AM01 DRAWINGS.pdf

PDF 13 MB Posted

Attached to
Cyberspace Test Group Facility, Eglin AFB, FL Federal contract opportunity
Solicitation number
W9127820R0057
Issued by
Department of the Army Corps of Engineers Engineering District Mobile

About this file

This document provides details for a federal contract opportunity for construction services. The solicitation is for the construction of a new Cyberspace Test Group Facility at Eglin Air Force Base in Florida. The 52,003 square foot facility will include a multi-level sensitive compartmented information facility utilizing conventional design and construction methods. It will have a concrete foundation, split-faced concrete block construction over a steel frame, and a sloped standing seam metal roof. The facility will also include fire suppression systems, all utilities, pavements, communications, site improvements, and associated support facilities. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Mobile. The opportunity closing date and award date are not specified in the document.

View the file

Other files for this federal contract opportunity

Other files attached to Cyberspace Test Group Facility, Eglin AFB, FL, newest first.
File Type Posted
W9127820R0057 JA_Redacted.pdf PDF
AM05.pdf PDF
AM05 DRAWINGS.pdf PDF
AM04.pdf PDF
AM03 DRAWINGS.pdf PDF
AM03.pdf PDF
AM02 DRAWINGS.pdf PDF
AM02.pdf PDF
AM01.pdf PDF
Site visit sign in sheet.pdf PDF
VOL1.PDF PDF
VOL6.PDF PDF
VOL3.PDF PDF
VOL4.PDF PDF
RTA DRAWINGS VOL1.pdf PDF
VOL5.PDF PDF
VOL2.PDF PDF
EM 385-1-1.pdf PDF
RTA DRAWINGS VOL2 .pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

