This is a notice of a forthcoming solicitation for a firm fixed-price construction contract. The U.S. Army Corps of Engineers, Honolulu District will issue a Request for Proposal for the FY23 Military Construction Army project to construct a 37,300 square foot Child Development Center at Schofield Barracks in Oahu, Hawaii. The project scope includes the building, 38,311 square feet of playground areas, 146 parking spaces, site development, utilities, lighting, paving, sidewalks, storm drainage, information systems, landscaping, signage, safety and security systems. Measures will include seismic design, standalone chillers, antiterrorism standards, and accessibility. Five existing buildings will be demolished. The performance period is 1,237 calendar days from notice to proceed, and the project magnitude is $25-50 million. The solicitation will utilize lowest price technically acceptable procedures. Proposals will be evaluated on experience, past performance, technical approach, and price. The notice provides details on the pre-proposal site visit, system for award management registration, and subcontracting goals for small businesses.

View the file

Other files

File Type Posted
22r20-CDC SB-Am-0008.pdf PDF
PN70551_CDC_SB_DWGS_Am-0007.pdf PDF
22r20-CDC SB-Am-0006.pdf PDF
22r20-CDC SB-Am-0005.pdf PDF
PN70551_CDC_SB_DWGS_Am-0005.pdf PDF
PN70551_CDC_SB_DWGS_Am-0004.pdf PDF
22r20-CDC SB-Am-0004.pdf PDF
PN70551_CDC_SB_DWGS_AM-0003.pdf PDF
22r20-CDC SB-Am-0003.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part4.pdf PDF
22r20-CDC SB-Am-0002.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part1.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part3.pdf PDF
PN70551_DESIGN COMPLETE_SPEC-am-0002.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part5.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part2.pdf PDF
PN70551_CDC_SB_DWGS_AM-0002.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part6.pdf PDF
22r20-CDC SB-Am-0001.pdf PDF
22r20 - RFP.pdf PDF
PN70551_100_DWG_Part1.pdf PDF
PN70551_100_DWG_Part6.pdf PDF
PN70551_100_DWG_Part11.pdf PDF
PN70551_100_DWG_Part9.pdf PDF
PN70551_100_DWG_Part2.pdf PDF
22r20-Map-SB.pdf PDF
PN70551_100_DWG_Part3.pdf PDF
PN70551_100_DWG_Part7.pdf PDF
PN70551_100_DWG_Part10.pdf PDF
PN70551_100_DWG_Part5.pdf PDF
PN70551_100_SPEC.pdf PDF
PN70551_100_DWG_Part8.pdf PDF
PN70551_100_DWG_Part4.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

Am-0007

3. EFFECTIVE DATE

17-Aug-2022

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than item 6) CODE

CONTRACTING DIVISION

BLDG 230 OTAKE ST.

FORT SHAFTER HI 96858

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

9A. AMENDMENT OF SOLICITATION NO.

W9128A22R0020

X 9B. DATED (SEE ITEM 11)

08-Jun-2022

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY22 MCA PN 070551 Child Development Center, Schofield Barracks, Oahu, Hawaii

See Continuation Page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

W9128A22R0020 Am-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0007)” is shown on each revised page.

a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are bold.

Section 02 61 13, para 1.2.3.1, 1.2.3.2, and 2.2

Section 09 30 10, para 2.7.2

Section 10 26 00, para 2.3

Section 33 71 02, para 2.1.3

b. NEW SECTIONS. The following are new pages to the solicitation.

Section 00 60 00, Appendix A – Requests for Information (#186 to 198)

Project Table of Contents, page 1

c. REPLACED SPECIFICATIONS. The following specifications are replaced in its entirety.

Section 02 16 13, Excavation and Handling of Contaminated Material

Section 09 30 10, Ceramic Quarry, and Glass Tiling

Section 10 26 00, Wall and Door Protection

Section 33 71 02, Underground Electrical Distribution

2. CHANGES TO DRAWINGS

a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith:

Sheet ID Sheet Number Mark Revision Date

A-501 172 of 423 A8 8/15/22

M-508 295 of 423 8 8/15/22

b. NEW DRAWINGS. The following new drawings are issued herewith:

N/A

3. The proposal due date and time has changed. See Am-0007, SF1442, Block 13A.

FY22 MCA PN70551 Child Development Center, Schofield Barracks, Oahu, Haw aii

DAYNA N MATSUMURA (808) 835-4379

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

08-Jun-2022

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________1237 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

BLDG 230 OTAKE ST.

FORT SHAFTER HI 96858

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) local time __23 Aug 2022__ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128A22R0020 108

(Am-0007)

FY22 PN 070551 Child Development Center, Schofield Barracks

W9128A22R0020

RFI # Question Response

Spec 02 61 13, Para 1.2.3.2 states that if onsite reuse of impacted soil is not feasible, dispose of impacted soil at the permitted disposal facility, so if this offsite disposal if required, will it be handled as a contract modification?

See Am-0007, Section 02 61 13, para 1.2.3.2

Spec 02 61 13, Para 1.2.3.1 calls out to relocate impacted soils under impermeable surface, such as pavement or building slabs, or 2’ clean soil cap. If IP soils relocate to under the building SOG, plumbing/mechanical/fire pipes and/or stubouts be allowed within the IP soil relocated area since the pipes will be covered with cushion material?

