B.08 Price List Amendment 0003.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- FY24 Yaquina Overhaul Solicitation
- Solicitation number
- W9127N23B0014
About this file
This document contains a price list amendment for a federal contract opportunity for ship repair and overhaul services. The opportunity involves Category A and Category B work items for the USACE vessel Yaquina, including main propulsion system repairs and overhauls, machinery services and replacements, hull work, hopper and deck components, and house and inspection services. Pricing is provided for labor rates at $500,000 for over and above work, and daily rates for pier side and dry docking extensions. The related federal contract opportunity is solicitation number W9127N23B0014 for FY24 Yaquina Overhaul from the Department of the Army Corps of Engineers in Portland.
View the file
Other files
Show 40 more
Latest 50 of 119 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation; provide | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Service; provide | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection / Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office; provide | 5.1.5 | 1 | Day | $ - 0 | |
| Parking; provide | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking (Lift Day) | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day Services; provide | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth for Vessel; provide | 5.2.3 | 15 | Day | $ - 0 | |
| Electrical Power; provide | 5.2.4 | 1 | Job | $ - 0 | |
| Steam / Chilled Water; provide | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemists Certifications | 5.2.6 | 1 | Job | $ - 0 | |
| Main Propulsion - Shaft Bearing Replacement | 5.3.2 | 1 | Job | $ - 0 | |
| Main Propulsion - Shaft and CPP Overhaul | 5.3.3 | 1 | Job | $ - 0 | |
| Main Propulsion - Propeller Blade Repairs | 5.3.5 | 1 | Job | $ - 0 | |
| Main Propulsion - Shafting & Rudder Clearances | 5.3.6 | 1 | Job | $ - 0 | |
| Main Propulsion - Water Lubricated Shaft Seal | 5.3.7 | 1 | Job | $ - 0 | |
| Machinery - Slops Tanks Annual Maintenance | 5.4.1 | 1 | Job | $ - 0 | |
| Machinery - Pump Room Bilge Cleaning | 5.4.2 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Bilge Cleaning | 5.4.6 | 1 | Job | $ - 0 | |
| Machinery - Emergency Generator Service | 5.4.7 | 1 | Job | $ - 0 | |
| Machinery - Dredge Yaquina MTU Engines Repairs and Services | 5.4.8 | 1 | Job | $ - 0 | |
| Machinery - Dock and Sea Trials | 5.4.9 | 1 | Job | $ - 0 | |
| CRPP Control Service Inspection | 5.4.10 | 1 | Job | $ - 0 | |
| Machinery - Box Cooler Cleaning | 5.4.11 | 1 | Job | $ - 0 | |
| Hull - Skin Valves and Sea Strainers Inspection | 5.5.5 | 1 | Job | $ - 0 | |
| Hull - Sluice Valve Replacement | 5.5.7 | 1 | Job | $ - 0 | |
| Hull - Watertight Doors; replace | 5.5.9 | 1 | Job | $ - 0 | |
| Hull - Steel Inserts | 5.5.10 | 1 | Job | $ - 0 | |
| Hopper Door Retaining Bar Repair | 5.6.5 | 1 | Job | $ - 0 | |
| Hopper I Beam Inspection | 5.6.6 | 1 | Job | $ - 0 | |
| Hopper Inspection Staging | 5.6.7 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection Setup | 5.7.1 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection, Oil and Seal Change | 5.7.2 | 1 | Job | $ - 0 | |
| Procure Bow Thruster Pod, Propeller and Parts | 5.7.4 | 1 | Job | $ - 0 | |
| Deck - Annual Rescue Boat Davit Maintenance | 5.8.3 | 1 | Job | $ - 0 | |
| Deck - Chain Locker Cleaning | 5.8.4 | 1 | Job | $ - 0 | |
| Deck - Launch Davit 5 Year Maintenance | 5.8.6 | 1 | Job | $ - 0 | |
| Deck - Lift Raft Annual Service | 5.8.7 | 1 | Job | $ - 0 | |
| Deck - Navigation, Communication and GMDSS Maintenance | 5.8.9 | 1 | Job | $ - 0 | |
| Deck - Replace Navigation Radar Equipment | 5.8.10 | 1 | Job | $ - 0 | |
| Deck - Hopper Discharge Chute | 5.8.11 | 1 | Job | $ - 0 | |
| Deck - Replace Deck Crane Mounting Bolts | 5.8.12 | 1 | Job | $ - 0 | |
| House - Clean and Inspect Galley Exhaust Dutching | 5.9.1 | 1 | Job | $ - 0 | |
| House - Fire Suppression Services | 5.9.3 | 1 | Job | $ - 0 | |
| House - HVAC | 5.9.4 | 1 | Job | $ - 0 | |
| House - SAT TV Dish | 5.9.5 | 1 | Job | $ - 0 | |
| House - Replace Galley #4 Freezer | 5.9.6 | 1 | Job | $ - 0 | |
| Inspection - ABS Inspection Services | 5.10.1 | 1 | Job | $ - 0 | |
| Inspection - Audio Gauging Services | 5.10.2 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Services | 5.1.2 | 1 | Job | $ - 0 | |
| Main Propulsion - Strut Bore Reprair | 5.3.1 | 1 | Job | $ - 0 | |
| Main Propulsion - Rudder Assembly Replacement | 5.3.4 | 1 | Job | $ - 0 | |
| Main Propulsion – Emergency Inflatable Shaft Seals Replacements | 5.3.8 | 1 | Job | $ - 0 | |
| Machinery - House Main HVAC Supply Fan Overhaul | 5.4.3 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Supply Fan Overhaul | 5.4.4 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Exhaust Fan Overhaul | 5.4.5 | 1 | Job | $ - 0 | |
| Machinery – FO Tank Level Indicators | 5.4.12 | 1 | Job | $ - 0 | |
| Machinery – Replace Expansion Joint for #2 Supply Fan | 5.4.13 | 1 | Job | $ - 0 | |
| Machinery – Replace Conduit E-Gen Switchboard to Forward Fire Pump Controller | 5.4.14 | 1 | Job | $ - 0 | |
| Hull Above Waterline; apply coatings | 5.5.1 | 23000 | SqFt | $ - 0 | |
| Hull Below Waterline; apply coatings | 5.5.2 | 3000 | SqFt | $ - 0 | |
| Hull - Hull Anode Renewal | 5.5.3 | 1 | Job | $ - 0 | |
| Hull - Internal Tank Inspection | 5.5.4 | 1 | Job | $ - 0 | |
| Hull - Sliding Piece Fit-Up | 5.5.6 | 1 | Job | $ - 0 | |
| Hull - Suction Inlet Hull Rings and Pipe Liners Replacement | 5.5.8 | 1 | Job | $ - 0 | |
| Hopper Door Bearing Support Channel Overhaul | 5.6.1 | 1 | Job | $ - 0 | |
| Hopper Door Hinge Bushings Renewal | 5.6.2 | 1 | Job | $ - 0 | |
| Hopper Door Hydraulic Cylinder Overhaul | 5.6.3 | 1 | Job | $ - 0 | |
| Hopper Door Operating Rod Replacement | 5.6.4 | 1 | Job | $ - 0 | |
| Hopper Overflow Hydraulic Cylinder Overhaul | 5.6.8 | 1 | Job | $ - 0 | |
| Hopper Swell Compensator Cylinder Overhaul | 5.6.9 | 1 | Job | $ - 0 | |
| Bow Thruster - Po Preservation | 5.7.3 | 1 | Job | $ - 0 | |
| Bow Thruster - Sleeve Replacement | 5.7.5 | 1 | Job | $ - 0 | |
| Deck - 20-inch Pipe Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| Deck - Anchor and Anchor Chain Reconditioning | 5.8.2 | 1 | Job | $ - 0 | |
| Deck - Coating Weather Decks; apply coatings | 5.8.5 | 6000 | SqFt | $ - 0 | |
| Deck – Yaquina Launch Repair | 5.8.8 | 1 | Job | $ - 0 | |
| Deck -– Replace Electric Whistle on Kingpost | 5.8.13 | 1 | Job | $ - 0 | |
| House - Coating Aluminum House; apply coatings | 5.9.2 | 4000 | SqFt | $ - 0 | |
| TOTAL CATEGORY B: | $ - 0 |
Over & Above Work
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 11,500 | $0.00 | ||
| Materials & Subcontractor | 6.1 | 11,500 | $ 500,000.00 | $500,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $500,000.00 |
File details come from the government source that posted it. Updated .