/2

C

C

C C

C

C C

C C

C

C C

C C

C C

C

C

C

C C

C

C

C

C

C

C

C

C

C

JJ

J

JJ

C C

C

C

C

J

J

J

J J

J

J

J

J

J

J

J

J

J

J

J

J

JJ

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

CB

C C

J

J J J

J J

J

J

C

J

T-TR3

TR3

WP

A B

GFEDC

WSTA

EP403

E3

DE-ICING TRAINER

MTF INSTRUCTORS

AND MANAGERS

WOMEN VESTIBULE

MEN VESTIBULE

LOBBY

VESTIBULE

STORAGE

WOMEN

MEN

WOMEN VESTIBULE

MEN VESTIBULE

COMM

COMPUTER LAB

MASS BRIEFING

ROOM

STAIR

CLASSROOM

CLASSROOM

L2- 22

L4A- 13

L4A- 12

L4A- 9

L4A- 7

L4A- 10

L4A- 9 L4A- 10 L4A- 11

L4A- 14L4A- 14

L4A- 8

L4A- 7

L4A- 8

L4A- 4

L4A- 4

L4A- 6

L4A- 2

L4A- 3

L4A- 3 L4A- 1

L2- 22

L2- 22

L4A- 16

L4A- 16

L4- 3

L2- 22

L4- 18 L4A- 16

L4A- 16

L4- 1 L4- 29L4- 29

L4- 2

L4- 1

L4- 3

L4- 5

L4- 6 L4- 10 L4- 8

L4- 7L4- 6L4- 10

L4- 4

L4- 7 L4- 8 L4- 9

L4- 9

L4- 5

L4- 4 L4- 11

L4- 12

L4- 14 L4- 17

L4- 13 L4- 14 L4- 15

L4- 11

L4- 12

L4- 16L4- 15

L4- 16 L4- 17 L4- 13

L4- 19

L4- 22 L4- 23 L4- 24 L4- 25

L4- 25L4- 23

L4- 3L4- 19

L4- 22

L4- 26 L4- 27

L4- 26

L4- 28

3+1 CKT

L4A- 27,29,31

L4A- 33

2 CKT

L2- 26,28

3+1 CKT

L2- 19,21,23

L2- 25

L1- 15

L4A- 22

L4A- 21

L4A- 20

L4A- 23

L4A- 25 L4A- 22

L4A- 21

L2- 17

L2- 14

L2- 13

L2- 13

L2- 13

L2- 6

L4- 3

L2- 10

L2- 10

L2- 12

L4A- 24

WP

L4- 18

L4- 24

L4- 27

L2- 16

L2- 15

L2- 16

L4A- 26

L4- 3

L4A- 1

L4A- 11 L4A- 12

L4A- 2

L2- 14

L4A- 18

M A

T C

H L

IN

E E

P

M A

T C

H L

IN

E E

P

VAV-1N-5

VAV-1S-5

VAV-1S-7

VAV-1S-4

VAV-1S-3

VAV-1S-1

MTF CHIEF

CORRIDOR

TESTING

MTF NCOIC/DOI

VAV-1N-4VAV-1N-3VAV-1N-2

VAV-1N-1

L2- 18

L2- 18

L2- 18

L2- 18

L2- 18

L2- 18

L2- 18

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L2- 20

L1- 12 L1- 12

L1- 12

L1- 12

L1- 12

L1- 12

L1- 12 L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

L1- 10

VAV-1S-2

VAV-1N-6

JAN

MEN

WOMEN

CONFERENCE

MEETING

116 CORRIDOR

JAN

BREAK ROOM

CORRIDOR

SECURE

PERSONNEL

VESTIBULE

L4- 2

L4- 1

L4A- 17

L4A- 19 L1- 25

L1- 23

L1- 27 L1- 29

L1- 26 L1- 28

L1- 24

L1- 22

1 1

LACTATION ROOM

MACHINE ROOM

FCU-2

DCU-3

DCU-8

TR3A

VAV-1S-6

L4- 18

L2- 24

L2- 6

L4A- 13

L4A- 5

+65" L4A- 15

L2- 18

L4A- 30

L4A- 32

L4A- 28

+84"

+89"

+89"

L4A- 34

L4A- 34

L4A- 35

+60" +60"

+60" +60"

L4- 30 L4- 32

+84" +84"

+60"

+84"

L4- 31

L4- 31

+89"

+89"

