AM03.pdf

PDF 232 KB Posted

Attached to
Cyberspace Test Group Facility, Eglin AFB, FL Federal contract opportunity
Solicitation number
W9127820R0057
Issued by
Department of the Army Corps of Engineers Engineering District Mobile

About this file

This document contains an amendment to a solicitation for construction services and the related federal contract opportunity. The amendment modifies the solicitation for construction of a new Cyberspace Test Group Facility at Eglin Air Force Base in Florida. The project involves construction of a 52,003 square-foot multi-level sensitive compartmented information facility with a concrete foundation, split-faced concrete block over a steel frame, sloped standing seam metal roof, fire suppression systems, all utilities, pavements, communications, site improvements and associated support facilities. The amendment revises specifications, replaces pages, and provides revised drawings to be inserted into the solicitation. The Department of the Army Corps of Engineers Engineering District Mobile is the agency seeking these construction services for the Cyberspace Test Group Facility at a budget of an estimated $25M.

View the file

Other files for this federal contract opportunity

Other files attached to Cyberspace Test Group Facility, Eglin AFB, FL, newest first.
File Type Posted
W9127820R0057 JA_Redacted.pdf PDF
AM05.pdf PDF
AM05 DRAWINGS.pdf PDF
AM04.pdf PDF
AM03 DRAWINGS.pdf PDF
AM02.pdf PDF
AM02 DRAWINGS.pdf PDF
AM01.pdf PDF
AM01 DRAWINGS.pdf PDF
Site visit sign in sheet.pdf PDF
VOL2.PDF PDF
EM 385-1-1.pdf PDF
RTA DRAWINGS VOL2 .pdf PDF
VOL1.PDF PDF
VOL6.PDF PDF
VOL3.PDF PDF
VOL4.PDF PDF
RTA DRAWINGS VOL1.pdf PDF
VOL5.PDF PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127820R0057-0003 06 AUG 2020 MEF19017

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127820R0057

9B. DATED (SEE ITEM 11)

7 JUL 2020

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: CYBERSPACE TEST GROUP FACILITY FTFA 163007, EGLIN AIR FORCE BASE, FLORIDA Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/REVISED DRAWINGS

FOR AMENDMENT NO. 0003

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

CYBERSPACE TEST GROUP FACILITY FTFA 163007 W9127820R0057

EGLIN AIR FORCE BASE, FLORIDA MEF19017

SF 30 Page 2

Amendment No. W9127820R0057-0003

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

VOLUME 1

01 57 19 revised paragraph 3.19.D

05 40 00 revised paragraphs 2.1.c.1 and 2.1.e.1

PART II - NOTE: Revised and added drawings are listed below. These revised and added drawings are to be inserted into the folio in the proper numerical sequence.

Drawings that have been revised by this amendment shall be deleted from the folio.

All drawings listed below are revised unless indicated otherwise.

Sheet Reference Number Title

COVER SHEET

GC004 SITE USE AND WORK RESTRICTION PLAN

CC005 SITE WORK PHASING PLAN

CS501 PAVING DETAILS

S-103 SECOND FLOOR FRAMING PLAN - WEST

S-304 SECOND FLOOR FRAMING PLAN - WEST

P-601 PLUMBING SCHEDULES - 1

Encl as stated:

2 Revised and replaced pages of the specifications as indicated in Part I.

6 Revised drawings as indicated in Part II.

FY19 CYBERSPACE TEST GROUP FACILITY W9127820R0057

EGLIN AFB, FLORIDA MEF19017

01 57 19 Page 1

Revised by Amendment No. W9127820R0057-0003

SECTION 01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS - EGLIN STANDARD

3.19 INSTALLATION RESTORATION PROGRAM (IRP)

A. Contractors and Project Manages (PM) planning projects on Eglin AFB should be aware of the potential to encounter soil/groundwater contamination throughout many areas of the base. The following guidance has been developed to assist in the planning, designing and construction of projects in possibly contaminated areas (IRP sites). The first set of guidance is the most stringent and involves projects planned in and area that has know contamination and regulatory Land Use Controls. The second set of guidance applies to projects near a known IRP site with suspected contamination. The last set of guidance is general and applies to any areas of the base where contamination has not been confirmed. It is imperative that planners, designers, and contractors involve Eglin AFB 96 CEG/CEIEA early and often in the planning, designing, and construction process to minimize the impact that contaminated soils/groundwater may have on their project.

B. Projects located on a site with known soil and/or groundwater contamination with land use controls:

1. There are land use controls on this area imposed by an environmental regulatory agency designed to protect public health.

2. Project Manager should investigate and plan to ensure all monitor wells/cleanup systems are avoided.

3. Project Manager should submit detailed work plans to Eglin AFB 96

CEG/CEIEA early in planning stages so Eglin AFB 96 CEG/CEIEA can obtain concurrence from the regulatory agencies on project details.

4. Project Manager should educate workers on potential to encounter contamination and also should ensure workers are adequately protected with personal protective equipment.

5. If unusual soil or groundwater color/odor is encountered during subsurface work, contact Eglin AFB 96 CEG/CEIEA.

C. Projects located near a site with known or suspected soil and/or groundwater contamination without land use controls:

1. If unusual soil or groundwater color/odor is encountered during subsurface work, contact Eglin AFB 96 CEG/CEIEA.

2. Project Manager should investigate and plan to ensure all monitor wells/cleanup systems are avoided.

3. Project Manager should educate workers on potential to encounter contamination and also should ensure workers are adequately protected with personal protective equipment.

D. Sites without land use controls and not in close proximity to known contamination or IRP site (The site conditions of this project is defined in AF Form 813 that is included in the spec Appendix C which does not indicate any known IRP sites in close proximity so guidance of this paragraph is applicable):

1. If unusual soil or groundwater color/odor is encountered during subsurface work, contact Eglin AFB 96 CEG/CEIEA.

01 57 19 Page 2

2. Project Manager should educate workers on potential to encounter contamination and also should ensure workers are adequately protected with Personal Protective Equipment.

Be aware that the regulatory agency can halt the project for long periods of time due to the discovery of contamination but Eglin AFB 96 CEG/CEIEA is committed to expediting projects with IRP compliance related issues.

(Note: The remainder of the section is unchanged by this amendment.)

05 40 00

SECTION 05 40 00 - COLD-FORMED METAL FRAMING

2.1 STEEL STUDS, JOISTS, TRACKS, BRACING, BRIDGING AND ACCESSORIES

Framing components shall comply with ASTM C955 and the following.

a. Provide products with an average recycled content of steel products so postconsumer recycled content plus one half of preconsumer recycled content not less than 25 percent.

b. Steel Sheet: ASTM A1003/A1003M, Structural Grade, Type H, metallic coated, of grade and coating weight as follows:

(1) Grade: As required by structural performance.

(2) Coating: G60 (Z180), A60 (ZF180), AZ50 (AZ150), or GF30 (ZGF90).

c. Steel Studs: Manufacturer's standard C-shaped steel studs, of web depths indicated, punched, with stiffened flanges, and as follows:

(1) Minimum Base-Metal Thickness: 0.0428 0.053 inch.

(2) Minimum Flange Width: 1-5/8 inches.

d. Steel Track: Manufacturer's standard U-shaped steel track, of web depths indicated, unpunched, with straight flanges, and as follows:

(1) Minimum Base-Metal Thickness: Matching steel studs.

(2) Minimum Flange Width: 1-1/4 inches.

e. Roof Truss Members: Manufacturer's standard C-shaped steel sections, of web depths indicated, unpunched, with stiffened flanges, and as follows:

(1) Minimum Base-Metal Thickness: 0.0428 0.053 inch.

(2) Minimum Flange Width: 1-5/8 inches.

(Note: The remainder of the section is unchanged by this amendment.)