This document contains a request for information and questions and answers related to a solicitation for the construction of a Small Arms Range facility at the Mississippi Air National Guard base in Flowood, Mississippi. The solicitation seeks a fixed-price contract to complete construction of an indoor small arms range, including site development, foundations, structural framing, interior finishes, and HVAC, electrical, fire protection and plumbing systems. The base bid also includes options for a target retrieval system, stall system, and screw conveyor system. The period of performance is 365 days with a proposal due date of September 9, 2021 and pre-bid conference scheduled for August 12, 2021. The project is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The estimated value is between $5-10 million.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127Q-21-B-0001 Small Arms Range, #LRXQ159097

REQUEST FOR INFORMATION (RFI) #2

17 August 2021

3. Question: Please advise if shifting the building 10'-0 from the existing building is a viable option. See attached drawing

Answer 3: Due to the buildings proximity to the ANG boundary the building cannot be shifted to the west.

4. Question: Question from Landscaping subcontractor….What is the installed size of the

(20) Pin Oak trees on the Small Arms Range job.

Answer 4: The pin oaks shall be 45 gallon/3" caliper.

REQUEST FOR INFORMATION (RFI) #1

13 August 2021

1. Question regarding E-sheets and division 26 of the specifications.. See Amendment #01 to replace E.6 with E0.6-R1:

Question A: What size kVA cable is needed?

Answer: (3) 2 AWG AL, 15KV, 133% EPR, Type MV-105. Refer to details on revised sheet E0.6.

Question B: There is not a detail showing the pole hardware at the new dip pole. Please advise.

Answer: Refer to details on revised sheet E0.6.

Question C: Will 6” be needed on the bore for the primary, or will 4” be sufficient?

Answer: 4” is sufficient. Refer to details on revised sheet E0.6.

Question D: Do you want a spare conduit bored out to the pole?

Answer D: NO

W9127Q-21-B-0001 Small Arms Range, #LRXQ159097

2. Question: The small arms range equipment is specified in Section 11 67 23 of the specifications. Most suppliers advised that delivery in 90 to 120 calendar days with significant time required for installation and system testing. A period of performance of 365 calendar days is insufficient. We request the period of performance be increased to a minimum of 15 months or 450 days.

Answer 2: We are aware of the volatility of the construction market and related lead times;

we are monitoring the situation and how any changes may impact this project. We believe even with a 90-day delivery, the period of performance of 365 calendar days is obtainable. No changes in the PoP will be made during this bid process.

REMINDER:

1. Proposal Due Date – Thursday, September 09, 2021 @ 1:00 PM (CST)

File details come from the government source that posted it. Updated .