W9128F-21-R-0032_VOL3 - FTD Only Specs.pdf
PDF 26 MB Posted
- Attached to
- B-21 MPF/FTD Construction Federal contract opportunity
- Solicitation number
- W9128F21R0032
About this file
This document outlines a federal solicitation to construct facilities for the B-21 bomber program. The U.S. Army Corps of Engineers seeks to build a Mission Operations Planning Facility and a Field Detachment Training Facility at Ellsworth Air Force Base in South Dakota. The MPF will provide over 47,000 square feet of secure operations planning space, while the FTD will offer over 57,000 square feet of secure maintenance training and classroom areas. Both facilities must meet Intelligence Community Directive/Intelligence Community Standard 705 security standards. The project scope also includes associated site development, utilities infrastructure, and potential optional systems for fixtures and equipment, intrusion detection, access control, backup power, and surveillance cameras. Interested offerors can find additional details by visiting the listed procurement website. The solicitation number is W9128F21R0032, with the Army Corps of Engineers District Omaha serving as the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS FOR CONSTRUCTION
Solicitation No. W9128F-21-R-0032
Volume III – FTD Specifications
B-21: MISSION OPERATIONS PLANNING
FACILITY (MPF) & B-21: FIELD TRAINING
DETACHMENT FACILITY (FTD)
PN FXBM1088037 (MPF) & FXBM1088018 (FTD)
95% DESIGN REVIEW
ELLSWORTH AFB, SOUTH DAKOTA
JULY 2021
US ARMY CORPS OF ENGINEERS
OMAHA DISTRICT
VOLUME III 95% REVIEW
This page was intentionally left blank for duplex printing.
VOLUME III
95% REVIEW
00 01 00 - 1 PROJECT TABLE OF CONTENTS
SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF
B-21 MISSION OPERATIONS PLANNING FACILITY (MPF) PN FXBM1088037 AND
B-21 FIELD TRAINING DETACHMENT FACILITY (FTD), PN FXBM1088018 (FY22)
Volume III – FTD Specifications
PROJECT TABLE OF CONTENTS
NOTE: WHERE CONFLICTS EXIST WITHIN THESE SPECIFICATIONS, THE MORE STRINGENT
REQUIREMENTS GOVERN.
DIVISION 01 - GENERAL REQUIREMENTS
01 33 29 SUSTAINABILITY REPORTING
01 33 29AT SUSTAINABILITY REQUIREMENTS SCORESHEET
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
01 91 00.15 10AT PROJECT REQUIREMENTS
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR
TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 THERMAL AND MOISTURE PROTECTION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
00 01 00 - 2 PROJECT TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION (CONTINUED)
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIER
07 42 13.23 METAL COMPOSITE MATERIAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 91 00 PREFORMED JOINT SEALS
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 77 20 DECORATIVE FIBERGLASS REINFORCED WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
12 59 00 SYSTEMS FURNITURE
00 01 00 - 3 PROJECT TABLE OF CONTENTS
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL
SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 10AT JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL
AND OPEN COMPETITION
23 64 26 CHILLED WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL
SYSTEMS (HVAC)
25 05 11.01AT HEATING VENTING AND AIR CONDITIONING BUILDING
LEVEL CONTROL SECURITY CONTROLS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL
SYSTEMS (ESS)
25 05 11.02AT ELECTRONIC SECURITY SYSTEM BUILDING LEVEL
CONTROL SECURITY CONTROLS
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL
SYSTEMS (FIRE ALARM)
25 05 11.03AT FIRE ALARM SYSTEM BUILDING LEVEL CONTROL
SECURITY CONTROLS
25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL
SYSTEMS (CONFIGURABLE SYSTEMS)
25 05 11.04AT CONFIGURABLE SYSTEMS BUILDING LEVEL CONTROL
SECURITY CONTROLS
25 05 11.05 CYBERSECURITY FOR FACILITY-RELATED CONTROL
SYSTEMS (ELECTRICAL)
00 01 00 - 4 PROJECT TABLE OF CONTENTS
DIVISION 25 - INTEGRATED AUTOMATION (CONTINUED)
25 05 11.05AT ELECTRICAL AND LIGHTING SYSTEMS BUILDING LEVEL
CONTROL SECURITY CONTROLS
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS)
INTEGRATION
DIVISION 26 - ELECTRICAL
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 13 00 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED
SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 LOW-VOLTAGE SWITCHGEAR
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 TELEVISION DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 41 16 INTEGRATED AUDIO VIDEO SYSTEMS AND EQUIPMENT
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 00 00AT FTD GEOTECHNICAL REPORT
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13 CHAIN LINK FENCES AND GATES
32 31 13.53 HIGH-SECURITY FENCES AND GATES
32 31 19 DECORATIVE METAL FENCES AND GATES
-- End of Project Table of Contents --
B-21: Field Training Detachment Facility (FTD) - Ellsworth AFB EL93
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 29
SUSTAINABILITY REPORTING
02/17
PART 1 GENERAL
1.1 REFERENCES
1.2 SUMMARY
1.3 SUBMITTALS
1.4 GUIDING PRINCIPLES VALIDATION (GPV)
1.4.1 Sustainability Action Plan
1.4.2 Costs
1.4.3 Calculations
1.4.4 Third Party Certification (TPC) Documentation
1.4.5 Third Party Certification (TPC)
1.4.5.1 TPC Registration Required
