This document contains a report from an inspection of the dredge Yaquina Launch conducted on behalf of the U.S. Army Corps of Engineers. The inspection included a visual examination of the hull and structural stiffening below the waterline, as well as liquid penetrant testing and positive material identification at various locations. The inspection found indications of pitting, fractures, and surface roughness. Liquid penetrant testing revealed fractures in the bottom plate, rudder stock hull penetration, and a frame weld. Positive material identification determined the vessel is constructed of aluminum alloy 5086 in all locations tested.
Also included is a solicitation from the Department of the Army Corps of Engineers Engineering District Portland for overhaul work on the dredge Yaquina in fiscal year 2024. No other details are provided on the products, services, pricing, or terms required under the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 119 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specialists in Nondestructive Examination
Seattle: 3229 S. 148 th Street, SeaTac, WA 98168 Phone: 206/766-8180 Fax: 206/766-8186
Portland: 10521 N. Lombard Street, Portland, OR 97203 Phone: 503/283-2668 Fax: 503/283-7656 Oakland: 2900 Main St., Suite 3201, Alameda, CA 94501 Phone: 510/748-0964 Fax: 510/748-9874
Los Angeles: 10600 Pioneer Blvd., Unit A, Santa Fe Springs, CA 90670 Phone: 562/944-3166 Fax: 562/944-3114 San Diego: 7030 Alamitos Ave., Suite B, San Diego, CA 92154 Phone: 619/512-5858
Houston: 1146 Sheffield Blvd., Suite O, Houston, TX 77015 Phone: 832/767-3238 www.iinspect.com II Report Cover – Page 1 of 3
DREDGE YAQUINA LAUNCH
Hull Inspection
October 2021
Seattle Portland Los Angeles San Diego Houston 3229 S. 148 th St. 10521 North Lombard St. Corporate Headquarters 2704 Transportation Ave., Unit C 1146 Sheffied Blvd., Suite O
SeaTac, WA 98168 Portland, OR 97203 10600 Pioneer Blvd., Unit A National City, CA 91950 Houston, TX 77015
(206) 766-8180 Fax (206) 766-8186 (503) 283-2668 Fax (503) 283-7656 Santa Fe Springs, CA 90670 (619) 512-5858 Fax (619) 512-5859 (832) 767-3238 seattle@iinspect.com portland@iinspect.com (562) 944-3166 Fax (562) 944-3114 sandiego@iinspect.com houston@iinspect.com la@iinspect.com www.iinspect.com
QA Manager/ Operations Manager Review
Signature Date
All drawings, specifications, and copies thereof furnished by International Inspection LLC (hereafter, “the Work Product”) are and shall remain the property of International Inspection LLC. The Work Product is to be used only with respect to work on the vessel/project listed above (hereafter, “The Project”) and is not to be used on any other project or delivered to any person or entity not directly involved with The Project. Submission or distribution of the Work Product to meet official regulatory requirements for other purposes in connection with The Project is not to be construed as publication in derogation of International Inspection LLC’s common law copyright or other reserved rights to Work Product.
Copyright (c) 2021 International Inspection LLC drosian Daniel C Rosian drosian Text Box 10/22/2021 drosian Text Box
Seat t le Por t land Oak land Los Ange les San Diego Hous ton
Specialists in Nondestructive Examination www.iinspect.com II Report Cover – Page 3 of 3
Visual, Liquid Penetrant, and Positive Material Identification testing methods were performed for the U.S, Army Corps of Engineers on the vessel Yaquina Launch on October 19, 2021 at Terminal 2 in Portland, Oregon. The owners were represented by Mr. Sam Repman. The survey was conducted by International Inspection personnel.
EXTENT OF SURVEY
Visual inspection of hull and structural stiffening below water line for in service related suspect areas. Liquid Penetrant testing was utilized to identify the area of extent in the locations deemed to qualify as suspect areas. Positive Material Identification (PMI) was performed to identify material used during fabrication.