See Am-0007, Section 02 61 13, para 1.2.3.1

Reference Sheet T-601. Key Notes #3 & #7 shows the coming Communications Cables to be by other. Sheet ES101, Key Note #3 indicates otherwise.

Sheet ES303, Key Note #2 request for exterior conduit to be PVC COATED RMC CONDUIT, SCHEDULE 80 PVC, STAINLESS STEEL OR RIGID ALUMINUM. Sheet ES307, Detail A13 TYPICAL CONCRETE ENCASED DUCTBANK shows all the conduits in Ductbanks are PVC Conduits encased in concrete. The Specifications show PVC Sch40 when encased in concrete. (33 71 02 - 2.1.3 Plastic Duct for Concrete Encasement Provide Type EPC-40 per UL 651 and NEMA TC 2).

See T-601, Key Notes #3 and #7 for work by NEC.

See ES-101, Key Note #3 for work by Spectrum under this contract.

See Am-0005, Response to RFI 184.

CU102 shows the pipe connection between the 42” x 29” CMP detention system and 40’ headers, whereas the F14/C509 show the CMP headers are directly connected to the detention chambers. Please clarify.

Follow detail showing direct connection of header for chambers. Per CU102, there is no small pipe connection between the headers and the main chambers. Small line indicates connection only to follow detail only.

Onsite MH material classified as satisfactory material per Spec 31 00 00, Para 1.5.1.

Additionally, satisfactory material must be expansive values less than 2%, but no onsite MH soil data is available in bid document. Please clarify if the onsite excavated MH material can be reused for embankment and backfill to minimize the double handling cost, hauling our and importing.

Comply with Section 31 00 00, Para 1.5.1.

After further review of Amendment 3, it was noticed that there were further changes on sheet M- 601 than what was circled and called out. These changes include but are not limited to -changes in CFM, static pressures, cooling coil data, total / sensible capacities, etc. for the AHU and DOAS units. Considering these changes, please confirm that the drawings of the units showing length, width & height are still accurate? If not, please kindly provide updated mechanical drawings accurately depicting true design dimensions so we can ensure compliance.

See Am-0003, Sheet M-601.

See Am-0007, Sheet M-508.

Please advise if contractor can utilize ADS storm chamber system to meet or exceed the detention system design?

The Government cannot specify proprietary manufacturer's products. However, the Contractor may offer an alternative design and shall be responsible for demonstrating that the selected product meets or exceeds all applicable UFC and UFGS requirements prior to and for any substitution request to be approved by the Government. The detention volumes, inlet and outlet pipe inverts and slopes, minimum pipe cover (including the detention chambers), discharge points, and overall detention system footprint and size, must be considered in selection of a specific manufacturer's system.

Section 00 60 00, Appendix A, Requests for Information - 1

FY22 PN 070551 Child Development Center, Schofield Barracks

W9128A22R0020

RFI # Question Response

On the water tank roof, this is the spec for the insulation. Would it be safe to say that we should include in our bid the minimum size available, which would be ½”?

Rigid insulation board minimum thickness is 1/2"

194 Please provide specification for Fall Protection Ridge Anchor. See Section 05 50 13, para 2.12.

Reference Spec 09 90 00. SSPC QP1 is required per section 1.5.2. There are few SSPC QP1 qualified subcontractors in Hawaii. Please clarify if the requirement is applicable for coatings for new water tank. If we are only bidding on the new building and trash enclosure, SSPC QP1 is not needed.

See Section 09 90 00 for applicable coatings.

196 Please provide specs for buggy bumpers. See Am-0007, Section 10 26 00, para 2.3.

Spec section 09 30 10 does not specify any type of waterproofing for tile. No reference to waterproofing for tile areas were found on the drawings. Please confirm there is no tile waterproofing required for this project.

See Am-0007, Section 09 30 10, para 2.7 and 2.8 See Am-0007, L15/A-501

Does grading of tree stumps need to match the existing conditions of the tree or the surrounding area?

Grind stumps to 12" below surrounding finish grade and backfill area to match surrounding finish grade.

Section 00 60 00, Appendix A, Requests for Information - 2

FY21 PN 70551 CHILD DEVELOPMENT CENTER W9128A-19-D-0008

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

DIVISION 05 - METALS

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 24 00 05/11, CHG 4: 08/18 DIRECT APPLIED EXTERIOR FINISH SYSTEMS

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 36 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS

07 54 19 02/13 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 15.00 20 08/16, CHG 2: 11/18 ALUMINUM STANDING SEAM ROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10 RESILIENT FLOORING

09 65 66 08/16, CHG 1: 08/18 RESILIENT ATHLETIC FLOORING

PROJECT TABLE OF CONTENTS Page 1

SECTION 02 61 13

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D5434 (2012) Field Logging of Subsurface Explorations of Soil and Rock

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926 Safety and Health Regulations for Construction

40 CFR 302 Designation, Reportable Quantities, and Notification

STATE OF HAWAII, DEPARTMENT OF HEALTH (DOH)

DOH HEER TGM Hazard Evaluation and Emergency Response (HEER) Office Technical Guidance Manual (TGM) for the Implementation of the Hawaii State Contingency Plan

1.2 DESCRIPTION OF WORK

Conduct contaminated soil work in accordance with this section, DOH HEER TGM, and applicable Federal, state, and installation regulations and requirements.

1.2.1 Soil Screening Survey

A soil screening survey was conducted for areas to be disturbed during the construction, including the areas around Buildings 2101, 2102, 2104, and 2105. Buildings 2101, 2104, and 2105 are planned for demolition. The report is appended to the end of this section.

Applicable Environmental Action Levels (EAL): The selected screening levels are the DOH Tier 1 EALs for unrestricted (i.e. residential) land use. This section provides information for those soils containing Chemicals of Potential Concern (COPC) greater than the EALs for unrestricted land use.

SECTION 02 61 13 Page 1 (Am-0008)

A multi-incremental (MI) sampling method was used, and the project area was split into eight Decision Units (DU), which included the grassy and paved project areas and building perimeters.

A. DUs Sampled and Analyzed:

DU-1 to DU-4 (Large landscaped or paved DUs): Soil sampling for the grassy and paved project areas, excluding the building perimeters, was conducted from 0-1 feet below ground surface (ft bgs). The COPCs were arsenic and pesticides.

Four Building Perimeter DUs (Buildings 2101, 2102, 2104, and 2105):

Soil 0-3 feet laterally from the building perimeters was sampled from 0-1 ft bgs. The COPCs were arsenic, lead, and pesticides.

B. Areas not Sampled:

Beneath Building Foundations (Buildings 2101, 2102, 2104, and 2105):

Soils beneath the building foundations were inaccessible and not sampled. The soils below the foundations were assumed to be arsenic-, lead-, and pesticide-impacted, exceeding the EALs for unrestricted land use.

Stockpile Located to the North of Building 2102: Conduct soil sampling using a MI sampling method in accordance with the DOH TGM, to determine the levels of contaminants, if any. The estimated soil amount is 10 cubic yards. The sampling frequency shall be one per 400 cubic yards. Assume COPCs will be below the EALs. If the concentrations are below the EALs for unrestricted land use, the soil may be reused onsite as fill material if it meets geotechnical requirements. If levels are above the EALs, reuse soils beneath hardscape or 2 ft clean soil cap. The soil stockpile must be tested for, at a minimum, the following: total petroleum hydrocarbons as diesel and residual range organics, polycyclic aromatic hydrocarbons, polychlorinated biphenyls, heavy metals, and organochlorine pesticides. Notify the Contracting Officer if levels are above the EALs.

1.2.2 COPC Impacted Areas Exceeding the EALs

Tables 1 and 2 summarize the findings from the soil screening survey.

Table 1. Soil Analytical results for DU-1 to DU-4 DU Location (approximate DU size) Depth (ft bgs) COPC Exceeding EAL Mitigation Measures

DU-1 Landscaped area around B2102 (~0.75 acre)

0-1 None exceeded No mitigation required.

SECTION 02 61 13 Page 2

DU Location (approximate DU size) Depth (ft bgs)

COPC Exceeding EAL Mitigation Measures

DU-2 Landscaped area around B2101 (~1 acre)

0-1 Arsenic (25 mg/kg) EAL: 24 mg/kg

No mitigation required. Conduct bioaccessible arsenic testing.

DU-3 Landscaped and paved areas around B2105 (~1 acre)

0-1 None exceeded No mitigation required.

DU-4 Paved areas around B2104 (~1.6 acre)

0-1 None exceeded No mitigation required.

Table 2. Soil Analytical Results and Assumptions for Buildings 2101, 2102, 2104, 2105

COPCs Exceeding the EALs Mitigation Measure

Building Perimeter, 0-3 ft lateral from foundation

Below Building Slab (no samples collected)

2101 0-1 Ar seni c ( 33 mg/ kg) Lead (140 mg/kg)

Assumed ar seni c- , l ead- , and pesticide-impacted

Reuse impacted soil onsite under hardscape or 2-ft clean soil cap1-2 Assumed ar seni c- and lead-impacted

2102 0-1 Ar seni c ( 33 mg/ kg) Lead ( 140 mg/ kg)

Assumed ar seni c- , l ead- , and pesticide-impacted

1-2 Assumed ar seni c- and lead-impacted

2104 0-1 Ar seni c ( 33 mg/ kg) Lead ( 140 mg/ kg)

Assumed ar seni c- , l ead- , and pesticide-impacted

1-2 Assumed ar seni c- and lead-impacted

2105 0-1 Ar seni c ( 33 mg/ kg) Lead ( 140 mg/ kg)

Assumed ar seni c- , l ead- , and pesticide-impacted

1-2 Assumed ar seni c- and lead-impacted

Arsenic EAL: 24 mg/kg Lead EAL: 200 mg/kg mg/kg: milligrams per kilograms

1.2.3 Mitigation Measures

Implement mitigation measures for the impacted soil.