1.5 SUSTAINABILITY SUBMITTALS
1.5.1 High Performance Sustainable Building (HPSB) Checklist
1.5.1.1 HPSB Checklist Submittals
1.5.2 "S" Submittals for Sustainability Documentation
1.5.3 Sustainability eNotebook
1.5.3.1 Sustainability eNotebook Submittal Schedule
1.6 DOCUMENTATION REQUIREMENTS
1.6.1 Commissioning
1.6.2 Energy Efficient Products
1.6.3 Indoor Water Use
1.6.4 Reduce Volatile Organic Compounds (VOC) (Low Emitting
Materials)
1.6.5 Indoor Air Quality During Construction
1.6.6 Recycled Content
1.6.7 Bio-Based Products
1.6.8 Waste Material Management (Recycling – Construction)
1.6.9 Additional Sustainability Requirements
1.6.9.1 Validation and Certification Restrictions
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 SUSTAINABILITY COORDINATION
3.1.1 Coordinating Sustainability Documentation Progress
3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION
3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING
MATERIALS) REQUIREMENTS
-- End of Section Table of Contents --
SECTION 01 33 29 Page 1
SECTION 01 33 29
SUSTAINABILITY REPORTING
02/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 189.1 (2014) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings
COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)
HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings
GREEN BUILDING INITIATIVE (GBI)
GBI GP Compliance (2016) GBI Guiding Principles Compliance Program for New Construction (DOD Version)
U.S. DEPARTMENT OF AGRICULTURE (USDA)
FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA Biopreferred Program)
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 433.300 Subpart C - Green Building Certification for Federal Buildings
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.2 SUMMARY
This specification includes general requirements and procedures for this project to be constructed and documented per the federally mandated High Performance and Sustainable Building or HPSB Guiding Principles (GP), Third Party Certification (TPC) requirements, UFC 1-200-02 High Performance and Sustainable Building Requirements, and other requirements
SECTION 01 33 29 Page 2 identified in this specification.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to this section. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Preliminary High Performance and Sustainable Building Checklist; G
Sustainability Action Plan; G
Preliminary Sustainability eNotebook; G
SD-11 Closeout Submittals
Final High Performance and Sustainable Building Checklist; G
Final Sustainability eNotebook; G
Amended Final Sustainability eNotebook; G
Amended Final High Performance and Sustainable Building Checklist;
G
Third Party Certification Certificate, Assessment, or Validation; G
1.4 GUIDING PRINCIPLES VALIDATION (GPV)
Provide construction related sustainability documentation to verify achievement of HPSB Guiding Principles Validation (GPV). Provide the following for GPV:
a. Refer to HPSB Checklist at the end of this specification section.
These requirements are based on legislative mandates that must be met by all projects. (Multiple checklists indicate multiple buildings that require HPSB tracking.)
b. No variations to the HPSB Checklist are allowed without written consent from the Contracting Officer. Immediately bring to the attention of the Contracting Officer any changes that impact meeting the approved HPSB Guiding Principles Requirements for this project.
c. All work, including "S" submittals, required to incorporate the applicable HPSB Guiding Principles Requirements indicated on the HPSB Checklist and in this contract.
d. Sustainability Action Plan
e. Construction related documentation for the project Sustainability eNotebook, and keep updated with regularly-scheduled construction meetings. Include construction related documentation containing the following components;
(1) HPSB Checklist
SECTION 01 33 29 Page 3
(2) Sustainability Action Plan
(3) Documentation illustrating HPSB Guiding Principles Requirements compliance (including "S" submittals)
1.4.1 Sustainability Action Plan
Include the following information in the Sustainability Action Plan:
a. Planned method to achieve each construction related GP requirement.
b. For each designated construction related HPSB Guiding Principles Requirements that is applicable, as defined in UFC 1-200-02, provide justification narrative explaining what precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply. Final government-approved narrative(s) must be included with the HPSB Checklist submittal.
c. Name and contact information for: Point of Contact (POC) responsible for ensuring sustainability goals are accomplished and documentation is assembled. For TPC that include on-site visit by third party representative, provide list of required attendees.
d. Include the Indoor Air Quality plan with the Sustainability Action Plan.
1.4.2 Costs
Bear all costs associated with constructing, demonstrating, and documenting that project complies with approved HPSB Guiding Principles Requirements.
1.4.3 Calculations
Provide calculations, product data, labels and product certifications, required in this section to demonstrate compliance with the HPSB Guiding Principles Requirements.