+60"+60" L4A- 5

L4A- 6

+60" L2- 24

ALCOVE

107 SECURITY

VESTIBULE

L4A- 36

L4A- 36

UH-7 UH-8

4 4

4 4 4

4 4 4

L2- 32

L2- 30

UH-12

4 4

L4- 7 L4- 10 L4- 6 L4- 15 L4- 16 L4- 17 L4- 19

L4- 21

L4- 21

L4- 21

2'-7" AFF2'-7" AFF

+84"

L2- 22

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:25

EP101

FTD

E L E

C T

R

IC

A L P

O W

E R

F

IR

S T

F L O

O R

P L A

N

A R

E A

A

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

J O

A K

E S

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

NORTH

0 2' 4' 8' 16'1/8" = 1'-0"A1

ELECTRICAL POWER FIRST FLOOR PLAN - AREA A

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD 705.

7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF

SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER

TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER

ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS

PENETRATING THESE PERIMETER WALLS. CONCEAL

RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE

PURPOSE OF ROUTING UTILITIES.

8. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION

AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED

WITH OTHER TRADES.

11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND

CABLING REQUIREMENTS.

1. JUNCTION BOX FOR POWER TO SOLENOID FOR

PLUMBING FIXTURE.

2. JUNCTION BOX FOR POWER TO HAND DRYER,

COORDINATE MOUNTING HEIGHT WITH EQUIPMENT.

3. POWER CONNECTION FOR ADA MOTORIZED DOOR

OPERATOR.

4. RECEPTACLES MOUNTED IN ONE SIDE OF FIRE-RATED

FLOOR BOX, FSR CAT. NO. FL-200-3 WITH FL-200-BSQ-C

U-ACCESS COVER, OR APPROVED EQUAL.

SHEET KEYNOTES

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

C

J

C

C

C

C C

C

C

C

J

T

C B

J

C

J

CB

C B

MD

MD

J J

L3

T-TR2

TR6

3+1 CKT

WP

WP

PNMLKJI

CLS PARTS

STORAGE

SECURITY SUITE

PRIVATE OFFICE

STAIR

COCKPIT PART

TASK TRAINER

CPTT SERVER

ROOM

TOOL CRIB

COMM

CORRIDOR

EP403

E1

RCP-1

L3- 15

L3- 17

L1- 37 L3- 12

L1- 11

L3- 12

L3- 8

L3- 9

L1- 11

L2- 8

L3- 15

L3- 8 L3- 8

L3- 10

L1- 15

L3- 13L3- 17

TR5

T-TR5

L2- 4

L2- 4

L2- 8

L2- 4

L2- 10

L3- 1,3,5 L3- 7

L2- 8

TR2

L1- 15

M A

T C

H L

IN

E E

P

MATCHLINE EP103

M A

T C

H L

IN

E E

P

MATCHLINE EP103

VAV-1S-9

CRAC-2

CRAC-1

VAV-1S-8

VAV-1S-10

JAN

SECURE CLOSET

CORRIDOR

DSS-1

COMM

TR2A

EP403

B1

L3- 11

L3- 13

SECURITY SUITE

OPEN OFFICE

3 CKT

L3- 9

L3- 10

L3- 2,4,6

CCU-1 CCU-2

WP

L1- 15

2 3

EP402

E1

UH-13

STAIR

139 CORRIDOR

CORRIDOR

CLS PARTS

STORAGE

CORRIDOR

SECURITY

VESTIBULE

SECURITY

VESTIBULE

T-TR6

T-L3

L1A- 20

L1A- 20

L1A- 20

DCU-1

+60"

DCU-2

DCU-4

DC-1

CH-1

NOTE: REFER TO

SITE PLAN FOR EXACT

LOCATION WITH

RESPECT TO

BUILDING.

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:26

EP102

FTD

E L E

C T

R

IC

A L P

O W

E R

F

IR

S T

F L O

O R

P L A

N

A R

E A

B

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

J O

A K

E S

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

1/8" = 1'-0"A2

ELECTRICAL POWER FIRST FLOOR PLAN - AREA B

NORTH

0 2' 4' 8' 16'

1/8" = 1'-0"F1

ENLARGED MECH EQUIPMENT PLAN

NORTH

0 2' 4' 8' 16'

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD 705.

7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF

SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER

TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER

ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS

PENETRATING THESE PERIMETER WALLS. CONCEAL

RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE

PURPOSE OF ROUTING UTILITIES.

8. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION

AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED

WITH OTHER TRADES.

11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND

CABLING REQUIREMENTS.

