About this file

This document includes a federal contract opportunity notice for construction services. The U.S. Army Corps of Engineers, Honolulu District is soliciting proposals for a firm fixed-price construction contract to build a 37,300 square foot Child Development Center at Schofield Barracks in Oahu, Hawaii. The project scope includes the building, 38,311 square feet of playground areas, 146 parking spaces, site work, utilities, and demolition of an existing band facility. The performance period is 1,237 calendar days from notice to proceed, and the project value is estimated between $25-50 million. Proposals will be evaluated on experience, past performance, technical approach, and price using LPTA procedures. The solicitation number is W9128A22R0020.

View the file

Other files

File Type Posted
22r20-CDC SB-Am-0008.pdf PDF
22r20-CDC SB-Am-0007.pdf PDF
PN70551_CDC_SB_DWGS_Am-0007.pdf PDF
22r20-CDC SB-Am-0006.pdf PDF
22r20-CDC SB-Am-0005.pdf PDF
PN70551_CDC_SB_DWGS_Am-0005.pdf PDF
PN70551_CDC_SB_DWGS_Am-0004.pdf PDF
22r20-CDC SB-Am-0004.pdf PDF
PN70551_CDC_SB_DWGS_AM-0003.pdf PDF
22r20-CDC SB-Am-0003.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part4.pdf PDF
22r20-CDC SB-Am-0002.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part1.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part3.pdf PDF
PN70551_DESIGN COMPLETE_SPEC-am-0002.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part5.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part2.pdf PDF
PN70551_CDC_SB_DWGS_AM-0002.pdf PDF
PN70551_DESIGN COMPLETE_DWG-am-0002-Part6.pdf PDF
22r20-CDC SB-Am-0001.pdf PDF
22r20 - RFP.pdf PDF
PN70551_100_DWG_Part6.pdf PDF
PN70551_100_DWG_Part11.pdf PDF
PN70551_100_DWG_Part9.pdf PDF
PN70551_100_DWG_Part2.pdf PDF
22r20-Map-SB.pdf PDF
PN70551_100_DWG_Part3.pdf PDF
PN70551_100_DWG_Part7.pdf PDF
PN70551_100_DWG_Part10.pdf PDF
PN70551_100_DWG_Part5.pdf PDF
PN70551_100_SPEC.pdf PDF
PN70551_100_DWG_Part8.pdf PDF
PN70551_100_DWG_Part4.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARDOUS MATERIAL MITIGATION :

1. A HAZARDOUS MATERIAL SURVEY REPOT IS APPENDED TO SECTION 02 82 00 ASBESTOS

REMEDIATION. REVIEW THE SURVEY REPORT. UNDERSTAND THE LIMITATIONS OF THE

SURVEY AND CONDUCT ADDITIONAL HAZARDOUS MATERIAL TESTING AS NEEDED.

2. ASSUME AND TREAT ALL PAINTED SURFACES AS LEAD-BASED PAINT (LBP). COMPLY

WITH THE REQUIREMENTS IN SECTION 02 83 00 LEAD REMEDIATION.

3. IF SUSPECT MATERIALS PREVIOUSLY UNFORESEEN BECOME UNCOVERED, TESTING

WILL BE REQUIRED PRIOR TO DISTURBANCE OF SUSPECTED MATERIALS. IN THE

ABSENCE OF TESTING, ASSUME THE MATERIAL CONTAINS HAZARDOUS SUBSTANCES,

AND DISTURB AND HANDLE IN A MANNER CONSISTENT WITH WORKING WITH KNOWN

HAZARDS.

CONTAMINATED SOIL MANAGEMENT:

1. CONDUCT CONTAMINATED SOIL WORK IN ACCORDANCE WITH 1) SECTION 02 61 13

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL AND 2) SOIL SCREENING

SURVEY FOR FY21 PN70551 CHILD DEVELOPMENT CENTER, ULRICH WAY, SCHOFIELD

BARRACKS, WAHIAWA.

2. THE SELECTED ACTION LEVELS ARE HAWAII DEPARTMENT OF HEALTH (DOH) TIER 1

ENVIRONMENTAL ACTION LEVELS (EAL) FOR UNRESTRICTED LAND USE, ABOVE A

DRINKING WATER RESOURCE AND MORE THAN 150 METERS FROM SURFACE WATER.

