W9128A-19-B-0001_Drawings_(Part_5_of_9).pdf
PDF 8 MB Posted
- Solicitation number
- W9128A-19-B-0001
About this file
Drawings (5 of 9)
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
B A
R R
A C
K S
L A
R G
E
M E
C H
A N
IC
A
L S
C H
E M
A
TI
C D
IA
G
R A
M S
A N
D E
Q U
IP
M
E N
T S
C H
E D
U
LE
S
REFER TO GENERAL INFORMATION
AND DETAILS FOR ADDITIONAL
INFORMATION AND DETAILS
1.
HVAC SYSTEM SEQUENCE OF OPERATION:
THE EFS SHALL BE PROVIDED WITH A HAND-OFF-AUTO SWITCH. IN THE HAND MODE,
THE UNIT SHALL BE MANUALLY OPERATED. IN THE AUTO POSITION, THE UNIT SHALL
OPERATE AS FOLLOWS:
1. THE EXHAUST FANS SHALL BE CONTROLLED VIA A T-STAT MOUNTED ON THE
WALL WHERE INDICATED ON THE DRAWINGS.
2. THE T-STAT SHALL MODULATE THE EXHAUST FAN VOLUME TO MAINTAIN A SPACE
TEMPERATURE SET BY THE ROOM CONTROLLER. THE SPACE SHALL BE
MAINTAINED AT A DEFAULT TEMPERATURE OF 75F, BUT SHALL BE FULLY
ADJUSTABLE BY THE USER.
120 V
A
H
OFF
T-STAT
OL
EF
EF STARTER
CONTROL DIAGRAM AND SEQUENCE OF OPERATIONS - BASE BID
NOT TO SCALEC1
HVAC SYSTEM SEQUENCE OF OPERATION:
THE HEAT PUMP UNIT SHALL BE PROVIDED WITH A HAND-OFF-AUTO SWITCH. IN THE
HAND MODE, THE UNIT SHALL BE MANUALLY OPERATED. IN THE AUTO POSITION,
THE UNIT SHALL OPERATE AS FOLLOWS:
1. THE PACKAGED HEAT PUMP UNIT SHALL BE CONTROLLED VIA A T-STAT
MOUNTED ON THE WALL WHERE INDICATED ON THE DRAWINGS.
2. THE T-STAT SHALL MODULATE THE SUPPLY AIR TEMPERATURE TO MAINTAIN A
SPACE TEMPERATURE SET BY THE ROOM CONTROLLER. THE SPACE SHALL BE
MAINTAINED AT A DEFAULT TEMPERATURE OF 75F, BUT SHALL BE FULLY
ADJUSTABLE BY THE USER.
3. THE UNIT SHALL AUTOMATICALLY SWITCH BETWEEN HEATING AND COOLING
OPERATIONS, BUT SHALL ALSO BE PROVIDED WITH A MANUAL CHANGEOVER
OPTION.
4. THE HEATING SETPOINT SHALL BE SET AT 70F, BUT SHALL BE FULLY
ADJUSTABLE.
5. THE UNIT SHALL OPERATE BASED ON A TIMER, SET BY THE USERS.
208 V
A
H
OFF
T-STAT
OL
HP
HP STARTER
CONTROL DIAGRAM AND SEQUENCE OF OPERATIONS - BID OPTION 1
NOT TO SCALEB1
POWER
BLDG SERVED EXT SP
(INCH WG)
FAN
RPMTYPE (CFM)
EXHAUST FAN (EF) SCHEDULE
ELECTRICAL
V PH HZ
EF
NO.
(HP)
(LBS)
WEIGHTAIRFLOW
EF-B-1 1,405 0.2DIRECT DRIVE
CENTRIFUGAL SIDEWALL
898 1/2 115 1 60 86BARRACKS
(DBA)
SOUND
LEVEL REMARKS
MCA
BLDG SERVED EXT SP
(INCH WG) REF
PACKAGED HEAT PUMP (HP) SCHEDULE
ELECTRICAL
V PH HZ
HP
NO. (LBS)
WEIGHT
HP-B-1 1735 1.10 R-410A 26.4 208 3 60 479BARRACKS
(DBA)
SOUND
LEVEL REMARKS
PROVIDE WITH COIL AND CABINET COATING
PER MANUFACTURERS RECOMMENDATION33,600
SENSIBLE
COOLING
(BTUH)
45,500
TOTAL
COOLING
(BTUH)
SUPPLY
AIRFLOW
(CFM)
OUTDOOR
AIRFLOW
(CFM)
SEER
1475.1/62.5
COOLING
ENT AIR
(DB°F/WB°F)
55.0/53.1
COOLING
LVG AIR
(DB°F/WB°F)
87.0/75.047,300
TOTAL
HEATING
(BTUH)
66.8
HEATING
ENT AIR
(DB°F)
95.0
HEATING
LVG AIR
(DB°F)
EM
120 V
EMERGENCY
SHUTDOWN
RELAY
EM EMERGENCY
SHUTDOWN
BUTTON (WHERE
INDICATED ON
PLANS)
RESET
BUTTON
HEAT PUMP CONTROL DIAGRAM
EM
EMERGENCY
SHUTDOWN SWITCH
EMERGENCY HVAC SHUTDOWN SWITCH CONTROL DIAGRAM
EMERGENCY HVAC SHUTDOWN SWITCH
SEQUENCE OF OPERATION:
1. ACTIVATION OF THE EMERGENCY
SHUTDOWN SWITCH SHALL SHUTDOWN
THE AFFECTED HP EQUIPMENT.
2. ALL LOW LEAKAGE MOTORIZED
EXHAUST AND OUTDOOR AIR DAMPERS
SHALL CLOSE UPON ACTIVATION OF THE
EMERGENCY SHUTDOWN SWITCH.
EM
120 V
EMERGENCY
SHUTDOWN
RELAY
EM EMERGENCY
SHUTDOWN
BUTTON (WHERE
INDICATED ON
PLANS)
RESET
BUTTON
EMERGENCY HVAC SHUTDOWN SWITCH
SEQUENCE OF OPERATION:
1. ACTIVATION OF THE EMERGENCY
SHUTDOWN SWITCH SHALL SHUTDOWN
THE AFFECTED EF EQUIPMENT.