SECTION 02 61 13 Page 3

1.2.3.1 Onsite Reuse

The intent of the design in encapsulation of the impacted soil within the project boundary. Relocate impacted soils under impermeable surfaces such as pavement or buildings slabs, or 2 ft clean soil cap. The i mpact ed soi l can be r el ocat ed under t he cushi on mat er i al f or pi pel i nes or under gr ound ut i l i t i es as l ong as t he cushi on mat er i al can ser ve as t he encapsul at i on and t he soi l i s i naccessi bl e f or t he s i t e user s. The geot ext i l e bar r i er must be pr ovi ded bet ween i mpact ed soi l and cl ean mat er i al .

1.2.3.1.1 DU-2, Grassy Area Around Building 2101

Arsenic was measured in the surface soil (0-1 ft bgs) at 25 milligrams per kilogram (mg/kg), above the EAL of 24 mg/kg. Prior to site disturbance, conduct Bioaccessible Arsenic Test for DU-2 from 0-1 ft bgs. Submit the bioaccessible arsenic test report for DU-2. For the bid purpose, assume the analytical result for bioaccessible arsenic will be below 24 mg/kg;

thus, soil mitigation will not be required.

If bioaccessible arsenic is equal to greater than 24 mg/kg, the impacted soil must be covered with hardscapes or a 2 ft of clean soil cap. Provide a geotextile barrier between impacted soil and clean materials. If this action is required, it will be a contract modification.

1.2.3.1.2 Buildings 2101, 2102, 2104, 2105

The impacted soil boundaries are shown in Table 3. Reuse the impacted soil onsite under hard surface or a 2 ft clean soil cap. Provide a geotextile barrier between impacted soil and clean materials.

Table 3. Impacted Soil Boundaries Building Lateral Boundary Vertical Boundary

2101 Building footprint and 5 ft lateral from the footprint edge

0-2 ft bgs

2102 Building footprint and 5 ft lateral from the footprint edge

0-2 ft bgs

2104 Building footprint and 5 ft lateral from the footprint edge

0-2 ft bgs

2105 Building footprint and 5 ft lateral from the footprint edge

0-2 ft bgs

1.2.3.2 Disposal

If onsite reuse is not feasible, dispose of impacted soil at a permitted disposal facility. Provide all necessary sampling and analysis for soil disposal. I f of f s i t e di sposal i s r equi r ed, i t wi l l be a cont r act modification.

1.2.4 Scheduling

Notify the Contracting Officer 14 calendar days prior to the start of excavation of contaminated material.

1.2.5 Work Plan

Submit a Soil Management Work Plan within 30 calendar days after notice to proceed. No work at the site, with the exception of site inspections and

SECTION 02 61 13 Page 4 surveys, must be performed until the Work Plan is approved. Allow 30 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the Soil Management Work Plan must include:

a. Schedule of activities.

b. Method of excavation and equipment to be used.

c. Impacted soil relocation plan.

d. Shoring or side-wall slopes proposed.

e. Dewatering plan, if applicable.

f. Storage methods and locations for liquid and solid contaminated material.

g. Borrow sources and haul routes.

h. Decontamination procedures.

i. Spill contingency plan.

j. Stockpiling.

k. Soil and air monitoring procedures.

l. Sampling and Analysis Plan (including soil testing, profiling, and waste characterization for disposal).

m. Disposal plan for clean and contaminated excess soils (including manifesting, hauling, and disposal facility's acceptance requirements of the soil).

n. Engineering Control Plan (i.e. erosion control, dust and debris control, worker and environmental protection, etc.).

o. Health and Safety Plan.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Soil Management Work Plan; G

Closure Report; G

SD-06 Test Reports

Sampling and Analysis for Borrow Soil; G

Bioaccessible Arsenic Test Report for DU-2; G

SECTION 02 61 13 Page 5

Confirmation Sampling and Analysis; G

Sampling of Stored Material

Sampling Liquid

Compaction

Turn-in Documents or Weight Tickets; G

1.4 REGULATORY REQUIREMENTS

1.4.1 Permits and Licenses

Obtain required federal, state, and local permits for the construction (e.g. NPDES) and excavation and storage of contaminated material. Permits must be obtained at no additional cost to the Government.

1.4.2 Air Monitoring

Conduct personnel and environmental monitoring during earthwork, particularly when handling contaminated media and waste debris, in accordance with the approved work plan.

PART 2 PRODUCTS

2.1 SPILL RESPONSE MATERIALS

Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials must be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials must be compatible with the type of materials and contaminants being handled.

2.2 BACKFILL

Onsite excavated soil should be considered for fill as much as practical if it meets the geotechnical requirements specified in Sect i on 31 00 00 EARTHWORK. If offsite borrow material is required, the material must be brought to the project site after obtaining an approval from the Contracting Officer.

Borrow soils used for backfill must be certified to be "free" from hazardous substances (i.e. below DOH EALs for unrestricted land use), either by the supplier, or through sampling and testing of the materials.

Supplier testing or other testing of off-site borrow materials must include, but not be limited to, pesticides, petroleum hydrocarbons, heavy metals, and other chemicals of potential concern. An alternative to supplier certification is representative sampling and testing of source materials prior to transport. The frequency for the testing of an imported clean fill stockpile or borrow area is one sample per 400 cubic yards.

Collection of samples for non-volatiles analyses (e.g. pesticides, metals) must be performed by multi-increment sampling for each sample submitted for laboratory analysis (e.g. at least 50 increments per a bulk sample

SECTION 02 61 13 Page 6 analyzed).

