AM03 DRAWINGS.pdf
PDF 4 MB Posted
- Attached to
- Cyberspace Test Group Facility, Eglin AFB, FL Federal contract opportunity
- Solicitation number
- W9127820R0057
About this file
This solicitation is for the construction of a new Cyberspace Test Group Facility at Eglin Air Force Base in Florida. The facility will be a multi-story, 52,003 square foot sensitive compartmented information facility with a concrete foundation, split-faced concrete block over a steel frame, and sloped standing seam metal roof. It will include fire suppression systems, all utilities, pavements, communications, and site improvements to provide a complete and useable facility. The work will be performed for the Department of the Army Corps of Engineers Engineering District Mobile. The response due date is not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127820R0057 JA_Redacted.pdf | ||
| AM05.pdf | ||
| AM05 DRAWINGS.pdf | ||
| AM04.pdf | ||
| AM03.pdf | ||
| AM02 DRAWINGS.pdf | ||
| AM02.pdf | ||
| AM01 DRAWINGS.pdf | ||
| AM01.pdf | ||
| Site visit sign in sheet.pdf | ||
| VOL1.PDF | ||
| VOL6.PDF | ||
| VOL4.PDF | ||
| RTA DRAWINGS VOL1.pdf | ||
| VOL5.PDF | ||
| VOL3.PDF | ||
| VOL2.PDF | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS VOL2 .pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE AL 36602
CYBERSPACE TEST GROUP FACILITY
EGLIN AIR FORCE BASE, FLORIDA
OKALOOSA COUNTY
JUNE 2020
MOBILE DISTRICT PROJECT CODE: MEF19017
RFP NUMBER: W9127820R0057
AMENDMENT NO. 0003
HALF SIZE DRAWINGS1
A
M E
N D
M E
N T
N O
- 2 k5en9jbm Polygon k5en9jbm Polygon k5en9jbm Line k5en9jbm Line
X
X
X X
D
A
Y
T
O
N
A
R
O
A
D
S
E
V
E
N
T
H
S
R
E
E
T
E
I
G
H
R
E
E
T
72A
TAXILANE 'T'
(PMEL BLDG)
TEMPORARY ROAD LOCATION
FOR APRON PERIMETER ROAD
(INSTALL TEMPORARY AIRFIELD
PAVEMENT MARKINGS DEPICTING
TEMPORARY ROAD LOCATION
NEW MAIN ACCESS DRIVE
FOR CYBERSPACE TEST
FACILITY
X
X
X
X
X X
XXXXXXXX
X X
X X
X X
X
X
XXXXXXX
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X
X
X X
X
X X
X
X X
X X
X X
X X
X
F
T
M
I N
NEW 6 FT
CONSTRUCTION
FENCE
35 36
GENERAL PARKING APRON
(CONTRACTOR STAGING /
LAYDOWN AREA)
E
X
I
S
T
I
G
P
R
K
I
N
G
EXISTING PARKING
(NO CONTRACTOR PARKING)
PLASTIC WATER FILLED
JERSEY BARRIERS
PLASTIC WATER FILLED
JERSEY BARRIERS
EXISTING PERIMETER
ROAD NOT IN USE
DURING CONSTRUCTION
EXISTING
FENCE
NEW
PERSONNEL
GATE
CHOCTAWHATCHEE AVE
NOTES:
1. THE CONTRACTOR SHALL SUBMIT THE TEMPORARY AIRFIELD SECURITY
FENCING AND/OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) LOCATION FOR
APPROVAL BY THE BASE ENGINEER AND SECURITY FORCES PRIOR TO
CONSTRUCTION ACTIVITIES COMMENCING AT THE PROJECT SITE. THE
TEMPORARY AIRFIELD SECURITY FENCE SHALL FOLLOW DESIGN CRITERIA
AS STATED ON THE ENGINEERING DESIGN MANUAL, EGLIN AIR FORCE
BASE (AFB) FLORIDA, FEBRUARY 2019 AND UFC 3-260-01 AIRFIELD AND
HELICOPTER PLANNING AND DESIGN, APPENDIX B SECTION 14. THE
TEMPORARY AIRFIELD SECURITY FENCING SHALL BE INSTALLED BEFORE
EXISTING FENCE CAN BE REMOVED. TEMPORARY FENCE CANNOT BE
WITHIN 50 FEET OF REDLINE AND CANNOT PENETRATE CONCRETE OF
GENERAL AVIATION RAMP. TEMPORARY FENCE SHALL BE 6 FEET HIGH
(MINIMUM) CHAIN LINK WITH TOP AND BOTTOM RAILS AND MESH FABRIC
SCREENING. THE TEMPORARY AIRFIELD SECURITY FENCE SHALL HAVE
MOUNTED SIGNS AT 100 FEET ON CENTERS IDENTIFYING A “CONTROLLED
AREA” SIGN.
2. ACTIVE OPERATIONAL AIRFIELD AREAS ARE AS FOLLOWS:
• TAXILANE T (NORTH OF PROJECT SITE) WILL BE ACTIVE FOR C-130 AND
SMALLER AIRCRAFT (116 FT FROM TAXIWAY CENTER LINE).
• LARGE AIRCRAFT WASHRACK WILL BE ACTIVE DURING CONSTRUCTION
• AREA OF THE GENERAL PARKING APRON IMMEDIATELY TO THE WEST
OF THE PROJECT SITE TO LIMITS DEFINED ON MAP WILL BE INACTIVE
AND AVAILABLE FOR CONTRACTOR LAYDOWN AND USE FOR THE
DURATION OF THE PROJECT.
3. INSTALL TEMPORARY CONSTRUCTION FENCE AROUND THE LIMITS OF
WORK AS INDICATED ON THESE PLANS. COORDINATE CHAIN AND
PADLOCKS ON GATES WITH EGLIN FIRE DEPARTMENT. EACH GATE TO BE
NUMBERED FOR EMERGENCY ACCESS. CONTRACTOR TO MAINTAIN FIRE
ACCESS THROUGH EACH INDIVIDUAL SITE AT ALL TIMES. ALSO REFER TO
CIVIL NOTES ON CI001 AND LEGEND ON SHEET CI002 FOR ADDITIONAL
CONSTRUCTION CONSIDERATIONS.
4. ALL CONSTRUCTION ACTIVITIES WILL BE SEPARATED INTO PHASES. THE
PHASING PLAN WILL SHOW OR DESCRIBE THE SEQUENCE OF
CONSTRUCTION ACTIVITY FOR EACH PHASE. THE PHASING PLAN WILL BE
INCORPORATED INTO THE CONTRACTOR'S MANAGEMENT PLAN AND
REFLECTED IN THE PROGRESS SCHEDULE. THE WORK AREA LIMITS (TO
DEFINE REQUIRED AIRCRAFT AND WORKER SAFETY AND SECURITY
CLEARANCES), BARRICADES, MAXIMUM EQUIPMENT HEIGHT, AND
TEMPORARY FENCING REQUIREMENTS WILL BE CLEARLY DELINEATED FOR
EACH PHASE. THE WORK AREA LIMITS WILL INCLUDE IDENTIFICATION OF
RESTRICTED AREAS REQUIRING ESCORTS AND FREE ZONES WITH SECURE
AREAS.
5. TRUCK WASHOUT AREA TO BE CONSTRUCTED, MAINTAINED, AND CLEANED
IN ACCORDANCE WITH FLORIDA DEPT OF ENVIRONMENTAL PROTECTION
REGULATIONS. PROVIDE DETAILS AND MAINTENANCE PLAN AS PART OF
THE STORMWATER POLLUTION PREVENTION PLAN.
6. ALL TEMPORARY TRAFFIC BARRIERS TO BE INSTALLED AND MAINTAINED
TO CLOSE ROADS TO ALL NON-CONSTRUCTION TRAFFIC AND SHALL BE
INSTALLED BY THE CONTRACTOR. COORDINATE WITH EGLIN SECURITY.
7. ALL FLIGHT LINE ACCESS REQUIRES AIRFIELD ESCORTS. CONTRACTOR
SHALL BE REQUIRED TO HAVE PERSONNEL THAT ARE FLIGHTLINE DRIVING
QUALIFIED TO ESCORT VEHICLES .
8. FLAGMEN WILL BE REQUIRED AS NEEDED FOR SAFETY BASED ON THE
ACTIVITY.
9. CONTRACTOR SHALL MAINTAIN GOVERNMENT ACCESS (VEHICULAR AND
PEDESTRIAN) TO GENERAL AVIATION RAMP THROUGH THE NEW GENERAL
AVIATION ACCESS DRIVE.
10. BUILDING 78 (PMEL) OPERATIONS CONDUCTS TESTING THAT CAN BE
AFFECTED BY CONSTRUCTION ACTIVITIES THAT GENERATE VIBRATIONS IN
THE GROUND (I.E.: HEAVY EARTH MOVING, COMPACTION EQUIPMENT, ETC.)
AND REQUIRES A 15 DAY ADVANCE NOTICE BEFORE THE WORK STARTS.
11. REFER TO SPECIFICATIONS SECTION 01 00 00, SECTION 01 11 00, AND
SECTION 01 14 00 FOR ADDITIONAL REQUIREMENTS.
12. CONTRACTOR SHALL COORDINATE THE LIMITS OF
PERMANENT PAVEMENT MARKINGS INSTALLATION,
INCLUDING MATERIAL , SIZE, AND TYPE, WITH THE BASE
AIRFIELD MANAGER AT LEAST 45 DAYS PRIOR TO
INSTALLATION. AIRFIELD CONSTRUCTION OF TEMPORARY
AND PERMANENT PAVEMENT MARKINGS SHALL FOLLOW
CRITERIA PER UFC 3-260-04.
13. AIRCRAFT WILL BE TOWED ADJACENT TO THE WORK AREA.
CONTRACTOR WILL BE NOTIFIED IF IT BECOMES
NECESSARY FOR AIRCRAFT TO PASS ON ITS OWN POWER.
SITE USE AND WORK RESTRICTION PLAN
1" = 100'
0 100' 200'
GC004FTFA 163007
S I T
E
U
E
D
W
R
K
R
E S
T R
I C
T I O
N
P
L A
N
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S m e f g c
M
Y
M
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
F
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
M
B
P L
C A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
U M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L I
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7G C
4.
dw g
/0 8/
:0
PM B
y:
G er th , J am es
W R
NEW BUILDING 90
CYBERSPACE
TEST FACILITY
DELINEATION FENCING SYSTEM (SILT FENCE, FOD FENCE W/ 6-INCH
SEPARATION AND 3-FT HIGH ORANGE SAFETY FENCE)
CONTRACTOR PARKING AREA
CONTRACTOR STAGING/LAYDOWN AREA
COORDINATE WEEKLY FOR MXG'S AIRCRAFT
WASHRACK SCHEDULE
WORK IN THIS AREA TO BE COORDINATED WITH
AIRFIELD MANAGER FOR MINIMUM DOWNTIME.
PLASTIC WATER FILLED JERSEY BARRIERS
XXXXXX 6-FT TEMPORARY CONSTRUCTION FENCE W/ FOD
FENCE MATERIAL ATTACHED (REFER TO DETAIL 4 IN SHEET CS502)
APPROX. EXISTING
EDGE OF TAXIWAY
DELINEATION FENCE
N
GENERAL
AVIATION
RAMP
LARGE
AIRCRAFT
WASHRACK
PROTECTED PEDESTRIAN CORRIDOR
NEW PARKING LOT SOUTH OF DAYTONA ROAD
LEGEND
HEAVY HAULER ACCESS ROUTE
(ESCORT REQUIRED)
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO THE
MAIN ENTRANCE OF THE EXISTING FACILITIES AND PARKING LOT
APPROACHES ADJACENT TO THE PROJECT SITE AND
SPECIFICALLY PMEL BUILDING UNLESS APPROVED BY THE COR.
R
K
I
N
G
NEW GATE IN 6 FT
CONSTRUCTION FENCE
N
O
P
A
R
K
I
N
G
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO THE
MAIN ENTRANCE OF THE EXISTING FACILITIES AND PARKING LOT
APPROACHES ADJACENT TO THE PROJECT SITE AND
SPECIFICALLY PMEL BUILDING UNLESS APPROVED BY THE COR.
NEW GENERAL
AVIATION
ACCESS DRIVE
NEW BUILDING 90 CYBERSPACE TEST FACILITY
NEW 6 FT
CONSTRUCTION FENCE
NEW GENERAL AVIATION
ACCESS DRIVE
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS
TO THE MAIN ENTRANCE OF THE EXISTING FACILITIES AND
PARKING LOT APPROACHES ADJACENT TO THE PROJECT
SITE AND SPECIFICALLY PMEL BUILDING.
SITE CONSTRUCTION ENTRANCE (LIGHT DUTY VEHICLES)
APRON PERIMETER ROAD
SITE CONSTRUCTION
ENTRANCE
AM
EN
DM
EN
T
/05 /20
CE
B
AMENDMENT 0003
CONTRACTOR POVS ONLY - NO WORK
VEHICLES/EQUIPMENT
CONTRACTOR POV
PARKING
CONTRACTOR
PARKING
AutoCAD SHX Text
TW T
AutoCAD SHX Text
TW T APR
AutoCAD SHX Text
TW O
AutoCAD SHX Text
TW S APR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 72A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X
X X
D
A
Y
T
O
A
D
CHOCTAWHATCHEE AVE
S
E
V
E
N
R
E
E
T
72A
TAXILANE 'T'
(PMEL BLDG)
X
X
X
X
X X
XXXXXXXX
X X
X X
X X
X
X
XXXXXXX
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X
F
T
M
I N
LARGE
AIRCRAFT
WASHRACK
35 36
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO THE
MAIN ENTRANCE OF THE EXISTING FACILITIES AND PARKING LOT
APPROACHES ADJACENT TO THE PROJECT SITE AND
SPECIFICALLY PMEL BUILDING (PHASE 1).
TEMPORARY ROAD LOCATION
FOR APRON PERIMETER ROAD
(INSTALL TEMPORARY AIRFIELD
PAVEMENT MARKINGS DEPICTING
TEMPORARY ROAD LOCATION
NEW MAIN ACCESS DRIVE
FOR CYBERSPACE TEST
FACILITY
APPROX. EXISTING
EDGE OF TAXIWAY
NEW 6 FT
CONSTRUCTION FENCE
NEW 6 FT
CONSTRUCTION
FENCE
0 100' 200'
GC005FTFA 163007
S I T
E
W
O R
K
P
H A
S I N
G
P
L A
N
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F G
C D
W G
M
M
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7G C
5.
dw g
/0 8/
:3
PM B
y:
G er th , J am es
W R
SITE WORK PHASING PLAN
1" = 100'
N
DELINEATION FENCING SYSTEM (SILT FENCE, FOD FENCE W/
6-INCH SEPARATION AND 3-FT HIGH ORANGE SAFETY FENCE)
PHASE 1 - CONSTRUCTION LIMITS, REFER TO NOTE 2.A.
PLASTIC WATER FILLED JERSEY BARRIERS
XXXXXX 6-FT. TEMPORARY CONSTRUCTION FENCE WITH FOD FENCE
MATERIAL ATTACHED (REFER TO DETAIL 4 ON SHEET CS502)
GENERAL
AVIATION
RAMP
PEDESTRIAN CORRIDOR
LEGEND
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS
TO THE MAIN ENTRANCE OF THE EXISTING FACILITIES AND
PARKING LOT APPROACHES ADJACENT TO THE PROJECT
SITE AND SPECIFICALLY PMEL BUILDING(PHASE 1).
NOTES:
1. THE CONTRACTOR SHALL DEVELOP A DETAILED PHASING
PLAN, USING THIS PLAN SHEET AS A BASE THAT WILL SHOW
OR DESCRIBE THE SEQUENCE OF CONSTRUCTION ACTIVITIES
FOR EACH PHASE. THE PHASING PLAN WILL BE
INCORPORATED INTO THE CONTRACTOR'S MANAGEMENT
PLAN AND REFLECTED IN THE PROGRESS SCHEDULE. THE
WORK AREA LIMITS (REQUIRED AIRCRAFT OPERATIONS,
WORKER SAFETY AND SECURITY CLEARANCES), BARRICADES,
MAXIMUM EQUIPMENT HEIGHT, AND TEMPORARY FENCING
AND PAVEMENT MARKINGS REQUIREMENTS WILL BE CLEARLY
DELINEATED FOR EACH PHASE. THE PHASING PLAN SHALL
INCLUDE WORK AREA LIMITS AND WILL INCLUDE
IDENTIFICATION OF RESTRICTED AREAS REQUIRING ESCORTS
AND FREE ZONES WITH SECURE AREAS.
2. CONSTRUCTION PHASING AND SEQUENCING REQUIREMENTS:
A. PHASE 1: CONSTRUCTION OF THE PARKING AREA,
LIGHTING, UTILITIES, LANDSCAPING, PAVEMENT MARKINGS
AND STORMWATER TREATMENT FACILITY SOUTH OF
DAYTONA ROAD. PHASE 1 SHALL INCLUDE THE
CONSTRUCTION OF THE NEW PEDESTRIAN CROSS WALK
(ACROSS DAYTONA ROAD) ASSOCIATED SIDEWALKS,
DELINEATION OF PEDESTRIAN SAFE PASSAGEWAYS TO
BUILDING 78 (PMEL), SIGNAGE AND PAVEMENT MARKINGS.
EFFORTS SHALL BE INITIATED UPON NOTICE TO PROCEED
(NTP) AND BE SUBSTANTIALLY COMPLETED IN 120 DAYS
FROM NTP. AREA SHALL BE TURNED OVER FOR
GOVERNMENT USE AT SUBSTANTIAL COMPLETION.
DURING THIS PHASE CONTRACTOR SHALL PROCESS AND
COMPLETE ALL DOCUMENTATION AND SUBMITTALS AS
RELATED TO CONSTRUCTION OPERATIONS OF REMAINING
PHASES.
B. PHASE 2: UPON NTP CONTRACTOR SHALL PROCESS AND
COMPLETE ALL DOCUMENTATION AND SUBMITTALS AS
RELATED TO CONSTRUCTION AND AIRFIELD OPERATIONS
INCLUDING THE NEW GENERAL AVIATION ACCESS DRIVE
AND NEW FACILITY CONSTRUCTION EFFORTS TO THE
AIRFIELD SOUTH OF B78 (PMEL). PREPARATION OF SUCH
SUBMITTALS SHALL START AT NTP AND BE SUBMITTED
WITHIN 30 DAYS OF NTP. IT IS ANTICIPATED THAT THE
REQUIRED AIRFIELDS REVIEWS SHALL TAKE
APPROXIMATELY 1 TO 2 MONTHS FOR REVIEW AND
APPROVAL. UPON APPROVALS CONSTRUCTION EFFORTS
WILL INITIATE ON THE INSTALLATION OF THE PROPOSED
NEW GENERAL AVIATION ACCESS DRIVE, MODIFICATIONS
TO THE AIRFIELD FENCE (SOUTH OF B78), NEW MANGATE
AND GATE INSTALLATION, REMOVAL OF LANDSCAPE
ISLANDS, PAVEMENT INSTALLATION, ASSOCIATED
UNDERGROUND UTILITIES, BOLLARDS AND BOLLARD FARM.
THE EXISTING PARKING LOT NORTH OF B85 AND THE
EXISTING DRIVE AISLE LOCATED EAST AND NORTH OF B78
SHALL REMAIN OPERATIONAL UNTIL THE NEW MAIN
ACCESS DRIVE, PAVEMENT INSTALLATION AND GATES ARE
COMPLETED AND ACCEPTED BY THE GOVERNMENT. WORK
TO BE SUBSTANTIALLY COMPLETED IN TWO MONTHS
AFTER TEMPORARY CONSTRUCTION WAIVER IS
APPROVED BY GOVERNMENT (REFER TO SECTION 01 00 00
FOR ADDITIONAL INFORMATION).
C. PHASE 3: UPON NTP CONTRACTOR SHALL PROCESS AND
COMPLETE ALL DOCUMENTATION AND SUBMITTALS AS
RELATED TO CONSTRUCTION AND AIRFIELD OPERATIONS
INCLUDING THE NEW CYBERSPACE BUILDING (B90)
CONSTRUCTION EFFORTS. PREPARATION OF SUCH
SUBMITTALS SHALL START AT NTP AND BE SUBMITTED
WITHIN 30 DAYS OF NTP. IT IS ANTICIPATED THAT THE
REQUIRED AIRFIELDS REVIEWS SHALL TAKE
APPROXIMATELY 1 TO 2 MONTHS FOR REVIEW AND
APPROVAL. UPON APPROVALS CONSTRUCTION EFFORTS
WILL INITIATE ON THE CONSTRUCTION OF THE SITE WORK
AND NEW CYBERSPACE BUILDING (B90) AND ASSOCIATED
INFRASTRUCTURE. WORK EFFORTS OUTSIDE OF THE
AIRFIELD OPERATIONS MAY INITIATE AT NTP.
3. BUILDING 78 (PMEL) OPERATIONS CONDUCTS TESTING THAT
CAN BE AFFECTED BY CONSTRUCTION ACTIVITIES THAT
GENERATE VIBRATIONS IN THE GROUND (I.E.: HEAVY EARTH
MOVING, COMPACTION EQUIPMENT, ETC.) AND REQUIRES A 15
DAY ADVANCE NOTICE BEFORE THE WORK STARTS.
4. OPEN TRENCHES, EXCAVATIONS, AND STOCKPILED MATERIAL
AT THE CONSTRUCTION SITE SHOULD BE PROMINENTLY
MARKED WITH ORANGE FLAGS AND LIGHTED WITH FLASHING
RED OR YELLOW LIGHT UNITS DURING HOURS OF
RESTRICTED VISIBILITY AND/OR DARKNESS.
5. CRANE/HOIST OPERATIONS:
A. COORDINATION WITH AIRFIELD OPERATIONS IS REQUIRED
IF THE HEIGHT OF AN EQUIPMENT WHILE IN OPERATION
WILL PENETRATE ANY OF THE AIRFIELD OPERATION PLANE
SURFACES (CLEAR ZONES).
B. IF EQUIPMENT PENETRATES THE OPERATION PLANE
SURFACES (CLEAR ZONES) AN FAA 7460-1, NOTICE OF
PROPOSED CONSTRUCTION ALTERATION, WILL REQUIRE
SUBMITTAL AND APPROVAL PRIOR TO CONSTRUCTION
START.
7. REFER TO SPECIFICATION SECTIONS 01 00 00 - ADDITIONAL
SPECIAL REQUIREMENTS, SECTION 01 11 00 - SUMMARY OF
WORK, 01 14 00 - WORK RESTRICTIONS FOR ADDITIONAL
REQUIREMENTS FOR CONSTRUCTION.
8. CONTRACTOR SHALL COORDINATE THE LIMITS OF
PERMANENT PAVEMENT MARKINGS INSTALLATION, INCLUDING
MATERIAL , SIZE, AND TYPE, WITH THE BASE AIRFIELD
MANAGER AT LEAST 45 DAYS PRIOR TO INSTALLATION.
AIRFIELD CONSTRUCTION OF TEMPORARY AND PERMANENT
PAVEMENT MARKINGS SHALL FOLLOW CRITERIA PER UFC
3-260-04.
PHASE 2 - CONSTRUCTION LIMITS, REFER TO NOTE 2.B.
PHASE 3 - CONSTRUCTION LIMITS, REFER TO NOTE 2.C.
NEW GATE IN 6 FT
CONSTRUCTION FENCE
GENERAL PARKING APRON
(CONTRACTOR STAGING /
LAYDOWN AREA)
E
X
I
S
T
I
G
R
K
I
N
G
N
T
R
A
C
T
R
K
I
N
G
EXISTING PARKING
(NO CONTRACTOR PARKING)
PLASTIC WATER FILLED
JERSEY BARRIERS
PLASTIC WATER FILLED
JERSEY BARRIERS
NEW BUILDING 90
CYBERSPACE
TEST FACILITY
EXISTING PERIMETER
ROAD NOT IN USE
DURING CONSTRUCTION
EXISTING FENCE
NEW 6 FT
CONSTRUCTION FENCE
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO THE
MAIN ENTRANCE OF THE EXISTING FACILITIES AND PARKING LOT
APPROACHES ADJACENT TO THE PROJECT SITE AND
SPECIFICALLY PMEL BUILDING (PHASE 1).
NEW GENERAL AVIATION
ACCESS DRIVE
AM
EN
DM
EN
T
/28
/20
CE
B
AMENDMENT 0003
AM
EN
DM
EN
T
/05
/20
CE
B
AutoCAD SHX Text
TW T
AutoCAD SHX Text
TW T APR
AutoCAD SHX Text
TW O
AutoCAD SHX Text
TW S APR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 72A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2%
VARIES, 20' TO 14'
OF CONSTRUCTION
GRADED AGGREGATE BASE
VARIES'
COMPACTED SUBGRADE
2'
TYPE 'F' CURB
6'
SIDEWALK 2'
VARIES
2% 2%
OF CONSTRUCTION
GRADED AGGREGATE BASE
HMA
COMPACTED SUBGRADE
STANDARD CLEARING AND GRUBBING LIMITS
12' TRAVEL LANE 12' TRAVEL LANE 18' PARKING STALL
2%
2%
2'
2%
10'-12' TRAVEL LANE 10'-12' TRAVEL LANE
2% 2%
HMA
STANDARD CLEARING AND GRUBBING LIMITS
GRADED AGGREGATE BASE
COMPACTED SUBGRADE
18' PARKING STALL
2%
2%
2%
2'
OF CONSTRUCTION
12' 12'
2% 2%
HMA
2%
2%
OF CONSTRUCTION
VARIES
VARIES FROM 24' TO 97.5'
OF CONSTRUCTION
GRADED AGGREGATE BASE
HEAVY DUTY ASPHALT PAVEMENT
(SEE DETAIL 10 ON THIS SHEET)
COMPACTED SUBGRADE
RIBBON CURB
2%
VARIES FROM 14' TO 17.5'
OF CONSTRUCTION
GRADED AGGREGATE BASE
LIGHT DUTY ASPHALT PAVEMENT
(SEE DETAIL 2 ON THIS SHEET)
COMPACTED SUBGRADE
2'
TYPE 'F' CURB
E Q
U I P
M E
R
D
VARIES
VARIES
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C S5
.d w g
/0 8/
:5
PM B
y:
G er th , J am es
W R
CS501FTFA 163007
P A
V I N
G
D
E T
A I L
S
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
S D
W G
M
M
12" STABILIZED SUBGRADE (95%
MAX DENSITY, ASTM D1557)
(DESIGN BY CONTRACTOR)
4" #57 STONE
NON-WOVEN FILTER
FABRIC (WEED CONTROL)
TYPICAL LIGHT DUTY
ASPHALT PAVEMENT
NTS
TYPICAL TRUCK RAMP
CONCRETE PAVEMENT
NTS
TYPICAL EQUIPMENT
YARD GRAVEL PAVEMENT
NTS
TYPICAL SECTION - MAIN ACCESS DRIVE
STA: 3+27.00 TO STA: 4+75.16
STA: 5+22.00 TO STA: 6+17.65
NTS
2'-0" 8"
1 9 /32
/16
6"
NOTE:
WHEN USED ON THE HIGH SIDE OF INVERTED PARKING AREA, THE
CROSS SLOPE OF THE GUTTER SHALL MATCH THE CROSS SLOPE OF THE
ADJACENT PAVEMENT. WHERE THIS CONDITION IS ENCOUNTERED, THE
FRONT FACE VERTICAL DIMENSION SHALL REMAIN AS SHOWN FOR
NORMAL SECTIONS.
6"
2" R
3" R
3/4 " R
TYPE "F" CURB &GUTTER
NTS
8" CONCRETE
RIBBON CURB
NTS
TYPICAL SECTION - MAIN ACCESS DRIVE
STA: 4+75.16 TO STA: 5+22
NTS
TYPICAL SECTION PARKING LOT SOUTH LANE
NTS
TYPICAL SECTION PARKING LOT NORTH LANE
NTS
18' PARKING STALL 18' PARKING STALL
CONCRETE WHEEL
STOP (TYP)
CONCRETE WHEEL
STOP (TYP)
SIDE VIEW
FRONT VIEW
5 5/8"
5"
1"
12" 12"
6'-0"
3/4 " T
O 1"
6"
MIN
FACE OF CURB OR EDGE OF PAVEMENT
"Ø REINFORCING BAR,
EMBEDDED 18" INTO SURFACE
2 #4 BARS CONTINUOUS
8" HOLE
TOP OF REINFORCING BAR FLUSH
WITH TOP OF CONCRETE
2 #4 BARS CONTINUOUS
CONCRETE WHEEL STOP
NTS
CURB TAPER
NTS
TYPICAL SECTION PARKING LOT MIDDLE LANE
NTS
18' PARKING STALL 18' PARKING STALL
8"
3/4" R 3/4" R
3"
NO. 4 REBAR
CONTINUOUS
12" STABILIZED SUBGRADE AT LBR 40
(COMPACT TO MINIMUM 95% DENSITY
FOR COHENSIONLESS SOILS PER ASTM
D1557 COMPACT IN PLACE)SUBGRADE
6" PORTLAND CEMENT
CONCRETE 6" GRADED CRUSHED AGGREGATE WITH LBR 100 BASE COURSE
(COMPACT TO MINIMUM 98% MODIFIED PROCTOR)
NOTE: REFER TO SECTION 31 00 00 FOR SUBGRADE REQUIREMENTS.
REFER TO SECTION 32 11 23 FOR AGGREGATE BASE COURSE REQUIREMENTS
1.5" EDGE DROP
(TYP)
2" HMA (HOT MIX ASPHALT-ONE LIFT)
SEAL COAT
6" GRADED CRUSHED AGGREGATE
WITH LBR 100 BASE COURSE
12" STABILIZED SUBGRADE AT LBR 40
(COMPACT TO MINIMUM 95% DENSITY
FOR COHENSIONLESS SOILS PER ASTM
D1557 COMPACT IN PLACE)SUBGRADE
NOTE: REFER TO SECTION 31 00 00 FOR SUBGRADE REQUIREMENTS.
REFER TO SECTION 32 11 23 FOR AGGREGATE BASE COURSE REQUIREMENTS
TYPICAL MAINLINE/
HEAVY DUTY ASPHALT PAVEMENT
NTS
1.5" EDGE DROP
(TYP)
4" HMA (HOT MIX ASPHALT-TWO EQUAL LIFTS)
PRIME COAT
6" GRADED CRUSHED AGGREGATE
WITH 100-CBR BASE COURSE
(COMPACT TO 98% MODIFIED PROCTOR)
12" STABILIZED SUBGRADE AT LBR 40
(COMPACT TO MINIMUM 95% DENSITY FOR COHENSIONLESS
SOILS PER ASTM D1557 COMPACT IN PLACE)
SUBGRADE
NOTES:
1. REFER TO PLAN SHEETS CG200 SERIES FOR PROPOSED FACILITY
PROFILE DESIGN.
2. REFER TO PLAN SHEETS CG100 SERIES FOR GRADING DESIGN FOR SITE.
TYPICAL SECTION - GENERAL AVIATION ACCESS
STA: 70+71.00 TO 71+88.00
NTS
(ALSO SEE DETAIL 13 ON THIS SHEET) (ALSO SEE DETAIL 13 ON THIS SHEET)
LIGHT DUTY ASPHALT
(SEE DETAIL 2 ON THIS SHEET)
AM
EN
DM
EN
T
/05
/20
CE
B
AMENDMENT 0003
NOTE: REINFORCING STEEL SHALL CONSIST OF No. 5 REBAR 12" OCBW
B GFEC.2 D.4
C D
2.7
W
/4
W21X44 (10) W18X40 (10) W18X40 (10) W21X44 (10) W21X50 (10) W21X44 (10)
W
W
W
W
W
W24X62 (20) W24X62 (20) W24X62 (20)
W
/4
W
/4
W
/4
W
/4
W
/4
W24X62 (20) W24X62 (20)
W24X62 (20)
W
W
W
W
W
W
W
W18X40 (10) W18X40 (10) W21X44 (14) W21X44 (10) W18X40 (10) W18X40 (10)
W
/2
W
W
W
W
W
W24X62 (20)
W24X55 (18)
W
W
W
W
/4
W
W
W24X62 (20)
W24X55 (18)
W
W
W
W
/4
W
W
W24X62 (20)
W24X55 (32)
W
/4
W
W
S-201 1
S-202
S-202
M A
T C
H
LI
N E
3.7
6.5
W
X
W12X19
HSS12X8X3/8
H S
S
X 6X
1/
'-4
'-8
'-5
1' -3
/4
1'
-0
'-7
4'
-7
/4
3' -0
/2
2'
-1 1"
'-5
26'-5" 24'-9" 1'-4" 24'-8" 12'-8" 13'-4" 26'-0" 26'-0"
S-203 1 S-2032
S-304
S-304
S-301
27k 27k 23k 23k 24k 24k 27k 27k 27k 27k 30k
23k 23k 21k 21k 30k 30k 24k 24k 26k 26k 27k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k
7k k k k
49k 49k 49k 49k 44k 44k
48k 48k 48k 48k 44k 44k
42k 42k
40k 40k 37k 37k 60k 60k 44k
42k 42k
44k 44k
43k
10k 10k10 k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k
10k 10k
30k30k k k
28k28k
CB 4T
CB 4T
10K1
10K1
2.5K1, TYP.
S-302
W
X
W
X
T/SLAB REF. EL: 17'-2"
W8X10
HSS 4x4x1/4" POST
(HIGH)
E.A.C.
E.A.C.
S-301
Sim
S-304
(2) #6xFULL LENGTH SUPPLEMENTAL
CHORD REINFORCING
(2) #6x80'-0" CENTERED ON BUILDING
SUPPLEMENTAL CHORD REINFORCING
(2) #6xFULL LENGTH SUPPLEMENTAL
CHORD REINFORCING
(2) #6x80'-0" CENTERED ON BUILDING
SUPPLEMENTAL CHORD REINFORCING
S-307
4' -1
1" 1'
-6
5' -3
BID OPTION #9:
HSS STUBS FOR UTILITY SUPPORT
HSS4x2x3/16; TYP. @ (4) PLACES
1/
2"
2' -0
1' -8
2' -0
5'
-5
/2
W8X15 (6)
LOW
LOW
HSS6X6X1/4 STUB OFF
COLUMN FACE
S-302
10K1
REFER TO 1/S-305 FOR
BUILT-UP EDGE ANGLE DETAIL
T .O
.S
'-3
S-203
3 5/8" CAST-IN-PLACE
CONCRETE CURB; TYP.
AT RECESS; SEE ARCH
FOR WALL LAYOUT
HSS VENEER SUPPORT
STRUCTURE ABOVE; SEE 2/S-202
E Q
E Q
E Q
1' -0
/4
FACE OF
BUILT-UP EDGE
ANGLE
k k
KEYPLAN - WEST
S-101/S-103/S-105
S-102/S-104/S-106
COMPOSITE FRAMING NOTES:
3" TYPE VLI 18 GA VULCRAFT OR EQUIVALENT (TH=0.0474 in, I=1.254 in^4/ft) W/ 3" CONCRETE COVER (6" TOTAL) REINFORCED W/ ONE LAYER WWF 6x6 W4.5 x W4.5
INSTALLATION/ATTACHMENT:
SUPPORT FASTENERS: 3/4"Øx4 1/2" SHEAR STUDS
3/4"Ø PUDDLE WELDS
SIDELAP FASTENERS: #10 TEK SCREWS
FASTENER LAYOUT: 12" MAX SPACING
SIDE LAP FASTENER @ 24" O.C. TYP.
SECOND FLOOR COMPOSITE BEAM CONNECTIONS TO BE
DESIGNED BY STEEL FABRICATOR'S DELEGATED ENGINEER
W18x35
BEAM SIZE
(20)
NO. OF SHEAR STUDS;
(36" O.C. MAXIMUM SPACING)
3/4"
AMOUNT OF CAMBER
BEAM LEGEND
SHEET NOTES
2ND FLOOR OVERFRAMING CONSISTING OF LIGHT
GAGE KNEE WALLS @ 2'-0" O.C. W/ 9/16" TYPE C 24 GA.
VULCRAFT OF EQUIVALENT (TH=0.0239 in, I=0.019 in^ 4/ft) W/ 1 7/16" LIGHT WEIGHT CONCRETE (110 PCF)
COVER (2" TOTAL) REINFORCED W/ ONE LAYER WWF
6x6 W2.1xW2.1. SEE DET. 3/S-504.
NOTE: DECK SPAN TO BE PERPENDICULAR TO
SUPPORTING KNEE WALLS; FINAL ORIENTATION OF
KNEE WALLS AND DECK BY CONTRACTOR.
15k 15k
ULTIMATE LEVEL BEAM REACTION
IN KIPS; 10k MINIMUM
ENGINEERED ALUMINUM CANOPY SYSTEM AND
FOUNDATIONS BY A DELEGATED DESIGN ENGINEER.
THE ENGINEER SHALL PROVIDE DETAILS FOR ALL
CONNECTIONS BACK TO THE LIGHT-GAUGE STUD
WALL, AS WELL AS LOADS REQUIRED TO BE RESISTED
BY THE LIGHT-GAUGE STUD FRAMING SYSTEM.
SPECIALTY LIGHT-GAUGE WALL FRAMING
DESIGNER SHALL DESIGN AND COORDINATE STUD
FRAMING TO SUPPORT CANOPY LOADS. CANOPY
LOADS SHALL NOT BEAR ON THE EXTERIOR VENEER.
=E.A.C.
= HSS 4x4x1/4" ELEVATOR RAIL SUPPORT COLUMN AND
HOIST BEAM SUPPORT. G.C. FIELD LOCATE BASED
ON FINAL RAIL SUPPORT LOCATIONS.
HSS4-R.S.
(EL:17'-1 1/4")
(EL:17'-2")
= MONORAIL CRANE SUPPORT BEAM FOR 4 TON CRANE
SYSTEM BY CRANE SPECIALTY ENGINEER
CB 4T
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S
E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J E
C T
N U
M B
E R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
M E
F
M
A Y
W
R
C Y
B E
R S
P A
C E
T E
S T
G R
O U
P F
A C
IL
IT
Y
E G
L
IN
A F
B F
L O
R
ID
A
S-103FTFA 16-3007
S E
C O
N D
F L
O O
R F
R A
M
IN
G P
L A
N
W E
S T
IC
M
IC
M
B J
B
L J
D
M
A Y
M E
F
S
1/8" = 1'-0"S-103
1 SECOND FLOOR FRAMING PLAN-WEST
0 4' 8' 16'
SCALE 1/8":1'-0"
2'
NORTH
A
M E
N D
A U
G
AMENDMENT 0003
8 9
ROOF
32' - 0"
FLAT ROOF
38' - 4"
8" LIGHT GAUGE STUD WALL;
REFER TO 6.00 SERIES
NOTES ON S-002
2 1/2" LIGHT GAUGE STUD
WALL; REFER TO 6.00 SERIES
NOTES ON S-002
ROOF JOIST; SEE PLAN
PROVIDE BOTTOM FLANGE BRACING
AT ALL PERIMETER BEAMS; TYP.
DESIGN JOIST FOR OUT-OF-PLANE
WIND REACTION INDICATED.
5"
16 GA. MINIMUM OVERFRAMING AND CONNECTIONS
BY DELEGATED LIGHT GAUGE DESIGNER
4" / 1' - 0"
ROOF JOIST; SEE PLAN
PROVIDE BOTTOM FLANGE BRACING
AT ALL PERIMETER BEAMS; TYP.
DESIGN JOIST FOR OUT-OF-PLANE
WIND REACTION INDICATED.
42'-3"
T/STEEL
PARAPET BEAM; SEE ELEVATIONS
STEPPED L8x6x7/16x2'-0" LLH FOR BRICK SUPPORT; COORDINATE LOCATIONS W/ ARCH.
CONT. L4x4x3/8 FOR JOIST SUPPORT
1/4" 3 @ 12
TYP.; WELD ALL
AROUND TO
COLUMNS
W/SPACER PLATES
MAX.
4'-0" O.C.
1-1/2" METAL DECK
L4X4X1/4 ALONG VALLEY FOR DECK
ATTACHMENT W/ LONG SCREWS
1/4" 6"
TYP.
CONT. L2x2x3/16" EDGE
ANGLE TURNED DOWN
8" 18 GA. MINIMUM
INFILL STUD FRAMING BY
DELEGATED DESIGN ENGINEER.
18 GA.x6"x6" BENT PLATE
TYPICAL ALONG VALLEYS, SCREWED
TO ROOF DECK EACH SIDE TO MATCH
SIDELAP FASTENER SIZE AND SPACING.
16 GA.x5"x3" LLV MIN.
CONT. DECK EDGE ANGLE
SCREWED TO EACH STUD
WITH (2) #12 SELF TAPPING
SCREWS AND TO TRUSS
W/#12@8" O.C. MAX SPACING
SECOND FLOOR ACCESS FLOORING
17' - 2"
SECOND FLOOR SLAB
16' - 0"
ENGINEERED MONORAIL
CRANE SUPPORT BEAM FOR
4 TON SYSTEM; SEE PLAN
COMPOSITE BEAM;
SEE PLAN
COMPOSITE DECK;
SEE PLAN
ACCESS FLOORING;
SEE ARCH.
12'-9"
B/CRANE BEAM
CONNECTION OF CRANE BEAM TO PRIMARY
STRUCTURE BY CRANE SPECIALTY ENGINEER
BRACING FOR CRANE BEAM BY
CRANE SPECIALTY ENGINEER
BRACE CONNECTION TO UNDERSIDE OF
DECK BY CRANE SPECIALTY ENGINEER
SECOND FLOOR ACCESS FLOORING
17' - 2"
SECOND FLOOR SLAB
16' - 0"
ENGINEERED MONORAIL
CRANE SUPPORT BEAM FOR
4 TON SYSTEM; SEE PLAN
COMPOSITE BEAM;
SEE PLAN
COMPOSITE DECK;
SEE PLAN
ACCESS FLOORING;
SEE ARCH.
BRACING FOR CRANE BEAM BY CRANE
SPECIALTY ENGINEER CONNECTION OF CRANE BEAM TO PRIMARY
STRUCTURE BY CRANE SPECIALTY ENGINEER
12'-9"
B/CRANE BEAM
SECOND FLOOR ACCESS FLOORING
17' - 2"
8 9
SECOND FLOOR SLAB
16' - 0"
14 GA. MIN. POUR STOP
BY DECK MFR.
3 1/2"
4"
14 GA. MIN. POUR STOP
BY DECK MFR.
3 1/2"
COMPOSITE BEAM;
SEE PLAN
HSS BRACE;
SEE ELEVATIONS
TYPICAL OVERFRAMING AT
AREAS WITHOUT ACCESS FLOOR;
REFER TO PLAN AND SECTION 3/S-504.
8" LIGHT GAUGE STUD WALL;
REFER TO 6.00 SERIES
NOTES ON S-002
BRICK VENEER;
SEE ARCH.
R E
C E
S S
3/ 4"
14 GA. MIN. POUR STOP
BY DECK MFR.
HSS12X8X3/8
SLAB EDGE
4"
FACE OF STUD
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S
E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J E
C T
N U
M B
E R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T
M O
B
IL
E A
L A
B A
M A
M E
F
M
A Y
W
R
C Y
B E
R S
P A
C E
T E
S T
G R
O U
P F
A C
IL
IT
Y
E G
L
IN
A F
B F
L O
R
ID
A
S-304FTFA 16-3007
S E
C T
IO
N
S A
N D
D E
T A
IL
S
IC
M
IC
M
B J
B
L J
D
M
A Y
M E
F
S
3/4" = 1'-0"S-304
1 SECTION AT FLAT ROOF
3/4" = 1'-0"S-304
2 CRANE BEAM ATTACHMENT 1
3/4" = 1'-0"S-304
3 CRANE BEAM ATTACHMENT 2
3/4" = 1'-0"S-304
4 SECTION THROUGH WEST LANDING SLAB
0 6" 1' 2'
SCALE 3/4":1'-0"
4'
A
M E
N D
A U
G
AMENDMENT 0003
SHEET
IDENTIFICATION
US Army Corps of Engineers ® Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J E
C T
N U
M B
E R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
M E
F
M A
Y
75 SOUTH "F" STREET
PENSACOLA, FLORIDA 32502
(850) 434-0513
(PROF. ENG. #: 3600)
PEI JOB #2019009
PETERSON ENGINEERING INC.PETERSON ENGINEERING INC.PETERSON ENGINEERING INC.PETERSON ENGINEERING INC.
FTFA 16-3007
C Y
B E
R S
P A
C E
T E
S T
G R
O U
P F
A C
IL
IT
Y E
G L
IN
A
F B
F
L O
R
ID
A
P-601
P L
U M
B
IN
G S
C H
E D
U L
E S
-1
B E
J
B E
J E
K
G D
P
M
A Y
M E
F
P
WATER HEATER SCHEDULE
MARK
CAPACI
TY GAL
INLET
TEMP
OUTLET
TEMP
RECOVERY
GAL/HR
1ST HOUR
DELIVERY
GAL/HR
SHIPPING
WEIGHT
LB
ELECTRICAL DATA BASIS OF DESIGN
REMARKS
V/PH/HZ KW MAKE MODEL
EWH-1 20 60 °F 140 °F 47 63 146 208/1/60 9 AO SMITH DSE-20-9 FURNISH TANK MODELS WITH T&P RELIEF VALVE, ANODE ROD, DIP TUBE, DRAIN VALVE, DIELECTRIC CONNECTIONS OR UNIONS
EWH-2 20 60 °F 140 °F 26 42 73 208/1/60 5 AO SMITH DEL-20S-5 FURNISH TANK MODELS WITH T&P RELIEF VALVE, ANODE ROD, DIP TUBE, DRAIN VALVE, DIELECTRIC CONNECTIONS OR UNIONS
AIR COMPRESSOR SCHEDULE
MARK
NO. OF
COMPRESSORS
SCFM
DISCHARGE
PRESSURE
ELECTRICAL SHUT OFF
PRESSURE
HP TYPE RECEIVER
(V/PH/HZ)
AC-1 1 70 90 PSI 115/1/60 175 PSI 25 VARIABLE SCREW 280 GAL. ASME RATED
NOTES:
1. PROVIDE COMPRESSOOR WITH START UP KIT.
2. PROVIDE VFD, STEP DOWN TRANSFORMER, AND DRIVE ISOLATION TRANSFORMER.
3. MOTOR AND REFRIGERANT DRYER SHALL BE MOUNTED ON TANK WHERE APPLICABLE.
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION
CONNECTIONS
REMARKS
WASTE CW HW AIR
P-1 WATER CLOSET 4" 1" -- -- FLOOR MOUNTED ELONGATED VITREOUS CHINA WITH WHITE OPEN FRONT SEAT AND MANUAL FLUSH VALVE AT 1.28 GPF.
P-1A WATER CLOST (ABA) 4" 1" -- -- FLOOR MOUNTED ELONGATED VITREOUS CHINA WITH WHITE OPEN FRONT SEAT AND MANUAL FLUSH VALVE AT 1.28 GPF.
P-2 URINAL 2" 3/4" -- -- WALL HUNG VITREOUS CHINA WITH MANUAL FLUSH VALVE AT 0.125 GPF.
P-2A URINAL (ABA) 2" 3/4" -- -- WALL HUNG VITREOUS CHINA WITH MANUAL FLUSH VALVE AT 0.125 GPF.
P-3 LAVATORY 1-1/4" 1/2" 1/2" -- COUNTER MOUNTED VITREOUS CHINA WITH SINGLE LEVEL MIXING VALVE AT 0.5 GPM AND GRID DRAIN.
P-3A LAVATORY (ABA) 1-1/4" 1/2" 1/2" -- COUNTER MOUNTED VITREOUS CHINA WITH SINGLE LEVER MIXING VALVE AT 0.5 GPM AND GRID DRAIN.
P-4 SINGLE COMPARTMENT SINK 1-1/2" 1/2" 1/2" -- 33”X22” STAINLESS STEEL WITH SINGLE LEVER WING SPOUT FACUET AND HAND HELD SPRAY AT 1.5 GPM.
P-5 SINGLE COMPARTMENT SINK 1-1/2" 1/2" 1/2" -- 19”X18” STAINLESS STEEL WITH SINGLE LEVER WING SPOUT FACUET AND HAND HELD SPRAY AT 1.5 GPM.
P-6 MOP SINK 3" 1/2" 1/2" --
MOLDED STONE 24”X24”X10” DEEP, WALL MOUNTED FAUCET WITH VACUUM BREAKER HOSE KIT AND FOOT CONTROL VALVES EQUAL TO FIAT MSB-2424.
PROVIDE BUCKET HOLDER.
P-7 ELECTRIC WATER COOLER (ABA) 1-1/4" 1/2" -- -- SPLIT LEVEL STAINLESS STEEL WITH BOTTLE FILLER AND FILTER.
P-8 SHOWER (ABA) 2" 1/2" 1/2" -- SINGLE LEVER CONTROL VALVE AT 1.5 GPM, 30” SLIDEBAR, 60” STAINLESS STEEL HOSE, VACUUM BREAKER AND HAND HELD SHOWER HEAD. SEE
INTERIOR DRAWINGS FOR SHOWER PAN/BASE AND WALLS.
HB HOSE BIBB -- 3/4" -- -- PROVIDE WITH VACUUM BREAKER
WH WALL HYDRANT -- 3/4" -- -- WALL BOX WITH LOCKING DOOR, VACUUM BREAKER AND SHALL BE FREEZE PROOF
FD FLOOR DRAIN 3" 3/4" -- -- PROVIDE WITH TRAP PRIMER
NOTES:
1. ALL PLUMBING FIXTURE COLORS/FINISHES SHALL BE WHYTE.
2. PROVIDE RH OR LH TRIP LEVER FOR ADA WATER CLOSETS AS REQUIRED FOR GRAB BAR CONFIGURATION.
P-10 HOSE REEL -- -- -- 1/2" 50'-0" HOSE REEL SECURED TO COLUMN OR AS INDICATED ON DRAWINGS. REFER TO DETAILS.
P-11 ELECTRIC WATER COOLER - BOTTLE FILLER ONLY 1/4" -- -- IN-WALL AUTOMATIC BOTTLE FILLING STATION, FILTERED, 8 GPH, AND STAINLESS.--
NOTES:
1. PROVIDE CIRCULATION PUMP WITH TOTAL HEAD OF 25FT, FLOW OF 24 GPM, 120/1/60 1/6HP. BASIS OF DESIGN TACO 0013, BRONZE BODY, CARTRIDGE TYPE CIRCULATING PUMP, HOT WATER RETURN.
REFRIGERATED AIR DRYER SCHEDULE
MARK SCFM
MAX WORKING
PRESSURE PSI
RLA
ELECTRICAL
(V/PH/HZ)
RAD-1 70 175 PSI 26 480/3/60
P-12 VALVE BOX 1/2" -- -- SPILL DRAIN TO FLOOR DRAIN PROVIDE FILTER AND AA-ZISE WATER HAMMER ARRESTOR.--
MAX AMPS
FLA
1. MOTOR AND REFRIGERANT DRYER SHALL BE MOUNTED ON TANK WHERE APPLICABLE.
AMENDMENT 0003
A
M E
N D
R E
M O
V E
D B
A S
IS
O
F D
E S
IG
N
/0 /2
| MEF19017GC005 |
| Sheets and Views |
| SITE WORK PHASING PLAN |
| MEF19017GC004 |
| Sheets and Views |
| SITE USE AND WORK RESTRICTION PLAN |
| MEF19017CS501 |
| Sheets and Views |
| PAVING DETAILS |
| MEF19017S103 |
| MEF19017S304 |
| MEF19017P601 |
| Sheets |
| P-601 - PLUMBING SCHEDULES-1 |
File details come from the government source that posted it. Updated .