EM
EMERGENCY
SHUTDOWN SWITCH
EF CONTROL DIAGRAM EMERGENCY HVAC SHUTDOWN SWITCH CONTROL DIAGRAM
M-602
BLDG. TYPE B
COOLING
AMB AIR
(DB°F/WB°F)
HEATING
AMBIENT
AIR
40°F
R H
JG
-M -6
.d gn
D T
IS
E
D J
B
JO
O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
G P
A D
M
IN
S M
A
LL
M
E C
H A
N
IC
A L
S C
H E
M A
TI
C
D
IA
G R
A M
S A
N D
E Q
U
IP
M E
N T
S C
H E
D U
LE
S
REFER TO GENERAL INFORMATION
AND DETAILS FOR ADDITIONAL
INFORMATION AND DETAILS
1.
POWER
BLDG
SERVED
EXT SP
(INCH WG)
FAN
RPMTYPE (CFM)
EXHAUST FAN (EF) SCHEDULE
ELECTRICAL
V PH HZ
EF
NO.
(HP)
(LBS)
WEIGHTAIRFLOW
EF-C-1
(DBA)
LEVEL REMARKS
735 0.20DIRECT DRIVE
SIDEWALL CENTRIFUGAL
1000 1/4 115 1 60 72GP ADMIN SMALL 42
SOUND
MCA
BLDG SERVED EXT SP
(INCH WG) REF
PACKAGED HEAT PUMP (HP) SCHEDULE
ELECTRICAL
V PH HZ
HP
NO. (LBS)
WEIGHT
HP-C-1 1085 1.0 R-410A 19.8 208 3 60 357
GP ADMIN
SMALL
(DBA)
SOUND
LEVEL REMARKS
PROVIDE WITH COIL AND CABINET COATING
PER MANUFACTURERS RECOMMENDATION20,900
SENSIBLE
COOLING
(BTUH)
23,700
TOTAL
COOLING
(BTUH)
SUPPLY
AIRFLOW
(CFM)
OUTDOOR
AIRFLOW
(CFM)
SEER
14.075.0/60.5
COOLING
ENT AIR
(DB°F/WB°F)
55.0/52.4
COOLING
LVG AIR
(DB°F/WB°F)
87.0/75.027,600
TOTAL
HEATING
(BTUH)
68.6
HEATING
ENT AIR
(DB°F)
95.0
HEATING
LVG AIR
(DB°F)
HVAC SYSTEM SEQUENCE OF OPERATION:
THE EFS SHALL BE PROVIDED WITH A HAND-OFF-AUTO SWITCH. IN THE HAND MODE,
THE UNIT SHALL BE MANUALLY OPERATED. IN THE AUTO POSITION, THE UNIT SHALL
OPERATE AS FOLLOWS:
1. THE EXHAUST FANS SHALL BE CONTROLLED VIA A T-STAT MOUNTED ON THE
WALL WHERE INDICATED ON THE DRAWINGS.
2. THE T-STAT SHALL MODULATE THE EXHAUST FAN VOLUME TO MAINTAIN A SPACE
TEMPERATURE SET BY THE ROOM CONTROLLER. THE SPACE SHALL BE
MAINTAINED AT A DEFAULT TEMPERATURE OF 75F, BUT SHALL BE FULLY
ADJUSTABLE BY THE USER.
120 V
A
H
OFF
T-STAT
OL
EF
EF STARTER
CONTROL DIAGRAM AND SEQUENCE OF OPERATIONS - BASE BID
NOT TO SCALEC1
HVAC SYSTEM SEQUENCE OF OPERATION:
THE HEAT PUMP UNIT SHALL BE PROVIDED WITH A HAND-OFF-AUTO SWITCH. IN THE
HAND MODE, THE UNIT SHALL BE MANUALLY OPERATED. IN THE AUTO POSITION,
THE UNIT SHALL OPERATE AS FOLLOWS:
1. THE PACKAGED HEAT PUMP UNIT SHALL BE CONTROLLED VIA A T-STAT
MOUNTED ON THE WALL WHERE INDICATED ON THE DRAWINGS.
2. THE T-STAT SHALL MODULATE THE SUPPLY AIR TEMPERATURE TO MAINTAIN A
SPACE TEMPERATURE SET BY THE ROOM CONTROLLER. THE SPACE SHALL BE
MAINTAINED AT A DEFAULT TEMPERATURE OF 75F, BUT SHALL BE FULLY
ADJUSTABLE BY THE USER.
3. THE UNIT SHALL AUTOMATICALLY SWITCH BETWEEN HEATING AND COOLING
OPERATIONS, BUT SHALL ALSO BE PROVIDED WITH A MANUAL CHANGEOVER
OPTION.
4. THE HEATING SETPOINT SHALL BE SET AT 70F, BUT SHALL BE FULLY
ADJUSTABLE.
5. THE UNIT SHALL OPERATE BASED ON A TIMER, SET BY THE USERS.
208 V
A
H
OFF
T-STAT
OL
HP
HP STARTER
CONTROL DIAGRAM AND SEQUENCE OF OPERATIONS - BID OPTION 1
NOT TO SCALEB1
EM
120 V
EMERGENCY
SHUTDOWN
RELAY
EM EMERGENCY
SHUTDOWN
BUTTON (WHERE
INDICATED ON
PLANS)
RESET
BUTTON
HEAT PUMP CONTROL DIAGRAM
EM
EMERGENCY
SHUTDOWN SWITCH
EMERGENCY HVAC SHUTDOWN SWITCH CONTROL DIAGRAM
EMERGENCY HVAC SHUTDOWN SWITCH
SEQUENCE OF OPERATION:
1. ACTIVATION OF THE EMERGENCY
SHUTDOWN SWITCH SHALL SHUTDOWN
THE AFFECTED HP EQUIPMENT.
2. ALL LOW LEAKAGE MOTORIZED
EXHAUST AND OUTDOOR AIR DAMPERS
SHALL CLOSE UPON ACTIVATION OF THE
EMERGENCY SHUTDOWN SWITCH.
EM
120 V
EMERGENCY
SHUTDOWN
RELAY
EM EMERGENCY
SHUTDOWN
BUTTON (WHERE
INDICATED ON
PLANS)
RESET
BUTTON
EMERGENCY HVAC SHUTDOWN SWITCH
SEQUENCE OF OPERATION:
1. ACTIVATION OF THE EMERGENCY
SHUTDOWN SWITCH SHALL SHUTDOWN
THE AFFECTED EF EQUIPMENT.