3. APPROXIMATE LOCATIONS OF CONTAMINATED AREAS ARE SHOWN IN CE101, CE102,

AND THE SOIL SCREENING SURVEY REPORT.

4. REUSE EXCAVATED SOIL AS MUCH AS POSSIBLE WITHIN THE PROJECT SITE IF IT MEETS

GEOTECHNICAL REQUIREMENTS. REUSE CONTAMINATED OIL ONSITE AND COVER WITH

A HARD SURFACE (E.G. ASPHALT) OR A 2-FT CLEAN SOIL CAP. INSTALL GEOTEXTILE

BARRIER DELINEATING IMPACTED SOIL FROM CLEAN SOIL CAP OR HARSCAPE.

DOCUMENT LOCATIONS AND DEPTHS OF REUSED IMPACTED SOILS IN THE CLOSURE

REPORT.

5. MIXING OF CONTAMINATED SOIL WITH CLEAN SOIL IS NOT PERMITTED. CONTAMINATED

SOIL SHALL BE STOCKPILED SEPARATELY BASED ON THE LOCATION AND/OR TYPE OF

CONTAMINATION.

6. DESIGN AND IMPLEMENT ENGINEERING CONTROLS TO PREVENT THE RELEASE OF

CONTAMINATED SOIL DURING EARTHWORK.

7. EXCESS CLEAN AND CONTAMINATED SOIL THAT WILL BE TRANSPORTED OFF-BASE FOR

DISPOSAL MUST BE CHARACTERIZED TO ENSURE COMPLIANCE WITH RECIPIENT

GUIDELINES AND REQUIREMENTS. PROVIDE ALL NECESSARY SOIL SAMPLING AND

ANALYSIS FOR DISPOSAL PER LANDFILL REQUIREMENTS.

8. NO VISIBLE EMISSION SHALL BE ALLOWED IN THE PROJECT SITE AND IN THE

SURROUNDING AREAS. BEST MANAGEMENT PRACTICE (BMPS) MUST BE USED TO

CONTROL EMISSIONS, DUST, AND SILICA.

9. FOLLOWING ALL PROJECT CONSTRUCTION, CONDUCT CONFRIMATION SOIL SAMPLING

FROM 0-1 FT BGS FROM ALL CHILD ACCESSIBLE AREAS (E.G. PLAYGROUNDS), TO

ENSURE LEVELS ARE BELOW THE DOH EALS FOR UNRESTRICTED LAND USE.

10. SUBMIT CLOSURE REPORT ONCE ALL EARTHWORK HAS BEEN COMPLETED. INCLUDE

ALL SOIL TEST RESULTS.

ENVIRONMENTAL PROTECTION:

1. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE DURATION OF THIS

CONTRACT. COMPLY WITH FEDERAL, STATE, LOCAL, AND INSTALLATION REGULATIONS

AND REQUIREMENTS PERTAINING TO ENVIRONMENTAL PROTECTION, INCLUDING WATER,

AIR, SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES, SILICA, OILY SUBSTANCES,

AND NOISE POLLUTION.

2. PREPARE AND SUBMIT ALL NECESSARY ENVIRONMENTAL PROTECTION, HAZARDOUS

MATERIALS/ CONTAMINATED SOIL ABATEMENT PLANS AS DESCRIBED IN THE

SPECIFICATIONS FOR REVIEW AND APPROVAL BY THE GOVERNMENT.

3. OBTAIN ALL NECESSARY CONSTRUCTION AND ENVIRONMENTAL PERMITS (E.G. NPDES).

SITE DISTURBANCE MUST NOT BEGIN UNTIL ALL PERMITS HAVE BEEN OBTAINED.

4. NO DEBRIS SHALL ENTER STORM DRAINS. BEST MANAGEMENT PRACTICES (BMP) MUST

BE IN PLACE AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO STARTING ANY

VEGETATION REMOVAL, GRADING, OR CONSTRUCTION WORK.

WASTE HANDLING AND DISPOSAL:

1. DISPOSE OF WASTE AT A PERMITTED OFF-BASE DISPOSAL FACILITY IN ACCORDANCE

WITH FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS.

2. PROVIDE ALL NECESSARY SAMPLING AND TESTING FOR WASTE CHARACTERIZATION

AND PREPARE WASTE MANIFEST, WHEN APPLICABLE.

3. SOLID AND HAZARDOUS WASTE SHALL BE PROPERLY PACKAGED AND DISPOSED OF IN

ACCORDANCE WITH APPLICABLE FEDERAL, STATE, LOCAL, AND INSTALLATION

REQUIREMENTS.

4. RECYCLE OR DISPOSE OF ANY CONSTRUCTION AND DEMOLITION (C&D) DEBRIS/WASTE

ACCORDINGLY AT A PERMITTED OFF-BASE DISPOSAL FACILITY IN ACCORDANCE WITH

HAWAII ADMINISTRATIVE RULES (HAR) 11-261 AND 11-262. CHARACTERIZE, TEST,

PROFILE, MANIFEST, AND DOCUMENT ALL C&D DEBRIS AND WASTE BEFORE IT IS

TRANSPORTED FROM THE PROJECT SITE FOR FINAL DISPOSAL/DISPOSITION.

CULTURAL AND NATURAL RESOURCES MANAGEMENT:

1. ONE EXCEPTIONAL TREE, CAPPARIS MOLLICELLA, IS LOCATED SOUTHWEST OF

BUILDING 2105 AND WILL REMAIN IN PLACE. REFER TO SHEETS C-101 AND C-202 FOR

TREE LOCATION.

2. CUTTING OR TRIMMING OF ANY TREES OVER 15 FEET TALL IS PROHIBITED DURING THE

BAT PUPPING SEASON, 01 JUNE TO 15 SEPTEMBER. CONTACT UNITED STATES ARMY

GARRISON HAWAII (USAG-HI) NATURAL RESOURCES PROGRAM FOR GUIDANCE ON

TREES THAT MUST BE CUT DURING THE BAT PUPPING SEASON (E.G. EMERGENCY

SITUATION SUCH AS THREATENING POWER LINE). COMPLY WITH THE USAG-HI TREE

CUTTING MEMORANDUM, DATED 20 JANUARY 2017.

3. NO ACCUMULATION OF GREEN WASTE IS ALLOWED ONSITE, TO PREVENT INFESTATION

OF COCONUT RHINOCEROS BEETLE.

4. THE PROJECT SITE IS LOCATED IN AN AREA OF LOW POTENTIAL FOR ENCOUNTERING

ARCHAEOLOGICAL RESOURCES. SHOULD HUMAN REMAINS OR POTENTIAL

ARCHAEOLOGICAL ARTIFACTS BE DISCOVERED DURING THE PROJECT, ALL WORK IN

THE AREA SHALL STOP, AND THE CONTRACTING OFFICER AND USAG-HI CULTURAL

RESOURCES SPECIALIST MUST BE IMMEDIATELY NOTIFIED.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

N

AL

S

U

BM

IT

TA

L 2/

/2

C :\R ev it_

Pr oj ec ts

\1

9_

E_ C en tra l_ aq ue ve do .rv t

/1 5/

:0

3:

P M

FY

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

FT

. S

H

AF

TE

R

, H

AW

AI

I

H O

'O H

U I'I

A

- J

V

C L

AQ R

W

/0

9/

SC

H O

FI

EL

D B

AR

R

AC

KS

O

AH

U , H

AW

AI

I

BI

SH

O P

ST

, S

U

IT

E

H

O N

O

LU

LU

, H

AW

AI

I 9

EN

VI

R O

N M

EN

TA

L N

O

TE

S

CE001

WORKER SAFETY:

1. COMPLY WITH ALL APPLICABLE FEDERAL AND LOCAL HEALTH AND SAFETY

REGULATIONS AND SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. ALL

WORK INVOLVING HAZARDOUS MATERIALS/WASTE AND CONTAMINATED SOIL, AND

SILICA MUST BE CONDUCTED IN A CONTROLLED MANNER PROTECTIVE OF WORKERS,

BASE PERSONNEL, AND THE ENVIRONMENT.

2. PREPARE AND IMPLEMENT A SITE-SPECIFIC HEALTH & SAFETY PLAN.

3. SITE WORKERS MUST BE INFORMED OF THE SITE CONDITIONS. THE HAZARDS MUST BE

PROPERLY IDENTIFIED, EVALUATED, AND MITIGATED PRIOR TO ANY SITE WORK.

PROVIDE HAZARD COMMUNICATION AND TRAINING TO THE WORKERS AND

SUBCONTRACTORS.

4. IF THE CONTRACTOR BRINGS HAZARDOUS MATERIALS OR CHEMICALS TO THE SITE,

SUBMIT AMOUNTS OF HAZARDOUS MATERIALS AND ASSOCIATED SAFETY DATA SHEETS

(SDS) TO THE CONTRACTING OFFICER. DO NOT BRING THE HAZARDOUS MATERIALS OR

CHEMICALS WITHOUT APPROVALS FROM THE CONTRACTING OFFICER.

ACRONYMS AND ABBREVIATIONS:

BGS BELOW GROUND SURFACE

BMP BEST MANAGEMENT PRACTICES

C&D CONSTRUCTION AND DEMOLITION

COPC CHEMICAL OF POTENTIAL CONCERN

DOH HAWAII DEPARTMENT OF HEALTH

EAL ENVIRONMENTAL ACTION LEVEL

FT FOOT/FEET

HAR HAWAII ADMINISTRATIVE RULES

LBP LEAD-BASED PAINT

MG/KG MILLIGRAMS PER KILOGRAM

MI MULTI-INCREMENTAL

SDS SAFETY DATA SHEET

USAG-HI UNITED STATES ARMY GARRISON HAWAII

FI

N

AL

S

U

BM

IT

TA

L N

O T

FO

R

C O

N

ST

R U

C

TI

O N

KA

IO

N A

AV

EN

U

KA

IO

N

A

AV

EN

U

ARSENIC, LEAD, AND PESTICIDE CONTAMINATED SOILS:

1. REFER TO SOIL SCREENING SURVEY FOR FY21 PN70551 CHILD DEVELOPMENT CENTER,

ULRICH WAY, SCHOFIELD BARRACKS, WAHIAWA, FOR DETAILED INFORMATION, LEVELS

OF COPC, AND REQUIREMENTS. THE SURVEY IS APPENDED TO SECTION 02 61 13.

2. SOIL FROM DU-2 AT 0-1 FT BGS CONTAINS ARSENIC ABOVE THE EAL FOR UNRESTRICTED

LAND USE. CONDUCT SAMPLING AND ANALYSIS FOR BIOACCESSIBLE ARSENIC AT 0-1 FT

BGS WITHIN DU-2. ASSUME BIOACCESSIBLE ARSENIC IS BELOW THE EAL OF 24

MILLIGRAMS PER KILOGRAM (MG/KG) AND CAN BE REUSED ON-SITE WITHOUT

RESTRICTIONS.

3. FOLLOWING ALL PROJECT CONSTRUCTION, CONDUCT SOIL SAMPLING FROM 0-1 FT BGS

FROM ALL CHILD ACCESSIBLE AREAS (E.G. PLAYGROUNDS), TO ENSURE LEVELS ARE

BELOW THE DOH EALS FOR UNRESTRICTED LAND USE.

4. IMPLEMENT ENGINEERING CONTROLS AND WORKER AND ENVIRONMENTAL PROTECTION

IN ACCORDANCE WITH SECTION 02 61 13 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL.

5. REUSE CONTAMINATED SOIL ON-SITE AND COVER WITH HARD SURFACE (E.G. ASPHALT)

OR 2-FT CLEAN SOIL CAP. USE A GEOTEXTILE LAYER TO DELINEATE CONTAMINATED

SOIL FROM THE CLEAN SOIL CAP OR HARDSCAPE. DOCUMENT LOCATIONS AND DEPTHS

OF REUSED CONTAMINATED SOILS IN THE CLOSURE REPORT.

5.1. IF ON-SITE REUSE OF CONTAMINATED SOIL IS NOT FEASIBLE, DISPOSE OF THE SOIL

AT A PERMITTED LANDFILL.

5.2. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE DURATION OF

THIS CONTRACT. COMPLY WITH FEDERAL, STATE, AND LOCAL REGULATIONS AND

INSTALLATION REQUIREMENTS PERTAINING TO ENVIRONMENTAL PROTECTION,

INCLUDING WATER, AIR, SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES,

SILICA, OILY SUBSTANCES, AND NOISE POLLUTION.

6. COLLECT MULTI-INCREMENTAL (MI) SOIL SAMPLES FROM THE SOIL STOCKPILE LOCATED

TO THE NORTH OF BUILDING 2102. ASSUME SOILS WILL BE REUSED ONSITE. DETAILS

FOR THE STOCKPILE SAMPLING ARE INCLUDED IN SECTION 02 61 13.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

N

AL

S

U

BM

IT

TA

L 2/

/2

C :\R ev it_

Pr oj ec ts

\1

9_

E_ C en tra l_ aq ue ve do .rv t

/1 5/

:0

3:

P M

FY

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

FT

. S

H

AF

TE

R

, H

AW

AI

I

H O

'O H

U I'I

A

- J

V

C

L AQ R

W

/0

9/

SC

H O

FI

EL

D B

AR

R

AC

KS

O

AH

U , H

AW

AI

I

BI

SH

O P

ST

, S

U

IT

E

H

O N

O

LU

LU

, H

AW

AI

I 9

EX

IS

TI

N

G S

O

IL

C O

N

TA

M

IN

AT

IO

N

IN

LA

N

D

SC

AP

ED

A N

D P

AV

ED

A R

EA

S

CE101

SOIL TEST RESULTS FOR LANDSCAPED AND PAVED AREAS

DU (AREA IN ACRES) DEPTH COPC EXCEEDING

EALS MITIGATION MEASURES

DU-1 LANDSCAPED AREA AROUND

B2102 (~0.75 AC)

0-1 NONE EXCEEDED NOT REQUIRED

DU-2 LANDSCAPED AREA AROUND

B2101 (~1 AC)

0-1 ARSENIC (25mg/kg) EAL: 24 mg/kg

NOT REQUIRED.

CONDUCT BIOASSESSIBLE ARSENIC TESTING

DU-3 LANDSCAPED AND PAVED

AREAS AROUND B2105 (~1 AC)

0-1 NONE EXCEEDED NOT REQUIRED

DU-4 LANDSCAPED AND PAVED

AREAS AROUND B2104 (~1.6 AC)

0-1 NONE EXCEEDED NOT REQUIRED

EXISTING SOIL CONTAMINATION IN LANDSCAPED AND PAVED AREAS

SCALE: 1" = 40'

TOTAL ARSENIC EXCEEDING DOH

EAL

LEGEND

SOIL STOCKPILE

CONDUCT SOIL SAMPLING AND ANALYSIS FOR REUSE.

REFER TO NOTE 6.

DU-3

DU-4

DU-2

DU-1

FI

N

AL

S

U

BM

IT

TA

L N

O T

FO

R

C O

N

ST

R U

C

TI

KA

IO

N A

AV

EN

U

KA

IO

N

A

AV

EN

U

ARSENIC, LEAD, AND PESTICIDE CONTAMINATED SOILS:

1. REFER TO SOIL SCREENING SURVEY FOR FY21 PN70551 CHILD DEVELOPMENT CENTER,

ULRICH WAY, SCHOFIELD BARRACKS, WAHIAWA, FOR DETAILED INFORMATION, LEVELS

OF COPC, AND REQUIREMENTS. THE SURVEY IS APPENDED TO SECTION 02 61 13.

2. UNLESS TESTED, ASSUME ARSENIC, LEAD, AND PESTICIDE CONTAMINATED SOIL

BENEATH ALL EXISTING BUILDINGS FROM 0-2 FT BELOW GROUND SURFACE (BGS) ABOVE

THE DOH EALS.

3. SOIL SAMPLING WAS CONDUCTED ALONG THE BUILDING PERIMETERS. ASSUME

ARSENIC AND LEAD CONTAMINATED SOIL IS PRESENT 0-5 FT LATERALLY FROM THE

BUILDING FOOTPRINTS AND 0-2 FT BGS.

4. IMPLEMENT ENGINEERING CONTROLS AND WORKER AND ENVIRONMENTAL PROTECTION

IN ACCORDANCE WITH SECTION 02 61 13 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL.

5. REUSE CONTAMINATED SOIL ON-SITE AND COVER WITH HARD SURFACE (E.G. ASPHALT)

OR 2-FT CLEAN SOIL CAP. USE A GEOTEXTILE LAYER TO DELINEATE CONTAMINATED

SOIL FROM THE CLEAN SOIL CAP OR HARDSCAPE. DOCUMENT LOCATIONS AND DEPTHS

OF REUSED CONTAMINATED SOILS IN THE CLOSURE REPORT.

5.1. IF ON-SITE REUSE OF CONTAMINATED SOIL IS NOT FEASIBLE, DISPOSE OF THE SOIL

AT A PERMITTED LANDFILL.

5.2. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE DURATION OF

THIS CONTRACT. COMPLY WITH FEDERAL, STATE, AND LOCAL REGULATIONS AND

INSTALLATION REQUIREMENTS PERTAINING TO ENVIRONMENTAL PROTECTION,

INCLUDING WATER, AIR, SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES,

SILICA, OILY SUBSTANCES, AND NOISE POLLUTION.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

N

AL

S

U

BM

IT

TA

L 2/

/2

C :\R ev it_

Pr oj ec ts

\1

9_

E_ C en tra l_ aq ue ve do .rv t

/1 5/

:0

3:

P M

FY

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

FT

. S

H

AF

TE

R

, H

AW

AI

I

H O

'O H

U I'I

A

- J

V

C

L AQ R

W

/0

9/

SC

H O

FI

EL

D B

AR

R

AC

KS

O

AH

U , H

AW

AI

I

BI

SH

O P

ST

, S

U

IT

E

H

O N

O

LU

LU

, H

AW

AI

I 9

EX

IS

TI

N

G S

O

IL

C O

N

TA

M

IN

AT

IO

N A

T

BU

IL

D

IN

G

P

ER

IM

ET

ER

S

AN

D

B

EL

O W

S

LA

BS

CE102EXISTING SOIL CONTAMINATION AT BUILDING PERIMETERS AND BELOW SLABS

SCALE: 1" = 40'

SOIL TEST RESULTS FOR BUILDING 2104 PERIMETER

BUILDING

PERIMETER DEPTH

COPC EXCEEDING EALS

BUILDING PERIMETER

0-5 FT LATERAL BELOW SLAB

2104-P 0-1 ARSENIC (38 mg/kg) LEAD (8,600 mg/kg)

ASSUMED ARSENIC, LEAD,

AND PESTICIDE

CONTAMINATED1-2 ASSUMED ARSENIC AND

LEAD CONTAMINATED

ARSENIC EAL: 24 mg/kg

LEAD EAL: 200 mg/kg

SOIL TEST RESULTS FOR BUILDING 2105 PERIMETER

BUILDING

PERIMETER DEPTH

COPC EXCEEDING EALS

BUILDING PERIMETER

0-5 FT LATERAL BELOW SLAB

2105-P 0-1 ARSENIC (34 mg/kg) LEAD (1,600 mg/kg)

ASSUMED ARSENIC, LEAD,

AND PESTICIDE

CONTAMINATED1-2 ASSUMED ARSENIC AND

LEAD CONTAMINATED

ARSENIC EAL: 24 mg/kg

LEAD EAL: 200 mg/kg

SOIL TEST RESULTS FOR BUILDING 2102 PERIMETER

BUILDING

PERIMETER DEPTH

COPC EXCEEDING EALS

BUILDING PERIMETER

0-5 FT LATERAL BELOW SLAB

2102-P 0-1 ARSENIC (27 mg/kg) LEAD (11,000 mg/kg)

ASSUMED ARSENIC, LEAD,

AND PESTICIDE

CONTAMINATED1-2 ASSUMED ARSENIC AND

LEAD CONTAMINATED

ARSENIC EAL: 24 mg/kg

LEAD EAL: 200 mg/kg

SOIL TEST RESULTS FOR BUILDING 2101 PERIMETER

BUILDING

PERIMETER DEPTH

COPC EXCEEDING EALS

BUILDING PERIMETER

0-5 FT LATERAL BELOW SLAB

2101-P 0-1 ARSENIC (33 mg/kg) LEAD (140 mg/kg)

ASSUMED ARSENIC,

LEAD, AND PESTICIDE

CONTAMINATED1-2 ASSUMED ARSENIC AND

LEAD CONTAMINATED

ARSENIC EAL: 24 mg/kg LEAD EAL: 200 mg/kg

SOIL CONTAMINATION

EXCEEDING EAL

LEGEND

FI

N

AL

S

U

BM

IT

TA

L N

O T

FO

R

C O

N

ST

R U

C

TI

File details come from the government source that posted it. Updated .