C7

EP402

SHEET KEYNOTES

1. POWER FOR EYEWASH/ALARM.

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

C C

C

CC

C C

C C

C C

CC

C

C

C

C C

CC

C

C

C

C

C

T

CB

CB

J

J

C

J

JJ

CBF

J

J

J

J

J

J

J

J

C B

H3

H1

L1

H2

L2

MDSB

TR1

T-TR1

T-L4

L4

H5

T-L5

L5

WP

EP401

B1

EP402

A1

SRQPNMLKJI

VIRTUAL

MAINTENANCE

TRAINER

MECHANICAL

T-TR4

L5- 1 L5- 3 L5- 1

L5- 9

L5- 8

L5- 2

L5- 4L5- 5

L5- 4

L5- 5

L3- 10

L5- 9 L5- 8

L5- 7

L5- 6

L5- 7L5- 6

L1- 9

L5- 10 L1- 1 L1- 2

L1- 1

L1- 5

L1- 3

L1- 19

L1- 4

L1- 1

L1- 2

L1- 6

L1- 5

L1- 7

L1- 6

L1- 8

L1- 8

WP

WP

L1- 19

L1- 21

L1- 20

EP403

E7

L1- 21

L5- 2

M A

T C

H L

IN

E E

P

MATCHLINE EP102

MATCHLINE EP102

TR4

TR4A

JAN

CORRIDOR

COMM

CORRIDOR

MACHINE ROOM

148 ELEVATOR

MAIN COMM

CORRIDOR

ELEC

EGRESS TRAINER

STAIR

ELEC

ENGINE PART TASK

TRAINER

LANDING GEAR

TRAINER

VAV-2E-2

LCP1

RCP2

RCP1

L1- 14

L3- 11

L4A

L1- 3

L1- 6

+60"

+60"

+60" L5- 2

L5- 1

L5- 8

+60"

L1- 14

L5- 11L5- 11

MPC FP

FCU-1

2 3

CORRIDOR

SECURITY

VESTIBULE

L1A

L1- 19 +60"

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:28

EP103

FTD

E L E

C T

R

IC

A L P

O W

E R

F

IR

S T

F L O

O R

P L A

N

A R

E A

C

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

J O

A K

E S

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

1/8" = 1'-0"A1

ELECTRICAL POWER FIRST FLOOR PLAN - AREA C

NORTH

0 2' 4' 8' 16'

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD 705.

7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF

SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER

TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER

ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS

PENETRATING THESE PERIMETER WALLS. CONCEAL

RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE

PURPOSE OF ROUTING UTILITIES.

8. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION

AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED

WITH OTHER TRADES.

11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND

CABLING REQUIREMENTS.

SHEET KEYNOTES

1. POWER FOR EYEWASH/ALARM.

2. SAFETY SWITCH FOR ELEVATOR CAB FAN AND LIGHTING.

3. ENCLOSED SHUNT TRIP CIRCUIT BREAKER FOR

ELEVATOR CONTROLLER.