A report for Sampling and Analysis for Borrow Soil must be submitted to the Contracting Officer. The detailed sampling procedures and the origin of the borrow material must be included in the report. Provide photographs and location maps for the origin of borrow materials. Provide all necessary soil sampling and testing results for the chemicals of potential concern. Do not bring material onsite until test results have been reviewed and approved by the Contracting Officer.

PART 3 EXECUTION

3.1 EXISTING STRUCTURES AND UTILITIES

No excavation must be performed until site utilities have been field located. Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations must be repaired at no cost to the Government. Utilities encountered that were not previously shown or otherwise located must not be disturbed without approval from the Contracting Officer.

3.2 CLEARING

Clearing shall be performed to the limits shown on the drawings in accordance with Section 31 11 00 CLEARING AND GRUBBING.

3.3 CONTAMINATED MATERIAL REMOVAL

3.3.1 Excavation

All impacted soil must be covered with hardscapes or 2 ft of clean soil.

If onsite reuse is not feasible, the impacted soil must be disposed of at a permitted disposal facility. Conduct all necessary earth moving work to meet the mitigation requirements of impacted soil as shown in paragraph

1.2.3 Mitigation Measures. Earthwork must be performed in a manner that will prevent exposures to the workers and site users, and limit releases and the potential for contaminated material to be mixed with uncontaminated material (refer to paragraph 3.7 Spills). An excavation log describing visible or olfactory signs of contamination encountered must be maintained for each area of excavation. Excavation logs must be prepared in accordance with ASTM D5434.

3.3.2 Shoring

If workers must enter the excavation, it must be evaluated, shored, sloped or braced as required by EM 385-1-1 and 29 CFR 1926 section 650.

3.3.3 Dewatering

Dewatering is not anticipated. If required, surface water must be diverted to prevent entry into the excavation. Dewatering must be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements are met. The dewatered effluent may be discharged back into the ground in close proximity in the construction site as long as any portion of the water does not enter a storm drain, and is not discharged to surface waters, wetlands, harbor, to a pit where the depth is greater than its width, or near proximity to the shoreline. When there is visible oil, the

SECTION 02 61 13 Page 7 oil must be removed as much as practical before the water is discharged to the ground. Prepare the dewatering plan in accordance with the applicable Federal and state regulations. Obtain necessary permits for dewatering from DOH Clean Water Branch, if required, and include a copy of permits in the Soil Management Work Plan. No dewatering must be performed without prior approval of the Contracting Officer.

3.4 CONFIRMATION SAMPLING AND ANALYSIS

After final grading is completed, conduct confirmation soil sampling and analysis to ensure that there are no contaminants above the EAL in the child-accessible areas (e.g. playgrounds). Collect confirmation soil samples using a multi-incremental (MI) method with minimum of 75 increments. The lateral and vertical boundaries are as follows:

Lateral boundary: All landscaped or exposed soil areas within the child accessible areas. Each DU shall not be greater than 0.5 acre. The lateral boundary excludes hardscaped areas such as building slabs, driveways, and roads.

Vertical boundary: 0-1 ft bgs

Test for arsenic, lead, and pesticides and include results in the Closure Report.

3.5 CONTAMINATED MATERIAL STORAGE

Material must be placed in temporary storage immediately after excavation. Storage units must be in good condition and constructed of materials that are compatible with the material or liquid to be stored.

All storage units must be clearly labeled, each with an identification number, and a written log must be kept to track the source of contaminated material in each temporary storage unit.

3.5.1 Stockpiles

Stockpiles must be constructed to isolate stored contaminated material, if any, from the environment. Stockpiles must be constructed to include:

a. A chemically resistant geomembrane liner free of holes and other damage. Non-reinforced geomembrane liners must have a minimum thickness of 20 mils. Scrim reinforced geomembrane liners must have a minimum weight of 40 lbs/1000 square feet. The ground surface on which the geomembrane is to be placed must be free of rocks greater than 0.5 inches in diameter and any other object which could damage the membrane.

b. Geomembrane cover free of holes or other damage to prevent precipitation from entering the stockpile. Non-reinforced geomembrane covers must have a minimum thickness of 10 mils. Scrim reinforced geomembrane covers must have a minimum weight of 26 lbs/1000 square feet. The cover material must be extended over the berms and anchored or ballasted to prevent it from being removed or damaged by wind.

c. Berms surrounding the stockpile, a minimum of 12 inches in height.

Vehicle access points must also be bermed.

d. The liner system must be sloped to allow collection of leachate.

Store and remove of liquid which collects in the stockpile, in

SECTION 02 61 13 Page 8 accordance with paragraph Liquid Storage.

3.5.2 Roll-Off Units

Roll-off units used to temporarily store contaminated material shall be water tight. A cover must be placed over the units to prevent precipitation from contacting the stored material. The Soil Management Work Plan must present the proposed location of the units, as well as alternate locations. Liquid which collects inside the units shall be removed and stored in accordance with paragraph Liquid Storage.

3.5.3 Liquid Storage

When there is visible oil on dewatering effluent, the oil should be removed as much as practical before the water is discharged to the ground. Liquid collected from dewatering (e.g. recovered free product) or equipment decontamination must be temporarily stored in 55-gallon barrels, or equivalent. Liquid storage containers must be water-tight and must be located and handled as specified in the approved work plan.