1.4.4 Third Party Certification (TPC) Documentation
This project has been designed for, and must be constructed to attain a sustainability rating of GBI GP Compliance . Project is already registered with the TPC Organization. Provide construction related sustainability documentation, in the format required by the TPC Organization, to the Contracting Officer for approval, and for final approval by the TPC organization. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation. Execute the following for the design side review of the documentation for GPC validation:
a. Refer to TPC Checklist at the end of this specification section.
b. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved TPC Requirements for this project.
c. Complete all work required to incorporate the applicable TPC
SECTION 01 33 29 Page 4
Requirements.
d. Maintain the construction related information, and provide replacement pages, in the Sustainability eNotebook pertaining to additions and changes to the approved sustainability requirements. Maintain the Sustainability eNotebook in electronic format. For more explanation, refer to paragraph SUSTAINABILITY eNOTEBOOK. Provide the following components in the Sustainability eNotebook, in addition to the GPV components above:
(1) TPC Checklist
(2) Completed TPC documentation for each identified requirement.
Forward to the Contracting Officer for approval.
(3) Copy of all correspondence with the TPC organization.
e. Provide the following information in the Sustainability Action Plan.
Provide this TPC information in addition to the GPV Action Plan items above:
(1) Planned method to achieve each TPC requirement.
(2) For each TPC requirement that is attempted but not achieved, provide narrative explaining how mission or activity precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.
(3) Provide name and contact information for: Sustainability Point of Contact (POC) and other names of sustainability professionals responsible for ensuring TPC sustainability goals are accomplished and documentation is assembled. Sustainability POCs are also responsible for ensuring GPV required in paragraph GUIDING PRINCIPLES VALIDATION (GPV) above.
f. Bear all costs associated with constructing, demonstrating, and documenting that project complies with approved TPC requirements, including but not limited to:
(1) TPC coordination with Government's AE and other consultants, TPC website requirements, and management for construction related documentation.
(2) Construction work required to incorporate TPC requirements.
(3) Submittals required to demonstrating compliance with Government approved TPC checklists.
(4) Documentation illustrating compliance with TPC requirements and additional documentation required by the TPC.
g. Provide all calculations, product data, and certifications, assessments, or validations required in this contract to demonstrate compliance with the TPC Requirements of this section.
SECTION 01 33 29 Page 5
1.4.5 Third Party Certification (TPC)
1.4.5.1 TPC Registration Required
Pay all fees associated with registration and achievement of Third Party Certification (TPC), by meeting all TPC and project requirements for a level of GBI GP Compliance . An equivalent TPC organization must demonstrate equivalency for Government consideration and meet the requirements of 10 CFR 433.300 , prior to use on the project. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation
Register project with TPC organization using the following format and content for construction phase review of the project by paying associated to GBI:
a. Project Title First Line: Building Owner (US Army, US Air Force, US Navy or US Marine Corps), Building Name (if known)
b. Project Title Second Line: MILCON P#, DD1391 Project Name
c. Project Address: UIC (Installation code), Category code, RPUID (Real Property Unique Identifier) Number
d. Project Owner Organization: US Army, US Air Force, US Navy or US Marine Corps
e. Primary Contact, Owner: Component Project Manager
f. Building Owner Organization: US Army, US Air Force, US Navy or US Marine Corps
g. Building Owner Organization Project Number
h. Additional Contact, Building Owner: Department of Public Works, Public Works Officer, Base Civil Engineer, or Designee
1.5 SUSTAINABILITY SUBMITTALS
Provide HPSB Checklist and other documentation in the Sustainability eNotebook to indicate compliance with the sustainability requirements of the project.
1.5.1 High Performance Sustainable Building (HPSB) Checklist
Provide construction documentation that provides proof of and supports compliance with the completed HPSB Checklist.
1.5.1.1 HPSB Checklist Submittals
Submit updated HPSB Checklist with each Sustainability eNotebook submittal. Attach final HPSB Checklist(s) to draft final DD1354 Real Property Record Submittal.
1.5.2 "S" Submittals for Sustainability Documentation
Submit the GPV and TPC sustainability documentation required in this specification as "S" submittals in all affected UFGS Sections.
SECTION 01 33 29 Page 6
a. Highlight GPV and TPC compliance data in "S" submittal.
b. Add "S" submittals to the Sustainability eNotebook only after submittal approval, and bookmark them as required in paragraph SUSTAINABILITY eNOTEBOOK below.
c. Ensure all approved "S" submittals (the sustainability documentation requirements) are included in each Sustainability eNotebook submittal.
