RFI 04 QA 20190827 - W9127Q-21-B-0001 Small Arms Range_.pdf
PDF 114 KB Posted
- Attached to
- Small Arms Range #LRXQ159097
- Solicitation number
- W9127Q-21-B-0001
About this file
This document contains a request for information (RFI) related to solicitation number W9127Q-21-B-0001 from the Department of the Army Mississippi Army National Guard. The solicitation seeks a firm fixed-price contract to construct a new indoor small arms range facility, designated as the Combat Arms Training and Maintenance Facility, at the Mississippi Air National Guard base in Flowood, MS. The base bid includes site development, foundations, structural framing, doors, windows, interior finishes, and HVAC, electrical, fire protection and plumbing systems. There are three option items for a target retrieval system, stall system, and screw conveyor system. The period of performance is 365 days from notice to proceed. The North American Industry Classification code is 236220 with a size standard of $39.5 million. The estimated value is between $5-10 million. The pre-bid conference is August 12, 2021 and bids are due September 9, 2021. The solicitation is set aside 100% for small business.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9127Q-21-B-0001 Small Arms Range, #LRXQ159097
I. REQUEST FOR INFORMATION (RFI) #04
27 August 2021
7. Question: Section 11 67 23 states in section 1.9 Bullet traps and Collection Section A.
states the bullet trap should beSelf Supporting, and section A.h states the “Trap: Fully self-supported requiring no prior construction site preparation other than a flat concrete pad with a prepared trench, and an optional boom.” Yet the range drawings Z301.1 and all the drawings for the range showing the bullet trap clearly show the top section of the trap being supported by the building. Which is correct?
Answer 7: The Trap will require support structure as shown in the Structural drawing and referenced in the Z-drawings. Disregard specification references to free-standing.
8. Question: Drawing Z301.1 shows the screw conveyor system as part of the Range Section AB1 (Base Bid) but the screw conveyor system is part of Option #3. Which is correct?
Answer 8: Sheet C0.1 lists what items are included in the Base Bid and ABI's 1-3. The last sentence says "Contractor shall disregard any ABI/Notes in the plans or specifications that contradict information in the notes above."
9. Question: On the Statement of Work LRXQ159097 Construct Small Arms Range May 2021, The Scope for the base bid does not call out any target system, yet the drawing Z301.1 shows the Genesis target retrieval system and the DRM Pro running man. Which is correct?
Answer 9: Sheet C0.1 lists what items are included in the Base Bid and ABI's 1-3. The last sentence says "Contractor shall disregard any ABI/Notes in the plans or specifications that contradict information in the notes above."
10. Question: Sheets A2.0 & A11.0 indicates Raised Access Flooring in Rm 111. There is no specification for this. Please advise.
Answer 10: See attached spec section 09 69 00 for Access Flooring --See Attached.
11. Question: Sheets A11.0 indicates new appliances. Are these contractors furnished/contractor installed OR government furnished/government installed?
Answer 11: Appliances listed on A11.0 are to be included.
REQUEST FOR INFORMATION (RFI) #03
26 August 2021
5. Question: Is there a blast rating for the windows or doors for this project? Could not locate in the drawings or the specifications.
Answer 5: The only blast-related building component is exterior laminated glazing - an interlayer within the outer pane is used per project requirements. No other blast rating is required on doors or exterior opening frames.
6. Question: There are some hardware sets with the following remark in the hardware spec. "Doors, Frames and Hardware to comply with blast standards as determined by UFC 4- 010-01 and small/large missile impact approvals". When blast UFC 4-010-01 is mentioned on a project, additional information is needed to get a quote to include project PSF level or the standoff distance plus the charge weight in order for manufacturer to calculate the proper PSF level. Please advise if blast is needed on this project or only ballistic rated material
Answer 6: No blast rating is required on exterior building hardware. Ballistic rated requirements are in SECTION 08 34 02.
REQUEST FOR INFORMATION (RFI) #2
24 August 2021
3. Question: Please advise if shifting the building 10'-0 from the existing building is a viable option. See attached drawing
Answer 3: Due to the buildings proximity to the ANG boundary the building cannot be shifted to the west.
4. Question: Question from Landscaping subcontractor….What is the installed size of the
(20) Pin Oak trees on the Small Arms Range job.
Answer 4: The pin oaks shall be 45 gallon/3" caliper.
REQUEST FOR INFORMATION (RFI) #1
22 August 2021
1. Question regarding E-sheets and division 26 of the specifications.. See Amendment #01 to replace E.6 with E0.6-R1:
Question A: What size kVA cable is needed?
Answer: (3) 2 AWG AL, 15KV, 133% EPR, Type MV-105. Refer to details on revised sheet E0.6.
Question B: There is not a detail showing the pole hardware at the new dip pole. Please advise.
Answer: Refer to details on revised sheet E0.6.
Question C: Will 6” be needed on the bore for the primary, or will 4” be sufficient?
Answer: 4” is sufficient. Refer to details on revised sheet E0.6.
Question D: Do you want a spare conduit bored out to the pole?
Answer D: NO
2. Question: The small arms range equipment is specified in Section 11 67 23 of the specifications. Most suppliers advised that delivery in 90 to 120 calendar days with significant time required for installation and system testing. A period of performance of 365 calendar days is insufficient. We request the period of performance be increased to a minimum of 15 months or 450 days.
Answer 2: We are aware of the volatility of the construction market and related lead times.
We believe even with a 90-day delivery, the period of performance of 365 calendar days shall remain during the bid process.
II. PENDING SOLICITATION AMENDMENT
NONE
III REMINDER:
1. Proposal Due Date – Thursday, September 09, 2021 @ 1:00 PM (CST)