U0032.pdf

PDF 129 KB Posted

Attached to
Navy Temecula Outpatient Clinic Initial Outfitting Federal contract opportunity
Solicitation number
W9127S-16-R-6032
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

Cut Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Navy Temecula Outpatient Clinic Initial Outfitting, newest first.
File Type Posted
A.07.24_W9127S16R6032_Amendment_02_Temecula.pdf PDF
Attachment_3_-_Bid_Schedule.xlsx XLSX spreadsheet
U5007.pdf PDF
F0415.pdf PDF
U0010.pdf PDF
M2600.pdf PDF
U0031.pdf PDF
Attachment 1 - Responsibility Matrix.pdf PDF
U0011.pdf PDF
A.07.24_W9127S16R6032_Amendment_01_Temecula.pdf PDF
U0008.pdf PDF
Attachment 3 - Bid Schedule.xlsx XLSX spreadsheet
U0009.pdf PDF
M8315_promed.pdf PDF
U0003.pdf PDF
U0004.pdf PDF
Attachment_26_-_Meetings_and_Travel_Matrix.pdf PDF
Attachment_11_-_Weekly_Report_Format_Example.xls XLS spreadsheet
Attachment_A_-_Past_Performance_Questionnaire.pdf PDF
Attachment_2_-_IO_Submittal_Requirements_and_Format.pdf PDF
Attachment_29_-_IO_Public_Affairs_Deliverables.pdf PDF
Attachment_3_-_Bid_Schedule.xlsx XLSX spreadsheet
Attachment_21_-__Acknowledgement_of_Final_User_Inputs_Template.docx DOCX document
Attachment_12_-_Commodity_Change_Tracker.xlsx XLSX spreadsheet
Attachment_9_-_Comprehensive_Interior_Design_Specs.pdf PDF
Attachment_8_-_Submittal_Distribution_List.xlsx XLSX spreadsheet
Temecula_Solicitation_Final.pdf PDF
Attachment_15_-_Acceptance_and_Closeout_Plan.pdf PDF
Attachment_1_-_Responsibility_Matrix.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U0032

Oxygen Aluminum Medical Cylinders M-60

SKU: CC-M60

MATERIAL: Every cylinder is produced from high strength aluminum alloy 6061-

T6.

FINISH: Standard oxygen cylinder finish is brushed body with green dome

(white dome for Canada) and heat sensitive clear coat finish.

VALVES: CGA designation valves installed upon request.

ACCESORIES: The M150, M122, M90 and M60 are available with either a carrying handle or collar and valve protective cap.

REGULATION & INSPECTION: All seamless aluminum alloy compressed gas cylinders are manufactured in accordance with U.S. Departmenet of

Transportation (DOT) 3AL and Transport Canada (TC) 3ALM requirements.

Every cylinder is inspected and tested by a DOT and TC authorized independent inspection agency.

rev. 01/08 ALL TANKS SHIPPED EMPTY, Cga 540 Valve Cap: 60.0 Cu Ft /1699

Liters Pic 9

Titan™ Oxygen Regulator 2 Diss Out. And Constant Flow 0-25 Lpm

SKU: WM-MRP-804

NEW EMS TITAN™ SERIES

OXYGEN EMS and FIRE SERVICE APPLICATIONS

CLICK-STYLE REGULATOR

Whether its EMS, ambulance, fire rescue or tactical medical use, Titan™

Oxygen Regulators will provide durable, impact-resistant service. With 100% brass construction, they’ve got the guts to withstand emergency conditions, keeping your costs down and availability up!

The Titan regulator’s flow selector is inset and exceptionally durable.

Seven models are available, all with a nickel-plated brass body.

FEATURES:

• All brass construction in high pressure, low pressure and relief zones

• Brass internal components

• 20 micron sintered bronze inlet filter

• Teflon® FEP100 pressure regulating seat

• Viton® and silicone O-Rings

• Fasteners and springs are stainless steel

File details come from the government source that posted it. Updated .