3.6 SAMPLING

3.6.1 Sampling of Stored Material

Samples of stored material that will be disposed of at an offsite facility must be collected at a frequency of one per 400 cubic yards or at the sampling frequency required by the recipient. Samples must be tested for the state and Federal criteria and analytes required by the receiving facility. Documentation of all analyses performed must be furnished to the Contracting Officer. The cost for sample analysis, documentation including photographs and narratives, and disposal of excess soil and liquid waste is the responsibility of the Contractor.

3.6.2 Sampling Liquid

Liquid collected from dewatering and decontamination must be sampled at a frequency of once for every 500 gallons of liquid collected or the sampling frequency required by the treatment/disposal facility. Samples must be tested for state and Federal criteria and analytes required by the disposal facility. Liquid waste must be disposed of or treated at offsite permitted facilities. The cost for sample analysis and disposal of liquid waste is the Contractor's responsibility. Documentation of all analyses performed, including sample location maps, sampling method, complete laboratory reports with chain-of-custody, total volume of liquid, and photographs, must be furnished to the Contracting Officer.

3.6.3 Sampling Beneath Storage Units

If the storage area for potentially contaminated or contaminated soils is located in a paved area, no soil testing will be required. However, geomembrane liners must be placed in accordance with paragraph 3.5.1 Stockpiles.

If the storage unit (e.g. stockpile) is located in an unpaved area, soil samples from beneath each storage unit must be collected prior to construction of and after removal of the storage unit. Samples must be collected at a frequency of one per each 2,000 square feet from a depth interval of 0 to 0.5 ft by using a MI sampling method with a minimum of 50 increments and must be tested for the following:

SECTION 02 61 13 Page 9

c. Arsenic and lead by EPA Method 6010B

d. Pesticides by EPA Method 8081

The Contractor must certify soil analytical results obtained after removal of the storage unit are not significantly greater than the initial soil analytical results obtained prior to construction of the storage unit.

The post-construction soil results must not exceed 120% of the initial analytical results obtained prior to using the storage area. Based on test results, soil which has become contaminated above action levels or significantly higher than initial testing results (exceeding 120% of the initial analytical results) must be removed and replaced with clean soil at no additional cost to the Government. Contaminated material which is removed from beneath the storage unit must be handled in accordance with the paragraph Sampling of Stored Material. As directed by the Contracting Officer and at no cost to the Government, additional sampling and testing must be performed to verify areas of contamination found beneath stockpiles have been cleaned up to below action levels or initial testing results.

3.7 SPILLS

In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302 ), pollutant, contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), notify the Contracting Officer immediately. If the spill exceeds the reporting threshold, follow the pre-established procedures as described in the Base Wide Contingency Plan for immediate reporting and containment. Immediate containment actions must be taken to minimize the effect of any spill or leak.

Cleanup shall be in accordance with applicable federal, state, and local regulations. As directed by the Contracting Officer, additional sampling and testing must be performed to verify spills have been cleaned up.

Spill cleanup, testing, and documentation must be done at no additional cost to the Government, and in close coordination with the host installation environmental function.

Immediately report any spills, including wastewater spills, to the Directorate of Public Works Environmental Spill Reporting Hotline at 808-656-111 during business hours, and 808-656-3272 for after hours.

3.8 BACKFILLING

Excavations must be backfilled immediately after all contaminated materials have been removed to the extent required for the project scope.

Backfill must be placed and compacted in accordance with Section 31 00 00

EARTHWORK.

3.8.1 Compaction

All backfill operations must adhere to Section 31 00 00 EARTHWORK.

3.9 DISPOSAL REQUIREMENTS

The Soil Management Work Plan must include a disposal plan for contaminated media and excavated waste debris, at a minimum including the sampling and analysis requirements for waste characterization and disposal facilities to be used. Provide Turn-in Documents or Weight Tickets for soil and waste disposal.

SECTION 02 61 13 Page 10

All waste, hazardous or non-hazardous, must be disposed of in accordance with laws and provisions and federal, state, and installation regulations and procedures. Ensure waste is properly characterized. The result of each waste characterization will dictate disposal requirements.

Documentation must be submitted to demonstrate the waste treatment, storage, or disposal facility is approved for the disposal of the excavated soil or materials. Submit one copy of the completed waste manifest, signed and dated by the initial transporter in accordance with 40 CFR 262. Provide a certificate that the waste was accepted by the disposal facility.

3.9.1 Non-Hazardous Waste

The appropriate stockpile or liquid sample results must be transmitted to disposal facilities for acceptance of waste disposal. If additional sampling and testing is required by the receiving facility for waste characterization and disposal, it must be done at no cost to the Government. Following acceptance from the disposal facilities and Contracting Officer, the hauling of the stockpiled soil/materials or liquid waste must be scheduled. For this project, the Contractor may assume that the contaminated soil/materials and liquid waste are non-hazardous waste.

