EROSION CONTROL NOTES AND
PROVIDE STABILIZED CONSTRUCTION ENTRANCE FOR EACH INGRESS AND EGRESS.
PRE-CONSTRUCTION VEGETATIVE GROUND COVER SHALL NOT BE DESTROYED, REMOVED OR
DISTURBED MORE THAN TWENTY (20) CALENDAR DAYS PRIOR TO SITE GRADING.
TEMPORARY SOIL STABILIZATION WITH APPROPRIATE VEGETATION SHALL BE APPLIED ON AREAS THAT
WILL REMAIN UNFINISHED FOR MORE THAN FOURTEEN (14) CALENDAR DAYS.
PERMANENT SOIL STABILIZATION WITH PERENNIAL VEGETATION SHALL BE APPLIED AS SOON AS
PRACTICAL AFTER FINAL GRADING.
DIVERT ALL STORM WATER FLOWING TOWARD THE CONSTRUCTION AREA USING APPROPRIATE
CONTROL MEASURES AS PRACTICAL.
BEST MANAGEMENT PRACTICES (BMPS):
TEMPORARY EROSION CONTROLS SHALL NOT BE REMOVED BEFORE PERMANENT EROSION
CONTROLS ARE IN-PLACE AND ESTABLISHED.
THE MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL BE IN PLACE BEFORE ANY
DEMOLITION OR EARTH MOVING PHASE IS INITIATED.
ALL ITEMS AND MATERIALS TO BE REMOVED SHALL BE DONE IN SUCH A MANNER AS TO PREVENT
DAMAGE TO ITEMS AND MATERIALS TO REMAIN. ALL SUCH DAMAGES SHALL BE REPAIRED TO
EXISTING OR BETTER CONDITION TO THE SATISFACTION OF THE CONTRACTING OFFICER'S
REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
GOVERNMENT DISPOSAL AREAS WILL NOT BE AVAILABLE FOR THE DISPOSAL OF WASTE
MATERIALS. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR DISPOSAL OF WASTE
MATERIALS. ALL WASTE MATERIAL SHALL BE PROMPTLY REMOVED AND DISPOSED OF OUTSIDE
THE LIMITS OF GOVERNMENT PROPERTY.
THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS DURING CONSTRUCTION,
DEWATERING, AND EXCAVATION TO PREVENT DAMAGE TO EXISTING UTILITIES. THE CONTRACTOR
SHALL BE HELD LIABLE IN THE EVENT OF ANY DAMAGE AND HELD RESPONSIBLE FOR THE
MAINTENANCE AND PROTECTION OF ALL EXISTING UTILITIES AND STRUCTURES SHOWN ON THE
DRAWINGS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE MAINTENANCE AND
PROTECTION OF EXISTING UTILITIES AND STRUCTURES NOT SHOWN ON THE DRAWINGS BUT MADE
KNOWN TO THEM. THE CONTRACTOR SHALL IMMEDIATELY REPAIR AND BE RESPONSIBLE FOR ALL
COSTS TO REPAIR ANY UTILITY, WHETHER SHOWN OR NOT SHOWN ON THE DRAWINGS, THAT ARE
DAMAGED BY THEIR WORK TO THE SATISFACTION OF THE CONTRACTING OFFICER'S
REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
13.
12.
11.
9.
10.
1.
3.
4.
6.
7.
8.
9.
2.
11.
10.
EXISTING STRUCTURES AND TREES NOT INDICATED ON THE PLANS FOR REMOVAL SHALL BE
PRESERVED. IF ANY SUCH STRUCTURES OR TREES OBSTRUCT CONSTRUCTION OPERATIONS, THE
COR SHALL BE NOTIFIED BEFORE PROCEEDING. CONTRACTOR SHALL ALSO REFER TO LANDSCAPE
DRAWINGS.
UNLESS OTHERWISE NOTED, OFFSET DIMENSIONS FROM THE BUILDING INDICATED ARE FROM THE
OUTSIDE FACE OF WALL. BUILDING LOCATIONS ARE WITH RESPECT TO OUTER WALL LINES.
FOR TOPOGRAPHIC INFORMATION, SEE TOPOGRAPHIC SURVEY NOTES ON SHEET GC002.
AZIMUTHS SHOWN ARE REFERENCED CLOCKWISE FROM TRUE SOUTH.
ALL UTILITY SERVICES SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. CONNECTION
TO THE WATER SERVICE LINE SHALL BE DONE WITH THE MINIMUM AMOUNT OF DISRUPTION AND
SHALL BE COORDINATED WITH THE COR AND DPW.
1.
2.
3.
5.
6.
CIVIL NOTES
7.
8.
GENERAL NOTES
NONCOMPLIANCE TO ANY CONTRACT REQUIREMENTS SHALL MEAN IMMEDIATE SUSPENSION OF ALL
WORK, AND REMEDIAL WORK SHALL COMMENCE IMMEDIATELY. COSTS INCURRED SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AND ARE CONSIDERED INCIDENTAL.
CONTRACTOR SHALL PROMPTLY NOTIFY THE COR IN WRITING OF ANY DISCREPANCIES AND/OR
CONDITIONS WHICH WILL ADVERSELY AFFECT THE CONSTRUCTION COST AND TIMELY COMPLETION
OF THE TERMS OF THE CONTRACT PRIOR TO START OF ANY WORK OR ORDERING OF MATERIALS
AND/OR EQUIPMENT. THE START OF ANY WORK AND ORDERING OF MATERIALS AND/OR EQUIPMENT
SHALL CONSTITUTE ACCEPTANCE OF THE EXISTING CONDITIONS. ANY COSTS OR TIME DELAYS
RESULTING FROM THE CONTRACTOR'S FAILURE TO VERIFY AND/OR NOTIFY SHALL BE
RESPONSIBILITY OF THE CONTRACTOR AND AT NO EXTRA COSTS SHALL BE REQUESTED FROM THE
GOVERNMENT.
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL BASE/FACILITY ACCESS BADGING
REQUIRED BY SECURITY FORCES.
DURING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ACCESS AND/OR
TEMPORARY RELOCATION OF BASE ROADS PER SPECIFICATIONS. CONTRACTOR SHALL MAINTAIN
ACCESS AT ALL TIMES TO ALL BUILDINGS WITHIN AND OUTSIDE THE CONSTRUCTION SITE LIMITS.
ALL GRADED AND DISTURBED AREAS, INCLUDING CONTRACTOR STAGING AND MOBILIZATION AREAS
AND AREAS DISTURBED BY DEMOLITION OPERATIONS (NOT SHOWN TO HAVE SURFACE REPLACED
WITH PAVEMENT) SHALL HAVE SURFACE RESTORED AND ESTABLISHED BY REGRASSING. GRASS
SHALL BE COMMON BERMUDA GRASS (CYNDON DACTYLON) PLANTED BY BROADCAST SEEDING, OR
HYDROMULCHING. THE CONTRACTOR SHALL PROVIDE TEMPORARY IRRIGATION FOR THE DURATION
OF THE LANDSCAPE MAINTENANCE PERIOD (90 DAYS AFTER COMPLETION) FOR THE PROPER
ESTABLISHMENT OF THE GRASS. TYPE AND MEANS OF TEMPORARY IRRIGATION SHALL BE AT THE
OPTION OF THE CONTRACTOR. TEMPORARY IRRIGATION SHALL REMAIN THE PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED UPON COMPLETION OF THE MAINTAINANCE PERIOD AND
ACCEPTANCE.
