About this file

Amendment 0006

View the file

Other files

File Type Posted
W9128A-19-B-0001_Abstract_of_Bids.pdf PDF
W9128A-19-B-0001_Am-0008_Drawings.pdf PDF
W9128A-19-B-0001_Am-0008_Specifications.pdf PDF
W9128A-19-B-0001_Am-0008.pdf PDF
W9128A-19-B-0001_Am_0007_Specifications.pdf PDF
W9128A-19-B-0001_Am_0007.pdf PDF
W9128A-19-B-0001_Am_0007_Drawings.pdf PDF
W9128A-19-B-0001_Am-0006_Specifications.pdf PDF
W9128A-19-B-0001_Am-0006_Drawings.pdf PDF
W9128A-19-B-0001_Am-0005_Drawings.pdf PDF
W9128A-19-B-0001_Am-0005.pdf PDF
W9128A-19-B-0001_Am-0004_-_Drawings_(Part_2_of_2).pdf PDF
W9128A-19-B-0001_Am-0004.pdf PDF
W9128A-19-B-0001_Am-0004_-_Specifications.pdf PDF
W9128A-19-B-0001_Am-0004_-_Drawings_(Part_1_of_2).pdf PDF
W9128A-19-B-0001_Am-0003.pdf PDF
W9128A-19-B-0001_Am-0003_-_Drawings.pdf PDF
W9128A-19-B-0001_Am-0003_-_Specifications.pdf PDF
W9128A-19-B-0001_Am-0002.pdf PDF
W9128A-19-B-0001_Am-0001.pdf PDF
W9128A-19-B-0001_Drawings_(Part_9b_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_8_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_7_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_5_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_9_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_3_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_6_of_9).pdf PDF
W9128A-19-B-0001_IFB.pdf PDF
W9128A-19-B-0001_Specifications.pdf PDF
W9128A-19-B-0001_Drawings_(Part_4_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_2_of_9).pdf PDF
W9128A-19-B-0001_Drawings_(Part_1_of_9).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY18 MCA PN91742 Operational Readiness Training Complex (Barracks), Phase 1, Pohakuloa Training Area, Island of Haw aii, Haw aii

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A19B0001

X 9B. DATED (SEE ITEM 11)

28-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

Am-0006

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jul-2019

CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128A19B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0006)” is shown on each revised page.

a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks or strikethrough.

Standard Form 1442 – Page 1 Section 05 12 00 – Page 6 Section 07 42 93 – Page 7 Section 13 48 00.00 10 – Pages 2, 4 Section 22 00 00 – Pages 47-51 Section 23 00 00 – Pages 7, 14-16, 19, 21-26 Section 23 05 93 – Pages 16-18 Section 23 07 00 – Pages 7, 14-15, 20-25, 27-31 Section 23 08 00.00 10 – Pages 11, 18

b. NEW SECTIONS. The following are new pages to the solicitation.

Section 00 60 00, Appendix A – Requests for Information (#64 through 81) Section 01 90 00, Attachment 11 – Technical Memorandum by Geolabs, Inc. Dated January 7, 2019 Section 01 90 00, Attachment 12 – USAG-P Installation Access Pass Application

c. DELETED SECTIONS. The following sections have been deleted from the solicitation in its entirety.

Section 23 82 02.00 10 – Unitary Heating and Cooling Equipment

2. CHANGES TO DRAWINGS.

a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued

Sheet ID Mark Revision Date

GI001 6 07/16/19

C-001 6 07/16/19

CS102 6 07/16/19

CS103 6 07/16/19

CS104 6 07/16/19

CS105 6 07/16/19

CS106 6 07/16/19

S-001 6 07/16/19 S-301 6 07/16/19 S-302 6 07/16/19

S-303 6 07/16/19 S-304 6 07/16/19 S-305 6 07/16/19 S-501 6 07/16/19 S-502 6 07/16/19

S-508 6 07/16/19 S-511 6 07/16/19

3. The bid opening date is EXTENDED (see SF1442, Page 1, Block 13A).

FY18 MCA PN91742 Operational Readiness Training Complex (Barracks), Phase 1, Pohakuloa Training Area, Island of Hawaii, Hawaii

X

DAYNA MATSUMURA 808-835-4379

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Jun-2019

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______7 calendar days and complete it within ________ 720 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 30 Jul 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USAED, HONOLULU

BLDG 230, ROOM 103

FT. SHAFTER HI 96858-5440

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

W9128A19B0001 2

(Am-0006)

FY18 MCA PN91742 Operational Readiness Training Complex (Barracks) Phase 1 Pohakuloa Training Area, Island of Hawaii, Hawaii

RFI # References Question Government Response 64 Sheet C-001 Geotech note 1 refers to a Geolabs Technical Memorandum, please provide a copy. See New Section 01 90 00, Attachment 11, per Am-0006.

65 Section 051200, Paragraph 1.3

Section 051200 – page 6 - 1.3 requires compliance with AISC. Specifically,

1.3 AISC QUALITY CERTIFICATION

Work must be fabricated in an AISC Certified Fabrication Plant, Category Std.

Submit AISC fabrication plant quality certification.

Work must be erected by an AISC Certified Erector, Category ASCE.

Submit AISC erector quality certification.