RESULTS OF SURVEY
The results are shown within the following report.
Respectfully submitted, Michael Fiskum Technician P7555
Client
Project fc
Inspector (Print Name)
203199ABC
8/26/2021
Fracture in bottom plate
Fracture at rudder stock hull penetration
Client Information Only
VISUAL INSPECTION REPORT
Page
Date/Time
Accept RejectIndication # Location
Pitting in base material1
Specification
Acceptance Criteria
U.S. Army Corps of Engineers
Description
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
Calib Due 2/26/2021
Light Meter Reading 800
Indication not accessible due to dock cradle
Stbd Side Shell
Stbd Btm. Plt.
Port Btm. Plt.
Port Btm. Plt.
Fracture in frame weld
Frame M
Report No.
Stbd Bow
Stbd Bow 0
P7555 10/19/21
7RevisionII-41-6002-B
WO# G222-9637 Dredge Yaquina Launch
Visual inspection performed on hull shell plating and stiffening.
T9074-AS-GIB-010/271 Rev. 1
Date Calib.
Additional Information
Procedure
Light Meter DLM 1000 Serial No.
Pitting under rubrail
Fracture at rudder stock hull penetration
Fracture in bottom plate
Michael Fiskum Signature
SNT-TC-1A Level II
Port Btm. Plt.
Project
UV fc
Inspector (Print Name) 3/18/2022
Description
Pitting in base material
Pitting under rubrail
Fracture at rudder stock hull penetration
Fracture in bottom plate
Fracture in bottom plate
Fracture at rudder stock hull penetration
Fracture in frame weld
Visual Acuity expires
Michael Fiskum
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
Signature
SNT-TC-1A Level II
Report No. P7555
T9074-AS-GIB-010/271 Rev. 1
10/19/21
WO# G222-9637 Dredge Yaquina Launch
Procedure
Material:
RevisionII-33-3003
Performed liquid dye penetrant testing on the items below.
13 Acceptance Criteria µW/cm2
02/26/22203199 A,B,C
Specification
Penetrant:
Stbd Btm. Plt.
Light Meter Reading
Page
Date/Time
Accept
LIQUID PENETRANT TEST REPORT
U.S. Army Corps of Engineers
RejectIndication # Location
Stbd Bow
800N/A White
Alluminum N/AThickness:
Additional Information:
Application:
Brushed
836-A1
0Port Btm. Plt.
Stbd Side Shell
Port Btm. Plt.
Client Information Only
Dwell Time:
Calib. DueSerial No.
Batch No.: 924-H6
Sherwin D40
Port Btm. Plt.
Frame M
Remover: Sherwin DR60 Batch No.: 923-H4
Developer: Sprayed
Light Meter DLM 1000 Date Calib. 08/26/21
10 Minutes
Dwell Time: 10 Minutes
Pre-Clean Procedure: Solvent spray and clean cloth wipe
Application: Batch No.:
Sherwin D100
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
Indication #1 (Visual) Indication #1 (PT)
Representative of pitting at various areas of the hull. No indication of pitting penetrating hull.
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
Indication #2 (Visual)
Indication of possible deviation.
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
Indication #3 (Visual) Indication #3 (PT)
Indication of surface roughness and .10" pit at arrow.Representative of pitting and surface roughness behind rubrail.
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
Indication #4 Outside (Above), Inside (Below) (Visual) Indication #4 Outside (Above). Inside (Below) (PT)
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
Indication of fracture at weld toe in rudder post doubler. Indication of fracture at weld toe in rudder post doubler.
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
Indication #5 (Visual) Indication #5 (PT)
Indication of melt through and possible fracture. Indication of base material fracture.
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
Indication #6 (Visual) Indication #6 (PT)
Indication of possible fracture. Indication of base material fracture.
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
Indication #7 Outside (Above), Inside (Below) (Visual) Indication #7 Outside (Above). Inside (Below) (PT)
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
Indication of fracture at weld toe in rudder post doubler. Indication of fracture at weld toe in rudder post doubler.