3.9.2 Hazardous Waste

If the contaminated media are identified as hazardous waste, it must be transported to an approved hazardous waste treatment, storage, or disposal facility within 90 days of accumulation. The Schofield DPW's appropriate hazardous waste generator ID should be obtained from the Contracting Officer and recorded on the hazardous waste manifest, and the soil must be transported using Hazardous Waste Manifests. The Contractor must coordinate with the Contracting Officer for signature of all hazardous waste manifests. Contact the Contracting Officer a minimum of 10 days in advance of the need for signature. Excavated soils, if determined hazardous, must be disposed of off-site in accordance with RCRA criteria in 40 CFR Part 261. The contaminated media must be transported using a licensed hazardous waste hauler.

3.10 CLOSURE REPORT

Submit two copies of a Closure Report within 14 calendar days of completing work at the site. The report must be labeled with the contract number, project name, location, date, name of general Contractor, and the Corps of Engineers District contracting for the work.

The report shall include any sampling results, a description of institutional controls to remain on site, drawings showing the locations and depths where contaminated soils, if any, were excavated or deposited.

The record of where contaminated soils are reused/relocated or remain on site must include detailed maps, including surveyed perimeters of remaining approximate areas of contaminated soil and depth-specific information as required by the Institutional Controls. In addition, copies of logbooks and any soil relocation efforts taken prior to relocation shall be included.

The Closure Report must include the following information as a minimum:

SECTION 02 61 13 Page 11

a. A cover letter signed by a responsible company official certifying that all services involved have been performed in accordance with the terms and conditions of the contract documents and regulatory requirements.

b. A narrative report including, but not limited to, the following:

(1) site conditions, ground water elevation, and cleanup criteria;

(2) excavation logs;

(3) field screening instrument readings;

(4) quantity of materials removed from each area of contamination;

(5) quantity of water/product removed during dewatering;

(6) sampling locations and sampling methods (e.g. for child-occupied areas);

(7) sample collection data such as time of collection and method of preservation;

(8) final sample chain-of-custody forms; and

(9) source and documentation of backfill.

(10) for any reused contaminated soils, locations and depths of reused soils

c. Copies of all chemical and physical test results.

d. Copies of all manifests and land disposal restriction notifications.

e. Copies of all certifications of final disposal signed by the responsible disposal facility official.

f. Waste profile sheets.

g. Scale drawings showing limits of each excavation, limits of contamination, known underground utilities within 50 feet of excavation, sample locations, and sample identification numbers.

On-site stockpile, storage, treatment, loading, and disposal areas must also be shown on the drawings.

h. Progress Photographs. Color photographs shall be used to document progress of the work. A minimum of four views of the site showing the location of the area of contamination, entrance/exit road, and any other notable site conditions must be taken before work begins. After work has been started, activities at each work location shall be photographically recorded daily. Photographs must be a minimum of 3 by 5 inches and shall include:

(1) Soil removal and sampling.

(2) Dewatering operations.

(3) Unanticipated events such as spills and the discovery of unforeseen contaminated material.

SECTION 02 61 13 Page 12

(4) Contaminated material/water storage, handling, treatment, and transport.

(5) Site- or task-specific employee respiratory and personal protection.

(6) Fill placement and grading.

(7) Post-construction photographs. After completion of work at each site, take a minimum of four views of each excavation site.

A digital version of all photos shown in the report must be included with the Closure Report. Photographs shall be a minimum of 3 inches by 5 inches and must be mounted back-to-back in double face plastic sleeves punched to fit standard three ring binders. Each print must have an information box attached. The box must be typewritten and arranged as follows:

Project Name: Direction of View:

Location: Date/Time:

Photograph No.: Description of View:

Attachment:

Soil Screening Survey Report for FY21 PN70551 Child Development Center, Ulrich Way, Schofield Barracks, Myounghee Noh & Associates, L.L.C., 24 November 2021 -- End of Section --