4. CONNECT SUMP PUMP TO THIS RECEPTACLE.

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

C

C

C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

JJ J

J JJ J

J

JJ

C

C

J

J

C

J

JJ

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

T

T

C B

J J

J

J

C

C

C

C C

C

L9

COMPUTER

SUPPORT

AETC INSTRUCTOR

OPEN OFFICE

AETC CLASSROOM

227 AETC CLASSROOM

AETC CLASSROOM

MEN

CORRIDOR

AETC CLASSROOM

AETC LEADERSHIP

ADMIN

AETC CLASSROOM

A B

GFEDC

3+1 CKT

3 CKT

L9A- 24

L9A- 18,20,22

L9A- 12,14,16

3+1 CKT3+1 CKT

L9A- 25 L9A- 33

L9A- 27,29,31 L9A- 19,21,23

3 CKT

L9A- 26,28,30

3+1 CKT

L9A- 7 L9A- 1,3,5

L7- 28

L7- 28

L7- 27 L7- 27

L9- 9

L9- 30 L9- 26 L9- 28

L7- 28

L8- 26

L7- 26

L7- 26 L7- 25

L7- 26

L7- 24L7- 20 L7- 21

L7- 19 L7- 19

L7- 21

L7- 21

L7- 24

L7- 23

L7- 23 L7- 22

L7- 24

L7- 26

L8- 6

L8- 3

L8- 3

L8- 3

L9A- 34

L9- 21

L9- 22

L9- 20

L9A- 36

L9- 31 L9- 33 L9- 35

L9- 29

L9- 30

L9- 32

L9- 16

L9- 17

L9- 19

L9- 14

L9- 14

L9- 10

L9- 11

L9- 15

L9- 8

L9- 6L9- 5

L9- 7

L9- 6 L9- 5

L9- 3

L9- 4

L9- 3

L9- 1 L9- 2

L9- 2

CORRIDOR

L9A- 9

L9- 9

L9A- 10

L9A- 17

L9- 9L9A- 13

L9A- 9

L9A- 15

L9A- 17

L9A- 10

L9A- 2,4

L9A- 6,8

TR7

L9- 9

CS STORAGE

L7- 20 L7- 22

L9- 10

WOMEN

WOMEN VESTIBULE

MEN VESTIBULE

EP403

B3

L7- 28

L7- 25

L9A- 10

STORAGE

TRAINING SYSTEMS

SUPPORT CENTER

COMM

CONFERENCE

STAIR

AETC CHIEF

VAV-2S-1

VAV-2S-2

VAV-2S-4

VAV-2S-3

VAV-2S-6

VAV-2N-1 VAV-2N-2

VAV-2N-3

VAV-2N-4

VAV-2N-5

L8- 27

L8- 27

L8- 27

L8- 27

L8- 27

L8- 27

L8- 27

L8- 29

L8- 29

L8- 29

L8- 29

L8- 29

L8- 29

L8- 29 L8- 29

L8- 29

L8- 29

L8- 29

L8- 29

L8- 4 L8- 2 L8- 1

L8- 5

TR7A

AVIONICS TRAINING

AREA

WSTA

WSTA

LCMS / LMS BACKUP

SERVER

L9A- 13

L9A

RCP5

2 CKT

2 CKT

L9A- 11

L9A- 11

L9A- 15

L9- 1

L9- 4

+60"

L9- 8

L9- 13 L9- 11 L9- 13

L9- 15 L9A- 32

L9- 20

L9- 21

L9- 24

L9- 23

L9- 32

L9- 29

L9- 29

+60"

+60"

+60"

+60"

+60"

+60" +60"

+60"

EF-7

3 3 3 3

UH-14

EP402

A6

CORRIDOR

CORRIDOR

AETC CLASSROOM

+60"

L9- 8

+60"

LV-8

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:31

EP104

FTD

E L E

C T

R

IC

A L P

O W

E R

S E

C O

N D

F L O

O R

P L A

N

A R

E A

A

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

K U

R E

N D

A

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

NORTH

0 2' 4' 8' 16'1/8" = 1'-0"B1

ELECTRICAL POWER SECOND FLOOR PLAN - AREA A

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD 705.

7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF

SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER

TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER

ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS

PENETRATING THESE PERIMETER WALLS. CONCEAL

RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE

PURPOSE OF ROUTING UTILITIES.

8. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION

AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED

WITH OTHER TRADES.

11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND

CABLING REQUIREMENTS.

1. JUNCTION BOX FOR POWER TO SOLENOID FOR

PLUMBING FIXTURE.

2. JUNCTION BOX FOR POWER TO HAND DRYER,

COORDINATE MOUNTING HEIGHT WITH EQUIPMENT.

3. RECEPTACLES MOUNTED IN ONE SIDE OF FIRE-

RATED FLOOR BOX, FSR CAT. NO. FL-200-3 WITH

FL-200-BSQ-C U-ACCESS COVER, OR APPROVED

EQUAL.

SHEET KEYNOTES

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

6 6 6 6 6

CC

CC

C

C

C C

C

C C

C C

C

CC

C

C

C C

C C

C

J

T

T C B

C

C

J J

J

COMM

WSTA

WSTA

WSTA

WSTA

WSTA

WSTA

MECH

STAIR

CLASSROOM

STAIR

JAN

STOR

STORAGE

EP401

B4

PNMLKJI

L8- 3

L6- 9

L6- 11

L6- 14

L6- 15 L6- 16

L6- 16

L6- 16

L7- 1

L6- 4 L6- 10

L6- 4

L6- 10

L6- 4L6- 2L6- 2

L6- 10

L6- 8 L6- 12

L6- 8

L6- 12

L6- 6 L6- 6L6- 8

L6- 12

CORRIDOR

CORRIDOR

L7- 3 L7- 4

L7- 4

L7- 2 L7- 2L7- 3

L7- 4

L7- 3 L7- 6

L7- 7

L7- 1

L7- 6

L7- 7

L7- 1

L7- 13

L7- 12

L7- 10

L7- 9

L7- 10

L7- 9 L7- 8 L7- 8

L7- 10

L7- 9

L7- 13

L7- 12

L7- 13

L7- 12

L7- 11

L7- 11

L7- 15

L7- 16

L7- 1

L7- 15 L7- 16

L7- 14

L7- 14

L7- 16

L7- 1

L7- 15

EP403

B6

CORRIDOR

L6- 13

MATCHLINE EP106

MATCHLINE EP106

M A

T C

H L

IN

E E

P

VAV-2S-8

VAV-2S-7

VAV-2S-9

VAV-2S-10

VAV-2S-12

VAV-2S-11

L7- 7

L7- 31 L7- 6 L7- 31

L8- 29 +89"

