1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0008 17 Sep 2016
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH)
Ft Shafter, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
W9128A-16-B-0003
9B. DATED (SEE ITEM 11)
08/04/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY15 Pkg A-003 Repair Bldg 155, Quad B, Schofield Barracks, Oahu, Hawaii
See page 2 of 2
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Am-0008 Standard Form 30
IFB No. W9128A-16-B-0003 Page 2 of 2 Pages
Item No. 14 (Continued)
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications.
Revised pages replace like-numbered pages. The revision mark (Am-0008) is shown on each revised page.
A. NEW SECTIONS OR PAGES. The following are added to the sections.
Section 00 73 00, Appendix G, Requests for Information (RFIs), #59 through 61
2. The bid opening remains UNCHANGED. See Am-0004, SF 1442, Page 1, Block 13A.
FY15 PKG A-003 Repair Building 155, Quad B, Schofield Barracks, Oahu, Hawaii W9128A-16-B-0003
RFI # Question Response
FP001 notes a .10 density for the attic area above the 3rd floor (concrete ceiling) as well as for the above ceiling space above the 3rd floor. The details do not note any combustibles in this attic or interstitial area. If there is no need to sprinkler this space as is allowed by NFPA and UFC for non-combustible concealed space then there is a significant savings. Can you please confirm it any sprinkler protection will be required in these areas above ceiling/attic areas ?
Sprinkler coverage is not required in the Attic space.
Will the Lanais require sprinkler protection – the drawings appear to show this area as non-combustible and open so no protection maybe required. Please confirm if protection of the Lanais are required per code.
The Lanais are treated as a Pathway to exit the building. Sprinkler Coverage is required.
The hydraulics are very very close to working/not working. I cannot make a full remote area (without reductions) as required by FM data sheet (required by UFC 3-
600-01) and in compliance with all UFC/FM/NFPA guidelines. Would the government be willing to wave any of the UFC requirements to try to keep a fire pump out of the contract. Specifically the newest UFC says to use a 12 psi backflow loss and we cannot lose 12 psi for backflow, 40’ of elevation (18 psi) and
10 psi safety with only 52 psi static and an HC2 calculation. We may be able to use just the waterflow if we are allow to not have the 12 psi loss for the backflow, if we can use 4.2K (1/2” NPT) heads for the light hazard areas and 5.6K (1/2” NPT) in the
HC2 areas. FM data sheet requires a 8.0K head for HC2 but NFPA 13 does not have this requirement so a 5.6K is NFPA compliant but not UFC 3-600-01. Please verify if a fire pump will be allowed/required.
Fire pump is not required.
Section 00 73 00, Appendix G, Requests for Information (RFIs) - 1 (Am-0008)