W9128A09D0004_-_01_GENERAL.pdf

PDF 571 KB Posted

Attached to
FY15 OMA Pkg A-003, Renovate, B155, quad B, Schofield Barracks, Oahu, Hawaii
Solicitation number
W9128A-16-B-0003
Issued by

About this file

1 of 14 Drawings

View the file

Other files

File Type Posted
16b3-OF1419-Bid_Abstract_signed.pdf PDF
16b3-am8.pdf PDF
16b3-am7.pdf PDF
16b3-am6.pdf PDF
16b3-am5.pdf PDF
16b3-am4.pdf PDF
16b3-am3-B155_Specs_Am3_7Sep2016.pdf PDF
16b3-am3-B155_Dwgs_Am3_6Sep2016.pdf PDF
16b3-am3.pdf PDF
16b3-am2.pdf PDF
16b3-Am-0001.pdf PDF
W9128A09D0004_-_03_CIVIL_Part_2.pdf PDF
W9128A09D0004_-_09_FIRE_PROTECTION.pdf PDF
W9128A09D0004_-_SPECIFICATIONS.pdf PDF
W9128A09D0004_-_08_PLUMBING.pdf PDF
W9128A09D0004_-_10_ELECTRICAL_Part_3.pdf PDF
W9128A09D0004_-_02_LIFE_SAFETY.pdf PDF
W9128A09D0004_-_04_LANDSCAPE.pdf PDF
16b5-Solicitation_-_20160815.pdf PDF
W9128A09D0004_-_07_MECHANICAL.pdf PDF
W9128A09D0004_-_10_ELECTRICAL_Part_1.pdf PDF
W9128A09D0004_-_03_CIVIL_Part_1.pdf PDF
W9128A09D0004_-_11_TELECOMM.pdf PDF
W9128A09D0004_-_10_ELECTRICAL_Part_2.pdf PDF
W9128A09D0004_-_06_STRUCTURAL.pdf PDF
W9128A09D0004_-_05_ARCHITECTURAL.pdf PDF
12of15-B155_Mechanical_RTA_30Sep2015.pdf PDF
15of15-B155_Telecommunications_RTA_30SEP2015.pdf PDF
2of15-B155_Environmental_RTA_30Sep2015.pdf PDF
5of15-B155_Structural_RTA_30Sep2015.pdf PDF
8of15-B155_Architectural_RTA_30Sep2015.pdf PDF
13of15-B155_Electrical_RTA_30SEP2015.pdf PDF
3of15-B155_Civil_RTA_30Sep2015.pdf PDF
6of15-B155_Architectural_RTA_30Sep2015.pdf PDF
9of15-B155_Architectural_RTA_30Sep2015.pdf PDF
7of15-B155_Architectural_RTA_30Sep2015.pdf PDF
10of15-B155_Fire_Protection_RTA_30Sep2015.pdf PDF
1of15-B155_General_RTA_30Sep2015.pdf PDF
14of15-B155_Electrical_RTA_30SEP2015.pdf PDF
Bldg_155_Specs_RTA_2of3.pdf PDF
11of15-B155_Plumbing_RTA_30Sep2015.pdf PDF
4of15-B155_Structural_RTA_30Sep2015.pdf PDF
16b3_solicitation-04Aug2016.pdf PDF
Bldg_155_Specs_RTA_3of3.pdf PDF
Bldg_155_Specs_RTA_1of3.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F I L

E

N

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L

T

C A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

N

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

US Army Corps of Engineers

Honolulu District

EXP DATE: 04/30/2018

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION AND

CONSTRUCTION OF THIS PROJECT WILL BE

UNDER MY OBSERVATION. SUPERVISION OF

CONSTRUCTION AS PER DEFINED IN SECTION

1.2(N) OF THE RULES AND REGULATIONS OF

THE BOARD OF PROFESSIONAL ENGINEERS,

ARCHITECTS AND SURVEYORS OF THE

STATE OF HAWAII.

F Y

O

M A

P

K G

R

E N

O V

A T

E

F

I R

F

L O

B

U I L D

I N

G

W H

E E

L E

R

A

R M

Y

A

I R

F I E

L D

O

A H

U

H

A W

A I I

W A

D

- W A

D

A N

S I

D

V H

M S

O

R B

T

S C

O T

T

R

J

H

A R

A D

A

A

I A

T

E D

No. 14637

ARCHITECT

PROFESSIONAL

LICENSED

H

A

W

A

I I

U

S

O

T

T

R

J.

A

D

A

H

A

R

G-001

T I T

H E

E T

L O

C A

T I O

N

M

A P

V

I C

I N

I T

Y

M

A P

P R

O J E

A

M

W A

A F

B

G

D

G N

LOCATION MAP VICINITY MAP PROJECT TEAM

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS, HONOLULU DISTRICT

FY15 OMA PKG A-015

RENOVATE FIRST FLOOR BUILDING 107

WHEELER ARMY AIRFIELD, OAHU, HAWAII

CONTRACT NO.: W9128A-09-D-0004, TASK ORDER: 0012

ARCHITECT (DESIGNER OF RECORD):

INK ARCH, LLC

650 IWILEI ROAD, SUITE 288

HONOLULU, HAWAII 96817

PHONE: (808) 536-1174

CIVIL ENGINEER:

SSFM INTERNATIONAL, INC.

501 SUMNER STREET, SUITE 602

HONOLULU, HAWAII 96817

PHONE: (808) 531-1308

LANDSCAPE ARCHITECT:

PBR HAWAII & ASSOCIATES, INC.

1001 BISHOP STREET, SUITE 650

HONOLULU, HAWAII 96813

PHONE: (808) 521-5631

STRUCTURAL ENGINEER:

CONSULTING STRUCTURAL HAWAII, INC.

931 HAUSTEN STREET, SUITE 200

HONOLULU, HAWAII 96826

PHONE: (808) 945-0198

MECHANICAL ENGINEER:

INSYNERGY ENGINEERING, INC.

828 FORT STREET MALL, SUITE 500

HONOLULU, HAWAII 96813

PHONE: (808) 521-3773

ELECTRICAL ENGINEER:

MK ENGINEERS, INC.

286 KALIHI STREET

HONOLULU, HAWAII 96819

PHONE: (808) 848-8622

FIRE PROTECTION/LIFE SAFETY:

S.S. DANNAWAY ASSOCIATES, INC.

720 IWILEI ROAD, SUITE 412

HONOLULU, HAWAII 96817

PHONE: (808) 526-9019

ENVIRONMENTAL:

EMET ENVIRONMETEO SERVICES, INC.

94-520 UKEE STREET, SUITE #A

WAIPAHU, HAWAII 96797

PHONE: (808) 671-8383

GEOTECHNICAL:

HIRATA AND ASSOCIATES, INC.

99-1433 KOAHA PLACE

AIEA, HAWAII 96701

PHONE: (808) 486-0787

SURVEYOR:

CONTROLPOINT SURVEYING, INC.

1150 SOUTH KING STREET, SUITE 1200

HONOLULU, HAWAII 96814

PHONE: (808) 591-2022

SUSTAINABILITY:

TRINITY MANAGEMENT GROUP, LLC

1916 YOUNG STREET, SUITE 102

HONOLULU, HAWAII 96826

PHONE: (808) 946-5554

OAHU

KAHUKU POINT

CITY

PEARL

WAHIAWA

WAIANAE

WAIPAHU

NANAKULI

EWA

POINT

KAENA

HALEIWA

WAIMEA

KAILUA

KANEOHE

HONOLULU

AIEA

KAAAWA

LAIE

PROJECT

LOCATION

KAUAI

OAHU

MOLOKAI

MAUI

HAWAII

PACIFIC OCEAN

HAWAIIAN ISLANDS

(NOT TO SCALE) (NOT TO SCALE)

WHEELER ARMY AIRFIELD

K

A

M

E

H

A

M

E

W

Y

V

T

E

R

A

N

S

M

E

M

O

R

I

W

Y

C

A

L

I

F

O

R

N

I

E

K

I

L

A

E

KAWAMURA

GATE

S

A

N

T

D

M

O

E

W

R

I

G

E

K

U

N

A

D

SCHOFIELD

BARRACKS

WHEELER

MIDDLE

SCHOOL

PROJECT LOCATION

BUILDING 107

745 WRIGHT AVENUE

WHEELER ARMY AIRFIELD, OAHU, HAWAII

W

I

L

I

K

I

D

READY TO ADVERTISE

(RTA) SUBMITTAL

JUNE 24, 2016

HAUL ROUTE

(SHOWN DASHED)

GENERAL

1 G-001 PROJECT TITLE, LOCATION MAP, VICINITY MAP, PROJECT TEAM

2 G-002 INDEX OF DRAWINGS

3 G-003 GENERAL NOTES, CODES

4 GI101 LIFE SAFETY SITE PLAN

5 GI102 LIFE SAFETY PLAN - FIRST FLOOR

6 GI103 LIFE SAFETY PLAN - SECOND AND THIRD FLOOR

CIVIL

7 GC001 CIVIL NOTES - 1

8 GC002 CIVIL NOTES - 2

9 GC101 TRAFFIC CONTROL PLAN

10 CD101 DEMOLITION AND EROSION CONTROL PLAN - 1

11 CD102 DEMOLITION AND EROSION CONTROL PLAN - 2

12 CD501 EROSION CONTROL DETAILS

13 CS101 OVERALL SITE PLAN

14 CS102 SITE PLAN - 1

15 CS103 SITE PLAN - 2

16 CS501 SITE DETAILS - 1

17 CS502 SITE DETAILS - 2

18 CS503 SITE DETAILS - 3

19 CG101 GRADING PLAN - 1

20 CG102 GRADING PLAN - 2

21 CG401 CURB RAMP DETAILS

22 CU101 UTILITY PLAN - 1

23 CU102 UTILITY PLAN - 2

24 CU201 UTILITY PROFILES

25 CU501 UTILITY DETAILS - 1

26 CU502 UTILITY DETAILS - 2

LANDSCAPE

27 LD101 LANDSCAPE TREE DISPOSITION PLAN

28 LD501 LANDSCAPE TREE DISPOSITION NOTES

29 LD502 LANDSCAPE TREE DISPOSITION DETAILS

30 LP101 LANDSCAPE PLANTING PLAN

31 LP501 PLANTING DETAILS

32 LP502 PLANTING DETAIL, LEGEND & NOTES

33 LI101 LANDSCAPE IRRIGATION PLAN

34 LI501 IRRIGATION DETAILS 1

35 LI502 IRRIGATION DETAILS 2

36 LI503 IRRIGATION DETIALS 3

37 LI504 IRRIGATION LEGEND AND NOTES

ARCHITECTURAL

38 A-001 GENERAL NOTES, ABBREVIATIONS, SYMBOLS

39 AD001 DEMOLITION NOTES

40 AD101 BUILDING 107 - DEMOLITION FIRST FLOOR PLAN

41 AD102 BUILDING 107 - DEMOLITION SECOND AND THIRD FLOOR PLANS

42 AD103 BUILDING 107 - DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN

43 AD104 BUILDING 107 - DEMOLITION SECOND AND THIRD FLOOR REFLECTED CEILING PLANS

44 AD105 STORAGE AND UPS BUILDINGS - DEMOLITION FLOOR PLANS AND REFLECTED CEILING

PLANS

45 AD106 GENERATOR BUILDING - DEMOLITION FLOOR PLAN AND REFLECTED CEILING PLAN

46 AD201 BUILDING 107 - DEMOLITION EXTERIOR ELEVATIONS - NORTH AND SOUTH

47 AD202 BUILDING 107 - DEMOLITION EXTERIOR ELEVATIONS - EAST AND WEST, FIRST FLOOR

NORTH LANAI ALONG GRIDLINE B

48 AD203 BUILDING 107 - DEMOLITION EXTERIOR ELEVATIONS - FIRST FLOOR NORTH LANAI

49 AD901 EXISTING PHOTO DETAILS

50 A-101 BUILDING 107 - OVERALL FIRST FLOOR PLAN

51 A-102 BUILDING 107 - PARTIAL FIRST FLOOR PLAN

52 A-103 BUILDING 107 - PARTIAL FIRST FLOOR PLAN

53 A-104 BUILDING 107 - PARTIAL FIRST FLOOR PLAN

54 A-105 BUILDING 107 - REFLECTED CEILING PLAN - FIRST FLOOR

55 A-106 ELEVATOR ADDITION - SECOND AND THIRD FLOOR PLANS

56 A-107 ELEVATOR ADDITION - SECOND AND THIRD FLOOR REFLECTED CEILING PLANS

57 A-108 ELEVATOR ADDITION AND STORAGE BUILDING - ROOF PLANS

58 A-109 STORAGE AND UPS BUILDINGS - FLOOR PLANS AND REFLECTED CEILING PLANS

59 A-110 GENERATOR BUILDING - FLOOR PLAN, REFLECTED CEILING PLAN

60 A-201 BUILDING 107 - EXTERIOR ELEVATIONS - NORTH AND SOUTH

61 A-202 BUILDING 107 - EXTERIOR ELEVATIONS - EAST AND WEST

62 A-203 BUILDING 107 - EXTERIOR ELEVATIONS - FIRST FLOOR EXTERIOR LANAI

63 A-204 STORAGE BUILDING AND UPS BUILDING - EXTERIOR ELEVATIONS

64 A-205 GENERATOR BUILDING - EXTERIOR ELEVATIONS

65 A-206 BUILDING 107 - TOILET FIXTURES AND ACCESSORIES MOUNTING HEIGHTS

66 A-207 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 102, 106, 108

67 A-208 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 108, 110, 118

68 A-209 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 112, 114, 116

69 A-210 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 120, 122

70 A-211 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 124, 126, 128, 130

71 A-212 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 140, 142, 144

72 A-213 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 146, 148, 150, 156

73 A-214 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 160, 162

74 A-215 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 164, 166, 168

75 A-216 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 170, 172, 174, 176

76 A-217 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 176, 178, 180, 182

77 A-218 BUILDING 107 - INTERIOR ELEVATIONS - ROOMS 184, 190, 192

78 A-219 ELEVATOR ADDITION - INTERIOR ELEVATIONS - ROOMS 250, 350

79 A-220 STORAGE AND UPS BUILDINGS - INTERIOR ELEVATIONS - ROOMS S100, U100, U101

80 A-221 GENERATOR BUILDING - INTERIOR ELEVATIONS - ROOM G100, G101

81 A-301 BUILDING 107 - BUILDING SECTIONS

82 A-302 BUILDING 107 - BUILDING SECTIONS

83 A-303 BUILDING 107 - WALL SECTIONS

84 A-304 BUILDING 107 - WALL TYPES

85 A-305 BUILDING 107 - WALL TYPES

86 A-306 BUILDING 107 - WALL TYPES

87 A-307 BUILDING 107 - WALL TYPES

88 A-308 BUILDING 107 - WALL PLAN SECTIONS

89 A-309 BUILDING 107 - WALL PLAN SECTIONS AND WALL TYPES CONTINUED

90 A-310 ELEVATOR ADDITION - BUILDING SECTIONS, GUARD AND HANDRAIL DETAILS

91 A-401 BUILDING 107 - ENLARGED RESTROOM AND BREAK ROOM PLANS

92 A-501 DOOR DETAILS

93 A-502 DOOR DETAILS

94 A-503 DOOR DETAILS

95 A-504 DOOR DETAILS

96 A-505 WINDOW DETAILS

97 A-506 WINDOW DETAILS

98 A-507 ELEVATOR ADDITION - ROOF DETAILS

99 A-508 ELEVATOR ADDITION - EXPANSION JOINT DETAILS

100 A-509 ELEVATOR ADDITION - DETAILS, FIRE EXTINGUISHER CABINET DETAILS

101 A-510 STORAGE AND UPS BUILDINGS - DETAILS

102 A-511 MILLWORK DETAILS

103 A-512 MISCELLANEOUS DETAILS

104 A-513 MISCELLANEOUS DETAILS

105 A-601 DOOR SCHEDULE

106 A-602 WINDOW SCHEDULE, DOOR AND WINDOW TYPES

107 A-603 SIGNAGE SCHEDULE AND DETAILS

108 A-604 SIGNAGE TYPES

109 A-605 SIGNAGE TYPES

110 A-606 FINISH AND MATERIALS SCHEDULE

111 A-607 INTERIOR ROOM FINISH SCHEDULE

112 AF101 BUILDING 107 - FIRST FLOOR FINISH LAYOUT PLAN

STRUCTURAL

113 S-001 GENERAL NOTES

114 S-002 GENERAL NOTES

115 S-101 BUILDING 107, STORAGE BUILDING, UPS BUILDING, AND ELEVATOR BUILDING FIRST

FLOOR PLAN

116 S-401 ELEVATOR BUILDING FOUNDATION AND SECOND FLOOR PLAN

117 S-402 ELEVATOR BUILDING THIRD FLOOR AND ROOF PLAN

118 S-403 EXISTING GENERATOR BUILDING FIRST FLOOR PLAN

119 S-404 EXISTING STORAGE BUILDING FIRST FLOOR AND NEW ROOF FRAMING PLAN

120 S-501 ELEVATOR BUILDING FOUNDATION DETAILS

121 S-502 ELEVATOR BUILDING FOUNDATION DETAILS

122 S-503 ELEVATOR BUILDING SECOND AND THIRD FLOOR DETAILS

123 S-504 ELEVATOR BUILDING ROOF DETAILS

124 S-505 ELEVATOR BUILDING STAIR SECTIONS

125 S-506 EXISTING BUILDING 107 FIRST FLOOR DETAILS

126 S-507 EXISTING BUILDING 107 FIRST FLOOR DETAILS

127 S-508 EXISTING BUILDING 107 INTERIOR LOADING AREA CONCRETE RAMP DETAILS

128 S-509 EXISTING BUILDING 107 EXTERIOR CONCRETE RAMP DETAILS

129 S-510 EXISTING BUILDING 107 AT/FP WINDOW RETROFIT DETAILS

130 S-511 EXISTING BUILDING 107 WINDOW OPENING CMU INFILL DETAILS

131 S-512 EXISTING GENERATOR BUILDING FIRST FLOOR DETAILS

132 S-513 EXISTING UPS BUILDING WALL HEADER RETROFIT DETAILS

133 S-514 EXISTING STORAGE BUILDING STRUCTURAL DETAILS

134 S-515 TYPICAL DETAILS

135 S-516 REPAIR DETAILS

MECHANICAL

136 M-001 MECHANICAL GENERAL NOTES, LEGEND

137 M-002 MECHANICAL SITE PLAN

138 MD101 FIRST FLOOR MECHANICAL PLAN - REMOVAL WORK

139 MD102 GENERATOR ENCLOSURE MECHANICAL FLOOR PLAN - REMOVAL WORK

140 M-101 PARTIAL FIRST FLOOR MECHANICAL PLAN - NEW WORK

141 M-102 PARTIAL FIRST FLOOR MECHANICAL PLAN - NEW WORK

142 M-103 GENERATOR ENCLOSURE MECHANICAL FLOOR PLAN - NEW WORK

143 M-201 MECHANICAL EXTERIOR ELEVATION - NEW WORK

144 M-501 HVAC SCHEMATICS AND CONTROLS

145 M-502 HVAC SCHEMATICS AND CONTROLS

146 M-503 DDC POINTS LIST

147 M-504 MECHANICAL DETAILS

148 M-505 MECHANICAL DETAILS

149 M-601 REFRIGERANT PIPING DIAGRAM

150 M-602 MECHANICAL EQUIPMENT SCHEDULES

151 M-603 MECHANICAL EQUIPMENT SCHEDULES

PLUMBING

152 P-001 PLUMBING GENERAL NOTES, LEGEND

153 PS101 PLUMBING SITE PLAN

154 PD101 FIRST FLOOR PLUMBING PLAN - REMOVAL WORK

155 P-101 FIRST FLOOR PLUMBING PLAN - NEW WORK

156 P-102 GENERATOR ENCLOSURE PLUMBING PLAN

157 P-401 FIRST FLOOR ENLARGED PLUMBING PLAN

158 P-501 PLUMBING DETAILS

159 P-502 PLUMBING DETAILS

160 P-601 SANITARY AND WATER PIPING DIAGRAMS

FIRE PROTECTION

161 F-001 FIRE PROTECTION NOTES, SYMBOLS AND ABBREVIATIONS

162 F-002 CODE INFORMATION SHEET

163 F-101 FIRE PROTECTION DEMOLITION FLOOR PLAN - FIRST FLOOR

164 F-102 FIRE SPRINKLER PLAN - FIRST FLOOR

165 F-103 FIRE SPRINKLER PLAN - SECOND AND THIRD FLOOR

166 F-501 FIRE SPRINKLER DETAILS

167 FA101 FIRE ALARM/ MASS NOTIFICATION PLAN - FIRST FLOOR

168 FA102 FIRE ALARM/ MASS NOTIFICATION PLAN - SECOND AND THIRD FLOOR

169 FA601 FIRE ALARM/ MASS NOTIFICATION SEQUENCE OF OPERATIONS, FIRE ALARM DETAIL

170 FA602 FIRE ALARM/ MASS NOTIFICATION RISER DIAGRAM

ELECTRICAL

171 E-001 ELECTRICAL SYMBOLS AND NOTES

172 E-002 NOTES

173 ED101 SITE ELECTRICAL PLAN - DEMOLITION

174 ED102 SITE ELECTRICAL PLAN A - DEMOLITION

175 ED103 SITE ELECTRICAL PLAN B - DEMOLITION

176 ED104 SITE ELECTRICAL PLAN C - DEMOLITION

177 ED105 BUILDING 107 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN

178 ED106 BUILDING 107 - FIRST FLOOR LIGHTING DEMOLITION PLAN

179 ED401 BUILDING 107 - ENLARGED EQUIPMENT ROOM DEMOLITION PLAN

180 ED402 GENERATOR BUILDING ELECTRICAL AND LIGHTING DEMOLITION PLANS

181 ED601 ONE-LINE DIAGRAM A - DEMOLITION

182 ED602 ONE-LINE DIAGRAM B - DEMOLITION

183 E-101 OVERALL SITE ELECTRICAL PLAN - NEW

184 E-102 SITE ELECTRICAL PLAN A - NEW

185 E-103 SITE ELECTRICAL PLAN B - NEW

186 E-104 SITE ELECTRICAL PLAN C - NEW

187 E-105 BUILDING 107 - FIRST FLOOR POWER PLAN "A"

188 E-106 BUILDING 107 - FIRST FLOOR POWER PLAN "B"

189 E-107 BUILDING 107 - FIRST FLOOR LIGHTING PLAN "A"

190 E-108 BUILDING 107 - FIRST FLOOR LIGHTING PLAN "B"

191 E-109 BUILDING 107 - SECOND FLOOR POWER PLAN "A"

192 E-110 BUILDING 107 - SECOND FLOOR POWER PLAN "B"

193 E-111 BUILDING 107 - SECOND FLOOR LIGHTING PLAN "A"

194 E-112 BUILDING 107 - SECOND FLOOR LIGHTING PLAN "B"

195 E-113 BUILDING 107 - THIRD FLOOR POWER PLAN "A"

196 E-114 BUILDING 107 - THIRD FLOOR POWER PLAN "B"

197 E-115 BUILDING 107 - THIRD FLOOR LIGHTING PLAN "A"

198 E-116 BUILDING 107 - THIRD FLOOR LIGHTING PLAN "B"

199 E-201 MAIN SWITCHBOARD ELEVATION

200 E-401 BUILDING 107 - STORAGE ROOM ELECTRICAL AND LIGHTING PLANS

201 E-402 ELEVATOR SHAFT ELECTRICAL PLANS

202 E-403 BUILDING 107 - ENLARGED FIRST FLOOR ELECTRICAL ROOM PLAN

203 E-404 GENERATOR BUILDING ELECTRICAL AND LIGHTING PLANS

204 E-405 BUILDING 107 - ENLARGED FIRST FLOOR COMMUNICATIONS ROOM PLAN

205 E-501 DUCT SECTION DETAILS

206 E-502 PULLBOX DETAILS

207 E-503 3 PHASE TRANSFORMER PAD DETAIL - 500 TO 750 KVA RATING

208 E-504 3' x 5' PRECAST CONCRETE HANDHOLE DETAILS

209 E-505 3' x 5' PRECAST CONCRETE HANDHOLE DETAILS

210 E-601 ONE-LINE DIAGRAM A - NEW

211 E-602 ONE-LINE DIAGRAM B - NEW

212 E-603 LIGHT FIXTURE DETAILS

213 E-604 LIGHT FIXTURE DETAILS

214 E-605 DIGITAL OCCUPANCY SENSOR WIRING DIAGRAMS

215 E-606 PANEL SCHEDULES

216 E-607 PANEL SCHEDULES

217 E-608 PANEL SCHEDULES

TELECOMMUNICATIONS

218 T-001 TELECOM SYMBOLS

219 T-002 TELECOM NOTES & ABBREVIATIONS

220 TD101 BUILDING 107 - FIRST FLOOR SIGNAL DEMOLITION PLAN

221 TD102 BUILDING 107 - FIRST FLOOR COMM ROOM PLAN

222 T-101 SITE TELECOM PLAN - NEW

223 T-102 BUILDING 107 - FIRST FLOOR COMMUNICATIONS PLAN "A"

224 T-103 BUILDING 107 - FIRST FLOOR COMMUNICATIONS PLAN "B"

225 T-201 RACK ELEVATIONS

226 T-401 BUILDING 107 - ENLARGED FIRST FLOOR COMMUNICATIONS ROOM PLAN

227 T-402 BUILDING 107 - ENLARGED SECOND FLOOR COMMUNICATIONS ROOM PLAN

228 T-403 BUILDING 107 - STORAGE ROOM COMMUNICATIONS PLAN

229 T-501 TELECOM LABELING GUIDE

230 T-502 TELECOM RACK DETAILS

231 T-503 CABLE RUNWAY DETAILS

232 T-504 CABLE TRAY DETAILS

233 T-505 PATCH PANEL AND TELECOM OUTLET DETAILS

234 T-506 MISCELLANEOUS TELECOM DETAILS

235 T-507 TELECOM GROUND BAR DETAILS

236 T-508 DUCT SECTION DETAILS

237 T-509 MANHOLE DETAILS

238 T-510 MANHOLE DETAILS

239 T-601 TELECOM SCHEMATIC DIAGRAM

240 T-602 CATV AND TELECOM GROUNDING SCHEMATIC DIAGRAM

241 T-603 TELECOM AND DATA OUTLET DIAGRAMS

242 T-604 TMH SCHEMATIC DIAGRAM AND AREA OF REFUGE INTERCOM SYSTEM

S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F I L

E

N

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L

A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

US Army Corps of Engineers

Honolulu District

EXP DATE: 04/30/2018

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION AND

CONSTRUCTION OF THIS PROJECT WILL BE

UNDER MY OBSERVATION. SUPERVISION OF

CONSTRUCTION AS PER DEFINED IN SECTION

1.2(N) OF THE RULES AND REGULATIONS OF

THE BOARD OF PROFESSIONAL ENGINEERS,

ARCHITECTS AND SURVEYORS OF THE

STATE OF HAWAII.

F Y

O

N

O V

A T

E

F

I R

O

I L D

I N

G

W H

E E

L E

R

A

R M

Y

A

I R

F I E

L D

O

A H

U

H

A W

A I I

W A

D

- W A

D

A N

S I

D

V H

M S

O

R B

T

S C

O T

T

R

J

H

A R

A D

A

A

I A

T

E D

No. 14637

ARCHITECT

PROFESSIONAL

LICENSED

H

A

W

A

I I

U

S

O

T

T

R

J.

A

D

A

H

A

R

G-002

I N

D E

X

O

F

D

R A

W I N

G S

W A

A F

B

G

D

G N

INDEX OF DRAWINGS

NO SHT ID SHEET TITLE NO SHT ID SHEET TITLE NO SHT ID SHEET TITLE NO SHT ID SHEET TITLE

GENERAL

PROJECT NAME:

FY15 OMA PKG A-015, RENOVATE FIRST FLOOR BUILDING 107

PROJECT TMK: 7-7-001:001 (77001001)

PROJECT ADDRESS:

BUILDING 107, 745 WRIGHT AVENUE, WHEELER ARMY AIRFIELD, OAHU, HAWAII 96857-5000

PARCEL AREA:

10,064 ACRES

OWNER'S NAME:

DEPARTMENT OF THE ARMY, US ARMY INSTALLATION MANAGEMENT COMMAND, PACIFIC REGION

OWNER'S ADDRESS:

745 WRIGHT AVENUE, WHEELER ARMY AIRFIELD, SCHOFIELD BARRACKS, HAWAII 96857-5000

OWNER'S PHONE NUMBER: (808) 656-1275

CODES

BUILDING CODE: 2012 INTERNATIONAL BUILDING CODE (IBC) WITH UFC 1-200-01 MODIFICATIONS

UNIFIED FACILITIES CRITERIA: CURRENT VERSIONS

ACCESSIBILITY: ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS, DOD (2008)

ZONING CODE

ZONING LUO DESIGNATION: AG-1 / F-1 / P-1

FEMA FLOOD DESIGNATION: D

TSUNAMI EVACUATION ZONE: NO

HISTORIC: WAAF IS A HISTORIC DISTRICT

BUILDING CODE

TYPE OF WORK: ALTERATION TO BUILDING 107 FIRST FLOOR, STORAGE BUILDING, UPS BUILDING, AND GENERATOR

BUILDING; ELEVATOR ADDITION FOR THREE FLOORS OF BUILDING 107

OCCUPANCY GROUP: BUILDING 107 FIRST FLOOR: A, B, S-1 (NON-SEPARATED OCCUPANCY GROUP A USED FOR

CALCULATIONS)

STORAGE BUILDING: S-1

UPS BUILDING: F-1

GENERATOR BUILDING: S-1, U

CONSTRUCTION TYPE: BUILDING 107 AND ELEVATOR ADDITION: TYPE IIA

STORAGE BUILDING: VB

UPS BUILDING: TYPE IIA

GENERATOR BUILDING: IIA

AUTOMATIC FIRE EXTINGUISHING SYSTEM: FIRST FLOOR: PROVIDED. SECOND FLOOR (NIC): EXISTING. THIRD FLOOR (NIC): NONE. ELEVATOR

ADDITION: PROVIDED ON 3-STORIES.

NUMBER OF STORIES: BUILDING 107 AND ELEVATOR ADDITION: EXISTING 3-STORY BUILDING

STORAGE BUILDING: EXISTING 1-STORY BUILDING

UPS BUILDING: EXISTING 1-STORY BUILDING

GENERATOR BUILDING: EXISTING 1-STORY BUILDING

BUILDING AREA

BUILDING 107 FIRST FLOOR AND

ELEVATOR LOBBY:

11,008 SF

FIRST FLOOR EXTERIOR LANAI: 1,123 SF

SECOND FLOOR ELEVATOR ADDITION: 423 SF

THIRD FLOOR ELEVATOR ADDITION: 423 SF

STORAGE BUILDING: 141 SF

UPS BUILDING: 584 SF

GENERATOR BUILDING: 629 SF ENCLOSED BUILDING SPACE WITH 676 OF EXTERIOR ENCLOSED WALL SPACE FOR

EXISTING EXTERIOR FUEL TANK

S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

A M

E

D W

N

B

Y

C K

D

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F I L

E

N

U M

B E

R

S I Z

E

S U

B M

I T

T E

D

B

Y

P L

A

L E

I S

S U

E

D

A T

E

D A

T E

M A

R K

D E

S C

R I P

T I O

N

C O

N T

R A

SHEET

IDENTIFICATION

D A

T E

A P

P R

SHEET OF

US Army Corps of Engineers

Honolulu District

EXP DATE: 04/30/2018

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION AND

CONSTRUCTION OF THIS PROJECT WILL BE

UNDER MY OBSERVATION. SUPERVISION OF

CONSTRUCTION AS PER DEFINED IN SECTION

1.2(N) OF THE RULES AND REGULATIONS OF

THE BOARD OF PROFESSIONAL ENGINEERS,

ARCHITECTS AND SURVEYORS OF THE

STATE OF HAWAII.

F Y

O

N

O V

A T

E

F

I R

O

I L D

I N

G

W H

E E

L E

R

A

R M

Y

A

I R

F I E

L D

O

A H

U

H

A W

A I I

W A

D

- W A

D

A N

S I

D

V H

M S

O

R B

T

S C

O T

T

R

J

H

A R

A D

A

A

I A

T

E D

No. 14637

ARCHITECT

PROFESSIONAL

LICENSED

H

A

W

A

I I

U

S

O

T

T

R

J.

A

D

A

H

A

R

G-003

G E

N E

R A

L

N

O T

E S

C

O D

E S

W A

A F

B

G

D

G N

GENERAL NOTES CODES

1. LAWS AND ORDINANCES: AS USED HEREIN SHALL MEAN ALL FEDERAL, COUNTY, STATE

AND NATIONAL CODES, ORDINANCES, STANDARDS, RULES AND REGULATIONS OF ANY

NATURE WHICH ARE PERTINENT TO, OR REGULATORY OVER, THE WORK COVERED BY

THE CONTRACT DOCUMENTS OF THIS PROJECT. ALL CONTRACTORS SHALL COMPLY

FULLY WITH ALL APPLICABLE LAWS AND ORDINANCES. ALL CONSTRUCTION SHALL

CONFORM TO THE CURRENT BUILDING CODE AND FEDERAL REGULATIONS HAVING

JURISDICTION OVER THIS PROJECT.

2. CONFLICT: IN THE CASE OF ANY CONFLICT WHEREIN THE METHODS, OR STANDARDS OF

INSTALLATION, OR THE SPECIFIED MATERIALS ARE NOT EQUAL TO, OR EXCEED THE

REQUIREMENTS OF THE LAWS OR ORDINANCES, THE LAWS OR ORDINANCES SHALL

GOVERN. IN THE CASE OF A DISCREPANCY IN THE DRAWINGS OR SPECIFICATIONS, BUT

NOT DIRECTLY RELATED TO THE PROVISIONS OR CODES, OR ORDINANCES, THE

CONTRACTOR SHALL 1) PROVIDE THE BETTER QUALITY, OR GREATER QUANTITY OF

WORK, OR 2) COMPLY WITH THE MORE STRINGENT REQUIREMENT IN ACCORDANCE WITH

THE ARCHITECT'S INTERPRETATION, OR 3) REQUEST ADDITIONAL CLARIFICATION OR

INFORMATION. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF ALL

CONFLICTS.

3. CONDITIONS OF THE WORK: THE INFORMATION INDICATED ON THE DRAWINGS ARE

BASED ON LIMITED FIELD INVESTIGATIONS AND ON THE AVAILABLE RESOURCES AT THE

TIME OF DOCUMENT PREPARATION. AS A RESULT, THE ACCURACY AND COMPLETENESS

OF THE INFORMATION IS NOT GUARANTEED. THE CONTRACTOR SHALL, THEREFORE

VERIFY THE DIMENSIONS SHOWN ON THE DRAWINGS WITH ACTUAL FIELD

MEASUREMENTS, EXAMINE THE JOB SITE, VERIFY ALL FIELD CONDITIONS AND PROVIDE

THE LABOR AND MATERIALS REQUIRED TO COMPLETE THE REQUIRED WORK. ALL WORK

SHALL BE PERFORMED IN A PROFESSIONAL MANNER THAT IS OF ACCEPTABLE

WORKMANSHIP OF THE RESPECTIVE TRADES. THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER PRIOR TO THE COMMENCEMENT OF WORK, IF THERE ARE ANY

DIMENSIONAL DISCREPANCIES, OR IF THERE ARE ANY CONDITIONS THAT EXIST WHICH

MAY PREVENT THE CONTRACTOR'S PERFORMANCE OF WORK, AND/OR OF ANY AND ALL

ADDITIONAL WORK THAT MAY BE REQUIRED AS A RESULT OF THE OBSERVED

CONDITIONS.

4. OMISSIONS: OMISSIONS OF THE DRAWINGS, OR SPECIFICATIONS, OR THE OMISSIONS OF

DETAILS OF WORK WHICH ARE MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF

THE DRAWINGS AND SPECIFICATIONS, OR WHICH ARE CUSTOMARILY PERFORMED,

SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED, OR

INCORRECTLY DESCRIBED DETAILS OF THE WORK, BUT SHALL BE PERFORMED AS IF

FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS AND

SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

VERBALLY OF SUCH OMISSIONS AND PROVIDE A WRITTEN STATEMENT OF THE

OMISSIONS WITHIN (5) WORKING DAYS OF VERBAL NOTIFICATION.

5. INTENT OF THE DRAWINGS: THE DRAWINGS ARE INTENDED TO DEFINE AND ESTABLISH

THE PHYSICAL REQUIREMENTS OF THE PROJECT, I.E., THE DESIGN, LOCATIONS AND

DIMENSIONS OF THE WORK, BASED ON RECOGNIZED STANDARDS, EVEN IF NOT

ACTUALLY SHOWN, BUT REASONABLY INFERRED. ALL WORK SHOWN IS "NEW" UNLESS

OTHERWISE NOTED AS "EXISTING". THE CONTRACTOR SHALL REVIEW AND VERIFY THE

INFORMATION ON ALL DRAWINGS BEFORE PERFORMING THE WORK AND NOTIFY THE

CONTRACTING OFFICER OF ANY DISCREPANCIES. THE CONTRACTOR SHALL

COORDINATE THE WORK OF ALL SUBCONTRACTORS/TRADES TO ACHIEVE THE DESIGN

INTENT AND SPECIFIED REQUIREMENTS AND IS RESPONSIBLE TO COMPLETE ANY AND

ALL WORK ASSOCIATED WITH SUCH COORDINATION.

6. COMPLETION OF THE WORK: THE CONTRACTOR SHALL IN THE WORK OF ALL TRADES,

PERFORM ANY AND ALL CUTTING, PATCHING, REPAIRING, RESTORING AND THE LIKE

NECESSARY TO COMPLETE THE WORK AND RESTORE ANY DAMAGED OR AFFECTED

SURFACES RESULTING FROM THE WORK OF THIS CONTRACT TO THEIR ORIGINAL

CONDITION TO THE SATISFACTION OF THE CONTRACTING OFFICER. THE CONTRACTOR IS

SOLELY RESPONSIBLE FOR ALL MEANS, METHODS, TECHNIQUES, SEQUENCES AND

PROCEDURES OF CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO SAFETY

PRECAUTIONS.

7. CLEAN UP: THE CONTRACTOR SHALL CLEAN AND REMOVE ANY TRASH, DIRT, DEBRIS

AND SPILLAGE ARISING FROM THE WORK DAILY TO THE SATISFACTION OF THE

CONTRACTING OFFICER.

8. RECORD DRAWINGS: THE CONTRACTOR SHALL PROVIDE THE CONTRACTING OFFICER

WITH A SET OF "AS-BUILT" DRAWINGS OF WORK AS REQUIRED BY THE CONTRACT.

9. DIMENSIONS: UNLESS OTHERWISE NOTED IN THE CONSTRUCTION DOCUMENTS, ALL

DIMENSIONS ARE TAKEN TO THE FACE OF EXISTING STRUCTURE, OR FACE OF

CONSTRUCTION. WRITTEN DIMENSIONS PREVAIL, DO NOT SCALE DRAWINGS. SHOULD

DIMENSIONAL DISCREPANCIES BE FOUND, CONTACT THE CONTRACTING OFFICER FOR

CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK.

10. PREVENT DAMAGE: THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO

PREVENT DAMAGE TO EXISTING/COMPLETED STRUCTURES AND LARGE TREES. THE

CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY DAMAGE TO THESE ITEMS

CAUSED BY HIS OPERATIONS.

11. DO NOT BLOCK EXITS: THE CONTRACTOR SHALL NOT BLOCK OR OBSTRUCT ANY EXIT

WAYS DURING THE EXECUTION OF WORK THROUGHOUT THIS PROJECT.

12. EXISTING UTILITIES: THE CONTRACTOR SHALL COORDINATE AND VERIFY THE

LOCATIONS OF ALL UNDERGROUND OR OVERHEAD UTILITY LINES TO AVOID CONFLICTS

DURING ALL STAGES OF CONSTRUCTION.

13. SUBCONTRACTORS: THE USE OF UNLICENSED CONTRACTORS IS STRICTLY PROHIBITED.

THE CONTRACTOR IS RESPONSIBLE TO THE UNIVERSITY FOR ACTS AND OMISSIONS OF

THE CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND

EMPLOYEES, AND OTHER PERSONS PERFORMING PORTIONS OF WORK UNDER

CONTRACT WITH THE CONTRACTOR.

14. HAZARDOUS MATERIALS: HAZARDOUS MATERIAL ABATEMENT MEASURES SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR AS INDICATED IN THE DRAWINGS AND/OR

SPECIFICATIONS. BURNING OF ANY DEBRIS IS NOT PERMITTED. EXPLOSIVES ARE NOT

ALLOWED.

15. PERMITS: THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS REQUIRED.

14. WOOD: ALL NEW WOOD SHALL BE TERMITE TREATED. ALL PAINT ON WOOD SURFACES

SHALL CONTAIN A MILDEWCIDE ADDITIVE.

15. DISSIMILAR METAL PROTECTION: THE CONTRACTOR SHALL PROVIDE DISSIMILAR METAL

PROTECTION.

16. MECHANICAL AND ELECTRICAL ITEMS : ALL NEW EXPOSED MECHANICAL AND

ELECTRICAL PIPING, CONDUITS, DUCTWORK AND RELATED FITTINGS, AND FASTENERS

ARE TO BE PAINTED THE SAME COLOR AS THE COLOR OF THE SURFACE IT IS ATTACHED

TO UNLESS OTHERWISE NOTED.

17. SAFE OPERATIONS: THE CONTRACTOR SHALL ENSURE THAT ANY AND ALL

CONSTRUCTION ACTIVITIES DO NOT IMPACT OR INTERFERE WITH NORMAL OR SAFE

OPERATIONS AT THE PROJECT SITE.

18. RENOVATION WORK: THE CONTRACTOR SHALL PROPERLY SHORE BUILDING WALLS,

CEILINGS AND ANY OTHER COMPONENTS AFFECTED BY THE WORK AS REQUIRED TO

MAINTAIN A SAFE AND STABLE STRUCTURE.

19. SOUND AND NOISE CONTROL: THE CONTRACTOR SHALL NOTIFY AND COORDINATE WITH

THE CONTRACTING OFFICER ALL WORK THAT WILL GENERATE EXCESSIVE NOISE WHICH

MAY DISRUPT NORMAL OPERATING ACTIVITIES.

20. DEFINITIONS:

20.1. "FURNISH" MEANS "FURNISH ONLY". MATERIALS OR ITEMS TO BE FURNISHED SHALL

BE CONSIGNED TO THE CONTRACTOR AND DELIVERED TO THE SITE.

20.2. "INSTALL" MEANS "INSTALL ONLY" FURNISHED MATERIALS OR ITEMS. SUCH

MATERIALS OR ITEMS SHALL BE RECEIVED AT THE SITE, UNLOADED, STORED,

PROTECTED, AND INSTALLED IN PLACE, INCLUDING FINAL CONNECTION, UNLESS

SUCH WORK IS SPECIFICALLY EXCLUDED.

20.3. "PROVIDE" MEANS "FURNISH AND INSTALL" COMPLETE, IN PLACE AND READY FOR

USE, INCLUDING FINAL CONNECTIONS. ALL WORK SHOWN IN THE DRAWINGS SHALL

BE UNDERSTOOD AS "PROVIDE" WHETHER NOTES INDICATING "PROVIDE" ARE

INDICATED OR NOT.

20.4. WORDS "CONTRACTOR SHALL" ARE IMPLIED AND SHALL BE SO UNDERSTOOD

WHEREVER A DIRECTION IS STATED IN IMPERATIVE MOOD AND DIRECTION

"PROVIDE" IS USED.

20.5. UNLESS SPECIFICALLY STATED AS "EXISTING", ALL MATERIALS SHALL BE NEW IN ALL

CASES WHEN NOTES ARE ADDED TO DRAWINGS. ALSO, USES OF "FURNISH" AND

"PROVIDE" AUTOMATICALLY MEANS "NEW" UNLESS SPECIFICALLY STATED AS

"EXISTING".

21. HISTORIC SIGNIFICANCE: THE PROJECT SITE (BUILDING 107 AND THE SURROUNDING

AREAS) IS A CONTRIBUTING ELEMENT TO THE WHEELER ARMY AIR FIELD'S HISTORIC

DISTRICT. THE PROJECT SITE IS CONSIDERED HISTORICALLY IMPORTANT AREA WHICH

SHOULD BE TREATED AS REQUIRED BY FEDERAL, STATE, AND LOCAL HISTORICAL

STANDARDS AND CODES.

22. DEMOLITION NOTES: FOR ADDITIONAL DEMOLITION NOTES, SEE SHEET AD001. REFER

TO THIS SHEET AND NOTES PRIOR TO STARTING WORK.

WAAF_B107_G-001
WAAF_B107_G-002
WAAF_B107_G-003

File details come from the government source that posted it. Updated .