L6- 17

L6- 17

+89"

BREAK

+60"

+60"

+60"

+60"

+60"

+60"+60"+60"

L7- 36 L7- 34

L7- 32

L7- 32

L7- 36

L7- 34

1 1 1

UH-15

CORRIDOR

WSTA

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:33

EP105

FTD

E L E

C T

R

IC

A L P

O W

E R

S E

C O

N D

F L O

O R

P L A

N

A R

E A

B

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

K U

R E

N D

A

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

NORTH

0 2' 4' 8' 16'1/8" = 1'-0"B2

ELECTRICAL POWER SECOND FLOOR PLAN - AREA B

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD 705.

7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF

SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER

TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER

ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS

PENETRATING THESE PERIMETER WALLS. CONCEAL

RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE

PURPOSE OF ROUTING UTILITIES.

8. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION

AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED

WITH OTHER TRADES.

11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND

CABLING REQUIREMENTS.

1. RECEPTACLES MOUNTED IN ONE SIDE OF FIRE-RATED

FLOOR BOX, FSR CAT. NO. FL-200-3 WITH FL-200-BSQ-C

U-ACCESS COVER, OR APPROVED EQUAL.

SHEET KEYNOTES

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

6 6 6 6

B

C B

J

J

J

J

ELEC

MECHANICAL

STOR

COMM

H7

T-L7

L7

H8

T-L8

L8

T-L9

T-L6

EP402

A4

STAIR

STORAGE

ALCOVE

EP401

B7

SRQPNMLKJI

H6

L7- 18

L7- 18

L7- 18

CORRIDOR

L8- 26

L8- 26 L7- 1

L7- 1

EP403

B8

L6

M A

T C

H L

IN

E E

P

M A

T C

H L

IN

E E

P

MATCHLINE EP105

MATCHLINE EP105

VAV-2S-7

VAV-2E-1D

VAV-2E-1C

VAV-2E-1B

VAV-2E-1A

VAV-2E-4

VAV-2E-3

VAV-2E-5D

VAV-2E-5C

VAV-2E-5B

VAV-2E-5A

VAV-2N-6

T-L1

T-L2

RCP3

RCP4

LCP2

L7- 18

UH-16

CORRIDOR

A

KEY PLAN

B

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:34

EP106

FTD

E L E

C T

R

IC

A L P

O W

E R

S E

C O

N D

F L O

O R

P L A

N

A R

E A

C

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

K U

R E

N D

A

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

NORTH

0 2' 4' 8' 16'1/8" = 1'-0"A1

ELECTRICAL POWER SECOND FLOOR PLAN - AREA C

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD 705.

7. CONDUIT AND DEVICES ON THE PERIMETER WALLS OF

SECURE AREAS SHALL BE SURFACE MOUNTED IN ORDER

TO MAINTAIN THE INTEGRITY OF THE SECURE AREA PER

ICD 705. REFER TO DETAIL E1/EP501 FOR CONDUITS

PENETRATING THESE PERIMETER WALLS. CONCEAL

RACEWAYS WHERE WALLS ARE FURRED OUT FOR THE

PURPOSE OF ROUTING UTILITIES.

8. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

9. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

10. COORDINATE RECEPTACLE/JUNCTION BOX LOCATION

AND FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED

WITH OTHER TRADES.

11. REFER TO A/V SHEETS FOR ADDITIONAL RACEWAY AND

CABLING REQUIREMENTS.