1.5.3 Sustainability eNotebook
The Sustainability eNotebook is an electronic organizational file that serves as a repository for all required sustainability submittals. To support documentation of compliance with an approved HPSB and TPC checklist, provide and maintain a comprehensive and current Sustainability eNotebook Sustainability eNotebook must contain all required data to support full compliance with the HPSB Guiding Principles Requirements, including:
a. HPSB checklist
b. Sustainable Action Plan
c. Calculations
d. Labels
e. "S" submittals (sustainability documentation requirements)
f. Certifications, assessments, or validations
g. TPC documentation required in paragraph THIRD PARTY CERTIFICATION (TPC) above.
Provide sustainability eNotebook in the form of an Adobe PDF file;
bookmark each HPSB Guiding Principles Requirement , TPC requirement,and sub-bookmark at each document. Match format to HPSB Guiding Principles numbering system indicated herein. Maintain up-to-date information, spreadsheets, templates, and other required documentation with each current submittal. For TPC projects, provide a second Table of contents using TPC numbering system, for maintaining documentation unique to TPC.
Contracting Officer may deduct from the monthly progress payment accordingly if Sustainability eNotebook information is not current, until information is updated and on track per project goals.
1.5.3.1 Sustainability eNotebook Submittal Schedule
Provide Sustainability eNotebook Submittals at the following milestones of the project:
a. Preliminary Sustainability eNotebook
Submit preliminary Sustainability eNotebook for approval at the Pre-construction conference. Include Preliminary High Performance and Sustainable Building Checklist and TPC checklist.
b. Construction Progress Meetings. Provide up-to-date GP and TPC documentation in the Sustainability eNotebook for each meeting.
SECTION 01 33 29 Page 7
c. Final Sustainability eNotebook
Provide up-to-date Sustainability eNotebook at the Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until final sustainability documentation is complete. Submit three electronic copies of the Final Sustainability eNotebook on DVDs to the Government. Include Final High Performance and Sustainable Building Checklist.
d. Amended Final Sustainability eNotebook
Amend and resubmit the Final Sustainability eNotebook to include post-occupancy corrections, updates, and requirements. Include Amended Final High Performance and Sustainable Building Checklist.
Final progress payment retainage may be held by Contracting Officer until amended final sustainability documentation is complete. Submit three final electronic copies of the Amended Final Sustainability eNotebook Submittal on DVDs to the Government no longer than 30 days after the GP, TPC designated data collection period.
1.6 DOCUMENTATION REQUIREMENTS
a. Incorporate each of the following HPSB Guiding Principles Requirements into project construction; and provide documentation that proves compliance with each listed requirement. Items below are organized according to the HPSB Guiding Principles . For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.
b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.
1.6.1 Commissioning
Submit approved Final Commissioning Report required by Section 01 91 00.15 TOTAL BUILDING COMMISSIONING as proof of this tracking requirement.
1.6.2 Energy Efficient Products
Provide only energy-using products that are Energy Star rated, or have the Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide most efficient products that are life-cycle cost effective. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:
https://energy.gov/eere/femp/federal-energy-management-program and https://www.energystar.gov/ . Provide the following documentation:
Proof that products are labeled energy efficient and comply with the cited requirements.
1.6.3 Indoor Water Use
Provide only water-consuming products that are EPA WaterSense labeled, or the most efficient water fixtures available that meet the requirements of ASHRAE 189.1 Section 6.3.2, when EPA WaterSense products are not
SECTION 01 33 29 Page 8 available. Provide the following documentation:
For products available with EPA WaterSense labeling, proof that fixtures are labeled EPA WaterSense or Energy Star ; for all other fixtures, proof they comply with the cited efficiency requirements.
1.6.4 Reduce Volatile Organic Compounds (VOC) (Low Emitting Materials)
Meet the requirements of Table 3-1 at the end of this specification.
Provide the following documentation:
Provide certifications or labels that demonstrate compliance with cited requirements.
1.6.5 Indoor Air Quality During Construction
Prior to construction, create indoor air quality (IAQ) plan. Develop and implement the IAQ construction management plan during construction and flush building air before occupancy.
For new construction, indoor air quality plan must meet the requirements of ASHRAE 189.1 Section 10.3.1.4. (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60 percent.
Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and building air was flushed out in accordance with the cited standard.
1.6.6 Recycled Content
Comply with 40 CFR 247 . Refer to https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247 . Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements. Provide the following documentation:
a. Manufacturers’ documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.
b. Substitutions: Submit for Government approval, proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.
c. In order to complete compliance with FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items, refer to submittal requirement for recycled/recovered material content.
1.6.7 Bio-Based Products
Provide products and material composed of the highest percentage of biobased materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing
SECTION 01 33 29 Page 9 the intended end use or detracting from the overall quality delivered to the end user. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.
Comply with FSRIA 9002 USDA BioPreferred Program. Refer to https://www.biopreferred.gov/BioPreferred/ for the product categories and BioPreferred Catalog. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements. Provide the following documentation:
a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.
b. In order to complete compliance with FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts, refer to submittal requirement for biobased products.
1.6.8 Waste Material Management (Recycling – Construction)
Divert construction debris from landfill disposal where markets or on-site recycling exists, and provide documentation.