According to the AISC website only two companies in Hawaii have the required certification: Nan, Inc. and Swanson Steel.

Would it be acceptable to use local steel suppliers and erectors with relevant experience on projects of similar size and complexity or will AISC certified fabrication plants and/or AISC certified erectors be mandatory.

See Revised Section 05 12 00, Page 6, per Am-0006.

66 The Specifications have an HVAC section with Heat Pump packaged type heating/cooling units. The plan has these listed on the equipment schedule, however there are none shown on the plans. Will the government clarify where the heat pump units are to be installed?

See revised pages to the following sections, per Am-0006:

Section 13 48 00.00 10 Section 23 00 00 Section 23 05 93 Section 23 07 00 Section 23 08 00.00 10

In addition, Section 23 82 02.00 10 has been deleted in its entirety, per Am-0006.

67 Will the government provide condensate drain piping layout and Specs? See revised pages to Section 22 00 00, per Am-0006.

68 Sheet S-001 Sheet S-001 Special Inspections: Regarding Masonry Special Inspections - please advise what Level B requirements are. Specifications on special inspections not periodic or continuous, is level B continuous?

See General Note 12 on Revised Sheet S-001, per Am-0006.

69 We deem that existing appurtenances (water meter box, pit cover, stub outs etc.) of utility will be adjusted by others to match ground elevation. Will this work be complete prior to start this project?

See additional notes on Revised Sheets CS102 through CS106, per Am-0006.

70 Sheet A-503, Detail C1 On drawing C1 / A-503, typical locker section is shown. Please provide manufacturer’s information which applied to design.

See Section 10 51 13, per the original solicitation.

71 Base Access Note 2 on sheet C-001 indicates that the contractor is to pay for obtaining Installation Access Passes (IAP), including costs for certified background checks. Please provide all costs to be expected to be paid by the contractor for such IAP’s.

See Base Access Note 2 on Revised Sheet C-001, and New Section 01 90 00, Attachment 12, per Am-0006.

72 Geotechnical and Shoring Note 1 on sheet C-001 refers to a technical memorandum (“PTA Various Building Design Packages Preliminary Geotechnical Recommendations, Dated January 7, 2019 by Geolabs, Inc.”). Please provide this technical memorandum.

See New Section 01 90 00, Attachment 11, per Am-0006.

Section 00 60 00, Appendix A (Am‐0006)

FY18 MCA PN91742 Operational Readiness Training Complex (Barracks) Phase 1 Pohakuloa Training Area, Island of Hawaii, Hawaii

73 Section 07 61 14.00 20 – Steel Standing Seam Roofing

Please confirm it is acceptable to use the attached standing seam panel by HPM Custom Metal Roofing. Deviations from specifications are stated on the attached.

HPM is offering a component warranty in lieu of the NDL warranty which is also attached.

See Article 1.7 in Section 07 61 14.00 20, per the original solicitation.

74 Section 07 42 93 – Soffit Panels

Please confirm it is acceptable to use the soffits by local manufacturer HPM. Please see attached deviations from the specifications.

See Revised Section 07 42 93, Page 7, per Am-0006.

75 Sheet M-602 and M-603 Sheet M-602 & M-603, detail B1 calls out Bid Option 1 and describes diagram/sequence for heat pump. The bid schedule does not include a line for Bid Option 1 but only for Base Bid.

See Revised Sheets M-602 and M-603, per Am-0004.

76 Sheet M-102 and M-103 Sheet M-102 & M-103, only shows location for exhaust fans. There are no sheets that show location of heat pumps (Bid Option 1).

See Revised Sheets M-602 and M-603, per Am-0004.

77 the current plans (EXAMPLE: Plan sheet S-502) require the use of “BTB” under the new slabs-on-grade within the building footprint. This product is extremely specialized and is no longer manufactured anywhere in Hawaii (please see attached letter).

See Revised Sheet S-501, per Am-0004.

78 On amendment 3 plan sheet CS-101 the new gas line is required to be routed beneath the new fire lane; the least important feature to cross is the permeable pavement – there are MSE Walls and a concrete trench drain to cross as well. We recommend that the gas line be routed around the new fire lane to the west – this route will be far less costly. Please clarify?

See Revised Sheet P-100, per Am-0004.

79 On amendment 4 plan sheet S-508 no topping slab is indicated for building 131A/131 and 142A/142? Yet the specifications lead us to believe a topping slab is required for all buildings? Please clarify?

See Revised Sheet S-508, per Am-0006.

80 If possible can you provide clarity and a specification reference for the notes on the Amendment 4 plan sheets (EXAMPLE: A-503, etc.) making reference to CMU face sealer/water repellent and CMU skim coat of plaster?

Per the original solitication:

- See Section 07 19 00 for CMU face sealer/water repellent.

- See Section 09 24 23 for CMU skim coat of plaster.

81 In the amendment 4 Q/A it seems as if the requirement for any “BTB” was eliminated, however (see attached exhibit) there are still notes on the amended plan sheet S-502 implying it being required. Please clarify, as stated in a previous RFI the material is no longer available in Hawaii (see attached letter from the last known supplier)?

See Revised Sheet S-501, per Am-0006.

Section 00 60 00, Appendix A (Am‐0006)