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

6 6 6 6

6 6

6 6 6 6

6 6

J

J

J

J

J

J

J

J

C B

J

J

J

J

J

J

J

MECHANICAL

TR1T-TR1

JI

TR1- 5

TR1- 4

TR1- 2

TR1- 3TR1- 1

TR1- 6,8

TR1- 7,9

TR1- 10,12 TR1- 15,17

L1- 18

L1- 17

L1- 18

L1- 17

TR1- 14,16

TR1- 11,13

DCU-7

DCU-6

DCU-5

EF-1

HWP-1

HWP-2

CHWP-2

CHWP-1

B-2

B-1

AHU-1N

AHU-1S

UH-2

DSS-7

MAIN COMM

TR1- 18

TR1- 23

TR1- 20

TR1- 24

TR1- 22

TR1- 25

UH-1

1 4

L1A- 3 L1A- 1

L1A- 4

L1A- 2

L1A- 6

L1A- 8

L1A- 5

L1A- 7

LV-1

MECH

PN

L7- 29

L7- 29

L7- 29

L7- 29

UH-6

DOAS-1

AHU-2S

UH-5

EF-3

RO-1

L1A- 14

L1A- 12

L1A- 13

LV-7

LV-6

MECHANICAL

JI

L6- 3

L6- 1

L6- 3

L6- 1

UH-4

AHU-2E

EF-2

UH-3

AHU-2N

L1A- 16

L1A- 18

L1A- 19

L1A- 17

LV-4

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:35

EP401

FTD

E L E

C T

R

IC

A L P

O W

E R

E N

L A

R G

E D

P L A

N S

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

K U

R E

N D

A

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

1/4" = 1'-0"B1

ENLARGED MECHANICAL RM 173

AND COMM RM 172

NORTH

0 1' 2' 4' 8' 1/4" = 1'-0"B4

ENLARGED MECHANICAL RM 216

1/4" = 1'-0"B7

ENLARGED MECHANICAL RM 221

NORTH NORTH

0 1' 2' 4' 8' 0 1' 2' 4' 8'

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD705.

7. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

8. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

9. TRANSFORMERS INSTALLED IN TELECOMMUNICATIONS

ROOMS SHALL BE INSTALLED SO AS TO MAINTAIN A

MINIMUM DISTANCE OF 4'-0" FROM

TELECOMMUNICATIONS CABLING AND

TELECOMMUNICATIONS RACKS.

1. MOUNT DOUBLE DUPLEX ABOVE RACK. COORDINATE

INSTALLATION WITH CABLE TRAY. REFER TO

TELECOMM PLANS AND DETAILS.

2. NEMA L6-30R MOUNTED ABOVE RACK. COORDINATE

INSTALLATION WITH CABLE TRAY. REFER TO

TELECOMM PLANS AND DETAILS.

3. JUNCTION BOX FOR CONTROL PANEL POWER.

4. JUNCTION BOX FOR HVAC EQUIPMENT CONTROL

POWER.

5. TRANSFORMER SUSPENDED FROM STRUCTURE AT

10'-6" MINIMUM TO BOTTOM. REFER TO DETAIL D1/EP503.

SHEET KEYNOTES

1 TYP

2 TYP

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

6 6

CB

B

J J

CB

ELEC

ELEC

T-L4

MDSB

I

UH-10

EF-5

EF-4

UH-9

L1

L4

L4A

LCP1

RCP2

RCP1

H1

H2

H3

L2

MPC FP

L1- 36

L1- 36

L1- 36

L1A

LV-3

LV-2

ELEC

T-L9 T-L7 H7

L7

H8

T-L8

L8

I

L7- 17

L7- 17

L7- 17

L7- 17

L6

T-L6

H6

T-L1

T-L2

LCP2

RCP4

RCP3

UH-11

EF-6

LV-5

DC-1

CH-1

L1A- 9 L1A- 10 L1A- 11

WP

LK

CPTT SERVER

ROOM

CRAC-1

TR6

TR6- 2

TR6- 1

TR6- 2

TR6- 3

TR6- 1

TR6- 13,15

TR6- 21

TR6- 12,14

TR6- 20

TR6- 9,11

TR6- 19

TR6- 8,10

TR6- 18

TR6- 17

TR6- 4,6

TR6- 16

TR6- 5,7

TR6- 3

T-TR6

FE

LCMS / LMS BACKUP

SERVER

T R

A

T R

,3

T R

A

T R

,3

T R

A

T R

,3

T R

A

T R

A

,1

T R

A

T R

A

,1

T R

A

T R

A

,1

23456

L9- 25 L9- 18

L9- 25

L9- 27

L9- 18

L9- 27

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 12:33:36

EP402

FTD

E L E

C T

R

IC

A L P

O W

E R

E N

L A

R G

E D

P L A

N S

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

K U

R E

N D

A

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

GENERAL NOTES

1. REFER TO E-001 AND E-002 FOR ELECTRICAL LEGEND,

ABBREVIATIONS, AND ELECTRICAL GENERAL NOTES.

2. REFER TO EP601 FOR ELECTRICAL POWER ONE-LINE.

3. REFER TO EP604 AND EP605 FOR MECHANICAL

EQUIPMENT CONNECTION SCHEDULE.