1.6.9 Additional Sustainability Requirements
1.6.9.1 Validation and Certification Restrictions
Purchase of renewable energy certificates (RECs) specifically to meet project sustainability goals is prohibited.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 SUSTAINABILITY COORDINATION
3.1.1 Coordinating Sustainability Documentation Progress
Provide sustainability focus and coordination at the following meetings to achieve sustainability goals. The designated sustainability professional responsible for GP and TPC documentation must participate in the following meetings to coordinate documentation completion.
a. Pre-Construction Conference: Discuss the following: TPC and HPSB Checklists, Sustainability Action Plan, Construction submittal requirements and schedule, individuals responsible for achieving each Guiding Principle Requirement and TPC prerequisite and credit.
b. Construction Progress Meetings: Review GP and TPC sustainability requirements with project team including contractor and sub-contractor representatives. Demonstrate GP and TPC documentation is being collected and updated to the Sustainability eNotebook.
(1) For TPC that include on-site visit by third party representative, execute, coordinate, and facilitate the visit.
(2) Facility Turnover Meetings: Review Sustainability eNotebook for
SECTION 01 33 29 Page 10 completeness and identify any outstanding issues relating to final documentation requirements.
(3) Final Sustainability eNotebook Review
3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION
Finalize the sustainability certification or validation process and obtain the TPC Plaque and Certificate, assessment, or validation, indicating completion of the projects sustainability goals.
Provide and hang Plaque in accordance with contract documents.Provide one copy of original certificate, assessment, or validation, and deliver to Contractor Officer, unless otherwise instructed. Provide and hang Plaque in a prominent interior location approved by the Contracting Officer.
SECTION 01 33 29 Page 11
3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)
REQUIREMENTS
TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements
Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL CATEGORY
Adhesives and Sealants
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring; panel;
primers) Sealants (acoustical;
firestop; HVAC Air duct; primers) Caulks
SCAQMD Rule 1168 (Use "other" category for HVAC duct sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)
Aerosol adhesives Section 3 of Green Seal Standard GS-36 (except:
cleaners, solvent cements, and primers used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the application space air temp is less than 40 F (4.5 C).
Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Flat and nonflat topcoats, primers, undercoaters, and anti-corrosive coatings
Green Seal Stand ard GS-11
SECTION 01 33 29 Page 12
TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements
Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL CATEGORY
Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Concrete/masonry sealers (waterproofing concrete/masonry sealers), concrete curing compounds, dry fog coatings, faux finishing coatings, fire resistive coatings, floor coatings, graphic arts (sign) coatings, industrial maintenance coatings, mastic texture coatings, metallic pigmented coatings, multicolor coatings, pretreatment wash primers, reactive penetrating sealers, recycled coatings, shellacs (clear and opaque), specialty primers, stains, wood coatings (clear wood finishes), wood preservatives, and zinc primers
California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings or SCAQMD Rule 1113
SECTION 01 33 29 Page 13
Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL CATEGORY
Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Basement specialty coatings, high-temperature coatings, low solids coatings, stone consolidants, swimming-pool coatings, tub-and tile-refining coatings, and waterproofing membranes
California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings
Floor Covering Materials
For carpet, all locations:
CDPH/EHLB/Standard Method V1.1 (California Section 01350) or label for Section 9 of CDPH/EHLB/Standard Method V1.1 (California Section 013 50) none none
SECTION 01 33 29 Page 14
Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL CATEGORY
Composite Wood, Wood Structural Panel, and Agrifiber Products particleboard medium density fiberboard (MDF) wheatboard strawboard panel substrates door cores no added urea-formaldehyde resins including laminating adhesives for composite wood and agrifiber assemblies
Third-party certification (approved by CARB) of California A ir Resource Board 's (CARB) regulation , Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products none none
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) (except:
Structural panel components such as plywood, particle board, wafer board, and oriented strand board identified as "EXPOSURE 1," "EXTERIOR," or "HUD-APPROVED" are considered acceptable for interior use.)