SECTION 02 61 13 Page 13

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 30 10

CERAMIC, QUARRY, AND GLASS TILING

08/20

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 CERTIFICATIONS

1.3.1 Indoor Air Quality Certifications

1.4 QUALITY ASSURANCE

1.5 DELIVERY, STORAGE, AND HANDLING

1.6 ENVIRONMENTAL REQUIREMENTS

1.7 WARRANTY

1.8 EXTRA MATERIALS

PART 2 PRODUCTS

2.1 TILE

2.1.1 Porcelain Tile

2.1.2 Quarry Tile

2.1.3 Glazed Ceramic Wall Tile

2.2 SETTING-BED

2.2.1 Aggregate for Concrete Fill

2.2.2 Portland Cement

2.2.3 Sand

2.2.4 Hydrated Lime

2.2.5 Metal Lath

2.2.6 Reinforcing Wire Fabric

2.3 WATER

2.4 MORTAR, GROUT, AND ADHESIVE

2.4.1 Dry-Set Portland Cement Mortar

2.4.2 Latex-Portland Cement Mortar

2.4.3 Ceramic Tile Grout

2.4.4 Epoxy Resin Grout

2.4.5 Sealants

2.5 SUBSTRATES

2.5.1 Glass-Mat Gypsum Water-Resistant Backing Board

2.6 MISCELLANEOUS TRIMS

2.6.1 Transition Strips

2.6.2 Metal Strips

2.7 WATERPROOF MEMBRANE

2.7.1 General

2.7.2 Chlorinated-Polyethylene Waterproof Membrane

2.8 CRACK ISOLATION MEMBRANE

2.8.1 General

2.8.2 Liquid Applied Crack Isolation Membrane

2.9 COLOR, TEXTURE, AND PATTERN

PART 3 EXECUTION

SECTION 09 30 10 Page 1

3.1 PREPARATORY WORK AND WORKMANSHIP

3.2 GENERAL INSTALLATION REQUIREMENTS

3.3 INSTALLATION OF SUBSTRATES

3.3.1 Glass-Mat Water-Resistant Backing Board

3.4 INSTALLATION OF WALL TILE

3.4.1 Ceramic Tile Grout

3.4.2 Epoxy Resin Grout

3.5 INSTALLATION OF FLOOR TILE

3.5.1 Dry-Set and Latex-Portland Cement

3.5.2 Ceramic Tile Grout

3.5.3 Waterproof and Crack Isolation Membranes

3.5.4 Concrete Fill

3.6 INSTALLATION OF MISCELLANEOUS TRIMS

3.6.1 Transition Strips

3.6.2 Metal Trims

3.7 EXPANSION JOINTS

3.7.1 Walls

3.7.2 Floors

3.8 CLEANING AND PROTECTING

-- End of Section Table of Contents --

SECTION 09 30 10 Page 2

SECTION 09 30 10

CERAMIC, QUARRY, AND GLASS TILING

08/20 *

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A108/A118/A136.1 (2019) American National Standard Specifications for the Installation of Ceramic Tile

ANSI A137.1 (2019) American National Standards Specifications for Ceramic Tile

ASTM INTERNATIONAL (ASTM)

ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates

ASTM C144 (2018) Standard Specification for Aggregate for Masonry Mortar

ASTM C150/C150M (2020) Standard Specification for Portland Cement

ASTM C206 (2014) Standard Specification for Finishing Hydrated Lime

ASTM C207 (2018) Standard Specification for Hydrated Lime for Masonry Purposes

ASTM C648 (2020) Standard Test Method for Breaking Strength of Ceramic Tile

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SECTION 09 30 10 Page 3

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications

TILE COUNCIL OF NORTH AMERICA (TCNA)

TCNA Hdbk (2017) Handbook for Ceramic, Glass, and Stone Tile Installation

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Detail Drawings

SD-03 Product Data

Porcelain Tile

Recycled Content for Porcelain Tile; S

Quarry Tile

Recycled Content for Quarry Tile; S

Glazed Ceramic Wall Tile

Recycled Content for Glazed Ceramic Wall Tile; S

Transition Strips

Metal Strips

Setting-Bed

Mortar, Grout, and Adhesive

SECTION 09 30 10 Page 4

Glass-Mat Gypsum Water-Resistant Backing Board

Waterproof Membrane

Crack Isolation Membrane

Reinforcing Wire Fabric

SD-04 Samples

Tile; G

Accessories; G

Transition Strips; G

Metal Strips; G

Grout; G

SD-07 Certificates

Indoor Air Quality for Adhesives; S

Indoor Air Quality for Sealants; S

SD-08 Manufacturer's Instructions

Manufacturer's Approved Cleaning Instructions

SD-10 Operation and Maintenance Data

Porcelain Tile, Data Package 1

Quarry Tile, Data Package 1

Glazed Ceramic Wall Tile, Data Package 1

Transition Strips, Data Package 1

Metal Strips, Data Package 1

1.3 CERTIFICATIONS

1.3.1 Indoor Air Quality Certifications

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited in this Section.

1.4 QUALITY ASSURANCE

Provide installers having a minimum of two years of experience with a company specializing in performing the type of work described. Each type and color of tile to be provided from a single source. Each type and

SECTION 09 30 10 Page 5 color of mortar, adhesive, and grout to be provided from the same source.

1.5 DELIVERY, STORAGE, AND HANDLING

Ship tiles in sealed packages and clearly marked with the grade, type of tile, producer identification, and country of origin. Deliver materials to the project site in manufacturer's original unopened containers with seals unbroken and labels and hallmarks intact. Protect materials from weather, and store them under cover in accordance with manufacturer's printed instructions. Store and handle tiles per manufacturer's instructions for gauged porcelain tile and gauged porcelain tile panels/slabs.

1.6 ENVIRONMENTAL REQUIREMENTS

Do not perform ceramic tile work unless the substrate and ambient temperature is at least 50 degrees F and rising. Maintain temperature above 50 degrees F while the work is being performed and for at least 7 days after completion of the work. When temporary heaters are used, ventilate the area to the outside to avoid carbon dioxide damage to new tilework.

1.7 WARRANTY

Provide manufacturer's warranty to repair or replace defective tiling materials and workmanship, including tile, mortar and grout products and installation as a system, for a period of one year from date of final acceptance of the work..

1.8 EXTRA MATERIALS

Supply an extra carton of each type tile used in clean and marked cartons.

PART 2 PRODUCTS

2.1 TILE

Provide tiles that comply with ANSI A137.1 and are standard grade tiles.

Furnish gauged porcelain tile that comply with ANSI A137.3/A108.19 .

Provide a minimum breaking strength of 125 lbs. for wall tile and 250 lbs.

for floor tile in accordance with…

This is the start of the file's text. The full file is on GovTribe.