MOBILE DISTRICT

109 SAINT JOSEPH STREET

MOBILE AL 36602

CYBERSPACE TEST GROUP FACILITY

EGLIN AIR FORCE BASE, FLORIDA

OKALOOSA COUNTY

JUNE 2020

MOBILE DISTRICT PROJECT CODE: MEF19017

RFP NUMBER: W9127820R0057

AMENDMENT NO. 0001

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:1

:2

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-003

IN

D

E X

O F

D R

A W

IN

G

S

B

M A

G G

IO

R

E

T

W A

L L

IS

B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

INDEX OF DRAWINGS - VOLUME 2 OF 2

SHEET

NUMBER SHEET NAME

T-016 ENLARGED NEW MAINTENANCE HOLE 72 AND EX MH 73

T-017 ENLARGED NEW MAINTENANCE HOLE 71

T-018 ENLARGED BUILDING 90 MAINTENANCE HOLES

T-019 NON-CORE SERVICES COMMUNICATIONS SITE PLAN - BID OPTION 3

T-020 TELECOM SITE DETAILS

T-021 TELECOM SITE DETAILS

T-111 OVERALL FIRST FLOOR CONDUIT PATHWAY PLAN

T-112 OVERALL FIRST FLOOR OVERHEAD/ABOVE CEILING PATHWAY PLAN

T-113 OVERALL FIRST FLOOR BELOW FLOOR PATHWAY PLAN

T-114 OVERALL FIRST FLOOR CABLING DISTRIBUTION PLAN

T-115 ENLARGED FIRST FLOOR PLAN WEST

T-116 ENLARGED FIRST FLOOR PLAN EAST

T-121 OVERALL SECOND FLOOR CONDUIT PATHWAY PLAN

T-122 OVERALL SECOND FLOOR OVERHEAD/ ABOVE CEILING PATHWAY PLAN

T-123 OVERALL SECOND FLOOR BELOW FLOOR PATHWAY PLAN

T-124 OVERALL SECOND FLOOR CABLING DISTRIBUTION PLAN

T-125 ENLARGED SECOND FLOOR PLAN WEST

T-126 ENLARGED SECOND FLOOR PLAN EAST

T-201 TELECOM GROUNDING DETAILS

T-202 TELECOM OUTLET DETAILS

T-203 TELECOM OUTLET DETAILS

T-204 TELECOM DETAILS

T-205 TELECOM DETAILS

T-206 PROTECTIVE DISTRIBTION SYSTEM (PDS) DETAILS

T-207 PROTECTIVE DISTRIBTION SYSTEM (PDS) DETAILS

T-208 TELECOM MOUNTING DETAILS

T-301 CORE BACKBONE SINGLE LINE DIAGRAMS

T-302 NON-CORE BACKBONE AND UNCLASS SINGLE LINE DIAGRAMS

T-303 CLASS SIPR & NON CORE SINGLE LINE DIAGRAMS

T-304 NON-CORE SINGLE LINE DIAGRAMS

T-305 NON-CORE AND UNCLASS SINGLE LINE DIAGRAMS

T-306 LAB CLOSED NETWORKS SINGLE LINE DIAGAMS

T-307 OTHER, COMMERCIAL, AND LAB CLOSED NETWORK SINGLE LINE DIAGRAMS

T-308 CATV AND PA SINGLE LINE DIAGRAMS

T-401 TELECOM ENLARGED SERVER ROOM 114

T-402 TELECOM ENLARGED STORAGE ROOM 129

T-403 TELECOM ENLARGED ATL ANALYSIS ROOM 138

T-404 TELECOM ENLARGED C/EW ANALYSIS ROOM 140

T-405 TELECOM ENLARGED COMM ROOM 141 & AC SERVER ROOM 148

T-406 TELECOM ENLARGED COMM ROOM 152

T-407 TELECOM ENLARGED IDE SERVER ROOM 202

T-408 TELECOM ENLARGED 96 CTG. SEC. COMM ROOM 214

T-409 TELECOM ENLARGED COMM ROOM 234 & 240

T-501 TELECOM RACK ELEVATIONS- SERVER ROOM 114 & STORAGE ROOM 129

T-502 TELECOM RACK ELEVATIONS - ATL ANALYSIS ROOM 138

T-503 TELECOM RACK ELEVATIONS - C/EW ANALYSIS ROOM 140

T-504 TELECOM RACK ELEVATIONS - COMM. ROOM 141 & ACR SERVER ROOM 148

T-505 TELECOM RACK ELEVATIONS - COMM ROOM 152

T-506 TELECOM RACK ELEVATIONS - IDE SERVER ROOM 202

T-507 TELECOM RACK ELEVATIONS - ITS STORAGE ROOM 211 & 96 CTG. SEC, COMM ROOM 214

T-508 TELECOM RACK ELEVATIONS - COMM ROOM 234

T-509 TELECOM RACK ELEVATIONS - COMM. ROOM 240

TA001 AUDIO VISUAL LEGEND

TA111 AUDIO VISUAL FIRST FLOOR PLAN WEST

TA112 AUDIO VISUAL FIRST FLOOR PLAN EAST

TA121 AUDIO VISUAL SECOND FLOOR PLAN WEST

TA122 AUDIO VISUAL SECOND FLOOR PLAN EAST

TA201 AUDIO VISUAL DETAILS

TA301 AUDIO VISUAL DIAGRAMS

TY001 SECURITY LEGEND & NOTES

TY111 SECURITY FIRST FLOOR PLAN WEST

TY112 SECURITY FIRST FLOOR PLAN EAST

TY121 SECURITY SECOND FLOOR PLAN WEST

TY122 SECURITY SECOND FLOOR PLAN EAST

TY201 SECURITY DETAILS

TY202 SECURITY DOOR DETAILS

TY203 SECURITY DOOR DETAILS

TY204 SECURITY DOOR DETAILS

TY205 SECURITY DOOR DETAILS

TY301 SECURITY SINGLE LINE DIAGRAMS

TY302 SECURITY SINGLE LINE DIAGRAMS

INDEX OF DRAWINGS - VOLUME 2 OF 2

SHEET

NUMBER SHEET NAME

E-100 DEMO ELECTRICAL SITE PLAN

E-101 NEW WORK ELECTRICAL SITE PLAN

E-102 NEW WORK ELECTRICAL SITE LIGHTING PLAN

E-103 SITE LIGHTING DETAILS - BID OPTION 11

E-111 OVERALL FIRST FLOOR POWER PLAN & PATHWAYS

E-112 FIRST FLOOR POWER PLAN - WEST

E-113 FIRST FLOOR GROUNDING PLAN - WEST

E-114 FIRST FLOOR POWER PLAN - EAST

E-115 FIRST FLOOR GROUNDING PLAN - EAST

E-116 OVERALL SECOND FLOOR POWER PLAN

E-117 SECOND FLOOR POWER PLAN - WEST

E-118 SECOND FLOOR GROUNDING PLAN - WEST

E-119 SECOND FLOOR POWER PLAN - EAST

E-120 SECOND FLOOR GROUNDING PLAN - EAST

E-211 OVERALL FIRST FLOOR LIGHTING PLAN

E-212 FIRST FLOOR LIGHTING PLAN - WEST

E-213 FIRST FLOOR LIGHTING PLAN - EAST

E-214 OVERALL SECOND FLOOR LIGHTING PLAN

E-215 SECOND FLOOR LIGHTING PLAN - WEST

E-216 SECOND FLOOR LIGHTING PLAN - EAST

E-311 OVERALL FIRST FLOOR MECHANICAL POWER PLAN

E-312 FIRST FLOOR MECHANICAL POWER PLAN - WEST

E-313 FIRST FLOOR MECHANICAL POWER PLAN - EAST

E-314 OVERALL SECOND FLOOR MECHANICAL POWER PLAN

E-315 SECOND FLOOR MECHANICAL POWER PLAN - WEST

E-316 SECOND FLOOR MECHANICAL POWER PLAN - EAST

E-400 LIGHTNING PROTECTION PLAN

E-401 LIGHTNING PROTECTION DETAILS

E-500 DEV&RE LAB/THREAT DEVELOPMENT LAB ENLARGED 60Hz/00Hz & DC ROOM PLANS

E-501 CYBER/EW ENLARGED ROOM PLAN 60Hz

E-502 CYBER/EW ENLARGED ROOM PLAN 400Hz & DC

E-503 AVIONICS TEST LAB ENLARGED ROOM PLAN 60Hz

E-504 AVIONICS TEST LAB ENLARGED ROOM PLAN - 400Hz & DC

E-600 PANEL SCHEDULE INDEX

E-601 PANEL SCHEDULE

E-602 PANEL SCHEDULE

E-603 PANEL SCHEDULE

E-604 PANEL SCHEDULE

E-605 PANEL SCHEDULE

E-606 PANEL SCHEDULE

E-607 PANEL SCHEDULE

E-608 PANEL SCHEDULE

E-609 PANEL SCHEDULE

E-610 PANEL SCHEDULE

E-611 PANEL SCHEDULE

E-612 PANEL SCHEDULE

E-613 PANEL SCHEDULE

E-614 PANEL SCHEDULE

E-615 PANEL SCHEDULE

E-616 PANEL SCHEDULE

E-617 400Hz PANEL SCHEDULE

E-618 400Hz PANEL SCHEDULE

E-619 400Hz PANEL SCHEDULE

E-620 270VDC PANEL SCHEDULES

E-621 28VDC PANEL SCHEDULES

E-622 28VDC PANEL SCHEDULES

E-623 28VDC PANEL SCHEDULES

E-624 PANEL SCHEDULE

E-625 PANEL SCHEDULE

E-626 BUS DUCT PLUG SCHEDULES

E-627 BUS DUCT PLUG SCHEDULES

TELECOMMUNICATIONS

T-001 TELECOM LEGEND

T-002 GENERAL NOTES

T-003 TELECOM SITE NOTES

T-004 PARTIAL CORE SERVICES COMMUNICATIONS SITE PLAN

T-005 PARTIAL CORE SERVICES COMMUNICATIONS SITE PLAN

T-006 PARTIAL CORE SERVICES COMMUNICATIONS SITE PLAN

T-007 PARTIAL CORE SERVICES COMMUNICATIONS SITE PLAN

T-008 ENLARGED EXISTING MANHOLE 73 AREA

T-009 ENLARGED EXISTING MANHOLE 7C AREA

T-010 ENLARGED EXISTING MANHOLE 8C AND NEW MANHOLE 2E-1 AREA

T-011 ENLARGED EXISTING MANHOLE 2E AREA

T-012 ENLARGED EXISTING MANHOLE 2X AND 3X

T-013 ENLARGED EXISTING MANHOLE 17, 18, & 19

T-014 ENLARGED EXISTING MANHOLE 2B2

T-015 ENLARGED EXISTING MANHOLE 2B1

INDEX OF DRAWINGS - VOLUME 2 OF 2

SHEET

NUMBER SHEET NAME

FIRE PROTECTION

FA101 OVERALL FIRST FLOOR FIRE ALARM PLAN

FA102 PARTIAL FIRST FLOOR FIRE ALARM PLAN - WEST

FA103 PARTIAL FIRST FLOOR FIRE ALARM PLAN - EAST

FA104 OVERALL SECOND FLOOR FIRE ALARM PLAN

FA105 PARTIAL SECOND FLOOR FIRE ALARM PLAN - WEST

FA106 PARTIAL SECOND FLOOR FIRE ALARM PLAN - EAST

FA501 DETAILS - FIRE ALARM

FA502 FIRE ALARM SEQUENCE OF OPERATION

FX101 OVERALL FIRST FLOOR FIRE PROTECTION PLAN

FX102 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - WEST

FX103 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - EAST

FX104 OVERALL SECOND FLOOR FIRE PROTECTION PLAN

FX105 PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - WEST

FX106 PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - EAST

FX401 ENLARGED FIRE PUMP ROOM

FX501 DETAILS - FIRE PROTECTION

PLUMBING

P-001 PLUMBING LEGENDS, NOTES & ABBREVIATION

P-101 PARTIAL FIRST FLOOR PLAN WEST - PLUMBING BELOW SLAB

P-102 PARTIAL FIRST FLOOR PLAN EAST - PLUMBING BELOW SLAB

P-103 PARTIAL FIRST FLOOR PLAN WEST - PLUMBING ABOVE SLAB

P-104 PARTIAL FIRST FLOOR PLAN EAST - PLUMBING ABOVE SLAB

P-105 PARTIAL SECOND FLOOR PLAN WEST - PLUMBING BELOW SLAB

P-106 PARTIAL SECOND FLOOR PLAN EAST - PLUMBING BELOW SLAB

P-107 PARTIAL SECOND FLOOR PLAN WEST - PLUMBING ABOVE SLAB

P-108 PARTIAL SECOND FLOOR PLAN EAST - PLUMBING ABOVE SLAB

P-401 ENLARGED FIRST FLOOR PLAN - PLUMBING WASTE, VENT AND WATER

P-402 ENLARGED SECOND FLOOR PLAN - PLUMBING WASTE, VENT AND WATER

P-501 PLUMBING DETAILS-1

P-502 PLUMBING DETAILS-2

P-503 PLUMBING DETAILS-3

P-601 PLUMBING SCHEDULES-1

P-901 PLUMBING RISER EAST - WASTE AND VENT

P-902 PLUMBING RISER WEST - WASTE AND VENT

P-903 PLUMBING RISER - COMPRESSED AIR

P-904 PLUMBING RISER EAST - DOMESTIC WATER

P-905 PLUMBING RISER WEST - DOMESTIC WATER

MECHANICAL

M-001 HVAC LEGENDS, NOTES & ABBREVIATION

M-101 OVERALL FIRST FLOOR PLAN - HVAC

M-102 PARTIAL FIRST FLOOR PLAN - HVAC WEST

M-103 PARTIAL FIRST FLOOR PLAN - HVAC EAST

M-104 OVERALL SECOND FLOOR PLAN - HVAC

M-105 PARTIAL SECOND FLOOR PLAN - HVAC WEST

M-106 PARTIAL SECOND FLOOR PLAN - HVAC EAST

M-107 PARTIAL FIRST FLOOR PLAN - HVAC PIPING WEST

M-108 PARTIAL FIRST FLOOR PLAN - HVAC PIPING EAST

M-109 PARTIAL SECOND FLOOR PLAN - HVAC PIPING WEST

M-110 PARTIAL SECOND FLOOR PLAN - HVAC PIPING EAST

M-401 ENLARGED PLAN - HVAC

M-501 HVAC DETAILS-1

M-502 HVAC DETAILS-2

M-503 HVAC DETAILS-3

M-504 HVAC DETAILS-4

M-601 HVAC SCHEDULES-1

M-602 HVAC SCHEDULES-2

M-603 HVAC SCHEDULES-3

M-701 CHILLED WATER PIPING DIAGRAM - PRIMARY LOOP

M-702 CHILLED WATER PIPING DIAGRAM - SECONDARY LOOP

M-703 HVAC CONTROLS-1

M-704 HVAC CONTROLS-2

M-705 HVAC CONTROLS-3

ELECTRICAL

E-001 LEGEND AND ABBREVIATIONS

E-002 LIGHTING FIXTURE SCHEDULE

E-003 ELECTRICAL PRIMARY RISER

E-004 ELECTRICAL ONE-LINE DIAGRAM (277/480V) - BASE BID

E-005 BID OPTIONS ELECTRICAL ONE-LINE DIAGRAM (227/480V)

E-006 ELECTRICAL ONE-LINE DIAGRAM (120/280V)

E-007 400Hz, 28VDC, ONE LINE DIAGRAMS

E-008 GROUNDING SYSTEM RISER DIAGRAM

E-009 PENETRATION DETAILS

E-010 LIGHTING DETAILS

E-011 LIGHTING DETAILS

INDEX OF DRAWINGS THIS SHEET

INCLUDE VOLUME 2 DRAWINGS

A

M E

N D

M E

N T

/2

/2

WORK OF THIS CONTRACT INCLUDES THE CONSTRUCTION OF MULTIPLE SECURE AREAS IN ACCORDANCE WITH UFC 4-010-05 SENSITIVE COMPARTMENT INFORMATION FACILITIES PLANNING, DESIGN, CONSTRUCTION (1 FEB 2013, CHANGE 1 OCT 2013) AND TECHNICAL SPECIFICATIONS FOR THE CONSTRUCTION AND MANAGEMENT OF SENSITIVE COMPARTMENTED INFORMATION FACILITIES, VERSION 1.4 IC TECH SPEC-FOR ICD/ICS 705 (SEPTEMBER 28, 2017). THE RELATED BUILDING SYSTEMS AND ASSEMBLIES HAVE BEEN DESIGNED TO MEET THIS CRITERIA AND SHALL BE CONSTRUCTED AND INSTALLED BY THIS CONTRACT IN ACCORDANCE WITH THIS SAME CRITERIA. REFER TO SPECIFICATION SECTION 01 00 00 AND 01 11 00 FOR ADDITIONAL REQUIREMENTS. THE FOLLOWING PROVIDES ADDITIONAL GENERAL REQUIREMENTS AND DETAILED INFORMATION TO SUPPLEMENT THE DRAWING AND TECHNICAL SPECIFICATION REQUIREMENTS RELATED TO THE CONSTRUCTION OF THE SECURE AREAS OF THIS CONTRACT.

1. CONTRACTOR SHALL SCHEDULE AND COORDINATE THE SEQUENCE OF INSTALLATION OF ALL SECURE AREA PERIMETER WITH THE CONTRACTING OFFICER TECHNICAL REPRESENTATIVE (COTR) TO PROVIDE ADVANCE NOTIFICATION AND ACCESS TO BUILDING ASSEMBLIES AND SYSTEMS THAT ARE PART OF THE DESIGNATED SECURE AREA(S) FOR GOVERNMENT SECURITY INSPECTORS TO PERFORM REQUIRED INSPECTIONS, DOCUMENTATION AND TESTING DURING VARIOUS STAGES OF CONSTRUCTION OF SECURE AREA CONSTRUCTION BEFORE BEING CONCEALED BY OTHER WORK OF THIS CONTRACT. THESE ASSEMBLIES INCLUDE, BUT NOT LIMITED TO; SECURITY PERIMETER WALLS, FLOOR/CEILING, ROOF/CEILING, AND ALL PENETRATIONS THROUGH THE SECURE PERIMETER.

2. SECURITY STC RATED WALLS, FLOOR/CEILING, AND ROOF/CEILING ASSEMBLIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TESTED ASSEMBLY IDENTIFIED ON THE DRAWINGS AS THE “BASIS OF DESIGN” (OR APPROVED EQUAL) AND OTHER ADDITIONAL REQUIREMENTS IDENTIFIED ON THE DRAWINGS AND SPECIFICATIONS THAT MAY NOT BE SPECIFICALLY ADDRESSED IN THE TEST DATA SUCH AS; SEALING OF THE ASSEMBLY PERIMETER AT JUNCTION WITH OTHER SOUND RATED AND NON-SOUND RATED ASSEMBLIES, SEALING ALL PENETRATIONS, AND MODIFICATIONS TO ENHANCE PHYSICAL SECURITY PERFORMANCE (IE: STUD GAGE AND

SPACING, ETC.).

3. WHERE INDICATED FOR CONSTRUCTION TO BE SEALED, SEALING SHALL BE ACCOMPLISHED USING ACOUSTICAL SEALANT TO FILL ALL GAPS, HOLES AND SPACES AT ALL JUNCTIONS, PERIMETER AND PENETRATIONS THROUGH THE SECURITY ASSEMBLIES (WALL, FLOOR, AND CEILING – 6 SIDED BOX). FIRE SEALANT AT FIRE RATED CONSTRUCTION CONDITIONS WHEN REQUIRED, OTHERWISE SHALL BE ACOUSTICAL SEALANT. ALL

OTHER MATERIALS ARE UNACCEPTABLE.