EM
EMERGENCY
SHUTDOWN SWITCH
EF CONTROL DIAGRAM EMERGENCY HVAC SHUTDOWN SWITCH CONTROL DIAGRAM
M-603
BLDG. TYPE C
COOLING
AMB AIR
(DB°F/WB°F)
HEATING
AMBIENT
AIR
40°F
R H
JG
-M -6
.d gn
D T
IS
E
D J
O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
LA
U
N D
R Y
M
E C
H A
N
IC
A L
S C
H E
M A
TI
C
D
IA
G R
A M
S A
N D
E Q
U
IP
M E
N T
S C
H E
D U
LE
S
REFER TO GENERAL INFORMATION
AND DETAILS FOR ADDITIONAL
INFORMATION AND DETAILS
1.
POWER
ROOM
SERVED
EXT SP
(INCH WG)
FAN
RPMTYPE (CFM)
SUPPLY FAN (SF) SCHEDULE
ELECTRICAL
V PH HZ
SF
NO.
(HP)
(LBS)
WEIGHTAIRFLOW
1,760BELT DRIVEN
AXIAL PROPELLERLAUNDRY 0.2 794 1/4 115 1 60 58SF-E-1
(DBA)
SOUND
REMARKS
SUPPLY FAN CONTROL DIAGRAM
NOT TO SCALEB1
OL
OFF
M
120 V
SUPPLY FAN
STARTER
SEQUENCE OF OPERATION:
THE SUPPLY FAN OPERATION SHALL BE CONTROLLED BY A
DEDICATED ON/OFF SWITCH.
THE ROOM SHALL BE PROVIDED WITH A SIGNAGE TO TURN ON
THE SUPPLY FAN WHEN THE LAUNDRY ROOM IS IN USE.
THE SUPPLY FAN SHALL PROVIDE AIR TO THE DRYERS. EXCESS
AIR SHALL BE RELIEVED THROUGH EXHAUST LOUVERS.
FAN ON/OFF
SWITCH
ON
1.
2.
3.
PROVIDE WITH WEATHERHOOD,
SAFETY SCREENING, AND WALL BOX
EM
120 V
EMERGENCY
SHUTDOWN
RELAY
EM EMERGENCY
SHUTDOWN
BUTTON (WHERE
INDICATED ON
PLANS)
RESET
BUTTON
EMERGENCY HVAC SHUTDOWN SWITCH
SEQUENCE OF OPERATION:
1. ACTIVATION OF THE EMERGENCY
SHUTDOWN SWITCH SHALL SHUTDOWN
THE AFFECTED SF EQUIPMENT.
EMERGENCY HVAC SHUTDOWN SWITCH CONTROL DIAGRAM
EM
EMERGENCY
SHUTDOWN SWITCH
M-604
BLDG. TYPE E
R H
JG
-M -6
.d gn
D T
IS
E
D J
O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
LA
TR
IN
E
O N
LY
M E
C H
A N
IC
A
L S
C H
E M
A
TI
C D
IA
G
R A
M S
A N
D E
Q U
IP
M
E N
T S
C H
E D
U
LE
S
REFER TO GENERAL INFORMATION
AND DETAILS FOR ADDITIONAL
INFORMATION AND DETAILS
1.
POWER
ROOM
SERVED
EXT SP
(INCH WG)
FAN
RPMTYPE (CFM)
EXHAUST FAN (EF) SCHEDULE
ELECTRICAL
V PH HZ
EF
NO.
(HP)
(LBS)
WEIGHTAIRFLOW
EF-F-1 350 0.2
DIRECT DRIVE
CENTRIFUGAL SIDEWALL 1,725 1/4 115 1 60 48LATRINE
REMARKS
(DBA)
SOUND
EXHAUST FAN CONTROL DIAGRAM
NOT TO SCALEC1
OL
OFF
M
120 V
TYP. EF
STARTERSEQUENCE OF OPERATION:
1. THE EXHAUST FAN OPERATION SHALL BE INTERLOCKED
WITH THE ROOM LIGHTS.
ROOM LIGHT
SWITCH
ON
LIGHTS
ROOM
LIGHTS EM
120 V
EMERGENCY
SHUTDOWN
RELAY
EM EMERGENCY
SHUTDOWN
BUTTON (WHERE
INDICATED ON
PLANS)
RESET
BUTTON
EMERGENCY HVAC SHUTDOWN SWITCH
SEQUENCE OF OPERATION:
1. ACTIVATION OF THE EMERGENCY
SHUTDOWN SWITCH SHALL SHUTDOWN
THE AFFECTED EF EQUIPMENT.
EMERGENCY HVAC SHUTDOWN SWITCH CONTROL DIAGRAM
EM
EMERGENCY
SHUTDOWN SWITCH
M-605
BLDG. TYPE F
R H
JG
-M -6
.d gn
D T
IS
E
D J
G E
N E
R A
L
IN
FO
A
N D
D E
TA
IL
S P
LU
M
B
IN
G G
E N
E R
A L
N O
TE
S
A N
D L
E G
E N
D
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
S OR W SOIL OR WASTE
FCO/COTG
FD FLOOR DRAIN
PLUMBING LEGEND
SYMBOL
TYP TYPICAL
REQ'D REQUIRED
CO
CW
CV
CLEANOUT
COLD WATER
CHECK VALVE
CLN'G CEILING
ABOVE FINISHED FLOORAFF
ABBRV. DESCRIPTION
WALL CLEANOUT
VENT THRU ROOF
VENT
WCO
VTR
V
FLOOR CLEANOUT/ CLEANOUT TO GRADE
BV BALL VALVE
POINT OF REMOVALPOR
POINT OF CONNECTIONPOC
WATER HAMMER ARRESTERWHA
UNION
U/G UNDER GROUND
LAVATORYLAV
HOT WATERHW
CONTINUATIONCONT.