4. REFER TO EP606 THROUGH EP612 FOR PANEL

SCHEDULES.

5. SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD/ICS 705 AND UFC 4-010-05,

LATEST ADDITIONS. SECURE BOUNDARY SHALL INCLUDE

ALL APPLICABLE CONSTRUCTION ELEMENTS REQUIRED

FOR A "CONTINUOUS OPERATION" CLASSIFICATION.

COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN.

6. COORDINATE ALL SECURE BOUNDARY PENETRATIONS

WITH PHYSICAL SECURITY OFFICER (PSO) AND

CONTRACTING OFFICER (KO) PRIOR TO ROUGH-IN. ALL

SECURE BOUNDARY PENETRATIONS SHALL CONFORM TO

THE REQUIREMENTS OF ICD705.

7. PROVIDE PROPER NUMBER OF CONDUCTORS TO

ACHIEVE CIRCUITING AS SHOWN.

8. MINIMUM CIRCUIT CONDUCTORS SHALL BE #10 AWG.

CIRCUIT CONDUCTORS IN RUNS GREATER THAN 100 FT.

TO PANEL SHALL BE #8 AWG.

9. TRANSFORMERS INSTALLED IN TELECOMMUNICATIONS

ROOMS SHALL BE INSTALLED SO AS TO MAINTAIN A

MINIMUM DISTANCE OF 4'-0" FROM

TELECOMMUNICATIONS CABLING AND

TELECOMMUNICATIONS RACKS.

1/4" = 1'-0"A1

ENLARGED ELECTRICAL

RMS 170 & 171

1/4" = 1'-0"A4

ENLARGED ELECTRICAL RM 219

1/4" = 1'-0"D6

ENLARGED CH-1 AND DC-1

NORTH

0 1' 2' 4' 8'

NORTH

0 1' 2' 4' 8'

NORTH

0 1' 2' 4' 8'

1/4" = 1'-0"E1

ENLARGED CPTT SERVER RM 155

1/4" = 1'-0"A6

ENLARGED BACKUP SERVER RM 250

NORTH

0 1' 2' 4' 8'

1. MOUNT DOUBLE DUPLEX ABOVE RACK. COORDINATE

INSTALLATION WITH CABLE TRAY. REFER TO

TELECOMM PLANS AND DETAILS.

2. NEMA L6-30R MOUNTED ABOVE RACK. COORDINATE

INSTALLATION WITH CABLE TRAY. REFER TO

TELECOMM PLANS AND DETAILS.

3. JUNCTION BOX FOR CONTROL PANEL POWER.

4. JUNCTION BOX FOR HVAC EQUIPMENT CONTROL

POWER.

5. TRANSFORMER SUSPENDED FROM STRUCTURE AT 7'-6"

MINIMUM TO BOTTOM. REFER TO DETAIL D1/EP503.

6. MOUNT ALL WALL MTD. RECEPTACLES IN THIS ROOM AT

42" AFF TO ACCOUNT FOR 24" RAISED FLOOR.

7. MOUNT PANELBOARD AT A HEIGHT TO ACCOUNT FOR

24" RAISED FLOOR.

SHEET KEYNOTES

2TYP

TYP

2TYP

TYP

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

PROVIDE

CIRCUMFERENTIAL

CAULKING AROUND

ENTIRE CONDUIT ON

BOTH SIDE OF WALL (TYP)

SECURENON-SECURE

SECURE SPACE

PERIMETER WALL

SCHEDULE 40 PVC

(DIELECTRIC BREAK)

COUPLINGCOUPLING

METALLIC

CONDUIT OR PIPE

METALLIC

CONDUIT OR PIPE

WALL INSULATION

FLOOR

CEILING

ELEC. FITTING

TYP.

SURFACE MOUNTED

ELEC/COMM BOX

CONDUIT (ROUTED DOWN

WALL) STANDOFF PER ICD 705

CEILING ACCESS

PANEL (AS REQ'D)

RF SHIELDED WALL

J-BOX (AS REQ'D)

VOID AS APPLICABLE

SECURE SIDE

INTERIOR FACE

NONSECURE

SIDE

PIPE SLEEVE

SET IN GROUT

MASONRY WALL

OUTSIDE FACE

WALL INTERIOR

FACE

FLANGE AROUND SLEEVE

SCREWED THROUGH WALL FOIL

RIGID METAL

CONDUIT SLEEVE

PVC FEMALE

COUPLING (TYP)

CONTINUOUS WELD

AROUND SLEEVE

FIRE STOPPING AROUND

CONDUIT INSTALLED PER MFR'S

RECOMMENDATIONS (TYP)