LIQUID PENETRANT TEST REPORT
Page
U.S. Army Corps of Engineers Report No. P7555 Date/Time 10/19/21
Indication #8 (Visual) Indication #8 (PT)
Indication of fracture in weld at Frame M. Indication of fracture in weld at Frame M.
We hereby certify that the above information was examined in accordance with the specified requirements, and that the results indicated are the accurate interpretation of the undersigned inspector to the best of his/her knowledge, ability and integrity.
US Army Corp of Eng. 10/08/2021
International Insp Job# WR-P7555
27' 5" Dredge Yaquina Launch Boat
PMI Procedure: II-54-7006 Rev.6
PMI Instrument: Thermo Scientific Niton XL2 980
Instrument S/N# 112678
Tech: D. Rosian
Reading No Time Type Duration Units Sequence Item Description Material ID Al Al Error Mn Mn Error Results
1 10/19/2021 10:16 System Check 53.91 cps Final System Check 1 of 2 Pass
2 10/19/2021 10:18 System Check 55.34 cps Final System Check 2 of 2 Pass
3 10/19/2021 10:18 General Metals 10 % Final AA 6061 Calibration Standard AA 6061 : 0.00 99.07 0.033 0.099 0.026 Pass
4 10/19/2021 10:19 General Metals 10 % Final Stbd. SSHL - Aft Section AA 5086 : 1.31 98.73 0.043 0.63 0.054 Pass
5 10/19/2021 10:20 General Metals 10 % Final Stbd. SSHL - Mid Section AA 5086 : 1.33 98.85 0.041 0.553 0.053 Pass
6 10/19/2021 10:21 General Metals 10 % Final Stbd. SSHL - Fwd. Section AA 5086 : 0.96 98.83 0.04 0.602 0.053 Pass
7 10/19/2021 10:21 General Metals 10 % Final Port SSHL - Aft Section AA 5086 : 1.06 98.79 0.043 0.607 0.055 Pass
8 10/19/2021 10:22 General Metals 10 % Final Port SSHL - Mid Section AA 5086 : 1.28 98.78 0.044 0.63 0.057 Pass
9 10/19/2021 10:22 General Metals 10 % Final Port SSHL - Fwd. Section AA 5086 : 1.28 98.83 0.041 0.601 0.054 Pass
10 10/19/2021 10:23 General Metals 10 % Final Transom Plate AA 5086 : 1.26 98.84 0.04 0.637 0.054 Pass
11 10/19/2021 10:24 General Metals 10 % Final Btm. Plate - Port Aft Section AA 5086 : 0.87 98.86 0.039 0.58 0.052 Pass
12 10/19/2021 10:24 General Metals 10 % Final Btm. Plate - Port Mid Section AA 5086 : 1.57 98.8 0.041 0.599 0.053 Pass
13 10/19/2021 10:25 General Metals 10 % Final Btm. Plate - Port Fwd Section AA 5086 : 1.54 98.74 0.045 0.677 0.058 Pass
14 10/19/2021 10:26 General Metals 10 % Final Btm. Plate - Stbd. Aft Section AA 5086 : 1.67 98.75 0.046 0.606 0.057 Pass
15 10/19/2021 10:27 General Metals 10 % Final Btm. Plate - Stbd. Mid Section AA 5086 : 0.90 98.82 0.041 0.623 0.054 Pass
16 10/19/2021 10:27 General Metals 10 % Final Btm. Plate - Stbd. Fwd Section AA 5086 : 1.65 98.76 0.043 0.636 0.055 Pass
17 10/19/2021 10:28 General Metals 10 % Final Port Push Knee AA 5086 : 0.80 99.19 0.028 0.49 0.048 Pass
18 10/19/2021 10:29 General Metals 10 % Final Stbd. Push Knee AA 5086 : 0.90 99.16 0.031 0.525 0.052 Pass
19 10/19/2021 10:30 General Metals 10 % Final Cabin - Aft Section Stbd. AA 5086 : 1.20 98.8 0.042 0.621 0.056 Pass
20 10/19/2021 10:31 General Metals 10 % Final Cabin - Aft Section Port. AA 5086 : 1.23 98.84 0.039 0.586 0.051 Pass
21 10/19/2021 10:32 General Metals 10 % Final Cabin - Fwd. Section Stbd. AA 5086 : 0.79 99 0.037 0.492 0.051 Pass
22 10/19/2021 10:32 General Metals 10 % Final Cabin - Fwd. Section Port. AA 5086 : 0.88 98.97 0.037 0.475 0.049 Pass
23 10/19/2021 10:33 General Metals 10 % Final Cabin - Port Side AA 5086 : 0.80 98.8 0.041 0.638 0.055 Pass
24 10/19/2021 10:34 General Metals 10 % Final Cabin - Stbd Side AA 5086 : 1.26 98.76 0.042 0.647 0.055 Pass
25 10/19/2021 10:35 General Metals 10 % Final Cabin - Roof AA 5086 : 1.64 98.74 0.042 0.613 0.053 Pass
26 10/19/2021 10:36 General Metals 10 % Final Frame M - Stbd Side AA 5086 : 0.79 98.8 0.044 0.586 0.056 Pass
27 10/19/2021 10:37 General Metals 10 % Final Frame L - Stbd Side AA 5086 : 0.79 98.88 0.039 0.534 0.05 Pass
28 10/19/2021 10:38 General Metals 10 % Final Stbd. Rudder Post - Top Plate AA 5086 : 1.01 99.13 0.03 0.529 0.049 Pass
29 10/19/2021 10:39 General Metals 10 % Final Aft Hook Hatch Box AA 5086 : 0.79 98.63 0.05 0.692 0.061 Pass
30 10/19/2021 10:41 General Metals 10 % Final 3" Shaft Tubing - Stbd Side AA 5086 : 0.96 98.9 0.039 0.505 0.05 Pass
27' 5" Dredge Yaquina Launch Boat
PMI Procedure: II-54-7006 Rev.6
PMI Instrument: Thermo Scientific Niton XL2 980
Instrument S/N# 112678
Tech: D. Rosian
Reading No Time Type Duration Units Sequence Item Description Material ID Al Al Error Mn Mn Error Results
31 10/19/2021 10:42 General Metals 10 % Final Stbd. Engine Bed Longitudinal AA 5086 : 1.69 99.09 0.032 0.359 0.042 Pass
32 10/19/2021 10:44 General Metals 10 % Final Fuel Tank Top Plate AA 5086 : 0.79 98.83 0.04 0.58 0.052 Pass
33 10/19/2021 10:45 General Metals 10 % Final Port Rudder Post - Top Plate AA 5086 : 0.79 99.13 0.031 0.497 0.05 Pass
34 10/19/2021 10:45 General Metals 10 % Final Frame M - Port Side AA 5086 : 0.79 98.81 0.041 0.589 0.053 Pass
35 10/19/2021 10:46 General Metals 10 % Final Frame L - Port Side AA 5086 : 0.79 98.87 0.043 0.558 0.057 Pass
37 10/19/2021 10:50 General Metals 10 % Final Deck - Aft Section AA 5086 : *2.06 98.75 0.045 0.571 0.054 Pass
38 10/19/2021 10:54 General Metals 10 % Final AA 6061 Calibration Standard AA 6061 : 0.00 99.1 0.032 0.095 0.026 Pass
AA 5086 Composition Range
Aluminum (Al): 93.0 - 96.3
Manganese (Mn): 0.20 - 0.70
Technician: Daniel C Rosian 10/19/2021
27' 5" Dredge Yaquina Launch Boat
PMI Procedure: II-54-7006 Rev.6
PMI Instrument: Thermo Scientific Niton XL2 980
Instrument S/N# 112678
Tech: D. Rosian
File details come from the government source that posted it. Updated .