SECTION 01 33 29 Page 15
Source: ASHRAE 189.1 section 8.4.2 (Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL CATEGORY
Office Furniture Systems and Seating installed prior to occupancy
ANSI/BIFMA X7.1
ANSI/BIFMA X7.1:
(95 percent of installed office furniture system workstations and seating units)
Section 7.6.2 of ANSI/BIFMA e3 (50 percent of office furniture system workstations and seating units) none none
Ceiling and Wall Systems ceiling and wall insulation acoustical ceiling panels tackable wall panels gypsum wall board and panels wall coverings
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none
-- End of Section --
SECTION 01 33 29 Page 16
Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry
General Information FXBM1088018 Project ID (e.g. ABCD12345) xxxxxxxx1235454345 Real Property Unique ID (RPUID) xxxxxxxx Facility Number B-21Field Training Detachment (FTD)Facility Building Name
Ellsworth AFB Installation Rapid City City SD State Yes CONUS
ACC MAJCOM
USACE Construction Agent Womble, Paul AFCEC DM/CM (Last Name, First Name)
$47,000,000.00 PA
56,074 Building Size (SF) 2022 Program Year (FY####) 95% Design Project Phase 11/28/19 Design Started (MM/DD/YY)
08/30/24 BOD (MM/DD/YY)
GBI GP Guiding Principles Compliance Certification Method
100% HPSB Compliant 27% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA
Standard 90.1-2013) 2017V1 Scoresheet version
Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required
90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2
Yes HPSB I.1 Integrated Design 1 Yes HPSB I.2 Commissioning 1
HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3) Total Points 5 Possible Points 5
Yes HPSB II.1 Energy Efficiency 1
Yes Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective
27.0% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32) Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR 433 * Roof Attributes (Recommended) Select roof types (Check below)
Energy Efficient Products 1 Yes
Yes HPSB II.2 On-site Renewable Energy 1
Yes Installed renewable energy elements or projects were not lifecycle cost effective
1 Renewable energy types (check below)
0.0 Insert generation capacity (kW)
0.0% Insert percentage of total building
Yes HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1
Yes Installed solar hot water heater system or found installation not lifecycle cost effective
0.0 Insert generation capacity (MMBtu/yr)
0.0% Insert percentage of demand
Yes HPSB II.4 Metering 1 Yes Electric Metering: Select N/A if no service Yes Natural Gas Metering: Select N/A if no service
Drop-Down Box
Federal Requirements
Complete
No Entry Required Custom Entry
Solar PV
Solar CP
Solar Thermal Electric
Geothermal
GSHP Wind
Hydro Waste to Energy
Renewables were not lifecycle cost effective
09/15/2020 Date Project Registered (MM/DD/YY)
Date Project Certified (MM/DD/YY)
Cool roof
Green roof
Solar electric
Solar thermal
Solar Passive
7/9/2021 1
Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry
N/A Steam Metering: Select N/A if no service HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4) Total Points 6 Possible Points 6
Yes HPSB III.1 Indoor Water 1 Yes Indoor Water Metering 1 Yes HPSB III.2 Outdoor Water 1 Yes Outdoor Water Metering 1 N/A HPSB III.3 Alternative Water 1 Yes HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1
Change in Impervious Area (SF) * Pre-Award Cost Estimate ($) *
Yes Project addressed EISA 438 0 EISA Technical Constraints
Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)
On-Site LID Features Locations 0 Integrated Management Practices Employed
$1.00 Final LID Construction Cost ($) To be provided post construction Post Construction Analysis (Name of DOR)
HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5) Total Points 8 Possible Points 8
Yes HPSB IV.1 Thermal Comfort 1 Yes HPSB IV.2 Ventilation 1 Yes HPSB IV.3 Daylighting 1 Yes HPSB IV.4 1 Yes HPSB IV.5 Low Emitting Materials 1 Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 Yes HPSB IV.7 Environmental Tobacco Smoke Control 1 Yes HPSB IV.8 Occupant Health and Wellness 1
HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 5
Yes HPSB V.1 Recycled Content 1 Yes HPSB V.2 Biologically-based Products 1 Yes HPSB V.3 Ozone Depleting Substances 1 Yes HPSB V.4 Waste and Materials Management - Recycling 1 Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1
Yes 60% or greater diverted 60.0% Insert percentage diverted from landfill
HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7) Total Points 1 Possible Points 1
Yes HPSB VI.1 Address Climate Change Risk 1 Possible Points 27
27 Federal Requirements - Yes or N/A 0 Federal Requirements - No
100% Percentage of Federal Requirements Met
Moisture Control
Retaining stormwater impact receving water flow
Site too small to infiltrate significant volume
State or local restrict water harvesting
Shallow bedrock, contaminated soil, high ground water table, underground utilities