4. STC RATED ASSEMBLIES SHALL BE INSTALLED FOLLOWING MANUFACTURER’S INSTALLATION INSTRUCTIONS, REQUIREMENTS AND DETAILS FOR SOUND RATED AND FIRE RATED ASSEMBLIES.

5. STC RATED ASSEMBLIES IDENTIFIED ON THE DRAWINGS INDICATE “MINIMUM” STC RATINGS WHICH ARE THE REQUIRED MINIMUMS TO MEET PHYSICAL SECURITY STANDARDS, BUT HAVE BEEN DESIGNED USING HIGHER STC RATED ASSEMBLIES AS INDICATED ON THE DRAWINGS WITH TEST NUMBERS. THE CONTRACTOR SHALL CONSTRUCT THE STC RATED ASSEMBLIES TO MEET THE STATED “MINIMUM” STC RATING THAT WILL BE FIELD

TESTED BY THE GOVERNMENT TO VERIFY THE MINIMUM STC RATING IS ACHIEVED.

6. EVALUATION OF STC RATED ASSEMBLIES THAT ARE DIFFERENT FROM THE “BASIS OF DESIGN” STC ASSEMBLIES SHALL BE TESTED IN ACCORDANCE WITH ASTM E90 AND ASTM E413 TO ESTABLISH THE STC RATING OF THE

ASSEMBLY.

7. PROJECT INCLUDES WALLS THAT ARE COMPOSED OF SEVERAL WALL ASSEMBLY TYPES THAT REQUIRE THE CONTRACTOR TO SEQUENCE THE INSTALLATION WITH THE FOLLOWING ORDER OF PRECEDENCE FOR TERMINATIONS AT INTERSECTIONS AND PERIMETERS AND SEALING OF PENETRATIONS; FIRE, SOUND, AND NON-FIRE OR SOUND RATED ASSEMBLIES.

8. STC RATED DOOR ASSEMBLIES SHALL MEET SPECIFIED TESTING CRITERIA AND INSTALLED IN ACCORDANCE WITH THE TEST DATA AND MANUFACTURER’S INSTRUCTION AND CRITERIA.

9. ALL PENETRATIONS THROUGH SECURE AREA SECURITY WALLS AND STC RATED WALLS SHALL BE COMPLETELY SEALED ON BOTH SIDES OF THE PENETRATION WITH ACOUSTICAL SEALANT AT NON-FIRE RATED

CONDITIONS AND FIRE CAULK AT FIRE RATED ASSEMBLIES. PENETRATIONS INCLUDE BUT NOT LIMITED TO; CONDUITS, PIPING, DUCTWORK, RACEWAYS, STRUCTURAL COMPONENTS, ETC. IF SEALING OF PENETRATIONS THROUGH FIRE RATED ASSEMBLIES ONLY REQUIRES FIRE CAULKING ON ONE SIDE OF THE PENETRATION THE OTHER SIDE SHALL BE SEALED WITH ACOUSTICAL SEALANT.

10. SEAL BOTH SIDES OF THE STC RATED GYPSUM WALL BOARD AND METAL STUD PERIMETER WALLS WITH ACOUSTICAL SEALANT AT JUNCTURE WITH FLOOR SLAB, ADJACENT WALLS, STC FLOOR/CEILING AND STC ROOF/CEILING ASSEMBLIES. STC AND FIRE RATED WALL ASSEMBLIES SHALL EXTEND TO THE METAL FLOOR DECK OR ROOF DECK AND SEALED WITH FIRE SEALANT.

11. GYPSUM WALL BOARD / METAL STUD SECURITY WALL ASSEMBLY ADDITIONAL REQUIREMENTS:

A. METAL WALL STUDS, BOTTOM TRACK AND TOP TRACK SHALL BE MINIMUM 16 GAUGE STEEL. STUDS SHALL BE INSTALLED AT 16” O.C. MAXIMUM.

B. METAL WALL STUD FRAMING BOTTOM TRACK AND TOP TRACKS SHALL BE ATTACHED WITH ANCHORS AT 32” O.C. MAXIMUM (CLOSER IF REQUIRED BY TESTING) AND SET IN TWO ROWS OF CONTINUOUS

ACOUSTICAL SEALANT. COMPLETELY FILL VOIDS BETWEEN TOP TRACK AND DECK WITH FIRE SAFING MATERIAL OR NON-SHRINK GROUT.

C. ACOUSTIC INSULATION SHALL BE INSTALLED TIGHT BETWEEN METAL STUDS AND FASTENED IN A MANNER TO KEEP THE INSULATION FROM SLIDING DOWN LEAVING A VOID AT THE TOP OF THE WALL

ASSEMBLY.

12. GYPSUM WALL BOARD SHAFTWALL SECURITY WALL ASSEMBLY ADDITIONAL REQUIREMENTS:

A. METAL FRAMING SHALL BE MINIMUM 20 GAUGE STEEL (0.0329 INCH THICK BARE METAL).

B. BOTTOM TRACK AND TOP TRACK RUNNERS SHALL BE ATTACHED WITH ANCHORS AT 32” O.C. MAXIMUM (CLOSER IF REQUIRED BY TESTING) AND SET IN TWO ROWS OF CONTINUOUS ACOUSTICAL SEALANT

(FIRE CAULK IF A FIRE RATED ASSEMBLY). PROVIDE FIRE SAFING MATERIAL TO FILL VOIDS BETWEEN TRACK AND CORRUGATION OF DECK.

C. ACOUSTIC INSULATION SHALL BE INSTALLED TIGHT BETWEEN STUDS AND FASTENED IN A MANNER TO KEEP THE INSULATION FROM SLIDING DOWN LEAVING A VOID AT THE TOP OF THE WALL ASSEMBLY.

13. ALL WALL AND CEILING SURFACES THAT FORM THE SECURE AREA PERIMETER SHALL BE FINISHED, PAINTED TO PROVIDE A UNIFORM APPEARANCE, INCLUDING AT LOCATIONS BELOW ACCESS FLOORS AND ABOVE LAY-IN ACOUSTICAL CEILINGS. GYPSUM WALL BOARD SURFACES SHALL HAVE JOINTS TAPED, FINISHED AND PAINTED.

14. ALL WALLS AND CEILING SURFACES WITHIN THE SECURE AREA PERIMETER SHALL BE PAINTED, INCLUDING AT LOCATIONS BELOW ACCESS FLOORS AND ABOVE LAY-IN ACOUSTICAL CEILINGS. GYPSUM WALL BOARD

SURFACES SHALL HAVE JOINTS TAPED, FINISHED AND PAINTED.

15. UTILITIES AT SECURITY WALLS (SECURE AREAS A & B) - ALL ELECTRICAL SYSTEM PATHWAYS (CONDUITS AND BOXES), PIPING, AND OTHER BUILDING SYSTEMS SHALL BE SURFACE MOUNTED TO THE SECURITY WALL ASSEMBLY (DO NOT INSTALL WITHIN THE SECURITY WALL ASSEMBLY). WHERE ADDITIONAL GYPSUM BOARD / METAL STUD WALLS ("FRANGIBLE") ARE TO BE INSTALLED DIRECTLY OUT-BOARD OF THE SECURITY WALL ASSEMBLY, INSTALL CONDUITS, BOXES AND OTHER BUILDING SYSTEMS TO BE CONCEALED WITHIN THE OUTER FRANGIBLE WALL (UNLESS SHOWN OTHERWISE ON DRAWINGS). PAINT ALL SURFACE MOUNTED ITEMS.

16. UTILITIES AT SECURITY CEILING ASSEMBLIES - ALL ELECTRICAL AND COMMUNICATIONS SYSTEM PATHWAYS (CONDUITS AND BOXES), PIPING, AND OTHER BUILDING SYSTEMS SHALL ONLY BE SURFACE MOUNTED BELOW OR SUSPENDED BELOW THE STC SECURITY CEILING ASSEMBLY (DO NOT INSTALL WITHIN OR ABOVE THE SECURITY CEILING ASSEMBLY). THE ONLY ITEMS PERMITTED TO BE INSTALLED WITHIN THE STC SECURITY CEILING ASSEMBLY ARE LIMITED TO; STRUCTURAL FLOOR AND ROOF COMPONENTS, UTILITY SUSPENSION SYSTEM COMPONENTS (IE: UNI-STRUT) TO SUPPORT UTILITIES BELOW THE STC SECURITY CEILING. ALL PENETRATIONS THROUGH THE SECURITY CEILING ASSEMBLY SHALL BE COMPLETELY SEALED WITH ACOUSTICAL SEALANT.

17. SOUND ATTENUATION FOR SECURE AREA PERIMETER (FLOORS, WALLS, CEILINGS, DOORS, AND PENETRATIONS) - SOUND GROUP 4 (FIELD STC 50 (FSTC 50), MINIMUM. GOVERNMENT ACCREDITATION PROCESS WILL PERFORM FIELD TESTING TO VERIFY ACOUSTIC RATING IS ACHIEVED. CONTRACTOR TO PERFORM FIELD TESTING AND MAKE NECESSARY IMPROVEMENTS TO ACHIEVE THE REQUIRED MINIMUM FSTC RATING.

CONTRACTOR ACOUSTIC TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ICD/ICS 705 CHAPTER 9 INSTRUMENTAL ACOUSTIC TESTS FOR SECURE AREA PERIMETER (FLOOR, WALLS, AND CEILING) AND PROVIDE TEST REPORT WITH RESULTS. THE GOVERNMENT WILL PERFORM ACOUSTIC TESTING INDEPENDENT OF THE CONTRACTORS ACOUSTIC TESTING. CONTRACTOR SHALL MAKE NECESSARY CHANGES OR IMPROVEMENTS TO THE INSTALLED WORK TO REMEDY AREAS OR COMPONENTS OF THE NEW CONSTRUCTION IDENTIFIED BY THE CONTRACTOR TESTING AND GOVERNMENT TESTING BEING DEFICIENT.

SECURE AREA CONSTRUCTION - GENERAL NOTES - SECURE USE AREAS A & B

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:5

:4

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-004

S E

C U

R

IT

Y A

N D

S T

C C

O N

S T

R U

C T

IO

N

N O

T E

S

B

M A

G G

IO

R

E

R .F

IV

E

A S

H B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

A

M E

N D

M E

N T

/2

/2

BL

BL

BL

BLBL

BL

BL BL

BLBL

BLBL

BL

BL

BL

BL

BLBL

BL

BL

BL BL

BLBL

BL

BL

BL

BL

BL

BL

CRK

CRK

CRK

C R

K

C R

K

C R

K

C R

K

C R

K

C R

K

CRK

CRK

CRK

C R

K

CRKH

S

S H

S S

H S

S H

S S

C A

M C

C T

V ,E

X T

IDS

C R

K

C R

K

H S

S

KS

MON

S

CAM

S

K S

C R

K

KS

KS

M O

N S

K S

M O

N S

HSS

MD

MD

K S

HSS

HSS K

S

HSSHSS

KS

HSS

C R

K

KS

H S

S

MD

HSS

MD

K S

K S

K S

K S

C R

K

KS

K S

H S

S H

S S

HSS

K S

CRKKP

K P

ID

S IDS

KP

K P

K P

KP

KP

K P

IDS IDS

ID

S

IDSK

P

K P

IDS

ID

S

ID

S

K P

ID

S

M D

MD MD

MD

C R

K

ID

S

CAM

S

M D

M D

M D

M D

MON

S

C R

K

HSS

H S

S H

S S

H S

S

C A

M S C

A M

S

CAM

S

C A

M S

C A

M S

K S

M O

N S

C R

K K

S

MON

S

M O

N S

M O

N S

M O

N S

M O

N S

MON

S

A C

S

CAM

CCTV,360

CAM

CCTV

CAM

CCTV

S

S

S S

S

S

S

S

WN

MD

S S S

S

ID

S

CAM

S

K P

S S

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

M O

N S

C A

M S

K S

M O

N S

M O

N S

M O

N S

MON

S

HSS

S

S

CAM

S

M O

N S

GRAPHIC SECURITY LEGEND

ROOM NUMBER DESIGNATION

SECURE USE (HIGH) STC 50

(MINIMUM) (DESIGNED TO

ICD/ICS 705)

S STC 53 RATED DOOR

SECURE USE (MEDIUM) STC 50

(MINIMUM) (COLLATERAL USE

DESIGNED TO ICD/ICS 705)

SW STC 37 RATED WINDOWS

101A

SECURE USE (LOW) NON-STC

(COLLATERAL USE DESIGNED

TO DoD 5200.01 VOL 3)

CAM

CAM

CCTV

KS

CRK

ACS

MD

HSS

KP

IDS

WALL MOUNTED CAMERA - INTERIOR POINT TO

POINT SECURITY MONITORING SYSTEM

CCTV WALL MOUNTED CAMERA - EXTERIOREXT

CCTV SYSTEM - EQUIPMENT

KILL SWITCH - INTERIOR

CARD READER KEYPAD - INTERIOR

ACS PANEL

CEILING MOUNTED MOTION DETECTOR

WALL MOUNTED MOTION DETECTOR

HIGH SECURITY SWITCH

WALL MOUNTED KEY PAD

IDS CONTROL PANEL

SECURITY MONITORING SYSTEM POINT TO

POINT VIDEO DISPLAY - WALL MOUNTED

MON

NON-SECURE CONTROLLED

ACCESS USE (NON STC)

A

B

C

D

CAM CCTV CEILING MOUNTED CAMERA - INTERIOR

IDS ZONE

IDS ZONE

CCTV

S

MD

S

S ABOVE CEILING WHITE NOISE SPEAKER

BL ROTATING BEACON TYPE BLUE LIGHT

WHITE NOISE SURFACE MOUNTED SPEAKER

(MOUNT ON SECURE SIDE OF DOOR)

S

S

CCTV SECURITY MONITORMON

CCTV

S CEILING MOUNTED WHITE NOISE SPEAKER

WN

WHITE NOISE SURFACE MOUNTED TRANSDUCER

(MOUNT ON SECURE SIDE OF WINDOW)

S W

WHITE NOISE GENERATORWN

SOUND MASKING GENERATORWN

S

A B C

C.2

D

D.4

E F

2.7

5.3

2.2

3.3

3.7

3.8

4.1

4.4

6.5

7.4

130B

144C

145 146 147

MECHANICAL

YARD

144B

S

S

S

S

S

S

SS

SS

S

S

S

S

S

S

S

S

144A

S

S S

S

#1-5

#1-18 #1-17

#1-20

#1-16

#1-15

#1-12

#1-6

#1-11

#1-7

#1-10

#1-7

#1-12

#1-14

130A

S

A

A A

A

A

A

A A

A

A

AA

A

A A

A

A

C

D D

A

B

#1-12

#1-15

#1-7

#1-14

#1-16

#1-16 #1-16

#1-16

#1-17

#1-11

#1-6

#1-5

A #1-5

#1-5 #1-5

#1-5

#1-5

#1-10

#1-18

G-107/G-109

G-108/G-110

KEYPLAN - WEST - 1st FLOOR

GENERAL NOTES

1. REFER TO "TY" DRAWINGS FOR SPECIFIC REQUIREMENTS

FOR SECURITY SYSTEMS, ACCESS CONTROL SYSTEM,

CCTV SYSTEM AND SOUND MASKING SYSTEM.

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:5

:0

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-107

F

IR

S T

F L

O O

R S

E C

U R

IT

Y

P L

A N

W

E S

T

B

M A

G G

IO

R

E

T

W A

L L

IS

B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

FIRST FLOOR

ROOM

NUMBER ROOM NAME Area

100 LOBBY 300 SF

101 BREAKROOM 407 SF

102 CORR. 1409 SF

103 ELEV. 58 SF

104 JANITOR 70 SF

105 ELEC. 474 SF

106 MEN 221 SF

106A SHOWER 76 SF

107 WOMENS 221 SF

107A SHOWER 76 SF

108 ELEVATOR EQUIPMENT 127 SF

109 SERVICE ELEVATOR 88 SF

110 LOGISTICS/CE REP 844 SF

110A RECYCLE ROOM 79 SF

111 COMSEC 146 SF

112 VESTIBULE 111 SF

113 STAIR 2 239 SF

114 NCR SERVER ROOM 1108 SF

115 SECURE STORAGE 167 SF

116 SECURE CORRIDOR 123 SF

117 CORR. 321 SF

118 TEST SUITE 269 SF

119 NCR SECURITY MGRS 198 SF

120 RANGE OPS CENTER 337 SF

121 TEST SUITE 208 SF

122 TEST SUITE 213 SF

123 TEST SUITE 423 SF

124 TEST SUITE 426 SF

125 TEST SUITE 238 SF

126 TEST SUITE 239 SF

127 NCR CONFERENCE ROOM 690 SF

128 ACR GSSO 186 SF

129 ACR STORAGE 202 SF

130A CORR. 65 SF

130B ACR ISSO 932 SF

132 ACR ISSM 177 SF

133 ACR SYSADM 433 SF

134 CORRIDOR 623 SF

135 ACR CONF. RM 689 SF

136 AVIONICS TEST LAB 2534 SF

137 ATL STORAGE 175 SF

138 ATL ANALYSIS 347 SF

139 CYBER/EW LAB 2364 SF

140 C/EW ANALYSIS 276 SF

141 COMM RM 94 SF

142 CORR. 246 SF

143 STAIR 1 254 SF

144A POWER VESTIBULE MANTRAP 194 SF

144B DEV & RE LAB 466 SF

144C THREAT DEVELOPMENT LAB 764 SF

145 REPORT WRITING 1 192 SF

146 REPORT WRITING 2 192 SF

147 THREAT RESEARCH ROOM 215 SF

148 ACR SERVER 392 SF

149 COLLATERAL SECURITY 231 SF

150 COLLATERAL SECURITY LEAD 116 SF

151 BADGE 275 SF

152 COMM RM 304 SF

153 MECH. 555 SF

154 FIRE PUMP 130 SF

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

1/8" = 1'-0"G-107

1 FIRST FLOOR SECURITY PLAN - WEST

PLAN

NORTH

A

M E

N D

M E

N T

/2

/2

BLBL

BL

BL BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

HSS

HSS

CRK

C R

K

C R

K

C R

K

C R

K

C R

K

CRK

CRK

CRK

C R

K

C R

K

CRK

CRK

CRK

CRK

IDS

MD

MD

CAM

S

HSSHSS

C R

KA

C

S

K P

CAM

CCTV,EXT

K S

M O

N S

MON

S

MON MON

S

C A

M S

MH

HSS

CRK

MON

S

M O

N S

KS

KS

K S

K S

K S

K S

K S

K S

CRK

MD

H S

S

K S

KS

C R

K

HSS HSS

MD

MD

C R

K

M O

N S

K P

IDS

IDS

IDS

KP

K P

K P

ID

S

C R

K

CAM

S

CRK

MD

C A

M S

CAM

S

C R

K

WN

C A

M S

KP

C R

K CAM

S

H S

S

MD

MON

S

M O

N S

ACS

CAM

CCTV,360

CAM

CCTV

CAM

CCTV

CAM

CCTV

S

S

WN

MON

CCTV

CRK

C R

K C

R K

S

S

S

S

S S

S S

S S

S

MON

S

KPMD

H S

S M

O N

S

S

S

C R

K

S S

S

CRK

HSSKP

MD

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

S

WN

ID

S

CAM

S

CAM

S

S

WN

S

WN

S

WN

MON

CCTV

GRAPHIC SECURITY LEGEND

ROOM NUMBER DESIGNATION

SECURE USE (HIGH) STC 50

(MINIMUM) (DESIGNED TO

ICD/ICS 705)

S STC 53 RATED DOOR

SECURE USE (MEDIUM) STC 50

(MINIMUM) (COLLATERAL USE

DESIGNED TO ICD/ICS 705)

SW STC 37 RATED WINDOWS

101A

SECURE USE (LOW) NON-STC

(COLLATERAL USE DESIGNED

TO DoD 5200.01 VOL 3)

CAM

CAM

CCTV

KS

CRK

ACS

MD

HSS

KP

IDS

WALL MOUNTED CAMERA - INTERIOR POINT TO

POINT SECURITY MONITORING SYSTEM

CCTV WALL MOUNTED CAMERA - EXTERIOREXT

CCTV SYSTEM - EQUIPMENT

KILL SWITCH - INTERIOR

CARD READER KEYPAD - INTERIOR

ACS PANEL

CEILING MOUNTED MOTION DETECTOR

WALL MOUNTED MOTION DETECTOR

HIGH SECURITY SWITCH

WALL MOUNTED KEY PAD

IDS CONTROL PANEL

SECURITY MONITORING SYSTEM POINT TO

POINT VIDEO DISPLAY - WALL MOUNTED

MON

NON-SECURE CONTROLLED

ACCESS USE (NON STC)

A

B

C

D

CAM CCTV CEILING MOUNTED CAMERA - INTERIOR

IDS ZONE

IDS ZONE

CCTV

S

MD

S

S ABOVE CEILING WHITE NOISE SPEAKER

BL ROTATING BEACON TYPE BLUE LIGHT

WHITE NOISE SURFACE MOUNTED SPEAKER

(MOUNT ON SECURE SIDE OF DOOR)

S

S

CCTV SECURITY MONITORMON

CCTV

S CEILING MOUNTED WHITE NOISE SPEAKER

WN

WHITE NOISE SURFACE MOUNTED TRANSDUCER

(MOUNT ON SECURE SIDE OF WINDOW)

S W

WHITE NOISE GENERATORWN

SOUND MASKING GENERATORWN

S

F G H J K M N P

2.7

5.3

M.2

2.2

3.3

3.7

3.8

4.1

4.4

6.5

7.4

103 104

106 107

121122

125 116

108 110A

GENERATOR YARD

S

S

S

SS

SS

S

S

S

106A 107A

S

S

S

S

S

S

#1-3A

#1-2

#1-1

#1-19

#1-4 #1-3.2

#1-3.1

S

D

A

A A A A

A

A

A A

A

A

A A

C C

D D D

D D

B

D

PUBLIC AREA

D

B

#1-3A

#1-3A

#1-3A

#1-3

#1-3A#1-3A#1-3A

#1-3A

#1-3A

#1-1

#1-4

#1-19

#1-2

#1-3.2

#1-3.1

G-107/G-109

G-108/G-110

KEYPLAN - EAST - 1st FLOOR

GENERAL NOTES

1. REFER TO "TY" DRAWINGS FOR SPECIFIC REQUIREMENTS

FOR SECURITY SYSTEMS, ACCESS CONTROL SYSTEM,

CCTV SYSTEM AND SOUND MASKING SYSTEM.

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:5

:3

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-108

F

IR

S T

F L

O O

R S

E C

U R

IT

Y

P L

A N

E

A S

T

B

M A

G G

IO

R

E

T

W A

L L

IS

B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

FIRST FLOOR

ROOM

NUMBER ROOM NAME Area

100 LOBBY 300 SF

101 BREAKROOM 407 SF

102 CORR. 1409 SF

103 ELEV. 58 SF

104 JANITOR 70 SF

105 ELEC. 474 SF

106 MEN 221 SF

106A SHOWER 76 SF

107 WOMENS 221 SF

107A SHOWER 76 SF

108 ELEVATOR EQUIPMENT 127 SF

109 SERVICE ELEVATOR 88 SF

110 LOGISTICS/CE REP 844 SF

110A RECYCLE ROOM 79 SF

111 COMSEC 146 SF

112 VESTIBULE 111 SF

113 STAIR 2 239 SF

114 NCR SERVER ROOM 1108 SF

115 SECURE STORAGE 167 SF

116 SECURE CORRIDOR 123 SF

117 CORR. 321 SF

118 TEST SUITE 269 SF

119 NCR SECURITY MGRS 198 SF

120 RANGE OPS CENTER 337 SF

121 TEST SUITE 208 SF

122 TEST SUITE 213 SF

123 TEST SUITE 423 SF

124 TEST SUITE 426 SF

125 TEST SUITE 238 SF

126 TEST SUITE 239 SF

127 NCR CONFERENCE ROOM 690 SF

128 ACR GSSO 186 SF

129 ACR STORAGE 202 SF

130A CORR. 65 SF

130B ACR ISSO 932 SF

132 ACR ISSM 177 SF

133 ACR SYSADM 433 SF

134 CORRIDOR 623 SF

135 ACR CONF. RM 689 SF

136 AVIONICS TEST LAB 2534 SF

137 ATL STORAGE 175 SF

138 ATL ANALYSIS 347 SF

139 CYBER/EW LAB 2364 SF

140 C/EW ANALYSIS 276 SF

141 COMM RM 94 SF

142 CORR. 246 SF

143 STAIR 1 254 SF

144A POWER VESTIBULE MANTRAP 194 SF

144B DEV & RE LAB 466 SF

144C THREAT DEVELOPMENT LAB 764 SF

145 REPORT WRITING 1 192 SF

146 REPORT WRITING 2 192 SF

147 THREAT RESEARCH ROOM 215 SF

148 ACR SERVER 392 SF

149 COLLATERAL SECURITY 231 SF

150 COLLATERAL SECURITY LEAD 116 SF

151 BADGE 275 SF

152 COMM RM 304 SF

153 MECH. 555 SF

154 FIRE PUMP 130 SF

1/8" = 1'-0"G-108

1 FIRST FLOOR SECURITY PLAN - EAST

PLAN

NORTH

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

A

M E

N D

M E

N T

/2

/2

BL BL

BLBL

BLBL

BL

BLBL

BLBL

BL

BL

BL

BL

BL BL

BL BL

BL

BL

BL BL

BL

BL

BL

C R

K

C R

K

CRK

CRK

CRK

C R

K

C R

K

C R

K

C R

K

C R

K

C R

K

H S

S

H S

S

H S

S

HSS HSS

M D

MD

MD

MD MD

HSS

MD

C R

K

KP

K P

KP

ID

S

ID

S

ID

S

ID

S

KP

C R

K

MD

H S

S

C A

M S

ID

S

CAM

S

S S

C A

M S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

C R

K

MON

S

MON

S

CAM

CCTV,360

CAM

CCTV

CAM

CCTV

CAM

CCTV,180,EXT

CAM CCTV,E

XT

CAM

CCTV,EXT

S

W S

W S

W S

W S

W S

W

S W

S W

S W

S W

S W

S W

S W

S W

S W

S W

S W

S W

S

S

S

S

S

S

M O

N S

S

C A

M C

C T

V

GRAPHIC SECURITY LEGEND

ROOM NUMBER DESIGNATION

SECURE USE (HIGH) STC 50

(MINIMUM) (DESIGNED TO

ICD/ICS 705)

S STC 53 RATED DOOR

SECURE USE (MEDIUM) STC 50

(MINIMUM) (COLLATERAL USE

DESIGNED TO ICD/ICS 705)

SW STC 37 RATED WINDOWS

101A

SECURE USE (LOW) NON-STC

(COLLATERAL USE DESIGNED

TO DoD 5200.01 VOL 3)

CAM

CAM

CCTV

KS

CRK

ACS

MD

HSS

KP

IDS

WALL MOUNTED CAMERA - INTERIOR POINT TO

POINT SECURITY MONITORING SYSTEM

CCTV WALL MOUNTED CAMERA - EXTERIOREXT

CCTV SYSTEM - EQUIPMENT

KILL SWITCH - INTERIOR

CARD READER KEYPAD - INTERIOR

ACS PANEL

CEILING MOUNTED MOTION DETECTOR

WALL MOUNTED MOTION DETECTOR

HIGH SECURITY SWITCH

WALL MOUNTED KEY PAD

IDS CONTROL PANEL

SECURITY MONITORING SYSTEM POINT TO

POINT VIDEO DISPLAY - WALL MOUNTED

MON

NON-SECURE CONTROLLED

ACCESS USE (NON STC)

A

B

C

D

CAM CCTV CEILING MOUNTED CAMERA - INTERIOR

IDS ZONE

IDS ZONE

CCTV

S

MD

S

S ABOVE CEILING WHITE NOISE SPEAKER

BL ROTATING BEACON TYPE BLUE LIGHT

WHITE NOISE SURFACE MOUNTED SPEAKER

(MOUNT ON SECURE SIDE OF DOOR)

S

S

CCTV SECURITY MONITORMON

CCTV

S CEILING MOUNTED WHITE NOISE SPEAKER

WN

WHITE NOISE SURFACE MOUNTED TRANSDUCER

(MOUNT ON SECURE SIDE OF WINDOW)

S W

WHITE NOISE GENERATORWN

SOUND MASKING GENERATORWN

S

A B C

C.2

D

D.4

E F

2.7

5.3

2.2

3.3

3.7

3.8

4.1

4.4

6.5

7.4

234 239

231 230 229 228

227 226

224A

SW

SW

S

S

S

S

S S

S

#2-11

#2-10

#2-13

SW

SW

SW

SW

SW

SW SW SW SW SW SW SW SW SW SW

#2-12

S

B

B

B

B

C

C C

#2-11

#2-12

#2-13

#2-10

G-107/G-109

G-108/G-110

KEYPLAN - WEST - 2nd FLOOR

GENERAL NOTES

1. REFER TO "TY" DRAWINGS FOR SPECIFIC REQUIREMENTS

FOR SECURITY SYSTEMS, ACCESS CONTROL SYSTEM,

CCTV SYSTEM AND SOUND MASKING SYSTEM.

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:5

:0

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-109

S E

C O

N D

F L

O O

R S

E C

U R

IT

Y

P L

A N

W

E S

T

B

M A

G G

IO

R

E

T

W A

L L

IS

B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

SECOND FLOOR

ROOM

NUMBER ROOM NAME Area

200 CORR. 1587 SF

201 VESTIBULE 126 SF

202 IDE SERVER RM 475 SF

203 EVENT DESIGN COLLABORATION 299 SF

204 EVENT DESIGN COLLABORATION 321 SF

205 ELEV. 58 SF

206 ELECTRICAL 202 SF

207 BREAKROOM 358 SF

208 47 CTS CONFERENCE 633 SF

209 SERVICE ELEVATOR 88 SF

210 ITS WORKSTATIONS/WORK

BENCH/TRAINING

551 SF

211 ITS STORAGE 221 SF

212 ITS MISSION PREP 162 SF

213 STAIRS 354 SF

214 96 CTG. SEC. COMM. 297 SF

215 WORK AREA 1974 SF

216 OFFICE 124 SF

217 OFFICE 124 SF

218 TEST TOOL/EQUIP. STAGING 183 SF

219 MEN 286 SF

220 WOMEN 220 SF

220A LACTATION RM 67 SF

221 GROUP CLASSROOM 920 SF

221A STORAGE 226 SF

222 INVESTMENT GROUP 858 SF

223 INVESTMENT LEAD 118 SF

224 WORK AREA 3037 SF

224A OFFICE 165 SF

225 WORK AREA 4416 SF

226 OFFICE 164 SF

227 OFFICE 167 SF

228 OFFICE 122 SF

229 OFFICE 122 SF

230 OFFICE 122 SF

231 OFFICE 180 SF

232 CORR. 228 SF

233 STAIRS 260 SF

234 COMM RM 110 SF

235 IDE OFFICE 116 SF

236 IDE OFFICE 116 SF

237 IDE OFFICE 116 SF

238 IDE OFFICE 183 SF

239 MECH. 350 SF

240 COMM RM 239 SF

241 JANITOR 51 SF

242 STOR. 60 SF

243 EVENT DESIGN CENTER 1986 SF

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

1/8" = 1'-0"G-109

1 SECOND FLOOR SECURITY PLAN - WEST

PLAN

NORTH

A

M E

N D

M E

N T

/2

/2

BLBL

BL

BLBL

BL

BL

BL

BL

BL

BL

BL

BLBLBL

BL

BL

BL

BL

BL

BL

BL

BL

BL

ID

S

C R

K

C R

K

C R

K

C R

K

C R

K

HSS

HSS

MD

MD

CAM

S

C R

K

C R

K

C R

K

C R

K

C R

K

C R

K

CRK

CRK

C R

K

C R

K

CCTV

ID

S

IDS

ID

S

K S

K S

MD

MD

ID

S

CAM

S

M O

N S

M O

N S

M O

N S

S S

S S

HSS

CRK

C R

K

HSS

MD

C R

K

HSS

CRK

CRK

HSS

K P

K P K P

IDS

ID

S

K P

KP

K P

K P

K P

C R

K

CRK

M D

CAM

S

CAM

S

MON

S

MD

ID

S

M O

N S

MON

S

CAM

S

CAM

S

S S

S S

S S

WN

S

M O

N S

MON

S

M O

N S

HSS

M D

CAM

S

CAM

CCTV

CAM

CCTV

CAM

CCTV

CAM

CCTV

CAM

CCTV,180,EXT

CAM

CCTV,180,EXT

CAM

CCTV,E

XT

CAM

CCTV,EXT

S W

S W

S W

S W

S W

S W

S W

S W

S W

S S

S

S

S

S

S

S

HSS

S

S

GRAPHIC SECURITY LEGEND

ROOM NUMBER DESIGNATION

SECURE USE (HIGH) STC 50

(MINIMUM) (DESIGNED TO

ICD/ICS 705)

S STC 53 RATED DOOR

SECURE USE (MEDIUM) STC 50

(MINIMUM) (COLLATERAL USE

DESIGNED TO ICD/ICS 705)

SW STC 37 RATED WINDOWS

101A

SECURE USE (LOW) NON-STC

(COLLATERAL USE DESIGNED

TO DoD 5200.01 VOL 3)

CAM

CAM

CCTV

KS

CRK

ACS

MD

HSS

KP

IDS

WALL MOUNTED CAMERA - INTERIOR POINT TO

POINT SECURITY MONITORING SYSTEM

CCTV WALL MOUNTED CAMERA - EXTERIOREXT

CCTV SYSTEM - EQUIPMENT

KILL SWITCH - INTERIOR

CARD READER KEYPAD - INTERIOR

ACS PANEL

CEILING MOUNTED MOTION DETECTOR

WALL MOUNTED MOTION DETECTOR

HIGH SECURITY SWITCH

WALL MOUNTED KEY PAD

IDS CONTROL PANEL

SECURITY MONITORING SYSTEM POINT TO

POINT VIDEO DISPLAY - WALL MOUNTED

MON

NON-SECURE CONTROLLED

ACCESS USE (NON STC)

A

B

C

D

CAM CCTV CEILING MOUNTED CAMERA - INTERIOR

IDS ZONE

IDS ZONE

CCTV

S

MD

S

S ABOVE CEILING WHITE NOISE SPEAKER

BL ROTATING BEACON TYPE BLUE LIGHT

WHITE NOISE SURFACE MOUNTED SPEAKER

(MOUNT ON SECURE SIDE OF DOOR)

S

S

CCTV SECURITY MONITORMON

CCTV

S CEILING MOUNTED WHITE NOISE SPEAKER

WN

WHITE NOISE SURFACE MOUNTED TRANSDUCER

(MOUNT ON SECURE SIDE OF WINDOW)

S W

WHITE NOISE GENERATORWN

SOUND MASKING GENERATORWN

S

F G H J K M N P

2.7

5.3

M.2

2.2

3.3

3.7

3.8

4.1

4.4

6.5

7.4

208204

220 219

237236235

241 242

SW

S

S

SS

S

S

S S

221A

S

S

#2-9

#2-8

#2-14

#2-1

#2-4

#2-7 #2-6

#2-5

S

220A

SW SW SW SW SW

SW

SW

SW

S

B

C

B B B B

B

BBBB

C

C

D

B

C

#2-9 #2-8

#2-14

#2-13

#2-1

#2-1 #2-1 #2-4

#2-5

#2-6 #2-7

G-107/G-109

G-108/G-110

KEYPLAN - EAST - 2nd FLOOR

GENERAL NOTES

1. REFER TO "TY" DRAWINGS FOR SPECIFIC REQUIREMENTS

FOR SECURITY SYSTEMS, ACCESS CONTROL SYSTEM,

CCTV SYSTEM AND SOUND MASKING SYSTEM.

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:5

:1

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-110

S E

C O

N D

F L

O O

R S

E C

U R

IT

Y

P L

A N

E

A S

T

B

M A

G G

IO

R

E

T

W A

L L

IS

B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

SECOND FLOOR

ROOM

NUMBER ROOM NAME Area

200 CORR. 1587 SF

201 VESTIBULE 126 SF

202 IDE SERVER RM 475 SF

203 EVENT DESIGN COLLABORATION 299 SF

204 EVENT DESIGN COLLABORATION 321 SF

205 ELEV. 58 SF

206 ELECTRICAL 202 SF

207 BREAKROOM 358 SF

208 47 CTS CONFERENCE 633 SF

209 SERVICE ELEVATOR 88 SF

210 ITS WORKSTATIONS/WORK

BENCH/TRAINING

551 SF

211 ITS STORAGE 221 SF

212 ITS MISSION PREP 162 SF

213 STAIRS 354 SF

214 96 CTG. SEC. COMM. 297 SF

215 WORK AREA 1974 SF

216 OFFICE 124 SF

217 OFFICE 124 SF

218 TEST TOOL/EQUIP. STAGING 183 SF

219 MEN 286 SF

220 WOMEN 220 SF

220A LACTATION RM 67 SF

221 GROUP CLASSROOM 920 SF

221A STORAGE 226 SF

222 INVESTMENT GROUP 858 SF

223 INVESTMENT LEAD 118 SF

224 WORK AREA 3037 SF

224A OFFICE 165 SF

225 WORK AREA 4416 SF

226 OFFICE 164 SF

227 OFFICE 167 SF

228 OFFICE 122 SF

229 OFFICE 122 SF

230 OFFICE 122 SF

231 OFFICE 180 SF

232 CORR. 228 SF

233 STAIRS 260 SF

234 COMM RM 110 SF

235 IDE OFFICE 116 SF

236 IDE OFFICE 116 SF

237 IDE OFFICE 116 SF

238 IDE OFFICE 183 SF

239 MECH. 350 SF

240 COMM RM 239 SF

241 JANITOR 51 SF

242 STOR. 60 SF

243 EVENT DESIGN CENTER 1986 SF

1/8" = 1'-0"G-110

1 SECOND FLOOR SECURITY PLAN - EAST

PLAN

NORTH

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

A

M E

N D

M E

N T

/2

/2

GENERAL NOTES

1. DRAWINGS ON THIS SHEET ARE

PROVIDED TO SHOW DIAGRAMMATIC

LOCATION OF AIR BARRIER.

2. SEE SHEET A-002 THRU A-005 FOR

SPECIFIC WALL CONSTRUCTION

INFORMATION.

3. SEE WALL SECTIONS AND DETAILS

FOR ADDITIONAL AIR BARRIER

INFORMATION.

GRAPHIC LEGEND

AIR BARRIER LOCATION

KEYNOTES

PAINTED GYPSUM WALLBOARD

PERFORMS AS AIR BARRIER.

CONCRETE SLAB PERFORMS AS AIR

BARRIER.

ROOFING UNDERLAYMENT PERFORMS

AS AIR BARRIER

FLUID APPLIED AIR/MOISTURE

BARRIER PERFORMS AS AIR BARRIER.

A

B

C

D

SURFACE AREA

TEST ZONE 1:

TEST ZONE 2:

TEST ZONE 3:

TEST ZONE 4:

125,326 SF

2,873 SF

1,442 SF

1,002 SF

MEN

WORK AREA

OFFICE

CORR.

BREAKROOM

47 CTS

CONFERENCE

ELEC.

CORR.

SECURE

CORRIDOR

CORR.

TEST SUITE

C C

D

B B

D

D

D

WORK AREA

CORR.

MECH.

EVENT DESIGN

CENTER

IDE OFFICE

ACR ISSO

130B

ACR STORAGE

CORRIDOR

ACR SERVER

MECH.

C

D

B B B

B

DA

C

D

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:5

:0

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-113

A

IR

B A

R R

IE

R

B U

IL

D

IN

G

S E

C T

IO

N

S

B

M A

G G

IO

R

E

R .F

IV

E

A S

H B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

1/8" = 1'-0"G-113

1 SECTION - AIR BARRIER DIAGRAM

1/8" = 1'-0"G-113

2 SECTION - AIR BARRIER DIAGRAM

MECHANICL

YARD

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

A

M E

N D

M E

N T

/2

/2

INVESTMENT

GROUP

CORR.

COMM RM

IDE OFFICE

COMM RM

NCR

CONFERENCE

ROOM

CORR.

COLLATERAL

SECURITY

C C

D

D

A

B

A

B

D

D

B

ACR CONF. RM

CORRIDOR

REPORT WRITING

POWER

VESTIBULE

MANTRAP

144A

DEV & RE LAB

144B

EVENT DESIGN

CENTER

CORR.

WORK AREA

OFFICE

224A

GRAPHIC LEGEND

AIR BARRIER LOCATION

GENERAL NOTES

1. DRAWINGS ON THIS SHEET ARE

PROVIDED TO SHOW DIAGRAMMATIC

LOCATION OF AIR BARRIER.

2. SEE SHEET A-002 THRU A-005 FOR

SPECIFIC WALL CONSTRUCTION

INFORMATION.

3. SEE WALL SECTIONS AND DETAILS

FOR ADDITIONAL AIR BARRIER

INFORMATION.

SURFACE AREA

TEST ZONE 1:

TEST ZONE 2:

TEST ZONE 3:

TEST ZONE 4:

125,326 SF

2,873 SF

1,442 SF

1,002 SF

KEYNOTES

PAINTED GYPSUM WALLBOARD

PERFORMS AS AIR BARRIER.

CONCRETE SLAB PERFORMS AS AIR

BARRIER.

ROOFING UNDERLAYMENT PERFORMS

AS AIR BARRIER

FLUID APPLIED AIR/MOISTURE

BARRIER PERFORMS AS AIR BARRIER.

A

B

C

D

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D E

S

IG

N E

D B

Y

B U

L L

O C

K T

IC

E

A S

S O

C

IA

T E

S

E

C

E R

V A

N T

E S

S T

R E

E T

P E

N S

A C

O L

A F

L O

R

ID

A

2 3 4 5

B

C

D

D R

A W

N B

Y

S B

M T

B Y

P L

O T

S C

A L

E

S

IZ

E

C K

D B

Y

P L

O T

D A

T E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

F

IL

E N

A M

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

:1 x

M O

B

IL

E D

IS

T

R

IC

T

M O

B

IL

E A

L A

B A

M A

M E

F

M

A Y

W

R

AMENDMENT 0001

/2

/2

:5

:2

P

M

C Y

B E

R S

P A

C E

T E

S T

G R

O U

P F

A C

IL

IT

Y

E G

L

IN

A F

B

F L

O R

ID

A

G-114

A

IR

B A

R R

IE

R

B U

IL

D

IN

G

S E

C T

IO

N

S

B

M A

G G

IO

R

E

R .F

IV

E

A S

H B

M

A G

G

IO

R E

B T

A

M

A Y

M E

F

G

FTFA 16-3007

1/8" = 1'-0"G-114

1 SECTION - AIR BARRIER DIAGAM

1/8" = 1'-0"G-114

2 SECTION - AIR BARRIER DIAGRAM

C C

D

A

BB

D

D

D

C

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

A

M E

N D

M E

N T

/2

/2

B

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U S

A

R M

Y

C

O R

P S

O

F

E

N G

I N

E E

R S

D E

S I G

N E

D

B

Y

B U

L L

O C

K

T

I C

E

A

S S

O C

I A

T E

S

E

C

E R

V A

N T

E

T R

E E

T

S

U I T

E

B

P E

N S

A C

O L

A

F

L O

R I D

A

2 3 4 5

B

C

D

D R

A W

N

B

Y

S B

M

B

Y

P L

C A

L E

S I Z

E

C K

D

B

Y

P L

D

T

E

D A

T E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

N

P R

O J E

U M

B E

R

F I L

E

N

A M

E

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R x

M O

B I L

E

D

I S

T R

I C

T

M O

B I L

E

A

L A

B A

M A

M E

F

C Y

B E

R S

P A

S

T

G

R O

C

I L

I T

Y

E G

L I

B

F

L O

R I D

A

V:

\2

6\ ac tiv e\

4\ ci vil

\d ra w in g\

_d sg n\ sh ee t_ file s\

M

EF

7C I0

.d w g

/0 7/

:3

PM B

y:

G er th , J am es

W R

CI001FTFA 163007

G E

N E

R A

L

C

I V

L

T

E S

C

B

R O

C K

M E

I E

R

J

G

E R

T H

S T

A N

T E

C

A

M

O R

A L E

S

M E

F C

I D

W G

M

M

GENERAL CIVIL NOTES

GENERAL:

1. BENCHMARK FOR CONSTRUCTION HAS BEEN PROVIDED ON SHEET V-102.

2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN

STRICT ACCORDANCE WITH THE MINIMUM ENGINEERING AND

CONSTRUCTION STANDARDS ADOPTED BY THE U.S, ARMY CORPS OF

ENGINEERS (USACE) MOBILE DISTRICT. WHERE CONFLICTS OR OMISSIONS

EXIST, THE USACE (MOBILE DISTRICT) STANDARDS SHALL DICTATE.

SUBSTITUTIONS AND DEVIATION FROM PLANS AND SPECIFICATIONS SHALL

BE PERMITTED ONLY WHEN WRITTEN APPROVAL HAS BEEN ISSUED BY

THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).

3. SHOP DRAWINGS OF ALL MATERIALS BEING USED SHALL BE SUBMITTED

AS PER SPECIFICATI0NS (SUBMITTALS).

4. ANY PENALTIES, STOP WORK ORDERS OR ADDITIONAL WORK RESULTING

FROM THE CONTRACTOR BEING IN VIOLATION OF THE REQUIREMENTS

ABOVE, SHALL BE FULLY BORNE BY THE CONTRACTOR.

5. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY IT SHALL BE THE

CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES AND

TO MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATION OF

THESE UTILITIES WITH THE OWNER OF THE UTILITY. THE CONTRACTOR

SHALL EXERCISE CAUTION WHEN CROSSING UNDERGROUND UTILITIES,

WHETHER SHOWN ON THE PLAN OR LOCATED BY THE UTILITY COMPANY.

ALL UTILITIES WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION

SHALL BE BROUGHT TO THE ATTENTION OF THE COR FIRST.

6. THE SEQUENCE OF CONSTRUCTION SHALL BE SUCH THAT ALL

UNDERGROUND INSTALLATIONS OF EVERY KIND, INCLUDING LANDSCAPE

SPRINKLERS LINES, SHALL BE PLACED BENEATH THE PAVEMENT AND ITS

EDGES PRIOR TO THE CONSTRUCTION OF THE PAVEMENT. THE

PAVEMENT SHALL NOT BE CUT WITHOUT PRIOR APPROVAL OF THE COR.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING ANY

CONSTRUCTION ACTIVITIES FROM TAKING PLACE OUTSIDE OF THE LIMITS

OF CONSTRUCTION SHOWN ON THE PLANS. ANY ON-SITE OR OFFSITE

AREAS DISTURBED BY CONTRACTOR OR SUB CONTRACTOR (EQUIPMENT

AND/OR PERSONNEL VEHICLES) SHALL BE RESTORED TO ORIGINAL

CONDITION OR BETTER.

8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE EXISTING SITE

CONDITIONS OF SOIL PRIOR TO NOTICE TO PROCEED. CONTRACTOR TO

DETERMINE IF ANY OFF SITE MATERIALS WILL NEED TO BE IMPORTED TO

ACHIEVE THE GRADES SPECIFIED ON THE PLANS.

9. CONTRACTOR TO PERFORM FIRE FLOW TEST ON ALL ADJACENT FIRE

HYDRANTS. FINAL FLOW TESTS AT THE END OF THE PROJECT WILL BE

REQUIRED ON ALL NEW FIRE HYDRANTS INSTALLED.

10. ALL PERMITTING AND REGULATORY COORDINATION MUST BE

CONDUCTED THROUGH THE EGLIN AFB CIVIL ENGINEER WITH THE

EXCEPTION OF THE NPDES CONSTRUCTION PERMIT, WHICH THE

CONTRACTOR MUST COORDINATE DIRECTLY WITH FDEP, SEE EROSION

CONTROL NOTE 6, THIS SHEET, AND SPECIFICATION SECTION 01 00 00.

ADDITIONAL SPECIAL CONTRACT REQUIREMENTS AND 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS. THE CONTRACTOR IS NOT TO

CONTACT OR COORDINATE ANY OTHER PERMITTING / REGULATORY

ACTIVITY WITHOUT PRIOR APPROVAL BY EGLIN AFB.

DEMOLITION:

1. THE CONTRACTOR SHALL OBTAIN NECESSARY PERMITS AND LICENSES

FOR PERFORMING THE DEMOLITION WORK AND SHALL FURNISH A COPY

OF SAME TO THE COR PRIOR TO COMMENCING THE WORK. THE

CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE PERMITS.

2. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES OR LOCAL

AUTHORITIES FURNISHING ELECTRICAL, POWER SERVICE SO THEY CAN

REMOVE, RELOCATE, DISCONNECT, CAP OR PLUG THEIR EQUIPMENT IN

ORDER TO FACILITATE DEMOLITION. ALL OTHER UTILITIES (WATER,

TELEPHONE OR SEWER) SHALL BE DISCONNECTED, CAPPED OR PLUGGED

BY THE CONTRACTOR AS DIRECTED BY COR REPRESENTATIVE.

3. THE PAVING MARKED FOR DEMOLITION WHICH INCLUDES ALL ASPHALT,

CONCRETE, BASE, AND RETAINING WALLS (INCLUDING THE FOOTERS)

SHALL BE REMOVED.

4. ANY TREES MARKED FOR DEMOLITION, WHICH INCLUDES THE ROOTS

ASSOCIATED WITH THE TREE SHALL BE FULLY REMOVED. TREES NOT

MARKED FOR REMOVAL SHALL BE PROTECTED FROM DAMAGE.

5. SAW-CUT A SMOOTH STRAIGHT EDGE ON ANY PAVEMENT PROPOSED FOR

DEMOLITION PRIOR TO ITS REMOVAL. PRIOR TO CONNECTING PROPOSED

PAVEMENT TO EXISTING PAVEMENT, THE CONTRACTOR SHALL ENSURE

THAT THE EDGE OF THE EXISTING PAVEMENT IS STRAIGHT AND UNIFORM

PRIOR TO REPAVING.

6. CONTRACTOR TO DIVERT A MINIMUM OF 50%, AND PREFERABLY 75% IF

POSSIBLE, OF THE SOLID WASTE FROM THE LANDFILL. RECYCLE MATERIAL

TO BE SEPARATED AND DIVERTED TO RECYCLING FACILITY.

7. ALL MATERIAL SUCH AS ASPHALT AND CONCRETE SHALL BE STOCKPILED

AND REUSED ON SITE WHERE PRACTICAL. ALL EXCESS WASTE /

RECYCLED MATERIAL NOT RE-USED SHALL BE PROPERLY DISPOSED OF

OFF BASE AT AN APPROVED FACILITY.

OTHER UTILITY INFORMATION:

1. CONTRACTOR SHALL APPLY FOR AN EGLIN AFB DIG PERMIT BEFORE ANY

EXCAVATION IS BEGUN ON THE PROJECT.

2. LANDSCAPING SHALL NOT BE LOCATED WITHIN 3 FEET OF ANY FIRE

HYDRANT AND/OR FIRE DEPARTMENT CONNECTION.

3. WATER FOR FIRE FIGHTING PURPOSES SHALL BE AVAILABLE PRIOR TO

COMBUSTIBLES BEING BROUGHT ON SITE.

STORM DRAINAGE CONSTRUCTION NOTES:

1. UNLESS OTHERWISE NOTED, ALL STORM STRUCTURES SHALL MEET FDOT

STANDARDS.

2. UNLESS OTHERWISE NOTED ON THE PLANS STORM INLETS, MANHOLES,

AND CATCH BASINS SHALL BE PRE-CAST REINFORCED CONCRETE

STRUCTURES OR APPROPRIATE HDPE STRUCTURES SHALL BE REQUIRED

AT EACH CHANGE OF PIPE SIZE, CHANGE IN PIPE DIRECTION, OR PIPE

MATERIAL.

3. ALL SWALES, DITCHES MAXIMUM SIDE AND BACK SLOPES MUST NOT BE

GREATER THAN 4 TO 1, UNLESS OTHERWISE SPECIFIED ON THE PLAN

SHEETS AND SUFFICIENT STABILIZATION IS PROVIDED.

4. CONCRETE CURBS SHALL BE SAW CUT 1/4" AT INTERVALS OF TEN FEET

(10') WITH EXPANSION JOINTS AT STREET INTERSECTIONS, STRUCTURES,

AND ALONG CURVES AT SIXTY FEET (60') INTERVALS. ALL EXPANSION

JOINT MATERIAL IS REQUIRED TO BE INSTALLED THROUGH THE ENTIRE

DEPTH OF THE CONCRETE CURB.

5. ORDER OF CONSTRUCTION ACTIVITIES SHALL BE APPROVED BY COR

PRIOR TO CONSTRUCTION.

EARTHWORK, GRADING, STABILIZATION, PAVING AND DRAINAGE:

1. ALL ORGANIC SOILS BELOW UTILITY TRENCHES, PAVEMENT AND

BUILDINGS, SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIAL

AND COMPACTED TO NO LESS THAN 95% OF THE MODIFIED PROCTOR

MAXIMUM DENSITY (ASTM D-1557).

2. ALL PAVEMENT MARKINGS SHALL BE NON-REFLECTORIZED PAINT UNLESS

OTHER WISE NOTED.

3. THE REINFORCED CONCRETE PIPE SHALL BE CLASS III WITH WALL

THICKNESS "B" CONFORMING TO ASTM C - 76 OR AWWA 302 - 74 AND

GASKETS SHALL BE IN ACCORDANCE WITH ASTM C - 443 OR ASTM D - 412.

4. ALL PIPE CALL OUTS ARE MEASURED CENTER LINE TO CENTER LINE FOR

MANHOLES AND INLETS AND FROM THE END OF THE PIPE FOR MITERED

END SECTIONS.

5. DEWATERING MAY BE REQUIRED. SPECIAL CONDITIONS WILL BE

NECESSARY FOR DEWATERING IF REQUIRED (SEE SPECIFICATIONS).

6. ALL UTILITY PIPES SHALL HAVE 3 FEET MINIMUM COVER UNLESS

OTHERWISE SPECIFIED IN PLANS.

7. PLANS AND SPECIFICATIONS REQUIRE THAT COMPACTED BACKFILL BE

PLACED ALONG SIDE OF AND OVER ALL UTILITIES. TESTING SHALL BE PER

ASUS SPECIFICATIONS AND DETAILS AND CONTRACT SPECIFICATION

SECTION 31 00 00 - EARTHWORK .

8. INSTALL AND MAINTAIN GRASS OR SOD ON EXPOSED SLOPES WITHIN 48

HOURS OF COMPLETED FINAL GRADES, AS NOTED ON PLANS, AND AT ANY

OTHER TIME AS NECESSARY TO PREVENT EROSION, SEDIMENTATION OR

TURBID DISCHARGES TO ANY DOWNSTREAM WATER BODY, WETLAND, OR

OFF-SITE PROPERTY. SODDING ON SLOPES 3:1 AND STEEPER SHALL BE

STAKED.

9. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO CONTROL

TURBIDITY AND SEDIMENT INCLUDING, BUT NOT LIMITED TO, THE

INSTALLATION OF TURBIDITY BARRIERS AND SILT FENCES AT ALL

LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED

SOLIDS INTO THE RECEIVING WATER BODY EXISTS DUE TO THE

PROPOSED WORK. TURBIDITY AND SEDIMENT BARRIERS MUST BE

MAINTAINED AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED

AND DISTURBED SOIL AREAS ARE STABILIZED. THE CONTRACTOR SHALL

ALSO BE RESPONSIBLE FOR REMOVING THE BARRIERS. AT NO TIME

SHALL THERE BE ANY OFFSITE DISCHARGE WHICH VIOLATES THE WATER

QUALITY STANDARDS IN CHAPTERS 62-302 AND 62-4, FLORIDA

ADMINISTRATIVE CODE.

EROSION CONTROL NOTES:

1. TEMPORARY STABILIZATION IS REQUIRED OF ALL SOIL LEFT BARE.

MAXIMUM TIME FOR BARE SOIL WITHOUT COVER WILL BE 14 DAYS.

2. PERMANENT SOIL STABILIZATION REQUIRED FOR ALL DISTURBED AREAS

OF THE SITE.

3. STORMWATER INLETS AND STRUCTURES SHOULD BE PROTECTED FROM

SOIL DEPOSITION FIRST, TO PREVENT SOIL LOSS DURING THE

CONSTRUCTION PROCESS.

4. REQUIRED INSPECTIONS BY CONTRACTOR DURING CONSTRUCTION:

a. ONCE EACH WEEK OR WITHIN 24 HRS OF A STORM EVENT

(GREATER THAN 1/2 IN.) INSPECT ALL CONTROL MEASURES.

b. REPAIR ALL DAMAGED AREAS WITHIN 24 HRS OF

DISCOVERY.

c. REMOVE ANY BUILT-UP SEDIMENT AROUND FENCES THAT

REACHES 1/3 OF THE SILT FENCE HEIGHT, REMOVE

SEDIMENT THAT COLLECTS IN DRAINAGE BASINS AND

EXFILTRATION TRENCHES.

d. SILT FENCES SHOULD BE INSPECTED FOR DEPTH OF

SEDIMENT AND TEARS TO INSURE FABRIC HAS NOT PULLED

AWAY FROM POSTS.

e. INSPECT ALL TEMPORARY AND PERMANENT SOIL

STABILIZATION FOR WASHOUTS OR BARE SPOTS.

f. INSPECTION REPORTS MUST BE AVAILABLE FOR

INSPECTION AT ALL TIMES. THE SITE SUPERINTENDENT OR

QUALIFIED STORMWATER INSPECTOR SHALL CONDUCT ALL

INSPECTIONS AND MAINTAIN REPORTS.

g. DATES OF ALL MAJOR GRADING ACTIVITIES MUST BE

RECORDED AND MAINTAINED WITH SITE INSPECTIONS WHEN

MAJOR GRADING HAS CEASED IN ANY AREA, THE DATE

MUST ALSO BE RECORDED.

h. INSPECTION AND RECORD KEEPING SHALL BE IN

ACCORDANCE WITH THE PROJECT NPDES PERMIT

REQUIRED TO BE OBTAINED THROUGH FDEP.

5. GOOD HOUSEKEEPING. THE SITE SHOULD BE KEPT IN AN ORDERLY

FASHION, THE CONTRACTOR SHALL INSURE THE FOLLOWING ITEMS ARE

ADDRESSED.

a. AN EFFORT TO STORE ONLY WHAT IS NEEDED ON THE SITE.

b. KEEP ALL STORED MATERIALS IN A NEAT AND ORDERLY

FASHION IN THE ORIGINAL CONTAINERS WHEN POSSIBLE.

c. FOLLOW ALL MANUFACTURERS RECOMMENDED

PROCEDURES FOR DISPOSAL OF WASTE MATERIAL.

d. INSPECT DAILY TO ENSURE WASTE MATERIAL IS DISPOSED

OF PROPERLY.

6. THIS PROJECT HAS GREATER THAN ONE ACRE OF DISTURBED SOIL AND

REQUIRES AN NPDES PERMIT. SWPPP WILL BE PREPARED BY THE

CONTRACTOR AND MUST BE SIGNED BY THE CONTRACTOR AND

SUB-CONTRACTORS FOR COMPLIANCE BEFORE THE NTP IS APPROVED.

CONTRACTOR WILL PREPARE THE NOI APPLICATION, SHALL BE THE

SIGNATORY AUTHORITY / APPLICANT AND SHALL SUBMIT FOR THE NPDES

PERMIT THROUGH FDEP, ONCE APPROVED BY COR REPRESENTATIVE.

CONTRACTOR TO VERIFY THE PROJECT SWPPP IS IN ACCORDANCE WITH

(IAW) THE OVERALL EGLIN AFB SWPPP.

SPILL CONTROL NOTES:

1. IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT

PRACTICES DISCUSSED IN THE PREVIOUS NOTES OF THIS PLAN, THE

FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION AND

CLEANUP IAW PROJECT SPECIFICATION SECTION 01 57 19.

a. ALL SPILLS WILL BE REPORTED TO THE AIR FORCE

IMMEDIATELY TO EGLIN AFB ENVIRONMENTAL DEPARTMENT

(850.240.1628) PRIOR TO ANY CLEAN UP, AND IF AN

IMMEDIATE EMERGENCY CALL 911 FIRST. POINT OF

CONTACT IS ROBERT (BRUCE) STIPPICH.

b. ALL SPILL PREVENTION, CONTROL, CLEAN UP AND/OR

DISPOSAL SHALL BE IAW PROJECT SPECIFICATION SECTION

01 57 19.

SURVEY:

1. HORIZONTAL COORDINATES BASED ON FLORIDA STATE PLANE - NORTH

ZONE (NAD83), US SURVEY FEET. SURVEY PERFORMED BY SAM, LLC.

2. ELEVATIONS ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988

(NAVD88) UNITED STATES COASTAL AND GEODETIC SURVEY (U.S.C. & G.S.),

AS DETERMINED BY SAM, LLC.

3. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL SURVEY AND

PROPERTY MONUMENTS. IF A MONUMENT IS DISTURBED, THE

CONTRACTOR SHALL CONTRACT WITH THE SURVEYOR OF RECORD FOR

REINSTALLATION OF THE MONUMENT.

4. ALL CONSTRUCTION LINES AND GRADES SHALL BE ESTABLISHED AND

MAINTAINED BY THE CONTRACTOR.

OUTAGES:

1. CONTRACTOR SHALL COORDINATE ALL UTILITY OUTAGES A MINIMUM OF 14

WORKING DAYS PRIOR TO THE SCHEDULED EVENT WITH COR

REPRESENTATIVE AND ASUS.

2. TEMPORARY UTILITY TIE-INS: FOR TEMPORARY UTILITY TIE-INS, (I.E.

CONTRACT'S TRAILER) ELECTRICITY AND POTABLE WATER ARE USUALLY

AVAILABLE ON EGLIN AND THE CONTRACTOR MAY TIE INTO THESE. BOTH

TIE-INS MUST MEET CODE REQUIREMENTS, MUST BE METERED WITH

APPROVED REMOTE READABLE METERS, AND THE CONTRACTOR SHALL

PROVIDE ALL MANPOWER/EQUIPMENT FOR THESE TIE-INS. EGLIN WILL

ONLY PERFORM THE FINAL ELECTRICAL TIE-IN TO BASE LINES; ALL OTHER

WORK WILL BE ACCOMPLISHED BY THE CONTRACTOR.

3. CONTRACTOR AWARDED THIS PROJECT IS RESPONSIBLE FOR

MONITORING CONSTRUCTION AND SUBMITTING TO THE DISTRICT/FDEP

NOTICE OF CONSTRUCTION COMMENCEMENT AND AS-BUILT

CERTIFICATIONS FOR THE PROJECT WHEN COMPLETED THE CONTRACTOR

SHALL UTILIZE A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .