This document includes a federal contract opportunity notice for construction services. The U.S. Army Corps of Engineers, Honolulu District is soliciting proposals for a firm fixed-price construction contract to build a 37,300 square foot Child Development Center at Schofield Barracks in Oahu, Hawaii. The project scope includes the building, 38,311 square feet of playground areas, 146 parking spaces, site work, utilities, and demolition of an existing band facility. The performance period is 1,237 calendar days from notice to proceed, and the project value is estimated between $25-50 million. Proposals will be evaluated on experience, past performance, technical approach, and price using LPTA procedures. The solicitation number is W9128A22R0020.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZARDOUS MATERIAL MITIGATION :
1. A HAZARDOUS MATERIAL SURVEY REPOT IS APPENDED TO SECTION 02 82 00 ASBESTOS
REMEDIATION. REVIEW THE SURVEY REPORT. UNDERSTAND THE LIMITATIONS OF THE
SURVEY AND CONDUCT ADDITIONAL HAZARDOUS MATERIAL TESTING AS NEEDED.
2. ASSUME AND TREAT ALL PAINTED SURFACES AS LEAD-BASED PAINT (LBP). COMPLY
WITH THE REQUIREMENTS IN SECTION 02 83 00 LEAD REMEDIATION.
3. IF SUSPECT MATERIALS PREVIOUSLY UNFORESEEN BECOME UNCOVERED, TESTING
WILL BE REQUIRED PRIOR TO DISTURBANCE OF SUSPECTED MATERIALS. IN THE
ABSENCE OF TESTING, ASSUME THE MATERIAL CONTAINS HAZARDOUS SUBSTANCES,
AND DISTURB AND HANDLE IN A MANNER CONSISTENT WITH WORKING WITH KNOWN
HAZARDS.
CONTAMINATED SOIL MANAGEMENT:
1. CONDUCT CONTAMINATED SOIL WORK IN ACCORDANCE WITH 1) SECTION 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL AND 2) SOIL SCREENING
SURVEY FOR FY21 PN70551 CHILD DEVELOPMENT CENTER, ULRICH WAY, SCHOFIELD
BARRACKS, WAHIAWA.
2. THE SELECTED ACTION LEVELS ARE HAWAII DEPARTMENT OF HEALTH (DOH) TIER 1
ENVIRONMENTAL ACTION LEVELS (EAL) FOR UNRESTRICTED LAND USE, ABOVE A
DRINKING WATER RESOURCE AND MORE THAN 150 METERS FROM SURFACE WATER.
3. APPROXIMATE LOCATIONS OF CONTAMINATED AREAS ARE SHOWN IN CE101, CE102,
AND THE SOIL SCREENING SURVEY REPORT.
4. REUSE EXCAVATED SOIL AS MUCH AS POSSIBLE WITHIN THE PROJECT SITE IF IT MEETS
GEOTECHNICAL REQUIREMENTS. REUSE CONTAMINATED OIL ONSITE AND COVER WITH
A HARD SURFACE (E.G. ASPHALT) OR A 2-FT CLEAN SOIL CAP. INSTALL GEOTEXTILE
BARRIER DELINEATING IMPACTED SOIL FROM CLEAN SOIL CAP OR HARSCAPE.
DOCUMENT LOCATIONS AND DEPTHS OF REUSED IMPACTED SOILS IN THE CLOSURE
REPORT.
5. MIXING OF CONTAMINATED SOIL WITH CLEAN SOIL IS NOT PERMITTED. CONTAMINATED
SOIL SHALL BE STOCKPILED SEPARATELY BASED ON THE LOCATION AND/OR TYPE OF
CONTAMINATION.
6. DESIGN AND IMPLEMENT ENGINEERING CONTROLS TO PREVENT THE RELEASE OF
CONTAMINATED SOIL DURING EARTHWORK.
7. EXCESS CLEAN AND CONTAMINATED SOIL THAT WILL BE TRANSPORTED OFF-BASE FOR
DISPOSAL MUST BE CHARACTERIZED TO ENSURE COMPLIANCE WITH RECIPIENT
GUIDELINES AND REQUIREMENTS. PROVIDE ALL NECESSARY SOIL SAMPLING AND
ANALYSIS FOR DISPOSAL PER LANDFILL REQUIREMENTS.
8. NO VISIBLE EMISSION SHALL BE ALLOWED IN THE PROJECT SITE AND IN THE
SURROUNDING AREAS. BEST MANAGEMENT PRACTICE (BMPS) MUST BE USED TO
CONTROL EMISSIONS, DUST, AND SILICA.
9. FOLLOWING ALL PROJECT CONSTRUCTION, CONDUCT CONFRIMATION SOIL SAMPLING
FROM 0-1 FT BGS FROM ALL CHILD ACCESSIBLE AREAS (E.G. PLAYGROUNDS), TO
ENSURE LEVELS ARE BELOW THE DOH EALS FOR UNRESTRICTED LAND USE.
10. SUBMIT CLOSURE REPORT ONCE ALL EARTHWORK HAS BEEN COMPLETED. INCLUDE
ALL SOIL TEST RESULTS.
ENVIRONMENTAL PROTECTION:
1. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE DURATION OF THIS
CONTRACT. COMPLY WITH FEDERAL, STATE, LOCAL, AND INSTALLATION REGULATIONS
AND REQUIREMENTS PERTAINING TO ENVIRONMENTAL PROTECTION, INCLUDING WATER,
AIR, SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES, SILICA, OILY SUBSTANCES,
AND NOISE POLLUTION.
2. PREPARE AND SUBMIT ALL NECESSARY ENVIRONMENTAL PROTECTION, HAZARDOUS
MATERIALS/ CONTAMINATED SOIL ABATEMENT PLANS AS DESCRIBED IN THE
SPECIFICATIONS FOR REVIEW AND APPROVAL BY THE GOVERNMENT.
3. OBTAIN ALL NECESSARY CONSTRUCTION AND ENVIRONMENTAL PERMITS (E.G. NPDES).
SITE DISTURBANCE MUST NOT BEGIN UNTIL ALL PERMITS HAVE BEEN OBTAINED.
4. NO DEBRIS SHALL ENTER STORM DRAINS. BEST MANAGEMENT PRACTICES (BMP) MUST
BE IN PLACE AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO STARTING ANY
VEGETATION REMOVAL, GRADING, OR CONSTRUCTION WORK.
WASTE HANDLING AND DISPOSAL:
1. DISPOSE OF WASTE AT A PERMITTED OFF-BASE DISPOSAL FACILITY IN ACCORDANCE
WITH FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS.
2. PROVIDE ALL NECESSARY SAMPLING AND TESTING FOR WASTE CHARACTERIZATION
AND PREPARE WASTE MANIFEST, WHEN APPLICABLE.
3. SOLID AND HAZARDOUS WASTE SHALL BE PROPERLY PACKAGED AND DISPOSED OF IN
ACCORDANCE WITH APPLICABLE FEDERAL, STATE, LOCAL, AND INSTALLATION
REQUIREMENTS.
4. RECYCLE OR DISPOSE OF ANY CONSTRUCTION AND DEMOLITION (C&D) DEBRIS/WASTE
ACCORDINGLY AT A PERMITTED OFF-BASE DISPOSAL FACILITY IN ACCORDANCE WITH
HAWAII ADMINISTRATIVE RULES (HAR) 11-261 AND 11-262. CHARACTERIZE, TEST,
PROFILE, MANIFEST, AND DOCUMENT ALL C&D DEBRIS AND WASTE BEFORE IT IS
TRANSPORTED FROM THE PROJECT SITE FOR FINAL DISPOSAL/DISPOSITION.
CULTURAL AND NATURAL RESOURCES MANAGEMENT:
1. ONE EXCEPTIONAL TREE, CAPPARIS MOLLICELLA, IS LOCATED SOUTHWEST OF
BUILDING 2105 AND WILL REMAIN IN PLACE. REFER TO SHEETS C-101 AND C-202 FOR
TREE LOCATION.
2. CUTTING OR TRIMMING OF ANY TREES OVER 15 FEET TALL IS PROHIBITED DURING THE
BAT PUPPING SEASON, 01 JUNE TO 15 SEPTEMBER. CONTACT UNITED STATES ARMY
GARRISON HAWAII (USAG-HI) NATURAL RESOURCES PROGRAM FOR GUIDANCE ON
TREES THAT MUST BE CUT DURING THE BAT PUPPING SEASON (E.G. EMERGENCY
SITUATION SUCH AS THREATENING POWER LINE). COMPLY WITH THE USAG-HI TREE
CUTTING MEMORANDUM, DATED 20 JANUARY 2017.
3. NO ACCUMULATION OF GREEN WASTE IS ALLOWED ONSITE, TO PREVENT INFESTATION
OF COCONUT RHINOCEROS BEETLE.
4. THE PROJECT SITE IS LOCATED IN AN AREA OF LOW POTENTIAL FOR ENCOUNTERING
ARCHAEOLOGICAL RESOURCES. SHOULD HUMAN REMAINS OR POTENTIAL
ARCHAEOLOGICAL ARTIFACTS BE DISCOVERED DURING THE PROJECT, ALL WORK IN
THE AREA SHALL STOP, AND THE CONTRACTING OFFICER AND USAG-HI CULTURAL
RESOURCES SPECIALIST MUST BE IMMEDIATELY NOTIFIED.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
FI
N
AL
S
U
BM
IT
TA
L 2/
/2
C :\R ev it_
Pr oj ec ts
\1
9_
E_ C en tra l_ aq ue ve do .rv t
/1 5/
:0
3:
P M
FY
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R H
O N
O
LU
LU
D
IS
TR
IC
T
FT
. S
H
AF
TE
R
, H
AW
AI
I
H O
'O H
U I'I
A
- J
V
C L
AQ R
W
/0
9/
SC
H O
FI
EL
D B
AR
R
AC
KS
O
AH
U , H
AW
AI
I
BI
SH
O P
ST
, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
EN
VI
R O
N M
EN
TA
L N
O
TE
S
CE001
WORKER SAFETY:
1. COMPLY WITH ALL APPLICABLE FEDERAL AND LOCAL HEALTH AND SAFETY
REGULATIONS AND SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. ALL
WORK INVOLVING HAZARDOUS MATERIALS/WASTE AND CONTAMINATED SOIL, AND
SILICA MUST BE CONDUCTED IN A CONTROLLED MANNER PROTECTIVE OF WORKERS,
BASE PERSONNEL, AND THE ENVIRONMENT.
2. PREPARE AND IMPLEMENT A SITE-SPECIFIC HEALTH & SAFETY PLAN.
3. SITE WORKERS MUST BE INFORMED OF THE SITE CONDITIONS. THE HAZARDS MUST BE
PROPERLY IDENTIFIED, EVALUATED, AND MITIGATED PRIOR TO ANY SITE WORK.
PROVIDE HAZARD COMMUNICATION AND TRAINING TO THE WORKERS AND
SUBCONTRACTORS.
4. IF THE CONTRACTOR BRINGS HAZARDOUS MATERIALS OR CHEMICALS TO THE SITE,
SUBMIT AMOUNTS OF HAZARDOUS MATERIALS AND ASSOCIATED SAFETY DATA SHEETS
(SDS) TO THE CONTRACTING OFFICER. DO NOT BRING THE HAZARDOUS MATERIALS OR
CHEMICALS WITHOUT APPROVALS FROM THE CONTRACTING OFFICER.
ACRONYMS AND ABBREVIATIONS:
BGS BELOW GROUND SURFACE
BMP BEST MANAGEMENT PRACTICES
C&D CONSTRUCTION AND DEMOLITION
COPC CHEMICAL OF POTENTIAL CONCERN
DOH HAWAII DEPARTMENT OF HEALTH
EAL ENVIRONMENTAL ACTION LEVEL
FT FOOT/FEET
HAR HAWAII ADMINISTRATIVE RULES
LBP LEAD-BASED PAINT
MG/KG MILLIGRAMS PER KILOGRAM
MI MULTI-INCREMENTAL
SDS SAFETY DATA SHEET
USAG-HI UNITED STATES ARMY GARRISON HAWAII
FI
N
AL
S
U
BM
IT
TA
L N
O T
FO
R
C O
N
ST
R U
C
TI
O N
KA
IO
N A
AV
EN
U
KA
IO
N
A
AV
EN
U
ARSENIC, LEAD, AND PESTICIDE CONTAMINATED SOILS:
1. REFER TO SOIL SCREENING SURVEY FOR FY21 PN70551 CHILD DEVELOPMENT CENTER,
ULRICH WAY, SCHOFIELD BARRACKS, WAHIAWA, FOR DETAILED INFORMATION, LEVELS
OF COPC, AND REQUIREMENTS. THE SURVEY IS APPENDED TO SECTION 02 61 13.
2. SOIL FROM DU-2 AT 0-1 FT BGS CONTAINS ARSENIC ABOVE THE EAL FOR UNRESTRICTED
LAND USE. CONDUCT SAMPLING AND ANALYSIS FOR BIOACCESSIBLE ARSENIC AT 0-1 FT
BGS WITHIN DU-2. ASSUME BIOACCESSIBLE ARSENIC IS BELOW THE EAL OF 24
MILLIGRAMS PER KILOGRAM (MG/KG) AND CAN BE REUSED ON-SITE WITHOUT
RESTRICTIONS.
3. FOLLOWING ALL PROJECT CONSTRUCTION, CONDUCT SOIL SAMPLING FROM 0-1 FT BGS
FROM ALL CHILD ACCESSIBLE AREAS (E.G. PLAYGROUNDS), TO ENSURE LEVELS ARE
BELOW THE DOH EALS FOR UNRESTRICTED LAND USE.
4. IMPLEMENT ENGINEERING CONTROLS AND WORKER AND ENVIRONMENTAL PROTECTION
IN ACCORDANCE WITH SECTION 02 61 13 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL.
5. REUSE CONTAMINATED SOIL ON-SITE AND COVER WITH HARD SURFACE (E.G. ASPHALT)
OR 2-FT CLEAN SOIL CAP. USE A GEOTEXTILE LAYER TO DELINEATE CONTAMINATED
SOIL FROM THE CLEAN SOIL CAP OR HARDSCAPE. DOCUMENT LOCATIONS AND DEPTHS
OF REUSED CONTAMINATED SOILS IN THE CLOSURE REPORT.
5.1. IF ON-SITE REUSE OF CONTAMINATED SOIL IS NOT FEASIBLE, DISPOSE OF THE SOIL
AT A PERMITTED LANDFILL.
5.2. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE DURATION OF
THIS CONTRACT. COMPLY WITH FEDERAL, STATE, AND LOCAL REGULATIONS AND
INSTALLATION REQUIREMENTS PERTAINING TO ENVIRONMENTAL PROTECTION,
INCLUDING WATER, AIR, SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES,
SILICA, OILY SUBSTANCES, AND NOISE POLLUTION.
6. COLLECT MULTI-INCREMENTAL (MI) SOIL SAMPLES FROM THE SOIL STOCKPILE LOCATED
TO THE NORTH OF BUILDING 2102. ASSUME SOILS WILL BE REUSED ONSITE. DETAILS
FOR THE STOCKPILE SAMPLING ARE INCLUDED IN SECTION 02 61 13.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
FI
N
AL
S
U
BM
IT
TA
L 2/
/2
C :\R ev it_
Pr oj ec ts
\1
9_
E_ C en tra l_ aq ue ve do .rv t
/1 5/
:0
3:
P M
FY
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R H
O N
O
LU
LU
D
IS
TR
IC
T
FT
. S
H
AF
TE
R
, H
AW
AI
I
H O
'O H
U I'I
A
- J
V
C
L AQ R
W
/0
9/
SC
H O
FI
EL
D B
AR
R
AC
KS
O
AH
U , H
AW
AI
I
BI
SH
O P
ST
, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
EX
IS
TI
N
G S
O
IL
C O
N
TA
M
IN
AT
IO
N
IN
LA
N
D
SC
AP
ED
A N
D P
AV
ED
A R
EA
S
CE101
SOIL TEST RESULTS FOR LANDSCAPED AND PAVED AREAS
DU (AREA IN ACRES) DEPTH COPC EXCEEDING
EALS MITIGATION MEASURES
DU-1 LANDSCAPED AREA AROUND
B2102 (~0.75 AC)
0-1 NONE EXCEEDED NOT REQUIRED
DU-2 LANDSCAPED AREA AROUND
B2101 (~1 AC)
0-1 ARSENIC (25mg/kg) EAL: 24 mg/kg
NOT REQUIRED.
CONDUCT BIOASSESSIBLE ARSENIC TESTING
DU-3 LANDSCAPED AND PAVED
AREAS AROUND B2105 (~1 AC)
0-1 NONE EXCEEDED NOT REQUIRED
DU-4 LANDSCAPED AND PAVED
AREAS AROUND B2104 (~1.6 AC)
0-1 NONE EXCEEDED NOT REQUIRED
EXISTING SOIL CONTAMINATION IN LANDSCAPED AND PAVED AREAS
SCALE: 1" = 40'
TOTAL ARSENIC EXCEEDING DOH
EAL
LEGEND
SOIL STOCKPILE
CONDUCT SOIL SAMPLING AND ANALYSIS FOR REUSE.
REFER TO NOTE 6.
DU-3
DU-4
DU-2
DU-1
FI
N
AL
S
U
BM
IT
TA
L N
O T
FO
R
C O
N
ST
R U
C
TI
KA
IO
N A
AV
EN
U
KA
IO
N
A
AV
EN
U
ARSENIC, LEAD, AND PESTICIDE CONTAMINATED SOILS:
1. REFER TO SOIL SCREENING SURVEY FOR FY21 PN70551 CHILD DEVELOPMENT CENTER,
ULRICH WAY, SCHOFIELD BARRACKS, WAHIAWA, FOR DETAILED INFORMATION, LEVELS
OF COPC, AND REQUIREMENTS. THE SURVEY IS APPENDED TO SECTION 02 61 13.
2. UNLESS TESTED, ASSUME ARSENIC, LEAD, AND PESTICIDE CONTAMINATED SOIL
BENEATH ALL EXISTING BUILDINGS FROM 0-2 FT BELOW GROUND SURFACE (BGS) ABOVE
THE DOH EALS.
3. SOIL SAMPLING WAS CONDUCTED ALONG THE BUILDING PERIMETERS. ASSUME
ARSENIC AND LEAD CONTAMINATED SOIL IS PRESENT 0-5 FT LATERALLY FROM THE
BUILDING FOOTPRINTS AND 0-2 FT BGS.
4. IMPLEMENT ENGINEERING CONTROLS AND WORKER AND ENVIRONMENTAL PROTECTION
IN ACCORDANCE WITH SECTION 02 61 13 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL.
5. REUSE CONTAMINATED SOIL ON-SITE AND COVER WITH HARD SURFACE (E.G. ASPHALT)
OR 2-FT CLEAN SOIL CAP. USE A GEOTEXTILE LAYER TO DELINEATE CONTAMINATED
SOIL FROM THE CLEAN SOIL CAP OR HARDSCAPE. DOCUMENT LOCATIONS AND DEPTHS
OF REUSED CONTAMINATED SOILS IN THE CLOSURE REPORT.
5.1. IF ON-SITE REUSE OF CONTAMINATED SOIL IS NOT FEASIBLE, DISPOSE OF THE SOIL
AT A PERMITTED LANDFILL.
5.2. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE DURATION OF
THIS CONTRACT. COMPLY WITH FEDERAL, STATE, AND LOCAL REGULATIONS AND
INSTALLATION REQUIREMENTS PERTAINING TO ENVIRONMENTAL PROTECTION,
INCLUDING WATER, AIR, SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES,
SILICA, OILY SUBSTANCES, AND NOISE POLLUTION.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
FI
N
AL
S
U
BM
IT
TA
L 2/
/2
C :\R ev it_
Pr oj ec ts
\1
9_
E_ C en tra l_ aq ue ve do .rv t
/1 5/
:0
3:
P M
FY
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R H
O N
O
LU
LU
D
IS
TR
IC
T
FT
. S
H
AF
TE
R
, H
AW
AI
I
H O
'O H
U I'I
A
- J
V
C
L AQ R
W
/0
9/
SC
H O
FI
EL
D B
AR
R
AC
KS
O
AH
U , H
AW
AI
I
BI
SH
O P
ST
, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
EX
IS
TI
N
G S
O
IL
C O
N
TA
M
IN
AT
IO
N A
T
BU
IL
D
IN
G
P
ER
IM
ET
ER
S
AN
D
B
EL
O W
S
LA
BS
CE102EXISTING SOIL CONTAMINATION AT BUILDING PERIMETERS AND BELOW SLABS
SCALE: 1" = 40'
SOIL TEST RESULTS FOR BUILDING 2104 PERIMETER
BUILDING
PERIMETER DEPTH
COPC EXCEEDING EALS
BUILDING PERIMETER
0-5 FT LATERAL BELOW SLAB
2104-P 0-1 ARSENIC (38 mg/kg) LEAD (8,600 mg/kg)
ASSUMED ARSENIC, LEAD,
AND PESTICIDE
CONTAMINATED1-2 ASSUMED ARSENIC AND
LEAD CONTAMINATED
ARSENIC EAL: 24 mg/kg
LEAD EAL: 200 mg/kg
SOIL TEST RESULTS FOR BUILDING 2105 PERIMETER
BUILDING
PERIMETER DEPTH
COPC EXCEEDING EALS
BUILDING PERIMETER
0-5 FT LATERAL BELOW SLAB
2105-P 0-1 ARSENIC (34 mg/kg) LEAD (1,600 mg/kg)
ASSUMED ARSENIC, LEAD,
AND PESTICIDE
CONTAMINATED1-2 ASSUMED ARSENIC AND
LEAD CONTAMINATED
ARSENIC EAL: 24 mg/kg
LEAD EAL: 200 mg/kg
SOIL TEST RESULTS FOR BUILDING 2102 PERIMETER
BUILDING
PERIMETER DEPTH
COPC EXCEEDING EALS
BUILDING PERIMETER
0-5 FT LATERAL BELOW SLAB
2102-P 0-1 ARSENIC (27 mg/kg) LEAD (11,000 mg/kg)
ASSUMED ARSENIC, LEAD,
AND PESTICIDE
CONTAMINATED1-2 ASSUMED ARSENIC AND
LEAD CONTAMINATED
ARSENIC EAL: 24 mg/kg
LEAD EAL: 200 mg/kg
SOIL TEST RESULTS FOR BUILDING 2101 PERIMETER
BUILDING
PERIMETER DEPTH
COPC EXCEEDING EALS
BUILDING PERIMETER
0-5 FT LATERAL BELOW SLAB
2101-P 0-1 ARSENIC (33 mg/kg) LEAD (140 mg/kg)
ASSUMED ARSENIC,
LEAD, AND PESTICIDE
CONTAMINATED1-2 ASSUMED ARSENIC AND
LEAD CONTAMINATED
ARSENIC EAL: 24 mg/kg LEAD EAL: 200 mg/kg
SOIL CONTAMINATION
EXCEEDING EAL
LEGEND
FI
N
AL
S
U
BM
IT
TA
L N
O T
FO
R
C O
N
ST
R U
C
TI
File details come from the government source that posted it. Updated .