DOWNDN
SHOWERSH
ELECTRIC WATER HEATEREWH
BUILDINGBLDG
TEMPERATURE AND PRESSURE RELIEF VALVE
PLUMBING NOTES GENERAL NOTES:
THE ENTIRE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS
OF THE MILITARY HANDBOOKS, UFC PLUMBING SYSTEMS, MILITARY ENGINEERING
TECHNICAL LETTERS, INTERNATIONAL BUILDING CODE, INTERNATIONAL PLUMBING
CODE, INTERNATIONAL FIRE CODE, NATIONAL FIRE PROTECTION ASSOCIATION
CODE, NATIONAL ELECTRICAL CODE, ASME BOILER AND PRESSURE VESSEL CODE,
ASME PRESSURE PIPING CODE, AND ALL OTHER AGENCIES HAVING JURISDICTION.
THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO COVER THE COMPLETE
INSTALLATION OF SYSTEMS TO FUNCTION AS DESCRIBED AND SPECIFIED. THE
OMISSION OF REFERENCE TO ANY NECESSARY ITEM OF LABOR OR MATERIAL
SHALL NOT RELIEVE THE CONTRACTOR FROM PROVIDING SUCH LABOR AND
MATERIAL.
ALL EQUIPMENT SHALL BE CAPABLE OF FITTING INTO THE SPACES ALLOCATED
WHILE MEETING THE MANUFACTURER'S RECOMMENDED ACCESS REQUIREMENTS.
REVIEW ALL SPACES WHERE EQUIPMENT IS TO BE INSTALLED PRIOR TO
ORDERING OF EQUIPMENT AND NOTIFY THE ENGINEER OF ANY INADEQUATE
CLEARANCES OR CONDITIONS THAT WILL PREVENT THE PROPER INSTALLATION,
MAINTENANCE, AND OPERATION OF THE EQUIPMENT.
PROVIDE SHOP DRAWINGS FOR THE LAYOUT OF EQUIPMENT, AND PIPING SHOWING
COORDINATION OF ALL WORK WITH ALL OTHER TRADES, INCLUDING HVAC, FIRE
SPRINKLER, FIRE ALARM, CONTROLS, ELECTRICAL, AND COMMUNICATION SYSTEMS.
COORDINATION DRAWINGS SHALL OVERLAY HVAC, PLUMBING, FIRE SPRINKLER,
ELECTRICAL, AND FIRE ALARM SYSTEMS, AND ALL CONFLICTS BETWEEN TRADES
SHALL BE NOTED AND RESOLVED.
VERIFY AND COORDINATE ALL ROOF, WALL, AND FLOOR PENETRATIONS WITH
THE STRUCTURAL AND ARCHITECTURAL DRAWINGS PRIOR TO THE START OF
CONSTRUCTION.
OBTAIN APPROVAL FROM THE CONTRACTING OFFICER BEFORE MAKING ANY
PENETRATIONS THROUGH STRUCTURAL MEMBERS, WALLS, AND SLABS.
VERIFY THE EXACT LOCATION , SIZE, AND INVERT OF ALL EXISTING SEWER,
STORM DRAIN, AND WATER LINES AT THE NEW POINT OF CONNECTION PRIOR TO
THE START OF CONSTRUCTION.
TONE AND LOCATE ALL UTILITY LINES OR OTHER INTERFERENCES IN AREAS OF
PROPOSED TRENCH WORK PRIOR TO START OF EXCAVATION. REPAIR OR PAY
FOR ALL DAMAGES TO EXISTING UTILITIES.
DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF PIPING. PROVIDE
OFFSETS AS NECESSARY TO AVOID LOCAL OBSTRUCTIONS OR INTERFERENCE
WITH OTHER TRADES. REVIEW ALL PIPING RUNS PRIOR TO FABRICATION AND
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF ANY INTERFERENCE
AND/OR LACK OF ADEQUATE CLEARANCES.
SHOULD PROJECT CONDITIONS REQUIRE REARRANGEMENT OF WORK, MARK
SUCH CHANGES ON THE AS-BUILT DRAWINGS. IF THESE CHANGES REQUIRE
ALTERNATE METHODS TO THOSE APPROVED BY THE CONTRACT DOCUMENTS,
SUBMIT SHOP DRAWINGS SHOWING THE PROPOSED ALTERNATE METHODS TO THE
CONTRACTING OFFICER FOR REVIEW. DO NOT PROCEED UNTIL REVIEWED.
PATCH AND PAINT ALL EXPOSED MATERIAL, INCLUDING DUCTWORK, TO
MATCH ADJACENT SURFACES OR AS INDICATED.
REPAIR ANY DAMAGE TO EXISTING CONSTRUCTION RESULTING FROM THE
INSTALLATION OF MECHANICAL ITEMS. THE AREAS REPAIRED SHALL MATCH THE
ADJACENT SURFACES IN TEXTURE AND COLOR.
PROPERLY FIRESTOP ALL PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS,
OR PARTITIONS WITH A UL APPROVED SYSTEM APPROPRIATE FOR THE
PENETRATION TYPE AND FIRE RATING. FIRESTOP ALL PENETRATIONS BETWEEN
FLOORS.
PROVIDE ACCESS PANELS TO ALL CONCEALED VALVES, DAMPERS, AND EQUIPMENT.
PANELS SHALL BE MILCOR OR EQUAL. COORDINATE THE LOCATION OF ACCESS
PANELS TO INSURE THAT THE EQUIPMENT CAN BE MAINTAINED ADEQUATELY.
PROVIDE ISOLATION VALVES ON PIPING BRANCH LINES WHETHER SHOWN ON THE
DRAWINGS OR NOT.
PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN HOT WATER AND COLD
WATER PIPES.
INSULATE ALL SEWER PIPING RECEIVING AIR CONDITIONING CONDENSATE DRAINS,
ICE DRAINS, OR ANY OTHER COLD LIQUID WHICH MAY CREATE CONDENSATION,
FROM POINT OF CONNECTION TO TOP OF CONCRETE SLAB-ON-GRADE. INSULATE
FLOOR DRAIN AND FLOOR SINK BODIES EXPOSED TO AIR BELOW THE FLOOR.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
1.
THE CONTRACTOR SHALL NOT TURN ON THE GAS SYSTEM UNTIL THE SYSTEM IS
PROPERLY TESTED AND APPROVED BY THE GAS COMPANY.
18.
ALL EXTERIOR SEWER LINES SHALL HAVE A MINIMUM COVER OF 3 FEET AND A
MINIMUM 2% SLOPE.
