C.04_FormalAbstractOfOffers7N23B0014.pdf

PDF 172 KB Posted

Attached to
FY24 Yaquina Overhaul Solicitation
Solicitation number
W9127N23B0014
Issued by

About this file

This document is an abstract of offers for solicitation number W9127N23B0014, the FY24 Yaquina Overhaul opportunity issued by the Department of the Army Corps of Engineers Engineering District Portland. It summarizes four offers received in response to the requirement for ship repair work. The offers ranged in price from $8,074,934.31 to $9,599,194.12. Vigor Marine, LLC provided the lowest offer at $8,074,934.31, representing a 15.88% difference from the independent government estimate of $6,154,155.53. The other three offers were from Everett Ship Repair at $9,599,194.12, 31.21% above the IGE, and two additional offers that were 55.98% and 100% above the IGE respectively. The response due date for offers was August 15, 2023.

View the file

Other files

File Type Posted
C.04_BidRoster7N23B0014.pdf PDF
B.08 W9127N23B0014 Yaquina Overhaul Amendment 0003.pdf PDF
B.08 Price List Amendment 0003.xlsx XLSX spreadsheet
Port Sewage Flat Tank Top fR 94 95.pdf PDF
Furuno 2827 Radars.pdf PDF
VD-TM-91721User Op.Manual.pdf PDF
Y-2232-18 Arrgt Details of Bow Thruster Instl.pdf PDF
Bottom plating within 4th strake from keel.pdf PDF
Furuno GP-170.pdf PDF
Furuno GP-170 AIS.pdf PDF
Ned-deck Marine O M Davit SCH rev E 14-12-2010.pdf PDF
Tank Top in way of Trunnion Room.pdf PDF
DT50-55 Tech Manual 80-677.pdf PDF
Dredge Yaquina - TAB Report March 2023.pdf PDF
B.08 W9127N23B0014 Yaquina Overhaul Amendment 0002.pdf PDF
Furuno FE-700 Echo Sounder.pdf PDF
GX5500S.pdf PDF
LIPS-A004654.pdf PDF
Furuno RD-30 Repeater.pdf PDF
Y-2470-4_Installation_of_New_Hopper_Distribution_System.pdf PDF
Bottom plating in Steering Flat at port side aft of frame 88 .pdf PDF
Y-2496-3 Hyd Cylinders Ovfl Trough Hopper Doors.pdf PDF
95340 Swell Compensator Cylinder.pdf PDF
Y-2496-2 Arrgt Details Hopper Doors Operating Gear.pdf PDF
P7555 - Dredge Yaquina Launch Final.pdf PDF
19731_Longitudinal Stiffeners.pdf PDF
19731 REV 06 Sent to cust. 4.12.21.pdf PDF
Y-1032-16 Sheets 1 to 6.pdf PDF
Hundested 1-022-021126-2 MP700-CPG120 Installation Unit 6331-G1178.pdf PDF
Red Hawk FA-101 Fire Alarm System FAS Layout.pdf PDF
5241127.pdf PDF
Y-2636-1 Shaft Struts.pdf PDF
Y-2232-44 Seachests.pdf PDF
Y-2274-1 Detail 15-A Rudder Seal Ring.pdf PDF
D-1441-1.PDF PDF
Hundested 0-002-020932-2 MP700 Propeller Hoved Samling.pdf PDF
5241115 Trunnion.pdf PDF
Red Hawk FA-000 Fire Alarm System General Notes.pdf PDF
Y-3874-3 DIAGRAM Bilge and Ballast System.pdf PDF
Y-3872-4 Arrangement Firemain System.pdf PDF
Y-3874-4 Arrangement Bilge and Ballast System.pdf PDF
1788 0878 Stuffing Box female recess.pdf PDF
12V2000_P82_operating instructions.pdf PDF
Y-2636-2 Shafting Arrangement.pdf PDF
X-1441-2 Rev G.pdf PDF
Y-3872-3 DIAGRAM Firemain System.pdf PDF
Y-3872-5 DIAGRAM Sea Water Circ System.pdf PDF
Hundested 2-140-021135-1 MP700-CPG120 Flange Coupling Assembly.pdf PDF
Y-2274-1 Rudders.pdf PDF
Y-3872-6 Sea Water Argmt.pdf PDF
Show 40 more

Latest 50 of 119 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUED 3. DATE DUE

6/29/2023 8/15/2023

8. GOVERNMENT ESTIMATE

(CHECK A, B, OR C AND COMPLETE

B. REASONABLE CONTRACT

(WITHOUT PROFIT)

C. REASONABLE CONTRACT

6. NUMBER OF ADDENDA ISSUED 3

7A. ITEM NO. E. UNIT PRICE F. ESTIMATED AMT D. UNIT PRICE F. ESTIMATED E. UNIT PRICE F. ESTIMATED E. UNIT PRICE F. ESTIMATED

CLIN: AMOUNT AMOUNT AMOUNT

0001 Total Category A 1 JOB 4,151,173.32$ 4,151,173.32$ 4,968,671.00$ 4,968,671.00$ $4,461,458.67 $4,461,458.67 $0.00 Total Category B 1 JOB 503,400.89$ 503,400.89$ 2,300,575.00$ 2,300,575.00$ $2,029,675.64 $2,029,675.64 $0.00 Over & Above Work 1 JOB $1,499,581.32 1,499,581.32$ 2,099,025.12$ 2,099,025.12$ $1,583,800.00 $1,583,800.00 $0.00 Location Adjustment 1 JOB -$ -$ 230,923.00$ 230,923.00$ $ - -$ -$

6,154,155.53$ 6,154,155.53$ 9,599,194.12$ 9,599,194.12$ 8,074,934.31$ 8,074,934.31$ -$ -$ % Difference from IGE 55.98% 31.21% -100.00% % Difference from Low Bid -15.88% -100.00%

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

PAGE 1 OF 1 PAGES

Yes

NO. B

OFFEROR

Vigor Marine, LLC.

5555 N. Channel Ave.

Portland, OR 97217

B. BID SECURITY

C. AMENDS ACKNWLG

2730 Federal Ave.

Everett Ship Repair

Yes

Everett, WA 98201

Yes

YAQUINA OVERHAUL FY 24

7B. DESCRIPTION OF OFFERED ITEM 7C. EST QTYD. UNIT

TOTAL EVALUATED PRICE

X

D, E, AND F.)

IGE

A. HIRED LABOR

(INCLUDING PROFIT)

ABSTRACT OF OFFERS-HYBRID

W9127N23B0014

4. ISSUING OFFICE

PORTLAND DISTRICT, CORPS OF ENGINEERS

5. PROJECT TITLE

DISTRICT ENGINEER

NO. A

OFFEROR

P.O. BOX 2946

PORTLAND, OR 97208-2946

9. OFFERS

CONTRACTING OFFICER SIGNATURECONTRACT SPECIALIST SIGNATURE

NO. C

OFFEROR

C. AMENDS ACKNWLG

B. BID SECURITY B. BID SECURITY

C. AMENDS ACKNWLG

ABSTRACT

2023-08-16T08:20:05-0700
LUTJENS.IAN.KENNETH.1257945002
2023-08-21T07:22:53-0700
LASICH.BRANDON.MATTHEW.1255369012

File details come from the government source that posted it. Updated .