Non-potable water demand to small Structural, plumbing, and other mods not feasible
Soil infiltration capacity limited
State or local restrict use of green infrastructure or LID
Other
Bio-Retention
Infiltration Trench
Soil Amendments
Dry Wells Inlet Pollution Removal Device
Permeable Pavement/Pavers
Filter Strips Grassed Swells
Rain Barrels/Cisterns
Tree Box Filters Vegetated Buffers Vegetated Roof
Other
7/9/2021 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 91 00.15 10
TOTAL BUILDING COMMISSIONING
05/19
PART 1 GENERAL
1.1 SUMMARY
1.2 SYSTEMS TO BE COMMISSIONED
1.3 REFERENCES
1.4 COMMUNICATION WITH THE GOVERNMENT
1.5 SEQUENCING AND SCHEDULING
1.5.1 Sequencing
1.5.2 Project Schedule
1.6 SUBMITTALS
1.7 COMMISSIONING FIRM
1.7.1 Lead Commissioning Specialist
1.7.2 Technical Commissioning Specialists
1.7.3 Commissioning Standard
1.8 SUSTAINABILITY THIRD PARTY CERTIFICATION (TPC)
1.9 ISSUES LOG
1.10 CERTIFICATE OF READINESS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONSTRUCTION PHASE
3.1.1 Construction Commissioning Coordination Meeting
3.1.2 Construction Phase Commissioning Plan
3.1.2.1 Interim Construction Phase Commissioning Plan
3.1.2.1.1 Checklists
3.1.2.1.2 Template Building Envelope Inspection Checklists
3.1.2.2 Final Construction Phase Commissioning Plan
3.1.2.2.1 Pre-Functional Checklists
3.1.2.2.2 Functional Performance Test Checklists
3.1.2.2.3 Integrated Systems Test Checklists
3.1.3 Design Review
3.1.4 Construction Submittals
3.1.5 Inspection and Testing
3.1.5.1 Commissioning Team
3.1.5.1.1 Building Envelope Inspections Team
3.1.5.1.2 Mechanical System Pre-Functional Checks Team
3.1.5.1.3 Electrical System Pre-Functional Checks Team
3.1.5.1.4 Mechanical Functional Performance Systems Test Team
3.1.5.1.5 Electrical Functional Performance Systems Test Team
3.1.5.1.6 Other Pre-Functional and Functional Performance
Participants
3.1.5.2 Building Envelope Inspection
3.1.5.3 Pre-Functional Checks
SECTION 01 91 00.15 10 Page 1
3.1.5.4 Testing, Adjusting, and Balancing (TAB) Report and Field Acceptance Testing
3.1.5.5 HVAC Controls Test Reports
3.1.5.6 Tests
3.1.5.6.1 Functional Performance and Integrated Systems Tests
3.1.5.6.1.1 Checklist
3.1.5.6.1.2 Acceptance
3.1.5.6.2 HVAC Test Methods
3.1.5.6.2.1 Prior to Testing
3.1.5.6.2.2 Simulating Conditions
3.1.5.6.2.3 Setup
3.1.5.6.3 Sample Strategy
3.1.5.6.4 Seasonal Tests
3.1.5.6.4.1 Initial Functional Performance Tests
3.1.5.6.4.2 Full-Load Conditions
3.1.5.6.4.3 System Acceptance
3.1.5.6.5 Aborted Tests and Re-Testing
3.1.5.6.5.1 100 Percent Sample
3.1.5.6.5.2 Less than 100 Percent Sample
3.1.6 Training Plan
3.1.7 Systems Manual
3.2 COMMISSIONING REPORT
3.3 POST-CONSTRUCTION SUPPORT
3.3.1 Post-Construction Endurance Test
3.3.2 Post-Construction Site Visit
-- End of Section Table of Contents --
SECTION 01 91 00.15 10 Page 2
SECTION 01 91 00.15 10
TOTAL BUILDING COMMISSIONING
05/19
PART 1 GENERAL
1.1 SUMMARY
Commission the building systems listed herein. Employ the services of an independent Commissioning Firm. The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors. The Commissioning Firm must employ a Lead Commissioning Specialist that coordinates all aspects of the commissioning process. Conform to the commissioning procedures outlined in this specification.
1.2 SYSTEMS TO BE COMMISSIONED
Commission the following systems:
Heating, Ventilating, Air Conditioning, and Refrigeration Systems
(HVAC)
Building Automation System Utility Monitoring and Control System Lighting Systems Plumbing Systems Natural Gas and Propane Systems Water Pumping and Mixing Systems Energy and Water Utility Metering Systems and Sub-Meters Building Envelope: include moisture, thermal integrity, and air tightness for the entire buidling envelope including systems such as walls, fenestration, roofing, roof openings, slabs-on-grade, floor assemblies.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 202 (2013; Addenda B 2018) Commissioning Process for Buildings and Systems
ASSOCIATED AIR BALANCE COUNCIL (AABC)
ACG Commissioning Guideline (2005) Commissioning Guideline
NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
NEBB Commissioning Standard (2009) Procedural Standards for Whole Building Systems Commissioning of New Construction; 3rd Edition
SECTION 01 91 00.15 10 Page 3
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
ANSI/SMACNA 014 (2013) HVAC Systems Commissioning Manual, 2nd Edition
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 25-345-1 (2019) Systems Manual
1.4 COMMUNICATION WITH THE GOVERNMENT
The Lead Commissioning Specialist (CxC) must submit all plans, schedules, and reports, directly to the Contracting Officer Representative concurrent with submission to the CQC System Manager. The Lead Commissioning Specialist must have direct communication with the Contracting Officer's Representative regarding all elements of the commissioning process;
however, the Government has no direct contract authority with the Lead Commissioning Specialist.
1.5 SEQUENCING AND SCHEDULING
1.5.1 Sequencing
Complete the following prior to starting Functional Performance Tests of mechanical systems:
a. All equipment and systems have been completed, cleaned, flushed, disinfected, calibrated, tested, and operate in accordance with contract documents and construction plans and specifications.
b. Performance Verification Tests of the controls systems have been completed and the Performance Verification Test Report has been submitted and approved in accordance with Specification Section
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.
c. Testing, Adjusting, and Balancing has been completed and the Testing, Adjusting, and Balancing Report, has been submitted and approved in accordance with Specification Section 23 05 93 TESTING, ADJUSTING, AND
BALANCING FOR HVAC.
d. The building envelope is enclosed according to contract documents with final construction Specification Section 07 05 23 PRESSURE TESTING AN
AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
e. The Pre-Functional Checklists have been submitted and approved.
f. The Certificate of Readiness for mechanical systems has been submitted and approved.
Complete the following prior to starting Functional Performance Tests of the electrical systems:
a. All electrical, power generation, and lighting equipment and systems have been completed, calibrated, tested, and operate in accordance with contract documents and construction plans and specifications.
b. The building envelope is enclosed according to contract documents with
SECTION 01 91 00.15 10 Page 4 final construction completed.
c. Ceiling tiles, floor coverings, and window coverings are in place.
d. The Certificate of Readiness for electrical systems has been submitted and approved.
1.5.2 Project Schedule
Include the following tasks in the project schedule required by Section 01 32 01.00 10 PROJECT SCHEDULE. Ensure sufficient time is scheduled to accommodate the requirements of this specification section. The order of items listed below is not intended to imply a specified sequence:
a. Submission and approval of the Commissioning Firm and Commissioning Specialist
b. Submission and approval of the Testing, Adjusting, and Balancing (TAB) Firm and TAB Specialist specified in UFGS Section 23 05 93 Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
c. Submission of the Design Review Report specified herein.
d. Submission of the Design Review Report specified in UFGS Section 23 05 93Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC.
e. Submission and approval of the Construction Phase Commissioning Plan
f. Installation of permanent utilities (gas, water, electric)
g. Building Envelope Construction
h. Submission and approval of the Building Envelope Inspection Checklists
i. Air Barrier Pressure Tests specified in UFGS Section 07 05 23 Specification Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
j. Drainage and Vent, Building Sewers, Water Supply Systems and Backflow Prevention Assembly Tests specified in UFGS Section 22 00 00 Specification Section 22 00 00 PLUMBING, GENERAL PURPOSE
k. Factory Acceptance Testing for each of the systems to be commissioned as required by technical specifications
l. Manufacturer's Equipment Start-Up for each of the systems to be commissioned.
m. Potable Water System Flushing specified in UFGS Section 22 00 00 Specification Section 22 00 00 PLUMBING, GENERAL PURPOSE
n. Operational Tests of the plumbing system specified in UFGS Section 22 00 00 Specification Section 22 00 00 PLUMBING, GENERAL PURPOSE.
o. Potable Water System Disinfection specified in UFGS Section 22 00 00 Specification Section 22 00 00 PLUMBING, GENERAL PURPOSE
SECTION 01 91 00.15 10 Page 5
p. Submission and approval of the TAB Schematic Drawings, Report Forms, and Procedures specified in UFGS Section 23 09 93 Specification Section
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC.
q. Submission and approval of Duct Air Leakage Test Procedures specified in UFGS Section 23 95 93 Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
r. Duct Air Leakage Test Execution specified in UFGS Section 23 05 93 Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
s. Submission and approval of the Final Duct Air Leakage Test Report specified in UFGS Section 23 05 93 Specification Section 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
t. Testing, Adjusting, and Balancing (TAB) Field Work required by UFGS Section 23 05 93 Specification Section 23 05 93 TESTING, ADJUSTING, AND
BALANCING FOR HVAC
u. Submission and approval of the TAB Report specified in UFGS Section 23 05 93 Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING
FOR HVAC
v. TAB Field Acceptance Testing required by UFGS Section 23 05 93 Specification Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
w. Submission and approval of the Start-Up Testing Report specified in UFGS Section 23 09 00 Specification Section 23 09 00 INSTRUMENTATION
AND CONTROL FOR HVAC.
x. Submission and approval of the Performance Verification Test Procedures specified in UFGS Section 23 09 00 Specification Section
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.
y. Performance Verification Tests required by UFGS Section 23 09 00 Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
z. Performance Verification Test Report specified in UFGS Section 23 09 00 Specification Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
aa. Pre-Functional Checklist Submittal
bb. Functional Performance Testing for each system to be commissioned
cc. Integrated Systems Tests
dd. Post-Test Deficiency Correction for each system to be commissioned
ee. Re-Testing
ff. Training for each of the systems to be commissioned
gg. Systems Manual, Maintenance Plan, and Service Life Plan submission and approval
hh. Submission and approval of the Commissioning Report
SECTION 01 91 00.15 10 Page 6
ii. Seasonal Testing
jj. Post-Construction Endurance Testing
kk. Post-Construction Site Visit
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .