16b3-Am-0001.pdf

PDF 3 MB Posted

Attached to
FY15 OMA Pkg A-003, Renovate, B155, quad B, Schofield Barracks, Oahu, Hawaii
Solicitation number
W9128A-16-B-0003
Issued by

About this file

Am-0001

View the file

Other files

File Type Posted
16b3-OF1419-Bid_Abstract_signed.pdf PDF
16b3-am8.pdf PDF
16b3-am7.pdf PDF
16b3-am6.pdf PDF
16b3-am5.pdf PDF
16b3-am4.pdf PDF
16b3-am3-B155_Specs_Am3_7Sep2016.pdf PDF
16b3-am3-B155_Dwgs_Am3_6Sep2016.pdf PDF
16b3-am3.pdf PDF
16b3-am2.pdf PDF
W9128A09D0004_-_03_CIVIL_Part_2.pdf PDF
W9128A09D0004_-_09_FIRE_PROTECTION.pdf PDF
W9128A09D0004_-_SPECIFICATIONS.pdf PDF
W9128A09D0004_-_08_PLUMBING.pdf PDF
W9128A09D0004_-_10_ELECTRICAL_Part_3.pdf PDF
W9128A09D0004_-_02_LIFE_SAFETY.pdf PDF
W9128A09D0004_-_04_LANDSCAPE.pdf PDF
16b5-Solicitation_-_20160815.pdf PDF
W9128A09D0004_-_07_MECHANICAL.pdf PDF
W9128A09D0004_-_10_ELECTRICAL_Part_1.pdf PDF
W9128A09D0004_-_03_CIVIL_Part_1.pdf PDF
W9128A09D0004_-_11_TELECOMM.pdf PDF
W9128A09D0004_-_10_ELECTRICAL_Part_2.pdf PDF
W9128A09D0004_-_01_GENERAL.pdf PDF
W9128A09D0004_-_06_STRUCTURAL.pdf PDF
W9128A09D0004_-_05_ARCHITECTURAL.pdf PDF
12of15-B155_Mechanical_RTA_30Sep2015.pdf PDF
15of15-B155_Telecommunications_RTA_30SEP2015.pdf PDF
2of15-B155_Environmental_RTA_30Sep2015.pdf PDF
5of15-B155_Structural_RTA_30Sep2015.pdf PDF
8of15-B155_Architectural_RTA_30Sep2015.pdf PDF
13of15-B155_Electrical_RTA_30SEP2015.pdf PDF
3of15-B155_Civil_RTA_30Sep2015.pdf PDF
6of15-B155_Architectural_RTA_30Sep2015.pdf PDF
9of15-B155_Architectural_RTA_30Sep2015.pdf PDF
7of15-B155_Architectural_RTA_30Sep2015.pdf PDF
10of15-B155_Fire_Protection_RTA_30Sep2015.pdf PDF
1of15-B155_General_RTA_30Sep2015.pdf PDF
14of15-B155_Electrical_RTA_30SEP2015.pdf PDF
Bldg_155_Specs_RTA_2of3.pdf PDF
11of15-B155_Plumbing_RTA_30Sep2015.pdf PDF
4of15-B155_Structural_RTA_30Sep2015.pdf PDF
16b3_solicitation-04Aug2016.pdf PDF
Bldg_155_Specs_RTA_3of3.pdf PDF
Bldg_155_Specs_RTA_1of3.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0001 31 Aug 2016

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CECT – Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH) Ft Shafter, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A-16-B-0003 X

9B. DATED (SEE ITEM 11)

08/15/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY15 OMA Pkg A-003 Repair Building 155, Quad B, Schofield Barracks, Oahu, Hawaii

See Page 2 of 2 Pages

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0001 Standard Form 30

IFB No. W9128A-16-B-0003 Page 2 of 2 Pages

Item No. 14 (Continued)

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications.

Revised pages replace like-numbered pages. The revision mark (Am-0001) is shown on each revised page.

A. REVISED SECTIONS. The following sections are revised and are indicated in bold.

Section 00 10 00, page 1

Section 00 21 13, pages 5 and 6

Section 00 72 00, pages 1, 2, and 13

B. NEW SECTIONS OR PAGES. The following are added to the sections.

Main Table of Contents, page i

Section 00 21 13, page 29

Section 00 72 00, Appendix A, Wage Rates General Decision Number: HI16001, modification 7 dated

08/19/2016.

Section 00 73 00, Appendix C, Site Visit Sign-in Roster, pages 1 through 3

Section 00 73 00, Appendix D, Map to Building 252 at Fort Shafter, page 1

Section 00 73 00, Appendix E, Mechanical Room Photos, pages 1 through 7

Section 00 73 00, Appendix F, Updated Bond Forms, pages 1 through 6

Section 00 73 00, Appendix G, Requests for Information (RFIs), #1 and 5

C. DELETED SECTIONS OR PAGES. The following sections are deleted.

Section 00 72 00, Appendix A, Wage Rates General Decision Number: HI16001, modification 6 dated

07/29/2016.

2. Requests for Information (RFIs) were due by August 25, 2016 at 2:00 p.m., Hawaii Standard Time.

3. The bid opening remains UNCHANGED. See SF 1442, Page 1, Block 13A.

Main Table of Contents i

(Am-0001)

Section 00 01 00 - Table of Contents

MAIN TOC

MAIN TABLE OF CONTENTS

Invitation for Bid (IFB) No. W9128A-16-B-0003, FY15 PKG A-003 Repair Building 155, Quad B, Schofield Barracks, Oahu, Hawaii

Section 00 10 00 SF 1442 and Bid Schedule

Section 00 21 13 Instructions, Conditions and Notices To Bidders

Section 00 45 00 Representations and Certifications

Appendix A, SF LLL, Disclosure of Lobbying Activities

Section 00 72 00 Contract Clauses

Section 00 73 00 Special Contract Requirements

Appendix A, Project Signs

Appendix B, Justification & Approval Kaba Ilco Locks

Appendix C, Site Visit Sign-In Roster

Appendix D, Map to Building 252 at Fort Shafter

Appendix E, Mechanical Room Photos

Appendix F, Updated Bond Forms

Appendix G, Requests for Information (RFIs)

Division 1 General Requirements

Division 3 and 35 Technical Requirements

SUBMITTAL OF BIDS:

Bids may be submitted via U.S. Postal Service, Courier Service, or personally delivered as follows:

A. Bids submitted via U.S. Postal Service should be mailed to:

U.S. Army Corps of Engineers, Honolulu District

Contracting Division, ATTN: Dayna Matsumura / Kent Tamai

Building 230, Otake Street

Fort Shafter, Hawaii, 96858-5440

B. Bids submitted via courier service or hand delivered shall be to:

U.S. Army Corps of Engineers, Honolulu District

Contracting Division, ATTN: Dayna Matsumura / Kent Tamai

Building 252, Walker Drive

Fort Shafter, Hawaii, 96858-5440

See Section 00 73 00, Appendix D for a map to Building 252 at Fort Shafter.

Section 00 10 00 - 1

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

BID SCHEDULE

Invitation for Bid No. W9128A-16-B-0003

SECTION 00 10 00

BID SCHEDULE

FY15 PKG A-003 REPAIR BLDG 155, QUAD B

SCHOFIELD BARRACKS, OAHU, HAWAII

UNIT

CLIN. DESCRIPTION QUANTITY UNIT PRICE AMOUNT

0001 Building Repair 1 JOB $___________

0002 Concrete Spall Repair 200 SF $_________ $___________

0003 Concrete Crack Repair 1000 LF $_________ $___________

With Epoxy Injection

0004 Contractor Manpower Reporting 1 JOB $___________

TOTAL BID SCHEDULE $___________

NOTES:

1. Failure to provide a price on all items in the Bid Schedule may cause the bidder to be considered non-responsive.

2. Each Bidder must submit the following documents. Failure to submit all required documents may result in the offer being considered ineligible for award.

a. SF 1442 (pages 1 and 2) including acknowledging all amendments

b. Bid Schedule

c. Bid Guarantee (See SF 1442 Block 13B and Provision No. 52.228-1, Bid Guarantee, in Section 00 21 13)

d. Section 00 45 00 - Representations & Certifications, Appendix A - SF LLL, Disclosure of Lobbying

Activities

3. This solicitation is subject to availability of funds (See Section 00 72 00, Clause 52.232-18)

4. Requests for Information (RFIs) are due by August 25, 2016 at 2:00 p.m., Hawaii Standard Time.

5. Bidders shall furnish a copy of its Section 00 45 00 and Appendix A – SF LLL on a CD.

Section 00 21 13 - 5

Contracting Division

Attn: Contracting Officer, Kent Tamai (W9128A-16-B-0003)

Otake Street, Building 230

Fort Shafter, Hawaii 96858-5440

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the

GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

August 18, 2016 (Wednesday)

10:00 a.m., Hawaii Standard Time

POC: Darin Aihara at (808)835-4211

(c) Participants will meet at--

Building 155, Schofield Barracks, Oahu, Hawaii

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ http://www.usace.army.mil/Portals/2/docs/Contracting/UAI_Version%203__1%20NOV%202014.pdf

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any (48 CFR Chapter ) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

http://www.usace.army.mil/Portals/2/docs/Contracting/UAI_Version%203__1%20NOV%202014.pdf

Section 00 21 13 - 6

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV

2011)

(a) Definition. Covered DoD official is defined in the clause at 252.203-7000, Requirements Relating to

Compensation of Former DoD Officials.

(b) By submission of this offer, the offeror represents, to the best of its knowledge and belief, that all covered DoD officials employed by or otherwise receiving compensation from the offeror, and who are expected to undertake activities on behalf of the offeror for any resulting contract, are presently in compliance with all post-employment restrictions covered by 18 U.S.C. 207, 41 U.S.C. 2101-2107, and 5 CFR parts 2637 and 2641, including Federal

Acquisition Regulation 3.104-2.

252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

(a) Definitions. As used in this provision—

“System for Award Management (SAM) database” means the primary Government repository for contractor information required for the conduct of business with the Government.

“Commercial and Government Entity (CAGE) code” means—

(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or

(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an “NCAGE code.”

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc.

(D&B) to identify unique business entities.

“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR 32.11) for the same parent concern.

“Registered in the System for Award Management (SAM) database” means that—

(1) The contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and

Contractor and Government Entity (CAGE) code into the SAM database; and

(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number

(TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the

Government as part of the SAM registration process; and

(4) The Government has marked the record “Active.”

Section 00 21 13 - 11

Section 00 21 13 - Instructions to Bidders

52.214-5000 APPARENT CLERICAL MISTAKES

ARTHMETIC DISCREPANCIES

(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purposes of bid evaluation the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(End of Statement)

Section 00 72 00 – 1

Section 00 72 00 - General Conditions

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees MAY 2014

52.203-7 Anti-Kickback Procedures MAY 2014

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014

52.203-12 Limitation On Payments To Influence Certain Federal Transactions OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform

Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards OCT 2015

52.204-13 System for Award Management Maintenance JUL 2013

52.204-14 Service Contract Reporting Requirements JAN 2014

52.204-18 Commercial and Government Entity Code Maintenance JUL 2015

52.204-19 Incorporation by Reference of Representations and Certifications. DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors

Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters JUL 2013

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations NOV 2015

52.210-1 Market Research APR 2011

52.211-13 Time Extensions SEP 2000

52.211-15 Defense Priority And Allocation Requirements APR 2008

52.211-18 Variation in Estimated Quantity APR 1984

52.214-26 Audit and Records--Sealed Bidding OCT 2010

52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications

- Sealed Bidding

AUG 2011

52.214-28 Subcontracting Certified Cost Or Pricing Data--Modifications--Sealed Bidding OCT 2010

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-8 Utilization of Small Business Concerns OCT 2014

52.219-14 Limitations On Subcontracting NOV 2011

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014

52.222-7 Withholding of Funds MAY 2014

52.222-8 Payrolls and Basic Records MAY 2014

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) MAY 2014

52.222-12 Contract Termination-Debarment MAY 2014

52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility MAY 2014

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015

52.222-26 Equal Opportunity APR 2015

52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015

Section 00 72 00 – 2

52.222-29 Notification Of Visa Denial APR 2015

52.222-35 Equal Opportunity for Veterans OCT 2015

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014

52.222-37 Employment Reports on Veterans FEB 2016

52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015

52.222-54 Employment Eligibility Verification OCT 2015

52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated

Items

MAY 2008

52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007

52.223-16 Acquisition of EPEAT (R) - Registered Personal Computer Products OCT 2015

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction

Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets JAN 2012

52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014

52.228-14 Irrevocable Letter of Credit NOV 2014

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes FEB 2013

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-16 Progress Payments APR 2012

52.232-17 Interest MAY 2014

52.232-18 Availability of Funds APR 1984

52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984

52.232-27 Prompt Payment for Construction Contracts MAY 2014

52.232-33 Payment by Electronic Funds Transfer--System for Award Management JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors DEC 2013

52.233-1 Disputes MAY 2014

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-17 Layout of Work APR 1984

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) - Alternate I APR 1984

Section 00 72 00 – 13

(End of clause)

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.

(b) Weather conditions: Tropical. Data on temperature and rainfall may be obtained from the National Weather

Service.

(c) Transportation facilities: The Contractor shall make his own investigation on the condition and availability of public and private roads as well as clearances and restrictions.

52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:

(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.

(2) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(4) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule

(subject to the provisions of FAR 31.205-11).

(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Section 00 72 00 – Page 29

Section 00 72 00 - General Conditions

CLAUSES INCORPORATED BY REFERENCE

52.203-14 Display of Hotline Poster(s) OCT 2015

52.203-16 Preventing Personal Conflicts of Interest DEC 2011

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement DEC 2007

52.232-16 Alt I Progress Payments – Alternate I MAR 2000

Name

(!{)r/~11/ °k I;:;-,::;;

~\Jl o'r \'sq

Don:JY' !J (!{/:;.~ ~..____, SWv1D\06~ ;40---\/7~ ·f\A u

~ { rl + c

)~ S,\? l ~13b/c. (__..._! l/\ II\

J 6' F /- c:.(5 //] ~ /J/'/5 £c:L/,~ fD'-1,J/!Pp-._

~~1kL v

PA'W.- SA-PLA

Sign-In Sheet W9128A-16-B-0005 FY15 Pkg A-003 Repair Building 155, Quad B

Schofield Barracks, Oahu, Hawaii 18 August 2016

Company Phone Number

/i/(;c(// J; flrJJ-VP <f?<B-G~z_ OPl/v I (];60 -241<2 f7,J14 f?3~ - C/-~ {, ~ t>6VY\O sn~ 0? 3-.ro<t·Lf-c 0 '£ iASAlt= b1 r:-f{..e I C.Ov\.4--ro.c.1 ~"' ~ lo ?--11-B-01 ?"

~&-TJrtS, a C~,.vTt'.Z?t./;·~ qt; 7 - 2] :z-.-077..

{)u,Jlro 'fJ-a1,,. It¥\ (i,, <- 5$'§ t/f-~ Is 7 ;_ v -th~ lJLSAU-

Prime Sub AE Gov't

(J

~x ii v

W9128A-16-B-0003

Section 00 73 00, Appendix C - Sign-In Sheet - Page 1

_j0\-\.1':> M<- CA l<...t._ j~~+l~ l:k?11111 '1~ Cou1' 17/k~'i

¥'1Ai\ ~LWt)

~u-l l~~D.

Tµi--J.y 1'-J.AfL-VAf-~

-~ ( ( ~ ..--::-=(J .

~(: oJ_,A. I \\ tl./(./tA)--U/'"'--'

··~ . 'P {(:.?') , {i,,... \rtre1 v-e., I I (;

1~ Z <L>W\ lito Shovto HPf-1.tut ~kr--li·at.f.-\

(~+P J rp K\ tl-f }dz,,/l!J

Sign-In Sheet W9128A-16-B-0005 FY15 Pkg A-003 Repair Building 155, Quad B

Schofield Barracks, Oahu, Hawaii 18 August 2016

Company Phone Number

. E'"C.l4 C..O~P &16 ~l&o-0,'1Q;

€lH CoRP &oB 3~ o -/1DO

· Prtl M~f ft CIA$ ~ f!f ff fV-()l-!a1 ~11J7~~Sll

@.U Ll01)U t>-~t'lttl ~~ ~~~17--~ll( \ I l fs--tj--- e.,_,r~(l~ 8016- 3-So-q°i ao

-~+ 6.of-P 80t.- 2.~-4~&-j b ?w-/fKP. i ~ ~(\ ~ J' '-e7 - Ls- , '-"

!d-t..J Rtv (){/), ~ ~6i5S" nrJr '-' - u

.2£1V vrv5{\((i, ~i -6%"' ~ tl<?Ac;..(3:" ih, s~-4174··

50L....i0 >r/;ff/t: C..j r;./-1 l I tvb- ft ~Ji; 7'}-7-Ztll

J)~ /Vl~~ CbGT PDH 'Z'36· 431-q v .

k£N'T "-Tf\VlA-1 \;l.~466 ~ 35. 4 3 :t-::f-

Prime Sub AE Gov't v v v

~ I i/ v

V' v

W9128A-16-B-0003

Section 00 73 00, Appendix C - Sign-In Sheet - Page 2

17/f/l r 5 '1Fl {/(_/

/~(fh '/lle&~>?/ 1rff , I '-\ ·11?,+.\'\ K t\Z\ \lt.T\

~ \;},u ~'().q k \ i

Mt t.q0"-I }J!ZQu_ e#f fu~--l \ V\i\_ ..

az /) L:___ _t:bue; (-{[(?€([£'

Sf<p h ("n (µ?D"'VI(

I~ :;;Y ! .·"-~ ! L \!_:?',?

J-t f/~//;/.J l{J, r//14),'/,(

_.....:- r .

I Dht/ /l/a..rvtt-1'?7~

Sign-In Sheet W9128A-16-B-0005 FY15 Pkg A-003 Repair Building 155, Quad B

Schofield Barracks, Oahu, Hawaii 18 August2016

Company Phone Number lreiJe,,,_4{_ C''Dvz:>f-c.cvc+o? s 'ifr56-'i'f 5-,;;_rtr;<J

Szv(vte4a; c54tl/r!~5 '8(€ ~ ;;<.20-:> 3"~

~\:~t~\o Centrlll-\i rw\ LLG { JJ- -~3591 1'J " ". ~ ~

\\C..t-~ . <((o~ ~7¥ ( &z3cf v I

~.i/<4:3~;-(dl?Ale::f-Fm: ,&v. ~1- 63/-28'8'?

Q(b ~°\\ \fV\ Q.. ill:.,.! {~, E \u__. Tu1_L b4-\- 4~q ·S-f\J ,l(~ ~.J} U.I JI"" 1lk3q "' N ( t/.:.(/l/ & Coo ...... P ~l/9. •. RY7 6

-') L(,,.. (.,... / -fZ t.{5 l.e.v . ~ w S-r· e.z· u z,& n i ·x-c\ l (y .f i f'T • A~?/-380 s fi/A.e// ( t,i>;1 tv -li ( 11- 1'21. 'f J-fi( 91

EC-I/ Corv °S?OG--Jot--3 7 09" I

Prime Sub AE Gov't v ~v

- ·V' v v v

·•1;cf .•. / v

W9128A-16-B-0003

Section 00 73 00, Appendix C - Sign-In Sheet - Page 3

Section 00 01 00, Appendix D, Map to Building 252

Entrance to Fort Shafter is through Buckner Gate.

Due to heightened security, please have the following items available to provide to the guard:

1) valid drivers license;

2) vehicle registration;

3) certificate of insurance; and

4) current safety inspection.

All passengers must have a current photo ID.

Individuals renting a car will need to provide:

1) valid drivers license; and

2) rental car agreement.

Please allow sufficient time to be allowed on post and to find parking. (At least 1 hour)

Section 00 73 00, Appendix E – Mechanical Room Photos - Page - 1

Building 155, Mechanical Room 1st Floor East (Room E113)

Section 00 73 00, Appendix E – Mechanical Room Photos - Page - 2

Building 155, Mechanical Room 1st Floor East (Room E113)

Section 00 73 00, Appendix E – Mechanical Room Photos - Page - 3

Building 155, Mechanical Room 1st Floor West (Room E104)

Section 00 73 00, Appendix E – Mechanical Room Photos - Page - 4

Building 155, Mechanical Room 1st Floor West (Room E104)

Section 00 73 00, Appendix E – Mechanical Room Photos - Page - 5

Building 155, Mechanical Room 2nd Floor West (Room E237)

Section 00 73 00, Appendix E – Mechanical Room Photos - Page - 6

Building 155, Mechanical Room 2nd Floor West (Room E237)

Section 00 73 00, Appendix E – Mechanical Room Photos - Page - 7

Building 155, Mechanical Room 3rd Floor West (In Room 308)

Section 00 73 00, Appendix F, Updated Bond Forms - Page 1

Section 00 73 00, Appendix F, Updated Bond Forms - Page 2

Section 00 73 00, Appendix F, Updated Bond Forms - Page 3

Section 00 73 00, Appendix F, Updated Bond Forms - Page 4

Section 00 73 00, Appendix F, Updated Bond Forms - Page 5

Section 00 73 00, Appendix F, Updated Bond Forms - Page 6

FY15 PKG A-003 Repair Building 155, Quad B, Schofield Barracks, Oahu, Hawaii W9128A-16-B-0003

RFI # Question Response

1 Are the painted insignias on the 3rd floor in the gym room to remain? Yes, insignias are to remain.

Wanted to find out if anything from the Pre-Bid will be posted to FBO? i.e.

Sign-In Sheet, Q & A's etc.

Sign-in Sheet, and answers to RFIs will be posted to FBO.gov.

3 Will there be another walk through? No.

4 Do we deliver the proposal to Building 252 Contracting Office at Fort Shafter? See Am-0001, Table of Contents, Submittal of Bids

We need to submit a hard copy of our cost proposal & also a PDF on a CD. Is there any further requirements?

See Am-0001, Bid Schedule, Note 5.

Section 00 73 00, Appendix F, Requests for Information (RFIs) - 1

SF30-AM-0001
Table of Contents
Section 001000 - Bid Schedule
Section 00 21 13
Page 5
Page 6
Page 11
Section 00 72 00
Page 1
Page 2
Page 13
Page 29
Section 00 73 00
Appendix C, Sign-In Sheet
Appendix D, Map to Bldg 252 at Fort Shafter
Appendix E - Mechanical Room Photos
Appendix F - Updated Bond Forms
Appendix G - RFIs

File details come from the government source that posted it. Updated .