EMT

STEEL EMT

CONNECTOR

WITH SET

SCREW (TYP)

FLANGE

SLEEVE

SCREWS FRONT

VIEW

SIDE

VIEW

PROVIDE

CIRCUMFERENTIAL FIRE

STOP CAULKING AROUND

ENTIRE CONDUIT OR PIPE

ON BOTH SIDES OF WALL

(TYP)

SECURENON-SECURE

SECURE SPACE

PERIMETER WALL

METALLIC

CONDUIT OR PIPE

GROUND PENETRATING CONDUIT

WITHIN 6" OF WALL. PROVIDE #4

CU GROUND WIRE TO BUILDING

GROUNDING SYSTEM.

COUPLINGCOUPLING

METALLIC

CONDUIT OR PIPE

METALLIC

CONDUIT OR PIPE

CONDUIT GROUNDING CLAMP

WALL INSULATION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://Ellsworth B21/8996-12-Ellsworth AFB B21 FTD_E19.rvt

1/7/2022 13:23:52

EP501

FTD

E L E

C T

R

IC

A L P

O W

E R

D E

T A

IL

S

B -2

F

IE

L D

T R

A

IN

IN

G

D E

T A

C H

M E

N T

F

T D

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E S

U

IT

E

O M

A H

A N

E B

R A

S K

A

J O

A K

E S

K U

R E

N D

A

D E

L L E

D G

E

T L /R

A

N O

V E

M B

E R

W F

R

ADVERTISEMENT - 100% DESIGN

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

O U

T H

D A

K O

T A

P R

O J E

C T

N U

M B

E R

F

X B

M

N.T.S.E1

SECURE AREA BOUNDARY PENETRATION DETAIL W/ DIELECTRIC BREAK

N.T.S.B1

SURFACE MOUNTING DETAIL ON SECURE PERIMETER WALL

N.T.S.E6

CONDUIT WALL PENETRATION FOR EMI/RFI PROTECTION

N.T.S.B6

SECURE AREA BOUNDARY PENETRATION DETAIL W/O DIELECTRIC BREAK

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

A

M -0

D E

S

IG

N I

S S

U E

D F

O R

P R

IC

IN

G

/2

NOTE:

DO NOT USE THIS DETAIL FOR

PENETRATIONS THROUGH RATED

ASSEMBLIES (FIRE WALLS).

INSTEAD, REFER TO DETAIL B6 ON

THIS SHEET.

MAIN DISTRIBUTION SWITCHBOARD "MDSB"

2000AMP BUS WITH 100% NEUTRAL,

THREE SECTION, 480Y/277, 3PH, 4W, NEMA 1

SERVICE ENTRANCE RATED, 65KAIC

200S

SERVICE ENTRANCE

SECTION

DIGITAL

POWER

MONITOR

CTs

PTs

A-BUS

A-M1

2000AF

2000AT

LSIG & ARC

REDUCTION

G

N

REFER TO ELECTRICAL SITE

PLANS FOR PRIMARY

FEEDER

60A CLF

1" CONDUIT

M

PROVIDE BLDG.

AMRS/UFGS COMPLIANT

SMART METER. METER

SHALL BE EIG NEXUS

1262/1272

METER PRDUCT SERIES

OR EQUAL AND SHALL

BE SOCKETED AS A

SEPERATE ENCLOSURE

AND LOCATED

ADJACENT TO MDP AND

FIRE PUMP

CONTROLLER

COMPLETE WITH ALL

INSTRUMENT CT'S AND

PT'S FOR A COMPLETE

AND OPERATIONAL

SYSTEM.

SPD

208Y/120V

T-TR5

"TR5"

PANEL

225A

"TR4"

PANEL

225A

"TR3"

PANEL

225A

"TR2"

PANEL

225A

30V

208Y/120V

T-TR4

208Y/120V

T-TR3

208Y/120V

T-TR2

75KVA 112.5KVA 112.5KVA

XFMR: SIM

100AF

60AT

480Y/277V

1500KVA

12.47KV

600A 3P

600A 3P

"TR1"

PANEL

225A

208Y/120V

T-TR1

75KVA75KVA

17602230

A-F3 A-F2 A-F1

400AF

400AT

400AF

225AT

25Y22Y

"H2"

PANEL

225A "H1"

PANEL

225A

"L2"

PANEL

225A "L1"

PANEL

225A

208Y/120V

T-L2 208Y/120V

T-L1

75KVA

SPD SPD

400AF

225AT

22Y

"H3"

PANEL

225A

"L3"

PANEL

100A

20…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .