This document provides installation instructions for WEKA boxcoolers. The instructions cover various preparations required before installation such as ensuring proper clearance and orientation of the boxcooler. It also details the unpacking, mounting, and installation process including attaching mounting frames, installing tube bundles, and connecting piping. Additionally, the document provides guidance on start-up operation, maintenance, and troubleshooting potential performance failures. Key steps outlined include verifying electrical insulation of the tube bundle from the ship's hull, cleaning exterior surfaces, and plugging any leaking tubes.
View the file
Other files
Show 40 more
Latest 50 of 119 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEKA_Inst_ Manual_Boxcoolers_20060720.doc
Södra Snäckskalsvägen 4 S-417 29 Göteborg Sweden Telephone +46 31 511900 Telefax +46 31 515353 @-mail order@weka.biz Internet www.weka.biz
Installation manual for
WEKA BOXCOOLER
mailto:order@weka.biz http://www.weka.biz
CONTENTS
1. INTRODUCTION 4
1.1 Guarantee and liability 4
1.2 Receipt of goods 4
2. PREPARATIONS BEFORE INSTALLATION 5
2.1 Shape of sea-chest 5
2.2 Clearance for dismantling and cleaning 5
2.3 Sea-chest construction 5
2.4 Orientation & Levelling 5
2.5 Inlet- and Outlet grids in the ship�s hull 6
2.5.1 Inlet grids 6
2.5.2 Outlet grids 6
2.6 Protection of the ship�s hull 6
2.6.1 Sacrificial anodes in the sea-chest 6
2.6.2 ICCP System 7
2.7 Protection of the Boxcooler 7
2.7.1 Temporary protection unit - WEKA Guard� 7
2.7.2 Permanent protection unit - WEKA Protector� 7
2.8 Fittings & Piping 7
2.8.1 Construction and nozzle load 7
2.8.2 Vents 7
2.8.3 Drains 8
2.8.4 Valves 8
2.9 Instructions for conservation 8
2.10 Leakage due to damaged tubes 8
3. UNPACKING 9
3.1 Steps to be followed during unpacking of the boxcooler 9
3.2 Hoisting instruction 9
3.2.1 Hoisting tools 9
3.2.2 Rotating the tube bundle 9
4. INSTALLATION 11
4.1 Cut-out in, Mounting frame and Final painting 11
4.2 Installation of the boxcooler 11
4.3 Electric insulation from the ship�s hull 12
5. START-UP OPERATION 13
5.1 Connection protectors 13
5.2 Dirt removal 13
5.3 Operating procedures 13
5.3.1 Start-up 13
5.3.2 Shut-down operation 13
5.3.3 Inhibitors 13
5.3.4 Bolted joints 13
6. MAINTENANCE 14
6.1 Inspection 14
6.2 Cleaning 14
6.3 Locating tube leaks when loosing coolant. 14
7. PERFORMANCE FAILURES 15
Attachment I Exploded view of Boxcooler Attachment II Installation Athwart ship or Longitudinal Attachment III Hoisting instruction with eye-bolts Attachment IV Hoisting instruction with hoisting bar Attachment V Hoisting instruction with hoisting beam Attachment VI Fitting mounting frame to top-plate of sea-chest Attachment VII Installing the tube bundle to the mounting frame Attachment VIII Installing the bonnet to the tubesheet/mounting frame Attachment IX Placement of sacrificial anodes in sea chest Attachment X Plug
1. INTRODUCTION
Read this instruction manual before proceeding with installation of WEKA boxcooler Important documents besides this instruction manual are the order confirmation, the specification sheet and drawings.
1.1 Guarantee and liability
The �General conditions of sale of WEKA International AB� are applicable. Also refer to the order confirmation for possible additions.
1.2 Receipt of goods
Upon receipt of goods, please report any damage or discrepancy to WEKA Boxcoolers BV or to
WEKA International AB Compare the data on the nameplate, order confirmation and on the drawing Always store the boxcooler in a dry room with stable temperature conditions When the boxcooler is not put into operation immediately after receipt, then follow the
�Instruction for conservation�.
2. PREPARATIONS BEFORE INSTALLATION
2.1 Shape of sea-chest
The water content of the sea-chest has no significant influence on the thermal behaviour of the boxcooler.
The shape of the sea-chest is not critical, as long there is a free space around the boxcooler bundle of not less than 150 mm.
The shape of the top plate is of great influence for the cooling. No flow restrictions may be used on the underside of the top plate, to guarantee a smooth flow to the outlet grids.
Preferably the top plate near the outlet grids should be inclined (e.g. 10 degrees) to improve the water circulation to the outlet as well as the de-aeration of the sea-chest.
Preferably the sea-chest should allow withdrawal of the tube stack without dry-docking the ship. This can be realised by several means such as:
Observing the waterline Trimming the ship Implementing a �cofferdam�
In case more than one boxcooler is needed for the thermal duty, boxcoolers can either be connected in series or in parallel.
2.2 Clearance for dismantling and cleaning
Provide sufficient clearance above the boxcooler to permit withdrawal and replacement of the tube bundle. It may be desirable to provide extra flange connections in the piping near the boxcooler to make an easy dismounting possible.
2.3 Sea-chest construction
The top-plate of the sea-chest must be constructed for bearing the complete boxcooler. A weak construction may lead to leakage between bundle and mounting frame. The top of the mounting frame, which is welded to the top-plate of the sea-chest, must be fitted below or at the light-ship waterline.
Install a permanent vent pipe DN50 (2�) or larger at the highest point on the top-plate of the sea-chest.
The minimum distance between tube-bundle and the sea-chest walls shall be 150 mm (6�) or larger to secure a proper water flow around the tubes. Near frames or reinforcement bars a minimum distance of 100 mm (4�) is required.
The sea-chest shall be designed so as to avoid stray currents. Open frames or other openings between sea-chests are not recommended. Should openings be required, WEKA should be consulted. Protective devices against ship corrosion, such as anodes, should not be placed in sea-chests. See also section 2.6.1.
2.4 Orientation & Levelling
The boxcooler can be positioned both athwart-ships or longitudinally, see Attachment II.
The boxcooler must be set level and square so that pipe connections can be made without force. An inclined installation is only allowed after consulting WEKA Boxcoolers BV or WEKA International AB.
If the low temperature system consist of more than one boxcooler in series or parallel then each boxcooler must be installed in a separate sea-chest.
The frames between the various sea-chests should be either closed or completely open. Partly open can cause local high velocities of sea-water which can cause serious damage to the boxcooler.
Installing a low and high temperature system boxcooler in the same sea-chest is prohibited. Please consult WEKA Boxcoolers BV or WEKA International AB for approval.
2.5 Inlet- and Outlet grids in the ship�s hull
2.5.1 Inlet grids
The actual required opening is stated on the Specification sheet of the boxcooler.
The grids must be oriented transversely to the sailing direction.
This prevents too much turbulence and too high water velocities near the lower end of the bundle.
The width of the grids must be not larger than 50 mm. A pattern of holes is also acceptable.
The inlet grids need to be located in the lowest possible position just below the boxcooler. The distance between the inlet grids and the bundle must not be less than 150 mm (6�). This is to minimize the risk for unacceptable vibrations. Also in shallow, muddy waters, this configuration can be beneficial.
2.5.2 Outlet grids
The actual required opening is stated on the Specification sheet of the boxcooler.
The grids must be oriented longitudinally to the sailing direction and must be positioned as high as possible in the sea-chest directly under the top-plate but still below the empty water line. Maximum distance from underside of top plate to the uppermost outlet slot is 25 mm.
The width of the grids must not be larger than 50 mm.
The distance between the outlet grids and the bundle of the boxcooler must be not less than 150 mm (6�).
Please contact WEKA International AB for having the total number and size of the grids estimated for the application. A drawing of the sea-chest with all relevant dimensions must be sent together with your request.
2.6 Protection of the ship�s hull
2.6.1 Sacrificial anodes in the sea-chest
The ship needs to be protected from corrosion. Corrosion protection for the hull should not be placed in the sea-chests. Protective devices against ship corrosion, such as sacrificial anodes, may induce stray currents, which may damage the boxcooler. Should anodes be required in a sea-chest, care must be applied as to their number, weight, and position, in order to avoid the generation of potentially excessive stray currents. The size and placement of the anodes must be related to the design of the sea-chest and the placement of the boxcoolers. Please consult WEKA Boxcoolers BV or WEKA International AB for advise regarding amount and placement of the sacrificial anodes. Large sacrificial anodes may cause stray currents which may damage the boxcooler. Reference is also made to sections 2.3 and 2.7.2.
The following advice is given for general consideration.
Boxcoolers - as electrically (galvanically) isolated from the ship's hull - are subject to damage by stray current. While WEKA boxcoolers have WEKA Guard and WEKA Protector devices to protect from stray currents, excessive stray currents may damage even WEKA boxcoolers. More information about stray currents may be found on WEKA's web page.
Inlet grids Outlet grids
Preferable solution: no sacrificial anode in the seachest!
If sacrificial anodes are prescribed for corrosion protection of the seachest, such anodes shall be placed at the bottom of the sea chest, below the boxcooler. The anodes should be equally spread at all sides on the bottom.
If sacrificial anodes are prescribed, the weight should be as low as possible. Unnecessarily large anodes may try to protect the ship's hull also outside the seachest; the stray current flows thereby resulting may damage the boxcooler. The weight per anode should in any case not exceed 2 kg.
A schematic overview is shown in enclosure (Attachment IX).
2.6.2 ICCP systems
Where an ICCP (Impressed Current Cathodic Protection) system will be used on board, Weka should be advised of the electrical output of the system (i.e. the current rating per anode) in order to advise the minimum distance between anode and boxcooler seachest. In all cases the Dielectric Shield of ICCP anode must never cover the boxcoolers seachest grating.
2.7 Protection of the Boxcooler
2.7.1 Temporary protection unit - WEKA Guard�
In the shipment is included a device which protects the boxcooler from damage by regular welding currents. This device (WEKA-Guard) must be connected to the boxcooler and to the ship's hull during the newbuilding process of the ship when the ship-based electrical supply is not yet available. If not installed, the boxcooler may suffer from severe corrosion due to welding currents. Welding with boxcoolers in place must be made using most modern and best available professional welding methods. Once the ship is completed and due for delivery, the WEKA Guard will be replaced by the WEKA Protector, which from this point takes over the protection of the boxcooler. An instruction for how to connect the WEKA Guard is included in the shipment of the boxcooler or can be downloaded from www.weka.biz.
2.7.2 Permanent protection unit - WEKA Protector�
WEKA strongly recommends the yard to install one WEKA Protector per boxcooler. This protects the boxcooler from damage by well designed and properly working regular ICCP-systems or by regular currents originating from small sacrificial anodes. The WEKA Protector is a small device, which is placed in the vicinity of the boxcooler to be protected. An instruction for how to install and operate the WEKA Protector will be included in the shipment of the boxcooler or can be downloaded from www.weka.biz.
2.8 Fittings & Piping
2.8.1 Construction and nozzle load
The piping must be constructed in a way that the boxcooler can be mounted without any problems. The boxcooler is not intended to serve as anchor points for piping; this can result in over-stressing or damaging of the bonnet. Therefore the piping must be designed and installed in such a way that the piping loads on the boxcooler are negligible.
2.8.2 Vents
It is advisable to install vent valves in the piping for de-aeration of the system.
http://www.weka.biz.
http://www.weka.biz.
2.8.3 Drains
The piping must be provided with drains near the boxcooler. Installing valves on the drains is recommended.
2.8.4 Valves
It may be desirable to provide valves in the piping system to permit inspection and repairs without draining the complete system.
2.9 Instructions for conservation
The boxcooler is supplied without any conservation. In case the boxcooler will not be installed immediately, we advise to treat the boxcooler with a rust preventive liquid of a type suited for long term conservation. When necessary, contact a specialised company. Take the material of the boxcooler (see Specification sheet) into consideration. Be aware that in uncontrolled storage conditions large amounts of water can accumulate in the heat exchanger as a result of condensation.
2.10 Leakage due to damaged tubes
Leakage due to damaged tubes is normal, and in line with industrial experience. Each boxcoler from WEKA is designed with a sufficient over-capacity. The boxcooler is a cooling system, not only a number of tubes.
When a leakage is found (procedure described in Section 6.3), the leaking tube shall be plugged off at both ends. Plugs for this purpose are supplied with each order, can be ordered from WEKA, or can be easily produced by any mechanical workshop or on board ship in a lathe in copper or brass material. The form and measurements are visible from the enclosed drawing.
3. UNPACKING
Generally boxcoolers are packed in wooden cases. It is advised to unpack near the job site to prevent damage.
3.1 Steps to be followed during unpacking of the boxcooler
a. Remove cover of the case.
b. Take the mounting frame out of the case to weld it on top of the seachest.
c. Close the case until the tube bundle is needed for installation.
d. Remove cover and sidewalls of the case.
e. Remove the bonnet from the tubesheet by removing the bolts.
f. Rotate the tube bundle as described in section 3.2.2
g. Attach the hoisting beams or eye bolts to make the tube bundle suitable for hoisting. Perform the hoisting as described in section 3.2.
3.2 Hoisting instruction
Hoisting of the boxcoolers, and parts of it, may only be done by trained and skilled personnel. Use hoisting materials and tools, which are suitable for the load. The weight of the tube bundles can be found on the Specification sheet of the boxcooler.
3.2.1 Hoisting tools
For hoisting of the tube bundles there are two ways of hoisting;
1. Using four eye-bolts M12 (DIN580; C15). Four threaded holes are available in the tubesheet for this purpose. Eye-bolts are not supplied with the boxcooler. Make sure the load is uniformly spread over all of the eye-bolts. See Attachment III for details.
2. Using the hoisting bar and beam according to Attachment IV. These may be used for hoisting the tube bundle out of the packing and to the jobsite. These tools are not supplied with the boxcooler. In Attachment IV details can be found to fabricate these parts.
3. Only applicable when hoisting beams according to Attachment V are supplied. Use the hoisting beams that are supplied with the boxcooler. These beams must be fitted to the tubesheet using M12 bolts with a minimum tensile strength of 500 N/mm2 (72500 psi). Four threaded holes are available in the tubesheet for this purpose. See Attachment V for details.
3.2.2 Rotating the tube bundle
Each tube bundle must be rotated using a hoisting procedure to get it into the mounting position (see figure below). The rotating must be performed on a flat sub-soil. Always use a protective material such as rubber between sub-soil and tube bundle to prevent damage. Rotating a tube bundle, which is standing on the tube sheet by pushing it over and let it fall to the floor is not allowed.
Warning:
The bundle tubes can easily be damaged. Prevent this by removing the cover and side walls carefully.
Warning:
Do not hoist the boxcooler by using cables or chains that are put through the lane in the middle of the bundle or connected to a support plate. This is likely to cause severe damage to the tube bundle.
4. INSTALLATION
4.1 Cut-out in, Mounting frame and Final painting
Cut a hole to the correct size in the top-plate of the sea-chest. Size of the cut-out is obtained using dimensions A and C from the Specification sheet of the boxcooler together with Attachment VI. Radius in each corner of the cut-out to be < 50 mm. Place the mounting frame into position and weld it to the top-plate according to the right detail of figure below.
Take precautions to prevent bending due to the heat input. Large mounting frames have an extra reinforcement strip between the long sides. Do not remove this until the mounting frame is welded to the top plate. Round all edges after welding � before the touch-up paint is applied. See also Attachment VI.
4.2 Installation of the boxcooler
Perform the following steps during installation of the boxcooler.
Step 1: Place mounting frame gasket (without web) into position on the mounting frame. Place the tube-bundle in position on the mounting frame. For hoisting instructions see section 3.2 Install the hexagon socket head screws and washers in the stepped holes in the tubesheet. First the plastic washer � then the metal washer � finally the hexagon socket head screw. Make sure there is a plastic bushing fitted in the hole of the tubesheet. The metal washer must be mounted with the sloped side facing
up. Tighten them with a wrench moment of 30 Nm. (22 lb ft). See Attachment VII for more details.
Warning The inside of the sea-chest and mounting frame must be adequately protected. An extra protection with an epoxy resin is required for part of the top-plate and mounting frame.
We advise to conserve at least an area around the hole of 200 mm (8�).
Step 2: Place the bonnet gasket (with web) on the tubesheet and check if the gasket web matches the lanes between the tubes and to the partition plates in the bonnet. Make sure there is an insulation bushing in each hole of the tubesheet. Next, position the bonnet and install all hexagon bolts according to attachment VIII. It is important that these bolts are tightened following a diametrically staggered pattern according attachment VIII. Repeat this pattern for 2 or 3 times and use with a limitation of 10 Nm (7 lb ft) the first time. The maximum wrench moment is 35 Nm (25 lb ft).
Note: excessive tightening may endanger the electric insulation! (See section 4.3)
Step 3: Verify by measuring that the tube bundle is insulated from its surrounding parts. See section 4.3 for the applicable method.
Step 4: Connect the piping.
4.3 Electric insulation from the ship�s hull
To prevent corrosion of the sea-chest, and to safeguard the anti-marine growth characteristic of the boxcooler, the tube bundle must be fully electrically insulated from the top-plate of the sea-chest. For this reason, the bolt holes are provided with insulating bushings. Verify during installation of the tube bundle that these bushings are present in each hole and that they are not broken. There shall be bushings for the hexagon socket head screw as well as for the hexagon bolts. See Attachment 1.
After installing the complete boxcooler including bonnet, verify it is insulated from the rest of the ship.
That should be done as follows:
Tube bundle not in water Measure the resistance between tubesheet and a bare piece of the top-plate of the sea-chest. The resistance must be more than 500Ω. Values under 50Ω are not acceptable. Values between 50Ω and 500Ω need further investigation to determine the cause for these values.
Tube bundle in water Measure the potential (DC) between the tubesheet and a bare piece of the top-plate of the sea-chest. The voltage should be at least 300 mV. In case a very low voltage is measured (=O V) this indicates a short-circuit and a non-insulated boxcooler.
5. START-UP OPERATION
The equipment is designed for use with the conditions specified on the identification plate, specification sheet and/or drawing. It must not be operated at conditions which exceed those specified.
5.1 Connection protectors
All nozzle openings must be inspected for foreign material. Protective plugs and covers may not be removed until just prior to connecting the piping.
5.2 Dirt removal
The entire system shall be clean before starting operation. If foreign material can be expected, the use of strainers in the piping towards the heat exchanger is required.
5.3 Operating procedures
5.3.1 Start-up
During start-up all vent valves should be opened and left open until all passages have been purged from air and are completely filled with fluid.
5.3.2 Shut-down operation
When shutting down the system, the boxcooler should be drained completely or filled with a suitable antifreeze liquid when there is the possibility of freezing or corrosion damage. A complete draining of the bundle tubes is only possible after disassembly of the bundle and pouring the water out of the bundle.
5.3.3 Inhibitors
There can be reasons to add an inhibitor to the circuit of the boxcooler. Contact a specialised company, which can also check for harmfulness of the inhibitor to the materials of the boxcooler (see Specification sheet for material of the tube bundle). Follow the instructions of the supplier for use of the inhibitor.
5.3.4 Bolted joints
Due to normal relaxing of the gasket joints all external bolted joints require re-tightening after the boxcooler has once reached its operating temperature. Re-tightening may only be done when the unit is cold and depressurised. The same wrench moments as mentioned in section 4.2, steps 1 and 2 are applicable.
6. MAINTENANCE
6.1 Inspection
At regular intervals. i.e. the docking periods of the ship, an examination shall be made of the exterior condition of the boxcooler. The condition of the sea-chest is to be inspected with regard to dirt and anti-fouling paint. It is not necessary to examine the interior condition of the boxcooler (the inside of the boxcooler).
6.2 Cleaning
Provided the boxcooler is properly installed and electrical insulated from the ship�s hull, marine growth will not occur on the boxcooler. Still, when dry-docking there is a possibility that the boxcooler is or becomes dirty from mud or sand. Cleaning of the boxcooler can easily be done from outside by using high-pressure water jet. The tube-stack of the boxcooler will probably have a greenish or brownish appearance. Don�t remove this layer since this consists of copper-oxide. The copper-oxide is a stable chemical fraction and is the very reason for why the boxcooler shows anti-fouling growth characteristic.
6.3 Locating tube leaks when loosing coolant.
Extreme whether conditions, collision and objects entering the sea-chest are reason which can damage the tube bundles of the boxcooler and cause leakages of the pipes. If this happens, there are ways to overcome the problems and to repair the leaking pipes:
The ship is afloat Depressurise and drain the freshwater cooling system by closing off the valves on the inlet- and the outlet piping of the boxcooler.
The ship must be trimmed to make sure the top of the tubesheet is below the waterline. Loosen the hexagon bolts but do not remove them. Wait until the coolant has leaked out under the bonnet. If water leaks between tubesheet and mounting frame, tighten the hexagon socket head bolts until leaking stops.
Never loosen the hexagon socket head bolts when the ship is afloat!!!
After that, the hexagon bolts and the bonnet can be removed. Due to the pressure acting on the outside of the tube bundle, the water will make it visible which tube is leaking.
Leaking tubes can be plugged off with conical plugs (copper or brass). Do not apply too much force when installing a plug. This will cause deformation of the tube sheet that will result in leakage of the surrounding tubes. Conical plugs of the correct size are obtainable from WEKA Boxcoolers AB.
The ship is in dry-dock Depressurise and drain the freshwater cooling system by closing off the valves on the inlet- and the outlet piping of the boxcooler.
Dismount the boxcooler from the sea-chest. Fit the bonnet and the bonnet gasket to the tubesheet and blind all nozzle openings. Test the boxcooler with hydraulic pressure or compressed air (submerge boxcooler in water) applying the pressure stated on the identification plate. At the point where water or air appears, the tube bundle is leaking. Again, plug off the leaking pipes as described above.
7. PERFORMANCE FAILURES
The failure of the boxcooler to perform satisfactorily may be caused by one or more factors, such as:
a. Excessive fouling at the outside of the tubes. Boxcooler is not installed correctly. Electrical insulation between tubesheet and hull fails.
Solution: Clean tube bundle according to section 6.2. Re-install the boxcooler to obtain electrical insulation acc. to section 4.3.
b. Presence of air or gas resulting from improper piping installation or lack of suitable vents.
Solution: Ventilate complete system.
c. Restricted outboard water flow.
Solution:
-Check the inlet and outlet openings for an unrestricted entrance.
-Check for air-traps in the upper region of the sea-chest.
-Check size of the openings and/or consult WEKA Boxcoolers BV or WEKA International AB
d. Operating conditions differ from design conditions.
NOT BE DISCLOSED TO ANY THIRD PERSON WITHOUT PERMISSION.
THIS DRAWING AND THE DESIGN IS OUR PROPERTY AND MUST
AutoCAD
FILENAME:
Industrieweg 8 P.O. Box 3052 2935 ZH Ouderkerk a/d IJssel Netherlands E-mail
Fax Phone
: www.weka.biz
: +31 (0)180-516588 : +31 (0)180-516064 A4 00
DIMENSIONS IN MILLIMETER
AFMETINGEN IN MILLIMETERVOOR AFMETINGEN ZONDER OPGEGEVEN TOLERANTIE GELDT;
FOR ALL DIMENSIONS WITHOUT STATED TOLERANCE,APPLICABLE;
CHECKED:
NAME:
MATERIAL:
TITLE
%%P0,5
CLASSIFICATION:
SCALE:
DATE:
the owner not be multiplied,be used for third parties,or be
=MAX 3,2 m
ORDER.NR
AMERIKAANSE PROJECTIE
SHARP EDGES TO BE CHAMFERED 0,5x45
( ISO 128 )
AMERICAN PROJECTION
SCHERPE KANTEN BREKEN 0,5x45
PAINT SYSTEM:
Krimpen a/d Lek and may whitout the written permission of This drawing remains the property of WEKA MARINE B.V. in given to third parties for perusal
DRAWING.NR
OPPERVLAKTE RUWHEID
SURFACE ROUGHNESS
3,2
REVISION
u
REMARKS:
BOXCOOLERS
B B
A A
1 2
1 2 http://www.weka.biz
File details come from the government source that posted it. Updated .