19.
M WATER METER
CONSTRUCTION NOTES FOR GAS FACILITIES :
HAWAII GAS' PIPELINES IN THE PROJECT AREA ARE PLASTIC COATED AND CATHODIC
PROTECTED. THE CONTRACTOR SHALL BE EXTREMELY CAREFUL WHEN WORKING NEAR
THESE GAS PIPELINES.
1.
SINCE GAS LINE LOCATIONS ON FIELD MAPS ARE APPROXIMATE, THE CONTRACTOR
SHALL CALL HAWAII ONE CALL CENTER A MINIMUM OF FIVE (5) WORKING DAYS BEFORE
STARTING EXCAVATION TO ARRANGE FOR FIELD LOCATION OF THE EXISTING GAS
PIPELINES. THE TELEPHONE NUMBER IS 811 OR 1-866-423-7287.
THE CONTRACTOR SHALL WORK IN AN EXPEDITIOUS MANNER IN ORDER TO KEEP THE
UNCOVERED GAS PIPELINES EXPOSED FOR AS SHORT A PERIOD OF TIME AS POSSIBLE.
2.
THE CONTRACTOR SHALL EXCAVATE AND BACKFILL AROUND GAS PIPELINES IN THE
PRESENCE OF A REPRESENTATIVE OF HAWAII GAS. ALL BACKFILL WITHIN SIX INCHES OF
ANY GAS PIPELINE SHALL BE SELECT CUSHION MATERIAL APPROVED BY HAWAII GAS.
3.
FOR RELOCATION OF ANY GAS PIPELINE, THE CONTRACTOR SHALL NOTIFY HAWAII GAS
FIVE (5) WORKING DAYS BEFORE STARTING WORK. THE TELEPHONE NUMBER IS
935-0021. THE CONTRACTOR SHALL PROVIDE THE NECESSARY EXCAVATION AND
BACKFILL, OBTAIN TRAFFIC PERMITS, AND RESTORE PAVEMENT, SIDEWALKS, AND
OTHER FACILITIES. ANY RELOCATION OF GAS FACILITIES SHALL BE DONE BY HAWAII
GAS AND PAID FOR BY THE CONTRACTOR.
4.
THE CONTRACTOR SHALL NOTIFY HAWAII GAS IMMEDIATELY AFTER ANY DAMAGE HAS
BEEN CAUSED TO EXISTING GAS PIPELINES, COATINGS, OR ITS CATHODIC PROTECTION
DEVICES. THE TELEPHONE NUMBER IS 935-0021, 24 HOURS A DAY. THE CONTRACTOR
SHALL BE LIABLE FOR ANY DAMAGE TO HAWAII GAS' FACILITIES. REPAIR WORK ON SUCH
DAMAGE SHALL BE DONE BY HAWAII GAS WITH PAYMENT FOR THIS WORK TO BE BORNE
BY THE CONTRACTOR.
5.
MINIMUM VERTICAL AND HORIZONTAL CLEARANCE BETWEEN THE GAS PIPELINES AND
OTHER PIPELINES, CONDUITS, DUCT LINES, OR OTHER FACILITIES SHALL BE 12 INCHES.
ADEQUATE SUPPORT AND PROTECTION FOR GAS PIPELINES EXPOSED IN THE TRENCH
SHALL BE PROVIDED BY THE CONTRACTOR AND APPROVED BY HAWAII GAS.
6.
7.
P-001
R H
JG
-P -0
.d gn
D T
IS
E
D J
ESx ESx
D
D
D
D
BLD
G 14
2A
BLD
G 14
BLD
G 14
BLD
G 14
BLD
G 14
BLD
G 14
BLD
G 14
BLD
G 14
BLD
G 14
BLD
G 13
BLD
G 13
BLD
G 13
BLD
G 13
BLD
G 13
BLD
G 13
BLD
G 13
1A
BLD
G 12
BLDG 133
CONCRETE PAD
FOR GAS TANK.
SEE STRUCTURAL
FOR DETAILS
NEW GAS PIPING
PROVIDED BY HAWAII
GAS
TRENCHING
PROVIDED BY THE
CONTRACTOR.
NEW 1150 GALLON
LPG TANK PROVIDED
BY HAWAII GAS
25'-0"
CLEARANCE FOR
THE GAS TANK
EXISTING 2000
GALLON LPG TANK TO
REMAIN TO SERVE
LAUNDRY BLDG.
4" POTABLE WATER
CONNECTION BY
BASE WATER SUPPLY
CONTRACTOR
6" S. CONNECTION
BY OTHERS.
4" POTABLE WATER
CONNECTION BY
BASE WATER
SUPPLY
CONTRACTOR
6" S. CONNECTION
BY OTHERS
1 1/2" CW PROVIDE BY
BASE WATER SUPPLY
CONTRACTOR.
6" S. CONNECTION
BY OTHERS
P
LU
M B
IN
G
S
IT
E P
LA
N
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
BUILDING 135, 137, 138, 139, 144, 145,
146, 147, 148 - BARRACKS - LARGE
NO PLUMBING WORK IN THIS AREA
BUILDING 140, 149, - GP ADMIN - SMALL
NO PLUMBING WORK IN THIS AREA
BUILDING 131/131A, 142/142A -
SHOWER/LATRINES DUPLEX
FOR PLUMBING WORK, SEE PA101
BUILDING 133 - LATRINE ONLY
FOR PLUMBING WORK, SEE PF101
BUILDING 121 - LAUNDRY
FOR PLUMBING WORK, SEE PE101
SCALE: 1" = 40'-0"
PLUMBING SITE PLANA1 00 40' 80'
SCALE: 1" = 40'
120'
PLAN
NORTHTRUE
NORTH
PS101
D T
IS
E
D J
B
JO
R H
JG
-P -1
.d gn
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
EHH
AutoCAD SHX Text S
AutoCAD SHX Text
EHH
AutoCAD SHX Text S
AutoCAD SHX Text
EHH
AutoCAD SHX Text
EHH
AutoCAD SHX Text S
AutoCAD SHX Text
EHH
AutoCAD SHX Text
EHH
AutoCAD SHX Text
EHH
AutoCAD SHX Text
EHH
AutoCAD SHX Text W3/4
AutoCAD SHX Text W 1/2
AutoCAD SHX Text W3
AutoCAD SHX Text W3
AutoCAD SHX Text W3
AutoCAD SHX Text W3
AutoCAD SHX Text W2
AutoCAD SHX Text W1 1/2
AutoCAD SHX Text W2
AutoCAD SHX Text W2
AutoCAD SHX Text W2
AutoCAD SHX Text W4
AutoCAD SHX Text W12
AutoCAD SHX Text W1 1/2
AutoCAD SHX Text W12
AutoCAD SHX Text W4
AutoCAD SHX Text W4
AutoCAD SHX Text
SEEPAGE PIT #28
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
SEEPAGE PIT #27
AutoCAD SHX Text
SEEPAGE PIT #26
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
CESSPOOL #25
AutoCAD SHX Text
CESSPOOL #24
AutoCAD SHX Text
CESSPOOL #23
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
LEACHING WELL #3
AutoCAD SHX Text
LEACHING WELL #4
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
SEEPAGE PIT #18
AutoCAD SHX Text
CESSPOOL #19
AutoCAD SHX Text
MISSING CESSPOOL #16
AutoCAD SHX Text
MISSING CESSPOOL #21
AutoCAD SHX Text
MISSING CESSPOOL #20
AutoCAD SHX Text
CESSPOOL #22
AutoCAD SHX Text
CESSPOOL #12
AutoCAD SHX Text
CESSPOOL #11
AutoCAD SHX Text
CESSPOOL #13
AutoCAD SHX Text
MISSING CESSPOOL #32
AutoCAD SHX Text
MISSING CESSPOOL #31
AutoCAD SHX Text
GREASE TRAP
AutoCAD SHX Text
GREASE TRAP
AutoCAD SHX Text
SMH TOP=6383.6 INV.=6381.43
AutoCAD SHX Text
SEPTIC TANK SMH TOP=6383.5 PIPE INV.=6381.79
AutoCAD SHX Text
SEPTIC TANK SMH TOP=6382.76 PIPE INV.=6378.68
AutoCAD SHX Text
SEPTIC TANK SMH TOP=6375.10 PIPE INV.=6371.16
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text T-131A
AutoCAD SHX Text T-122A
AutoCAD SHX Text T-113A
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
CONN. 4" S. TO 6" S STUBOUT
BY OTHERS. SEE FY16 OMA
REPAIR BY REPLACEMENT
CESSPOOLS WITH SEPTIC
SYSTEMS PROJECT.
3" CW. PROVIDE 3"x4" REDUCER.
CONNECT TO 4" CW STUBOUT
PROVIDED BY BASE WATER
SUPPLY CONTRACTOR
COTG
COTG
GWH
3-1
P-1
4" VTR
4" VTR
4" VTR
ET
G
1" LPG. CONN.
FROM NEW LPG TANKS
WATER METER
RPBP
G SHUTOFF VALVE,
REGULATOR, & METER
FCO
HB
BLDG. 131 & 142 SCOPE
BLDG. 131A & 142A SCOPE
P-2
FDFD
COTG
FD
FDFCO, TYP.
ROUTE CW/HW
TO SHWR
FIXTURES, TYP.
CENTER HB ON
BOOTWASH PAD, TYP.
ROUTE CW TO
PLUMBING
FIXTURES, TYP.
WCO
P-3, TYP.
ROUTE WATER
PIPING HIGH AT CLN'G
ROUTE WATER
PIPING HIGH
AT CLN'G
P-4
P-4
HB
HB
HB
2" VTR
2" VTR
HB
HB
ROUTE CW TO
PLUMBING
FIXTURES, TYP.
P-2 P-1
P-2P-2 P-2
FD FD
3" VTR
(TYP. OF 6)
HW ISOLATION VALVE, TYP.
EXPANSION TANK
P-1 P-1 P-1
P-4
P-4 P-4 P-4 P-4 P-4 P-4 P-4 P-4
P-4
P-4 P-4 P-4 P-4 P-4 P-4 P-4 P-4 P-4
P-2 P-2 P-2 P-1 P-1 P-1
P-3, TYP.
PROVIDE 12"x12"
ACCESS PANEL AND
OPENING IN CMU
WALL TO WHA, TYP.
P-4
ROUTE CW PIPE U/G
BLDG. CW MAIN
SHUT OFF VALVE
ON RISER
TRAP PRIMER
TO FD'S, TYP.
TRAP PRIMERS
HEATER CONTROLLER,
TYP OF 2. ROUTE ALL
WIRING IN CONDUIT
B
LD
G
/1
A
, 1
/1
A
S H
O W
E R
/L A
TR
IN
E D
U P
LE
X
P
LU
M
B
IN
G F
LO
O
R P
LA
N
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
SCALE: 1/4" = 1'-0"
BLDG 131/131A, 142/142A - SHOWER/LATRINE DUPLEX - PLUMBING FLOOR PLANA1
P-101
BLDG. TYPE A
R H
JG
-P -1
.d gn
M
W
DD
W W W W W
D D D
4" VTR
LI
5-1
GWH
5-1
WMB
G
CONN. TO EXIST.
LPG PIPING
WATER METER
RPBP
WMB WMB WMB WMB
HB
FD
GWH
5-1
GWH
5-1
ET
CONN. 4" S. TO 6" S
STUBOUT BY OTHERS
1 1/2" CW POC TO
EXIST. WATER LINE
COTG
COTG
HB HB HB HB
ROUTE WATER PIPING
HIGH AT CLN'G
FD
COTG
FCO
FCO
G SHUTOFF VALVE,
REGULATOR, & METER
TRAP PRIMER
TO FD'S. PROVIDE W/
ACCESS PANEL, TYP.
PROVIDE ACCESS
PANEL FOR WHA'S
CW & HW SUPPLY
TO WMB'S. ROUTE
LOW ON WALL
ROUTE V PIPE
BELOW WINDOW SILL
WMB
POTABLE CW SERVICE
TO LATRINE BLDG. FOR
CONT. SEE VOL4 PLUMBING COTG
G
PROVIDE POTABLE 3/4" CW U/G
SERVICE FOR LATRINE BLDG.
ROUTE CW U/G
HEATER CONTROLLER.
PROVIDE CONDUIT FOR ALL
WIRING TO HEATERS
WMB WMB
B
LD
G
LA
U
N D
R Y
P
LU
M B
IN
G
F
LO
O R
P
LA
N
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
SCALE: 1/4" = 1'-0"
BLDG 121 - LAUNDRY - PLUMBING FLOOR PLANA1
P-102
BLDG. TYPE E
2" DIA. DRAIN PIPE
12" DIA. CONC. PIPE
20 CRUSHED ROCK FILL
A
FIN. FLR.
50"
38"
A
4"
4"
FOR CORNER
DETAIL, SEE
LIFTING RUNG SEE
DETAIL, FOR DETAIL SEE
SEDIMENT TRAP
6"
FROM BOOTWASH WASTE TO
SEWER
VENT PIPE,
TYP.DRAIN PIPE
C1
A1
1" THK. CHECKERED
COVER METAL PLATE
H40 RATING
DRAIN PIPE
NOT TO SCALE
LINT TRAP INTERCEPTOR DETAILA3
D T
IS
E
D J
B
JO
R H
JG
-P -1
.d gn
AutoCAD SHX Text M
AutoCAD SHX Text
SECTION A-A
PLAN VIEW
1 2
A
B
COTG
P-1 P-1 P-1
P-1 P-1 P-1
P-2P-2
P-2P-2
FD
FD
HB
COTG
HB
RPBP
2" VTR
2" VTR
4" VTR
COTG
CENTER HB ON
BOOTWASH PAD, TYP.
ROUTE NON-POTABLE CW
TO PLUMBING FIXTURES, TYP.
P-3, TYP.
ROUTE CW TO PLUMBING
FIXTURES EXPOSED LOW
ON WALL, TYP.
P-3, TYP.
ROUTE WATER PIPING
HIGH IN CLN'G SPACE, TYP.
BLDG. NON- POTABLE
WATER MAIN
SHUT-OFF VALVE
FCO
CONN. 4" S. TO 6" S STUBOUT
BY OTHERS. SEE FY16 OMA
REPAIR BY REPLACEMENT
CESSPOOLS WITH SEPTIC
SYSTEMS PROJECT.
PROVIDE 12"x12"
ACCESS PANEL AND
OPENING IN CMU
WALL TO WHA &
TRAP PRIMER, TYP.
TRAP PRIMER
TO FD'S, TYP.
ISOLATION VALVE W/
12"x12" ACCESS PANEL, TYP.
ROUTE CW TO
PLUMBING
FIXTURES EXPOSED
LOW ON WALL, TYP.
NON-POTABLE
WATER METER
NON-POTABLE 4" CW
POC PROVIDED BY
BASE WATER SUPPLY
CONTRACTOR
POTABLE 3/4" CW SERVICE.
FROM BLDG. 121
BLDG. POTABLE
WATER MAIN
SHUT-OFF VALVE
POTABLE
WATER METER
NOTES:
1. PROVIDE NON-POTABLE WATER FOR URINALS (P-2) AND
WATER CLOSET (P-1). PIPE SHALL BE COLOR PURPLE FOR
NON-POTABLE WATER DESIGNATION.
2. PROVIDE POTABLE WATER FOR LAVATORIES (P-3).
B
LD
G
LA
TR
IN
E
O N
LY
P
LU
M B
IN
G
F
LO
O R
P
LA
N
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
SCALE: 1/4" = 1'-0"
BLDG 133 - LATRINE ONLY - PLUMBING FLOOR PLANA1
P-103
BLDG. TYPE F
D T
IS
E
D J
B
JO
R H
JG
-P -1
.d gn
AutoCAD SHX Text M
M
P
LU
M B
IN
G
D E
TA
IL
S
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
IN SLEEVE
CENTER PIPE
ESCUTCHEON AT
FINISHED WALLS
CMU WALL OR
CONC. WALL
FIRESTOP W/ UL
APPROVED SYSTEM
C1 P-501
PIPE THRU WALL DETAIL
NOT TO SCALE C2
P-501
ADA CLEANOUT TO GRADE DETAIL
NOT TO SCALE
PLUG IF END
CONDITION
8" MIN.
WASTE LINE
SANITARY WYE
CONCRETE COLLAR
CONCRETE WALK
BRASS PLUG AT PAVING OR
CLEANOUT PLUG USE COUNTERSUNK
1/4" BEND
6" MIN.
FINISHED GRADE
MAIN UP TO MAXIMUM OF 6"
CLEANOUT SAME SIZE AS
MORTAR BED
TILE FLOOR NICKEL BRONZE
ADJUSTABLE STRAINER
STRUCTURAL SLABFLASHING CLAMP
W/ WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
SLOPED GROUT FILL
SHOWER PAN
NOTE: SEE PLUMBING SCHEDULE FOR FLOOR DRAIN TYPE.
CAST IRON CLEANOUT WITH ROUND
ADJUSTABLE SECURED NICKEL
BRONZE TOP, SLOTTED CLOSURE PLUG
INTO HUB & SEAL WITH
INDICATED). TURN DOWN
VAPOR BARRIER (WHERE
FIN. FLR.
1/4" BEND, LONG SWEEP
WASTE LINE
CONC. FLOOR
1"
3/4"
SQUARE HEAD VALVE
VACUUM BREAKER
FINISHED WALL
MIN.
4"
6"
12"
FINISHED FLOOR
INTERIOR/EXTERIOR WALL
PIPE WALL SUPPORT
HB W/ REMOVABLE
TEE HANDLE
18" ABV. FIN.
FLR./GRADE
VACUUM BREAKER
HB W/ REMOVABLE
TEE HANDLE
INTERIOR/EXTERIOR WALL
3/4"
SQUARE HEAD VALVE
PIPE WALL SUPPORT
1/2" POLISHED CHROME
W/LOOSE KEY W/
NON-REMOVABLE
VACUUM BREAKER &
19mm HOSE HOSE
OUTLET
CHROME PLATED, HEX.
HD. LOOSE KEY VALVE
W/ WALL PLATE
C4 P-501
FLOOR CLEAN OUT
NOT TO SCALE
B1 P-501
FLOOR DRAIN DETAIL
NOT TO SCALE
B3 P-501
HOSE BIBB DETAIL
NOT TO SCALE
B4 P-501
INTERIOR HOSE BIBB DETAIL
NOT TO SCALE
24" MIN.