8.
9.
7.
6.
5.
4.
EQUIPMENT AND STOCKPILED MATERIAL SHALL BE CONTROLLED IN A MANNER TO PREVENT
MOVEMENT RESULTING FROM WIND CONDITIONS.
CONTRACTOR SHALL MAINTAIN WORK AREAS FREE OF DUST, DIRT, AND DEBRIS WHICH MAY, IN THE
OPINION OF THE CONTRACTING OFFICER, ADVERSELY AFFECT GOVERNMENT OPERATIONS.
2.
3.
1.
HOUSEKEEPING SUCH AS THE DAILY CLEANUP OF DEBRIS, THE USE OF DUMPSTER FOR THE
CONTAINMENT OF CONSTRUCTION DEBRIS, AND THE PROPER STORAGE OF CONSTRUCTION
MATERIALS SHALL BE USED TO PREVENT DEBRIS AND CHEMICAL POLLUTION OF THE STORM
WATER.
14.
15. TEMPORARY EROSION CONTROLS USED DURING CONSTRUCTION PERIOD INCLUDE SILT FENCE, DRAIN INLET PROTECTION, CATCH BASIN, DUST FENCE, CONSTRUCTION ENTRANCE, AND A
CONCRETE WASH AREA.
13.
PROVIDE SECONDARY CONTAINMENT FOR LARGEST SINGLE DRUM STORED ON
SITE. PROVIDE ROOF/COVER TO PREVENT RAIN WATER ACCUMULATION INTO
SECONDARY CONTAINMENT.
16.
MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL BE IN PLACE BEFORE ANY
EARTH MOVING WORK IS INITIATED. THESE MEASURES SHALL BE PROPERLY CONSTRUCTED AND
MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
CONSTRUCTION SHALL BE SEQUENCED TO MINIMIZE THE EXPOSURE TIME OF CLEARED
SURFACE AREA.
ALL CONTROL MEASURES SHALL BE CHECKED AT LEAST ONCE A WEEK, PRIOR TO A STORM
EVENT, DURING A STORM EVENT, AND AFTER A STORM EVENT. THE CONTRACTOR SHALL
DOCUMENT HIS INSPECTIONS AND KEEP RECORDS OF HIS INSPECTIONS AND WHAT WAS DONE
TO MAINTAIN, CORRECT, OR IMPROVE THE CONTROL MEASURES.
CONSTRUCT FACILITIES TO RETAIN ON-SITE WASTEWATER SUCH AS CHLORINATED WATER AND
HYDROSTATIC TESTING WATER AND ALLOW THEM TO PERCOLATE INTO THE SOIL.
MAINTAIN SEDIMENT TRAPS AT DISCHARGE POINTS DURING SITE WORK AND UNTIL
PERMANENT EROSION CONTROLS ARE IN PLACE.
FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, SIZES, MATERIALS AND FINISHES PRIOR TO
START OF ANY WORK AND ORDERING OF MATERIAL AND/OR EQUIPMENT. THE EXISTING CONDITIONS, DIMENSIONS, SIZES, MATERIALS AND FINISHES INDICATED ON THESE DRAWINGS REPRESENTS THE
BEST INFORMATION AVAILABLE FROM FIELD INVESTIGATION AND RECORD DRAWINGS.
10.
11.
12.
CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
UNLESS SPECIFICALLY DIMENSIONED ON PLAN, THE CONSTRUCTION SITE LIMITS INDICATE THE
APPROXIMATE EXTENT OF THE PROJECT LIMIT BOUNDARIES.
14.
RESTRICT ALL WORKERS, GOVERNMENT'S PERSONNEL, MILITARY PERSONNEL, AND THE GENERAL
PUBLIC FROM ALL CONSTRUCTION HAZARDS AND ERECT AND MAINTAIN AN APPROVED SAFETY
BARRIER AROUND THE PROJECT AREA(S). ONLY AUTHORIZED PERSONAL SHALL BE ALLOWED
ENTRY INTO THE PROJECT AREA(S). THE PROJECT SHALL CONFORM TO ALL APPLICABLE SAFETY
LAWS, ORDINANCES AND LAWS.
SUBMIT SHOP DRAWINGS AND PRODUCT LITERATURE FOR REVIEW AND APPROVAL FOR ALL
CONTRACTOR FURNISHED ITEMS AS INDICATED IN THE SPECIFICATIONS.
15.
16.
CONTRACTOR TO OBTAIN ALL REQUIRED PERMIT(S) UNLESS OTHERWISE NOTED.
ALL ITEMS SHALL BE NEW, UNLESS OTHERWISE NOTED.
17.
18.
REMOVAL AND STORAGE OF HAZARDOUS MATERIAL DURING CONSTRUCTION, ALTERATION AND
DEMOLITION SHALL BE IN ACCORDANCE WITH APPLICABLE CODES & ORDINANCES.
19.
ALL REQUESTS FOR INFORMATION SHALL BE SUBMITTED WITH PROPOSED SOLUTIONS. REQUEST
FOR INFORMATION WITHOUT PROPOSED SOLUTIONS WILL BE RETURNED WITHOUT RESPONSE.
20.
17. SHOULD THE STAGING AREA (AS COORDINATED WITH THE COR) DIFFER FROM
THAT DELINEATED ON THE PROJECT PLANS, THE CONTRACTOR SHALL HAVE
THE REVISED LOCATION REVIEWED BY THE NATURAL RESOURCE MANAGER
AT THE DEPARTMENT OF PUBLIC WORKS.
SMOKING IS CONFINED TO ROADWAYS AND CIGARETTE BUTTS SHALL BE DISPOSED OF PROPERLY;
STAGING AREA(S) ARE DELINEATED ON THE PLANS. THE CONTRACTOR MAY REQUEST CHANGES OR
ADDITIONAL STAGING AREA LOCATIONS, HOWEVER, IT WILL BE SUBJECT TO APPROVAL BY THE
CONTRACTING OFFICER AND THE NATURAL RESOURCE MANAGER AT THE DEPARTMENT OF PUBLIC WORKS.
CONTRACTOR SHALL BALANCE EARTHWORK TO MINIMIZE THE NEED FOR OUTSIDE FILL. IF OUTSIDE
FILL IS NECESSARY, THE CONTRACTOR WILL NOTIFY THE CONTRACTING OFFICER AND THE NATURAL
RESOURCE MANAGER AT THE DEPARTMENT OF PUBLIC WORKS (DPW) (MICHELLE MANSKER, 656-2878
X 1029) PRIOR TO PLACING THE FILL.
ALL CONSTRUCTION EQUIPMENT, INCLUDING VEHICLES AND CLOTHING, WILL BE CLEANED OF DIRT
AND DEBRIS THAT COULD HARBOR NON-NATIVE SPECIES BEFORE BEING TRANSPORTED TO THE
CONSTRUCTION SITE.
2.
6.
5.
4.
3.
1.
IF ANY ACCIDENT OCCURS THAT RELEASES PETROCHEMICAL OR TOXIC SUBSTANCES, THE NATURAL
RESOURCE MANAGER AT THE DPW, THE HONOLULU FIRE DEPARTMENT, AND THE SOLID AND
HAZARDOUS WASTE BRANCH OF THE STATE DEPARTMENT OF HEALTH (PHONE#: 586-4226) SHALL BE
NOTIFIED IMMEDIATELY.
BEST MANAGEMENT PRACTICES (BMPS):
REMOVAL OF ALL INORGANIC (TRASH) AND ORGANIC WASTE SUCH AS APPLE CORES IS IMPERATIVE
AS THIS ATTRACTS RATS WHICH PREY ON THE NATIVE PLANTS AND ANIMALS.
ISLAND OF OAHU CONSTRUCTION PROJECT
THE ENTIRE PROJECT SITE WILL BE MONITORED AND INSPECTED BY THE
DPW ENVIRONMENTAL BRANCH AND THE STATE OF HAWAII.
18.
19. TRACKING OF SOIL ON INSTALLATION AND PUBLIC ROADS IS PROHIBITED.
WASHING OF SOIL INTO STREAMS OR STORM DRAIN INLETS OR CATCH
BASINS IS PROHIBITED.
PROVIDE SILT FENCE OR ALTERNATIVE BARRIER AROUND STOCKPILE AREA(S).20.
PRIOR TO ANY EXCAVATION, TRENCHING OR DIGGING, CONTRACTOR SHALL OBTAIN DIGGING
PERMIT FROM DIRECTORATE OF PUBLIC WORKS, US ARMY GARRISON, HAWAII.
CONSTRUCTION SHALL OCCUR BETWEEN THE HOURS OF 7:00AM TO 5:30PM MONDAY THRU FRIDAY, WITH NOISE GENERATING ACTIVITIES ONLY LIMITED TO THE HOURS OF 8:30AM TO 3:30PM MONDAY
THRU FRIDAY. EXCEPT AS APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
EXCAVATED MATERIALS SUITABLE AS FILL OR BACKFILL MATERIALS AND MEETING THE
SPECIFICATION REQUIREMENTS FOR ITS INTENDED USE SHALL BE STOCKPILED IN AN AREA
APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). THE CONTRACTOR SHALL
NOTIFY THE COR IMMEDIATELY IF ANY OF THE EXCAVATED MATERIALS CONTAIN PETROLEUM OR
OTHER HAZARDOUS MATERIALS. THE CONTRACTOR SHALL THEN SEEK DIRECTION ON HOW TO
HANDLE THE CONTAMINATED SOILS FROM THE COR AND COORDINATE WITH THE DIRECTORATE OF
PUBLIC WORKS (DPW) ENVIRONMENTAL COMPLIANCE BRANCH CHIEF, AND WHETHER THE MATERIAL
CAN BE REUSED OR REQUIRE DISPOSAL. EXCESS EXCAVATED SOILS NOT NEEDED FOR
CONSTRUCTION SHOULD BE REMOVED AND DISPOSED OFFSITE.
5. CONCRETE WASH OUT AREAS SHALL BE LINED WITH AT LEAST A 100 MIL IMPERMEABLE LAYER OR
EQUIVALENT WITH NO HOLES OR TEARS SO AS TO PREVENT LEACHING OF LIQUIDS INTO THE GROUND.
IF THE WASH OUT IS NEARING CAPACITY, VACUUM AND DISPOSE OF THE WASTE MATERIAL COLLECTED
USING APPROPRIATE BMP'S.
THE CONTRACTOR SHALL REVIEW THE DOCUMENTS FOR THE EXTENT OF NEW WORK, AND PROTECT
EXISTING ITEMS/AREAS NOT IN THE CONTRACT. ALL DAMAGED WORK AREAS AND ITEMS SHALL BE
REPAIRED AND REPLACED TO MATCH EXISTING CONDITIONS OR BETTER, AT NO ADDITIONAL COST
TO THE GOVERNMENT.
THE EQUIPMENT OPERATOR SHALL CLOSELY MONITOR EXCAVATED MATERIAL FOR SIGNIFICANT
CHANGES IN COLOR, SIZE (GRADATION), AND TYPE OF MATERIAL. SUCH CHANGES MAY INDICATE
THE PRESENCE OF AN UNMARKED UTILITY. IF SUCH CHANGES ARE NOTED, THE CONTRACTOR
SHALL CEASE ALL EXCAVATION BY EQUIPMENT, AND PROBE BY HAND. IF ANY QUESTIONS ARISE, THE CONTRACTOR SHALL CONTACT THE UNDERSIGNED.
THE CONTRACTOR SHALL SUBMIT A COMPLETED AND APPROVED US ARMY GARRISON HAWAII
DIRECTORATE OF PUBLIC WORKS EXCAVATION PERMIT FORM, WITH ATTACHMENTS, TO THE
CONTRACTING OFFICER ASSIGNED TO THIS PROJECT PRIOR TO ANY EXCAVATION. THE
CONTRACTOR SHALL MAINTAIN THIS PERMIT ON SITE AT ALL TIMES DURING EXCAVATION. THIS
APPLICATION BECOMES A CERTIFIED EXCAVATION PERMIT ONLY AFTER ALL UTILITY AGENCIES
HAVE APPROVED THE APPROPRIATE SECTIONS AND THE CONTRACTING OFFICER OR PROJECT
MANAGER HAS SIGNED THE FORM.
THE LOCATIONS OF EXISTING UTILITIES SHOWN ON PLAN AND PROFILE ARE ONLY APPROXIMATE.
WHERE THE EXISTING UTILITIES CAN NOT BE VERIFIED IN THE FIELD, THE CONTRACTOR SHALL
TONE/POTHOLE AND PHYSICALLY VERIFY LOCATIONS OF ALL EXISTING UTILITIES AND UTILITY
CROSSINGS PRIOR TO COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL ALSO VERIFY AND
CHECK ALL PERTINENT ELEVATION, LOCATION, AND DETAIL DIMENSIONS NOTED ON THE DRAWINGS
PRIOR TO PIPELINE UTILITY INSTALLATION. ANY DISCREPANCY WITH PLAN ARRANGEMENTS SHALL
BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR FOR CLARIFICATION.
4.
CONTRACTOR SHALL REMOVE FRAME, COVER, TOP CONE SECTION (OR (3ft) MINIMUM DEPTH), AND BREAK UP BOTTOM OF MANHOLES AND FILL WITH NON-EXPANDABLE MATERIAL; FOR ALL
MANHOLES TO BE ABANDONED IN PLACE.
12.
ALL PIPE AND FITTING SIZES ARE IN INCHES (in), UNLESS OTHERWISE INDICATED.13.
THE CONTRACTOR SHALL PERFORM A GENERAL SITE SURVEY AND LOCATE ALL UTILITIES WITHIN
THE AFFECTED AREA PRIOR TO EXCAVATION. THE CONTRACTOR SHALL VERIFY THAT THERE ARE
NO KNOWN EXISTING UTILITIES IN QUESTION FOR THE AFFECTED AREA BY USING THE CURRENT
UTILITY DRAWINGS AND TONING PRIOR TO EXCAVATION. ALL UTILITIES THAT ARE NOT SHOWN ON
THE PLANS, BUT HAVE BEEN LOCATED IN THE FIELD SHALL BE SHOWN ON THE CONSTRUCTION
AS-BUILT DRAWINGS. THE CONTRACTOR SHALL VERIFY THAT ALL WATER, SEWER, ELECTRICAL, GAS, AND DRAINAGE UTILITIES HAVE BEEN IDENTIFIED.
14.
EROSION CONTROL MEASURES SHOWN HEREIN REPRESENT THE MINIMUM
REQUIREMENTS. CONTRACTOR, AT HIS OWN EXPENSE, SHALL ADJUST EROSION
CONTROL MEASURES TO PROVIDE BEST MANAGEMENT PRACTICES TO ADDRESS
REQUIREMENTS OF HAR 11-54 AS NEEDED AND AS CONSTRUCTION PHASING AND
SEQUENCING REQUIRES. ANY REVISIONS AND/OR CHANGES AS A RESULT OF
THESE CONDITIONS SHALL REQUIRE REVIEW AND APPROVAL BY ENGINEER,
STATE AND COUNTY AGENCIES.
21.
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
O T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
N
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
Honolulu District
I N
K
A
R C
H
L L C
H O
N O
L U
L U
H
A W
A I I
P H
O N
E
I W
I L E
I
R
O A
D
S
U I T
E
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
F O
R
H A
F T
E R
O
A H
U
H
A W
A I I
H O
N O
L U
L U
D
I S
T R
I C
T
EXP. DATE: 04/30/2018
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT WILL BE
UNDER MY OBSERVATION. SUPERVISION OF
CONSTRUCTION AS PER DEFINED IN SECTION
1.2(N) OF THE RULES AND REGULATIONS OF
THE BOARD OF PROFESSIONAL ENGINEERS,
ARCHITECTS AND SURVEYORS OF THE
STATE OF HAWAII.
F Y
O
M A
K G
E N
O V
A T
E
F
I R
O
B
I L D
I N
G
W H
E E
L E
R
A
R M
Y
A
I R
F I E
L D
O
A H
U
H
A W
A I I
W A
D
- W A
D
A N
S I
D
M E
S S
F M
B R
W E
N D
Y
M
C L A
I N
T
E D
GC001
C I V
T
W A
A F
B
G
C D
ABBREVIATIONS
1.
UTILITY OUTAGE/LINE-STOPPING NOTES
STATE HISTORIC PRESERVATION DIVISION REQUIREMENTS
CONTRACTORS SHALL TAKE PRECAUTIONS TO PRESERVE ALL CULTURAL RESOURCES, HISTORICAL
AND/OR ARCHAEOLOGICAL, ENCOUNTERED DURING THE WORK. IF PREVIOUSLY UNIDENTIFIED OR
UNANTICIPATED RESOURCES ARE INADVERTENTLY DISCOVERED (BY THE CONTRACTOR,
GOVERNMENT PERSONNEL, CULTURAL MONITORS OR ARCHEOLOGISTS) DURING EXCAVATION,
TESTING, OR BORING; ALL ACTIVITIES THAT MAY DAMAGE OR ALTER SUCH RESOURCES WITHIN 35
FEET OF THE IMMEDIATE AREA SHALL BE TEMPORARILY SUSPENDED. THESE CULTURAL
RESOURCES MAY BE PREHISTORIC OR HISTORIC; SURFACE OR SUBSURFACE; AND INCLUDE BUT
ARE NOT LIMITED TO HUMAN SKELETAL REMAINS OR BURIALS; ARTIFACTS; SHELL, MIDDEN, BONE, CHARCOAL, SOIL, OR OTHER DEPOSITS; ROCKS OR CORAL ALIGNMENTS, PAVING, WALL, OR OTHER
CONSTRUCTED FEATURES; AND ANY INDICATION OF AGRICULTURAL OR OTHER USES. UPON SUCH
DISCOVERY OR FIND, THE CONTRACTOR SHALL ISOLATE THE MATERIAL WHERE FIRST IDENTIFIED, AND IMMEDIATELY NOTIFY THE STATE HISTORIC PRESERVE OFFICE, GOVERNMENT'S QUALITY
ASSURANCE PERSONNEL OR THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). WHEN SO
NOTIFIED, THE COR WILL CONTACT THE INSTALLATION CULTURAL RESOURCES MANAGER (ICRM)
AND THE CORPS ENVIRONMENTAL TECHNICAL BRANCH (CEPOH-EC-E) AS SOON AS POSSIBLE TO
DETERMINE IF ARCHAEOLOGICAL, HISTORICAL, OR CULTURAL RESOURCES ARE SIGNIFICANT. THE
ICRM AND/OR CEPOH-EC-E WILL DETERMINE WHAT PROCEDURES NEED TO BE IMPLEMENTED (E.G.
PROMPT AND PROPER DATA RECOVER) AND WILL ADVISE THE COR WHEN WORK CAN RESUME IN
THE AFFECTED AREA. THE CONTRACTOR SHALL NOT PROCEED IN THAT AREA UNTIL DIRECTED BY
THE COR OR HIS DESIGNATED REPRESENTATIVES.
1.
WITHIN ONE WEEK AFTER SITE AND EXTERIOR UTILITIES ARE INSTALLED, THE CONTRACTOR SHALL
PROVIDE TEMPORARY GRASSING IN ACCORDANCE WITH THE SPECIFICATIONS SECTION "SEEDING".
TEMPORARY GRASSING SHALL BE WITH ANNUAL RYE GRASS.
THE CONTRACTOR SHALL REMOVE ALL SILT AND DEBRIS RESULTING FROM THEIR WORK WHICH
ARE DEPOSITED IN DRAINAGE FACILITIES, ROADWAYS, AND OTHER AREAS. THE COSTS INCURRED
FOR ANY NECESSARY REMEDIAL ACTION BY THE GOVERNMENT SHALL BE PAID BY THE
CONTRACTOR.
IF GRADING, TRENCHING OR DEWATERING WORK INVOLVES CONTAMINATED SOIL AND/OR
HAZARDOUS MATERIAL, THEN ALL WORK SHALL BE DONE IN CONFORMANCE WITH SPECIFICATIONS, AND APPLICABLE STATE AND FEDERAL REQUIREMENTS. IF CONTAMINATED SOIL OR HAZARDOUS
MATERIAL IS ENCOUNTERED, CONTRACTOR SHALL IMMEDIATELY CONTACT THE COR.
ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATERS FROM DAMAGING THE
CUT FACE OF AN EXCAVATION OR THE SLOPED SURFACES OF A FILL. FURTHERMORE, ADEQUATE
PROVISIONS SHALL BE MADE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE SITE.
4.
2.
1.
3.
GRADING AND TRENCHING NOTES
CONTRACTOR SHALL CONSTRUCT NEW WATER MAINS FIRST WITH LATERAL RECONNECTION TO
NEW MAINS DONE AFTER MAIN IS COMPLETED. TEMPORARY WATER LATERAL OUTAGES NOT
EXCEEDING 4 HOURS SHALL BE ALLOWED (SUBJECT TO NOTIFICATION REQUIREMENTS BELOW). IF
THE 4 HOUR MAXIMUM OUTAGE CANNOT BE MET, CONTRACTOR SHALL PROVIDE WATER AND
PORTABLE TOILETS FOR BLDG OCCUPANTS AT NO ADDITIONAL COST TO THE GOVERNMENT.
CONTRACTOR SHALL NOTIFY THE COR A MINIMUM OF 60 DAYS PRIOR TO ANY UTILITY OUTAGE.
CONTRACTOR SHALL PROVIDE A LIST OF ALL FACILITIES BEING AFFECTED BY THE PROPOSED
OUTAGE & ESTIMATED LENGTH OF OUTAGE.
2.
WATER MAIN OUTAGES SHALL NOT BE ALLOWED FOR THIS PROJECT. ONLY WATER SERVICE
LATERAL OUTAGES (MAXIMUM 4 HOUR, UNLESS OTHERWISE APPROVED BY THE CONTRACTING
OFFICER) ARE ALLOWED. EXISTING WATER MAINS REQUIRING REMOVAL/RELOCATION SHALL BE
WET-TAPPED WITH TAPPING VALVES USING FITTINGS AND APPURTENANCES AS REQUIRED. ALL
WET-TAPPED LINES REQUIRE CONCRETE THRUST BLOCKS WITH STRUCTURAL STRUTS. CONCRETE
BLOCKS SHALL BE CURED FOR A MINIMUM OF 5 DAYS.
3.
7. UNDERGROUND UTILITY LINES AND/OR STRUCTURES, IF SHOWN, ARE PROVIDED FOR INFORMATION
ONLY AND ARE BASED ON INFORMATION SHOWN ON PLANS/MAPS PREPARED BY OTHERS. THE
INFORMATION SHOWN, THEREFORE, MAY OR MAY NOT BE REPRESENTATIVE OF ACTUAL FIELD
CONDITIONS. THE UNDERGROUND UTILITY LINES AND/OR STRUCTURES MAY OR MAY NOT BE
PRESENT AT THE LOCATIONS SHOWN OR OTHER UNDERGROUND UTILITY LINES AND/OR
STRUCTURES NOT SHOWN MAY BE PRESENT.
TOPOGRAPHIC SURVEY NOTES
NORTH ARROW REFERS TO TRUE NORTH.
ALL ELEVATIONS AND DISTANCES ARE IN FEET.
AZIMUTHS SHOWN ARE REFERENCED FROM TRUE SOUTH.
1.
2.
3.
4.
5.
6.
TOPOGRAPHICAL SURVEY MAP, FY15 OMA PKG A-015 RENOVATE FIRST FLOOR BUILDING 107
WHEELER ARMY AIRFIELD, OAHU, HAWAII WAS COMPLETED BY CONTROL POINT SURVEYING, INC.
ON SEPTEMBER 9, 2014.
ELEVATIONS ARE REFERENCED TO STA. BASE-3, RAILROAD SPIKE ELEV.= 677.03 FT.
WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.
UNLESS OTHERWISE NOTED, ALL LOCATIONS OF UNDERGROUND UTILITY LINES AND/OR
STRUCTURES ARE APPROXIMATE. NO GUARANTEE IS MADE ON THE ACCURACY OR
COMPLETENESS OF THE INFORMATION SHOWN. THE USER(S) OF THIS TOPOGRAPHIC SURVEY
SHALL VERIFY THE INFORMATION, AS NEEDED, DURING CONSTRUCTION.
8.
1. TRAFFIC CONTROL PLANS, IF REQUIRED BY THE COR, SHALL BE THE CONTRACTOR'S
RESPONSIBILITY.
GENERAL NOTE FOR TRAFFIC CONTROL PLAN
CONTRACTOR SHOULD ANTICIPATE TO ENCOUNTER NUMEROUS BOULDERS. THE RESULTING
EXTENDED TIME AND NECESSARY EQUIPMENT TO EXCAVATE THROUGH THE BOULDERS SHALL BE
ACCOUNTED FOR.
5.
EXPANSION JOINT
CONTRACTION JOINT
INVERT ELEVATION
INSIDE DIAMETER
FINISHED FLOOR
FEET, FOOT
HORIZONTAL
HAND VALVE
ELECTRICAL MANHOLE
ELEVATION
EACH WAY
DRAIN INLET/DUCTILE IRON
DIAMETER
ELECTRICAL
APPROXIMATE
CONNECTION
CENTERLINE
CONTINUATION
CONCRETE
BOTTOM OF CURB
ASPHALTIC CONCRETE
EJ.
CJ.
DET.
E.M.H.
EL. ELEV.
DWG.
D.I.
DIA.
APPROX.
CONN.
CONT.
CV.
C, CONC.
BC
A.C.
E
C
L
DETAIL
DRAWING
COVER
BUILDINGBLDG.
INV.
I.D.
I.E.
HORIZ.
F.F.
FT.
H.V.
EXIST., EX
E.W.
INVERT
EXISTING
SAWCUT JOINTSJ.
PAVEMENT
POUNDS PER SQUARE INCH
POLYVINYL CHLORIDE
SEWER CLEAN OUT
SEWER MANHOLE
SCHEDULE
OUTSIDE DIAMETER
ON CENTER
MANUFACTURER
MANHOLE
P, PAV'T
SHT
SMH
PVC
SCH
SCO
PSI
MIN.
OD
OC, O.C.
MFR.
MH
SHEET
MINIMUM
SDMH SEWER DRAIN MANHOLE
SDCO STORM DRAIN CLEANOUT
WATER MANHOLE
WATER LINE
WATER VALVE
VERTICAL
VALVE BOX
WMH
WL
WV
TW
VERT
VB
TOP OF WALL
TELEPHONETEL
STA. STATION
V.I.F. VERIFY IN FIELD
TC TOP OF CURB
SQ. SQUARE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
MULTIPLE DEPLOYMENT FACILITYMDF
ASP AMMUNITION SUPPLY POINT
F.F.E. FINISHED FLOOR ELEVATION
MILLIMETERmm
MAXIMUMMAX.
REINFORCED CONCRETE PIPERCP
ARV AIR RELIEF VALVE
NIC NOT IN CONTRACT
SHLD SHOULDER
SPOT ELEVATIONS.E.
B.O.D. BOTTOM OF DITCH
A.C.B. ASPHALT CONCRETE BASE
S SLOPE
BOTTOM OF SWALEBOS
TYPICALTYP.
BOTTOM OF WALLBW
PCC PORTLAND CEMENT CONCRETE
CONTRACTOR'S OPERATIONS
AND STORAGE AREA
COSA
RC REINFORCED CONCRETE
BV BOTTOM VERTICAL
TOP VERTICALTV
SUBBASESB
RECYCLED ASPHALT PAVEMENTRAP
KILOGRAMKG
SM SQUARE METERS
DEPT. OF PUBLIC WORKSDPW
DRAIN MANHOLEDMH
MEAN SEA LEVELMSL
POST INDICATOR VALVEPIV
IRRIG. IRRIGATION
FINISHED GRADEFG
CLEANOUT TO GRADECOTG, CO
LPG LIQUIFIED PETROLEUM GAS
LINEAR FEETL.F.
TBM TEMPORARY BENCH MARK
CONSTRUCTION NOTES
8.
2.
3.
4.
5.
6.
7.
CONFINED SPACE
NO CONTRACTOR SHALL PERFORM ANY CONSTRUCTION OPERATION SO AS TO CAUSE FALLING
ROCKS, SOIL OR DEBRIS IN ANY FORM TO FALL, SLIDE OR FLOW INTO EXISTING DRAINAGE
SYSTEMS, STREETS OR NATURAL WATERCOURSES. SHOULD SUCH VIOLATIONS OCCUR, THE
CONTRACTOR SHALL IMMEDIATELY MAKE ALL REMEDIAL ACTIONS NECESSARY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE WITH THE PROVISIONS OF
THE WATER QUALITY AND WATER POLLUTION CONTROL STANDARD CONTAINED IN HAWAII
ADMINISTRATIVE RULES, TITLE 11, CHAPTER 54, "WATER QUALITY STANDARDS" AND TITLE 11, CHAPTER 55, "WATER POLLUTION CONTROL".
FOR ENTRY BY THE CONTRACTING OFFICER, INCLUDING INSPECTORS, INTO A PERMIT
REQUIRED CONFINED SPACE AS DEFINED IN 29 CFR PART 1910.146(B), THE CONTRACTOR SHALL
BE RESPONSIBLE FOR PROVIDING:
1.
A.
B.
C.
2.
3.
ALL SAFETY EQUIPMENT REQUIRED BY THE CONFINED SPACE REGULATIONS
APPLICABLE TO ALL PARTIES OTHER THAN THE CONSTRUCTION INDUSTRY, TO INCLUDE,
BUT NOT LIMITED TO, THE FOLLOWING:
TWO-WAY RADIOS (WALKIE-TALKIES) IF OUT OF LINE-OF-SIGHT.
CONTINUOUS GAS DETECTOR (CALIBRATED) TO MEASURE OXYGEN, HYDROGEN
SULFIDE, CARBON MONOXIDE AND FLAMMABLES (CAPABLE OF MONITORING AT A
DISTANCE AT LEAST 20-FEET AWAY).
CONTINUOUS FORCED AIR VENTILATION ADEQUATE TO PROVIDE SAFE ENTRY CONDITIONS.
ONE ATTENDANT/RESCUE PERSONNEL TOPSIDE (TWO, IF CONDITIONS WARRANT IT).
1.
FULL BODY HARNESSES FOR UP TO TWO PERSONNEL.
LIFELINE AND ASSOCIATED CLIPS.
INGRESS/EGRESS AND FALL PROTECTION EQUIPMENT.
CELLULAR TELEPHONE TO CALL FOR EMERGENCY ASSISTANCE.
EMERGENCY (ESCAPE) RESPIRATOR (10 MINUTE DURATION).
INGRESS/EGRESS AND FALL PROTECTION EQUIPMENT.
THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AREA AND SURROUNDING
AREA FREE FROM DUST NUISANCE. THE WORK SHALL BE IN CONFORMANCE WITH THE AIR
POLLUTION CONTROL STANDARDS CONTAINED IN THE HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER 60.1, "AIR POLLUTION CONTROL".
THE CONTRACTOR SHALL ENSURE VEHICLE ACCESS TO AND FROM PUBLIC STREETS IS
MAINTAINED AT ALL TIMES.
ALL WORK CALLED FOR ON THE PLANS AND NOT ITEMIZED IN THE PROPOSAL AND ALL WORK NOT
CALLED FOR BUT REQUIRED FOR THE CONSTRUCTION OF THIS PROJECT, SHALL BE CONSIDERED
INCIDENTAL.
NO BLASTING SHALL BE ALLOWED ON THIS PROJECT.
THE CONTRACTOR SHALL RESTORE TO THEIR ORIGINAL CONDITION OR BETTER, ALL
IMPROVEMENTS DAMAGED AS A RESULT OF THE CONSTRUCTION, INCLUDING PAVEMENTS,
EMBANKMENTS, CURBS, SIGNS, LANDSCAPING, STRUCTURES, UTILITIES, WALLS, FENCES, ETC.
UNLESS PROVIDED FOR SPECIFICALLY IN THE PROPOSAL, DEMOLITION AND RESTORATION OF
EXISTING ITEMS SHALL BE INCIDENTAL AND INCLUDED WITHIN THE CONTRACT AMOUNT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING/ RECONSTRUCTING ALL CONCRETE
CURBS AND GUTTERS, CONCRETE SWALES, DRIVEWAYS AND SIDEWALKS DAMAGED DURING
CONSTRUCTION.
VERIFY AND CHECK ALL DIMENSIONS AND DETAILS SHOWN ON THE DRAWINGS PRIOR TO THE
START OF CONSTRUCTION. ANY DISCREPANCY SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER FOR DIRECTION.
10.
9.
8.
4.
5.
7.
6.
CONTRACTOR'S OPERATIONS AND STORAGE AREA (COSA) SHALL BE LOCATED WITHIN THE
PROJECT SITE. CONTRACTOR'S COSA SHALL BE APPROVED BY DPW. COSA SHALL BE RESTORED
TO ITS ORIGINAL CONDITION AFTER PROJECT COMPLETION. COSA SHALL BE FENCED (MIN HEIGHT
8FT) WITH A SIGN POSTED SHOWING CONTRACTOR'S NAME, POINT OF CONTACT (POC), AND
PHONE NUMBER FOR POC (24 HOURS/DAY), IN CASE OF AN EMERGENCY DURING OFF-HOURS.
11.
LIFE OF A STOCKPILE SHALL BE A MAXIMUM OF 6 MONTHS, WHEREBY CONTRACTOR SHALL REMOVE
AND DISPOSE OF THE STOCKPILE UNLESS WRITTEN AUTHORIZATION IS OBTAINED FROM THE COR.
IF THE STOCKPILING WORK INVOLVES CONTAMINATED SOIL AND/OR HAZARDOUS MATERIAL, THEN
ALL STOCKPILING WORK SHALL BE DONE IN CONFORMANCE WITH APPLICABLE STATE AND FEDERAL
REQUIREMENTS. THE CONTRACTOR SHALL COORDINATE WITH THE COR AND THE DIRECTORATE OF
PUBLIC WORKS (DPW) ENVIRONMENTAL COMPLIANCE BRANCH CHIEF. THE CONTRACTOR SHALL
ALSO CONTACT THE SOLID AND HAZARDOUS WASTE BRANCH OF THE STATE DEPARTMENT OF
HEALTH FOR MORE INFORMATION (PHONE#: 586-4226).
NO STOCKPILING WORK SHALL BE DONE ON SATURDAYS, SUNDAYS AND HOLIDAYS AT ANY TIME
WITHOUT PRIOR APPROVAL FROM THE CONTRACTING OFFICER.
THE LIMITS OF THE AREA TO BE STOCKPILED SHALL BE FLAGGED BEFORE THE COMMENCEMENT OF
THE STOCKPILING WORK.
3.
4.
2.
1.
STOCKPILING NOTES
ALL AREAS WITHIN THE CONSTRUCTION LIMITS SHALL BE CLEARED AND GRUBBED, AND SHALL
BE REGRASSED.
12.
CU
COPPER
ADA AMERICANS WITH DISABILITIES ACT
ARCH. ARCHITECTURAL
MECHANICALMECH.
OIL WATER SEPARATOROWS
FIRE HYDRANTF.H.
HEIGHTH
ELECTRICELEC.
COMMUNICATIONCOMM.
DOWN SPOUTD.S.
BACKFLOW PREVENTERBFP
CONVENTIONAL STANDOFF CCSD
DISTANCE
LENGTHL
SPR SPRINKLER HEAD
TRANSFORMERTRANSF
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
Honolulu District
I N
K
A
R C
H
L L C
H O
N O
L U
L U
H
A W
A I I
P H
O N
E
I W
I L E
I
R
O A
D
S
U I T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
F O
A
F T
E R
O
A H
U
H
A W
A I I
H O
N O
L U
S
T R
I C
T
EXP. DATE: 04/30/2018
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT WILL BE
UNDER MY OBSERVATION. SUPERVISION OF
CONSTRUCTION AS PER DEFINED IN SECTION
1.2(N) OF THE RULES AND REGULATIONS OF
THE BOARD OF PROFESSIONAL ENGINEERS,
ARCHITECTS AND SURVEYORS OF THE
STATE OF HAWAII.
F Y
O
N
O V
A T
E
F
I R
O
I L D
I N
G
W H
E E
L E
R
A
R M
Y
A
I R
F I E
L D
O
A H
U
H
A W
A I I
W A
D
- W A
D
A N
S I
D
M E
S S
F M
B R
W E
N D
Y
M
C L A
I N
T
E D
GC002
C I V
T
A
A F
B
G
C D
IN THE EVENT OF ABOVE NORMAL
RAINFALL, CONTRACTOR SHALL
REMOVE INLET PROTECTION AND
REPLACE AFTER EVENT HAS PASSED.
NOTE:
3" DIA. PERF. PVC
PIPE SEWN INSIDE
OVERFLOW GAP
SEDIMENT FILTER
EXISTING CATCH BASIN
2"x4" TOP, BOTTOM, AND MID.
1"x2" NAILER
2"x8" TOP RAIL
4"x6" POST
4"X4" BRACING
AT 16'-0" O.C.
4"X4" BRACING
AT 8'-0" O.C.
GRADE VARIES
1' DIA. CONC. FOOTING
CLOTH BARRIER
BURIED BELOW GRADE
NOTES:
1. CLOTH BARRIER NOT SHOWN IN FRONT VIEW
2. CLOTH BARRIER TO BE A "WOVEN GEOTEXTILE" OR
"NURSERY SHADE"
3. LUMBER SIZES ARE NOMINAL INCHES
4. AS SHOWN CLOTH TO BE BURIED AT BASE TO
INDICATED DIM.
5. 1"x2" CLOTH BARRIER CAPS TO BE NAILED 12" O.C.
6. BURLAP IS NOT ACCEPTABLE AS THE CLOTH BARRIER
7. CLOTH TO HAVE NO HORIZONTAL SEAMS
8. VERTICAL SEAMS TO BE MADE OVER UPRIGHTS ONLY
9. ALL SEAMS TO BE CAPPED WITH MINIMUM OF 1"x2"
10. ALL JOINTS TO BE SECURELY FASTENED BY
MECHANICAL MEANS
11. CONTRACTOR TO ENSURE STAKES AND FOOTINGS
ARE CLEAR OF ALL UNDERGROUND UTILITIES FOR
INSTALLATION.
8'-0"8'-0"
1'-6"
9'-6" MIN.
6" MIN. OVERLAP
OR PER SPEC.
NOTES:
PLAN
SECTION
OVERLAP
9" SOCK BARRIER
(MULTI-FILAMENT
POLYPROPYLENE)
9" SOCK BARRIER
(MULTI-FILAMENT
POLYPROPYLENE)
LIMITS OF GRADING
AND/OR GRUBBING
WORK AREA
RUNOFF FLOW
PROTECTED
AREA
PROTECTED
AREA
WORK AREA
RUNOFF FLOW
PROTECTED
AREA
9" SOCK BARRIER
(MULTI-FILAMENT
POLYPROPYLENE)
RUNOFF FLOW
WORK AREA
1. FILL COMPOSITION IS WOOD MULCH.
2. FILL SHALL NOT CONTAIN BIOSOLIDS
AND SHOULD BE CONSISTENT WITH
EPA GUIDELINES.
SCALE: 1" = 1' - 0"
CATCH BASIN PROTECTION DETAIL
A1
SCALE: 1" = 1'- 0"
COMPOST FILTER SOCK DETAIL
B1
SCALE: 1/4" = 1'-0"
DUST FENCE DETAIL
C3
GRAPHIC SCALE:
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
Honolulu District
I N
K
A
R C
H
L L C
H O
N O
L U
L U
H
A W
A I I
P H
O N
E
I W
I L E
I
R
O A
D
S
U I T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
F O
A
F T
E R
O
A H
U
H
A W
A I I
H O
N O
L U
S
T R
I C
T
EXP. DATE: 04/30/2018
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT WILL BE
UNDER MY OBSERVATION. SUPERVISION OF
CONSTRUCTION AS PER DEFINED IN SECTION
1.2(N) OF THE RULES AND REGULATIONS OF
THE BOARD OF PROFESSIONAL ENGINEERS,
ARCHITECTS AND SURVEYORS OF THE
STATE OF HAWAII.
F Y
O
N
O V
A T
E
F
I R
O
I L D
I N
G
W H
E E
L E
R
A
R M
Y
A
I R
F I E
L D
O
A H
U
H
A W
A I I
W A
D
- W A
D
A N
S I
D
M E
S S
F M
B R
W E
N D
Y
M
C L A
I N
T
E D
CD501
E R
O S
I O
N
C
O N
T R
T
A I
A
A F
B
C
D D
G N
4' 8'0 2'
1/4" = 1' - 0"
1" = 1' - 0"
0 1' 2'
XXX
SECTION
6"
NEW CONC. SIDEWALK EXISTING CONC.
SIDEWALK
4" THICK CONC. WITH 6X6-
W2.9 X W2.9 WWF REINF.
CENTERED IN SLAB
SAWCUT LINE
AT SCORE LINE
EXIST. CONC.
EXIST. BASE
COURSE
DOWEL,
SEE DETAIL BELOW
4" BASE COURSE
NEW CONC. CURB SECTION
CONC. CURB PLAN VIEW
D5
CS501
3"
3"
1'-0"
AC TRANSITION
EXIST.
GROUND
#5 SMOOTH
DOWELS 12"
LONG
CONC. CURB,
SEE DET.
NEW CURB
#5 SMOOTH
DOWELS 12"
LONG
EXIST. CURB
1" DRILLED HOLE
EMBED 12" LONG
SMOOTH DOWELS
WITH EPOXY.
SAWCUT LINE
EXISTING AC
PAVEMENT
TACK COAT
EXIST. AC
PAVEMENT
PRIME COAT
MATCH EXIST.
PAV'T THICKNESS
NEW CURB SHALL BE
COLORED AND IMPRINTED
TO SIMULATE EXISTING
STONE CURBS (VERIFIED
IN FIELD).
NOTE:
X X X X X X X X X
4" THICK CONC WITH 6X6
W2.9XW2.9 WWF REINF.
CENTERED IN SLAB
4" THICK BASE
COURSE
COMPACTED SUBGRADE
1. SCARIFY TO MINIMUM DEPTH OF 6" (COMPACT TO 95%
MAX DRY DENSITY)
2. FOR SIDEWALK JOINTS, SEE DET.
NOTES:
A1
CS501
6"
T Y
P
R=1/2", TYP.
4" THICK CONC WITH 6X6
W2.9XW2.9 WWF REINF.
CENTERED IN SLAB
REPLICATED HISTORIC
CONC. CURB
PAVEMENT AS
SHOWN ON PLANS
1/8" RADIUS
FINISH GRADE
COMPACTED SUBGRADE
4" THICK BASE COURSE
2.0% MAX
X X
X X
X X
X
VARIES, SEE PLAN
6"6"
SAWCUT JOINT
CONC
SIDEWALK
EXPANSION JOINT
SAWCUT OR FORMED
GROOVED FILL WITH
JOINT SEALER
1/2" SQ JOINT SEALANT
OVER PRE-MOLDED
JOINT FILLER
NEW CONC
1/8" SAWCUT
R=1/2", TYP.
CURB GRADE
6" 1"
7"
1/4" R
1" R
AC PAVEMENT /
CONCRETE PAVEMENT
FINISH GRADE
COMPACTED SUBGRADE
CURB LINE
4" THICK
BASE COURSE
TYPICAL JOINT LAYOUT DETAIL
SAWCUT JOINT
EXPANSION JOINT, TYP. AT EVERY 6TH JOINT
EDGE OF CONC. PAVEMENT
SPACING = W (MIN.)
OR 1.25*W (MAX.)
1. ALL JOINT EDGES SHALL BE TOOLED WITH 1/2" RADIUS.
2. ALL JOINTS TO BE FILLED SHALL BE SLIGHTLY UNDER FILLED WITH JOINT SEALER CONFORMING TO
ASTM 1190.
3. ALL JOINTS SHALL BE MECHANICALLY CLEANED, PRIMED AND PREPARED IMMEDIATELY BEFORE
INSTALLATION OF JOINT SEALER.
NOTES:
W I D
V
A R
I E
S
S E
E
P
L A
N S
1. B= 0" AT CURB RAMPS.
2. C= 0" AT CURB RAMPS.
NOTES:
PLAN
ELEVATION
SECTION "A"
6"
1"
VARIES
SEE PLANS
6"
1 4
1 4
VARIES
SEE PLANS
6"
6" 1"
7"
B
1 2
C
1 2
CURB GRADE
R = 1"
R =
1" DIA. HOLE
X X X X X X X X
0% MIN TO 2% MAX
SLOPE
4" THICK CONC WITH 6X6
W2.9XW2.9 WWF REINF.
CENTERED IN SLAB
FACE OF WALL, PER PLAN
LIGHT BROOM FINISH
PERPENDICULAR TO
SIDEWALK
1/2" SQ. JOINT SEALANT
OVER 1/2" THK
PRE-MOLDED JOINT FILLER
1/2" RADIUS TOOLED
EDGE, TYP.
FINISH GRADE
COMPACTED
SUBGRADE
4" BASE COURSE
CONCRETE SIDEWALK ABUTTING BUILDING
VARIES, SEE PLAN
6"6"
CONC. PAVM'T
ADJACENT TO BLDG.
CONC. PAVM'T
ADJACENT TO LANDSCAPE
X
X
X
PLAN
6"6"
EXIST. CONC.
SIDEWALK
1" DIA. DRILLED
HOLE EMBED 12"
LONG SMOOTH
DOWELS WITH EPOXY
NEW CONC.
SIDEWALK
#5 SMOOTH DOWELS
12" LONG @ 9" O.C.
AC PAVM'T
CONC. PVM'T
BASE COURSE
FLUSH CURB
DROP CURB
CONC.
SIDEWALK
ADA RAMP
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
Honolulu District
I N
K
A
R C
H
L L C
H O
N O
L U
L U
H
A W
A I I
P H
O N
E
I W
I L E
I
R
O A
D
S
U I T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
F O
A
F T
E R
O
A H
U
H
A W
A I I
H O
N O
L U
S
T R
I C
T
EXP. DATE: 04/30/2018
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT WILL BE
UNDER MY OBSERVATION. SUPERVISION OF
CONSTRUCTION AS PER DEFINED IN SECTION
1.2(N) OF THE RULES AND REGULATIONS OF
THE BOARD OF PROFESSIONAL ENGINEERS,
ARCHITECTS AND SURVEYORS OF THE
STATE OF HAWAII.
F Y
O
N
O V
A T
E
F
I R
O
I L D
I N
G
W H
E E
L E
R
A
R M
Y
A
I R
F I E
L D
O
A H
U
H
A W
A I I
W A
D
- W A
D
A N
S I
D
M E
S S
F M
B R
W E
N D
Y
M
C L A
I N
T
E D
SCALE: 3" = 1' - 0"
CONCRETE SIDEWALK JOINT DETAILS
A1
SCALE: 3/4" = 1' - 0"
CONCRETE SIDEWALK CONNECTION
C1
SCALE: 3/4" = 1' - 0"
CONNECTION TO EXIST CONCRETE CURB DETAIL
C2
SCALE: 1" = 1' - 0"
TYPICAL CONCRETE SIDEWALK DETAIL
C3
SCALE: 1" = 1' - 0"
CONCRETE SIDEWALK WITH CURB DETAIL
B3
SCALE: 1 1/2" = 1' - 0"
CONCRETE CURB DETAILS
D5
SCALE: 1" = 1'-0"
CONCRETE SIDEWALK DETAILS
A2
SCALE: 1" = 1' -0"
CONCRETE DROP CURB DETAIL
B5
CS501
S I T
E
D
E T
A I L
S
W A
A F
B
C
S D
G N
0 3" 6" 9" 12"
GRAPHIC SCALE:
1" = 1' - 0"
3" = 1' - 0"
0 1' 2' 3'
3/4" = 1' - 0"
0 1' 2'
1' 2'0 6"
1 1/2" = 1' - 0"
SCALE: 1" = 1' -0"
FLUSH CURB DETAIL
A4
File details come from the government source that posted it. Updated .