12"
6"
6"
GAS PIPE
SELECT MATERIAL
I.D. PIPE SLEEVE 1/2"
LARGER THAN PIPE OR
INSULATION O.D.
A1 P-501
GAS PIPE TRENCH DETAIL
NOT TO SCALE
AC PAVEMENT/FIN. GRADE
FIN. GRADE
RPBP WATTS MDL 909
OR BWS APPROVED
EQUAL
30" MAX.
12" MIN.
A2 P-501
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
NOT TO SCALE
FINISHED FLOOR FINISHED GRADE
COPPER CW
SUPPLY. SIZE
SHOWN ON DWGS.
A4 P-501
WATER METER DETAIL
NOT TO SCALE
MUELLER MODEL MVR 2" OR
3" OR APPROVED EQUAL
NOTE: OPTIONALAL REMOTE AMR READING SYSTEM BY MUELLER.
CW PIPE. SIZES
SHOWN ON DWGS.
BALL VALVE, TYP.
UNION
CHECK VALVE
#10 COPPER
TRACING WIRE
GAS PIPE
WARNING TAPE
STRAINER
P-501
D T
IS
E
D J
B
JO
R H
JG
-P -5
.d gn
1/4" MIN
P
LU
M B
IN
G
F
IX
TU
R
E S
C H
E D
U
LE
GENERAL NOTES THIS SHEET ONLY
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
REMARKSSYMBOL DESCRIPTION TRAP SIZE WASTE VENT HOT
WATER WATER
COLD
2" 2"2" 1/2"1/2"P-4 SHOWER
WATER CLOSET, WALL MOUNTED
FLUSH VALVE
INTEGRAL 4" 2" - 1"P-1 1.28 GPF ULTRA LOW FLOW TYPE.
P-2 0.125 GPF FLOW ULTRA LOW TYPEURINAL, WALL MOUNTED, FLUSH VALVE,
ULTRA LOW FLOW
INTEGRAL 2" 2" 3/4"
3/4"HB PROVIDE WITH VACUUM BREAKERHOSE BIBB
2"1 1/2" 1/2"LAVATORY, WALL MOUNTEDP-3 0.5 GPM FLOW
2" 2"2" 1/2"1/2"WMB WASHING MACHINE BOX
2"
-FD PROVIDE WITH TRAP PRIMERFLOOR DRAIN -2"2"2"
2"1 1/2" 1/2"LAVATORY, WALL MOUNTED, ACCESSIBLEP-3A 0.5 GPM FLOW2" -
P-601
D T
IS
E
D J
B
JO
R H
JG
-P -6
.d gn
PLUMBING FIXTURE SCHEDULE
O
LI
C
IT
A
TI
O
N N
O
FI
LE
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M B
E R
S
IZ
E
S U
B M
IT
TE
D B
Y
P
LO
T S
C A
LE
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
D A
TE
A
P P
R
US Army Corps of Engineers
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A N
S I D
IS
S
U E
D A
TE
P A
C
IF
IC
O
C E
A N
H O
N O
LU
LU
, H A
W A
II
B O
W E
R S
A N
D K
U B
O
TA
M A
N A
G E
M E
N T
-4
A
K O
K I S
TR
E
E T
W A
IP
A
H U
, H I 9
W
A
-1 5-
D -0
A S
N O
TE
D
W
A
-1 5-
D -0
D
C
A
B
1 2 3 4 5
SHEET ID
FY
M C
A P
N
O P
E R
A
TI
O N
A L
R E
A D
IN
E
S S
TR
A
IN
IN
G C
O M
P
LE
X (B
A R
R A
C K
S
P H
P
O H
A K
U
LO
A T
R A
IN
IN
G A
R E
A
IS
LA
N
D O
F H
A W
A
II,
H A
W A
II
/2 /8
/2 /8
S H
O W
E R
/L A
TR
IN
E D
U P
LE
X
P
LU
M
B
IN
G E
Q U
IP
M
E N
T S
C H
E D
U
LE
S
HEIGHT
BUILDING
SERVED
GAS WATER HEATER (GWH) SCHEDULE
APPROXIMATE DIMENSIONS
GWH
NO. (LBS)
WEIGHT
PROPANESHOWER/LATRINE 23-5/8" 115GWH-3-1
REMARKS
(INCH)
WIDTH
17-3/4"
(INCH)
DEPTH
(INCH)
11-1/4"
TYPE OF FUEL
226,755
HEATER OUTPUT
(BTU/H)
HEATER
EFFICIENCY
70/140
WATER TEMPERATURE
IN/OUT (F) VOLT
ELECTRICAL
120 1.48
AMP
5"
FLUE
SIZE
EXPANSION TANK SCHEDULE
UNIT LOCATION SYSTEM SERVE TYPE
FILL PRESS.
AT TANK
(PSIG)
TEMP. RANGE (DEG F) TANK
VOL.
(GAL.)
RELIEF VALVE (PSI)
PRECHARGE
(PSI)
OPER.
WEIGHT
(LBS)MIN. MAX.
ET-1 DOMESTIC WATER SYSTEM 50 200
NOTES: 1. SUPPORT ON FLOOR / OFF WALL
2. PROVIDE WITH AIR VENT
THERMAL EXPANSION TANK,
POTABLE WATER SYSTEM
SHARED UTILITY ROOM 6.4- 150 55 17 12 18
TANK
DIAMETER
TANK
HEIGHT REMARKS
RATED FOR EXTERIOR USE.
P-602
BLDG. TYPE A
D T
IS
E
D J
B
JO
R H
JG
-P -6
.d gn
| Mech RTA block A_B.pdf |
| RH000215J_M-602 |
| RH000215J_M-603 |
| RH000215J_M-604 |
| RH000215J_M-605 |
| Plumbing RTA bloc A_B.pdf |
| RH000215J_P-001 |
| RH000215J_PS101 |
| RH000215J_P-101 |
| RH000215J_P-102 |
| RH000215J_P-103 |
| RH000215J_P-501 |
| RH000215J_P-601 |
| RH000215J_P-602 |
| RH000215J_P-603 |
| RH000215J_P-901 |
| RH000215J_P-902 |
File details come from the government source that posted it.