AM02 DRAWINGS.pdf
PDF 18 MB Posted
- Attached to
- Cyberspace Test Group Facility, Eglin AFB, FL Federal contract opportunity
- Solicitation number
- W9127820R0057
About this file
This document provides details for a federal contract opportunity for construction services. The solicitation is for the construction of a new Cyberspace Test Group Facility at Eglin Air Force Base in Florida. The 52,003 square foot facility will include a multi-level sensitive compartmented information facility utilizing conventional design and construction methods. It will have a concrete foundation, split-faced concrete block construction over a steel frame, and a sloped standing seam metal roof. The facility will also include fire suppression systems, all utilities, pavements, communications, site improvements, and associated support facilities to provide a complete and usable space. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Mobile. The opportunity closing date and award date are not specified in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127820R0057 JA_Redacted.pdf | ||
| AM05.pdf | ||
| AM05 DRAWINGS.pdf | ||
| AM04.pdf | ||
| AM03 DRAWINGS.pdf | ||
| AM03.pdf | ||
| AM02.pdf | ||
| AM01 DRAWINGS.pdf | ||
| AM01.pdf | ||
| Site visit sign in sheet.pdf | ||
| VOL1.PDF | ||
| VOL6.PDF | ||
| VOL4.PDF | ||
| RTA DRAWINGS VOL1.pdf | ||
| VOL5.PDF | ||
| VOL3.PDF | ||
| VOL2.PDF | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS VOL2 .pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE AL 36602
CYBERSPACE TEST GROUP FACILITY
EGLIN AIR FORCE BASE, FLORIDA
OKALOOSA COUNTY
JUNE 2020
MOBILE DISTRICT PROJECT CODE: MEF19017
RFP NUMBER: W9127820R0057
AMENDMENT NO. 0002
HALF SIZE DRAWINGS1
A
M E
N D
M E
N T
N O
- 2 k5en9jbm Polygon k5en9jbm Polygon k5en9jbm Line k5en9jbm Line
X
X
X X
D
A
Y
T
O
N
A
R
O
A
D
CHOCTAWHATCHEE AVE
S
E
V
E
N
T
H
S
R
E
E
T
72A
TAXILANE 'T'
(PMEL BLDG)
X
X
X
X
X X
XXXXXXXX
X X
X X
X X
X
X
XXXXXXX
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X
F
T
M
I N
LARGE
AIRCRAFT
WASHRACK
35 36
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO THE
MAIN ENTRANCE OF THE EXISTING FACILITIES AND PARKING LOT
APPROACHES ADJACENT TO THE PROJECT SITE AND
SPECIFICALLY PMEL BUILDING (PHASE 1).
TEMPORARY ROAD LOCATION
FOR APRON PERIMETER ROAD
(INSTALL TEMPORARY AIRFIELD
PAVEMENT MARKINGS DEPICTING
TEMPORARY ROAD LOCATION
NEW MAIN ACCESS DRIVE
FOR CYBERSPACE TEST
FACILITY
APPROX. EXISTING
EDGE OF TAXIWAY
NEW 6 FT
CONSTRUCTION FENCE
NEW 6 FT
CONSTRUCTION
FENCE
0 100' 200'
GC005FTFA 163007
S I T
E
W
O R
K
P
H A
S I N
G
P
L A
N
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F G
C D
W G
M
Y
M
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
E
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
M
B
P L
C A
L E
S I Z
E
C K
D
B
Y
P L
D
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
U M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L I
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7G C
5.
dw g
/0 7/
2:
P M B y:
G er th , J am es
W R
SITE WORK PHASING PLAN
1" = 100'
N
DELINEATION FENCING SYSTEM (SILT FENCE, FOD FENCE W/
6-INCH SEPARATION AND 3-FT HIGH ORANGE SAFETY FENCE)
PHASE 1 - CONSTRUCTION LIMITS, REFER TO NOTE 2.A.
PLASTIC WATER FILLED JERSEY BARRIERS
XXXXXX 6-FT. TEMPORARY CONSTRUCTION FENCE WITH FOD FENCE
MATERIAL ATTACHED (REFER TO DETAIL 4 ON SHEET CS502)
GENERAL
AVIATION
RAMP
PEDESTRIAN CORRIDOR
LEGEND
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS
TO THE MAIN ENTRANCE OF THE EXISTING FACILITIES AND
PARKING LOT APPROACHES ADJACENT TO THE PROJECT
SITE AND SPECIFICALLY PMEL BUILDING(PHASE 1).
NOTES:
1. THE CONTRACTOR SHALL DEVELOP A DETAILED PHASING
PLAN, USING THIS PLAN SHEET AS A BASE THAT WILL SHOW
OR DESCRIBE THE SEQUENCE OF CONSTRUCTION ACTIVITIES
FOR EACH PHASE. THE PHASING PLAN WILL BE
INCORPORATED INTO THE CONTRACTOR'S MANAGEMENT
PLAN AND REFLECTED IN THE PROGRESS SCHEDULE. THE
WORK AREA LIMITS (REQUIRED AIRCRAFT OPERATIONS,
WORKER SAFETY AND SECURITY CLEARANCES), BARRICADES,
MAXIMUM EQUIPMENT HEIGHT, AND TEMPORARY FENCING
AND PAVEMENT MARKINGS REQUIREMENTS WILL BE CLEARLY
DELINEATED FOR EACH PHASE. THE PHASING PLAN SHALL
INCLUDE WORK AREA LIMITS AND WILL INCLUDE
IDENTIFICATION OF RESTRICTED AREAS REQUIRING ESCORTS
AND FREE ZONES WITH SECURE AREAS.
2. CONSTRUCTION PHASING AND SEQUENCING REQUIREMENTS:
A. PHASE 1: CONSTRUCTION OF THE PARKING AREA,
LIGHTING, UTILITIES, LANDSCAPING, PAVEMENT
MARKINGS AND STORMWATER TREATMENT FACILITY
SOUTH OF DAYTONA ROAD. PHASE 1 SHALL INCLUDE THE
CONSTRUCTION OF THE NEW PEDESTRIAN CROSS WALK
(ACROSS DAYTONA ROAD) ASSOCIATED SIDEWALKS,
DELINEATION OF PEDESTRIAN SAFE PASSAGEWAYS TO
BUILDING 78 (PMEL), SIGNAGE AND PAVEMENT MARKINGS.
EFFORTS SHALL BE INITIATED UPON NOTICE TO PROCEED
(NTP) AND BE SUBSTANTIALLY COMPLETED IN 120 DAYS
FROM NTP. AREA SHALL BE TURNED OVER FOR
GOVERNMENT USE AT SUBSTANTIAL COMPLETION.
DURING THIS PHASE CONTRACTOR SHALL PROCESS AND
COMPLETE ALL DOCUMENTATION AND SUBMITTALS AS
RELATED TO CONSTRUCTION OPERATIONS OF REMAINING
PHASES.
B. PHASE 2: UPON NTP CONTRACTOR SHALL PROCESS AND
COMPLETE ALL DOCUMENTATION AND SUBMITTALS AS
RELATED TO CONSTRUCTION AND AIRFIELD OPERATIONS
INCLUDING THE NEW GENERAL AVIATION ACCESS DRIVE
AND NEW FACILITY CONSTRUCTION EFFORTS TO THE
AIRFIELD SOUTH OF B78 (PMEL). PREPARATION OF SUCH
SUBMITTALS SHALL START AT NTP AND BE SUBMITTED
WITHIN 30 DAYS OF NTP. IT IS ANTICIPATED THAT THE
REQUIRED AIRFIELDS REVIEWS SHALL TAKE
APPROXIMATELY 1 TO 2 MONTHS FOR REVIEW AND
APPROVAL. UPON APPROVALS CONSTRUCTION EFFORTS
WILL INITIATE ON THE INSTALLATION OF THE PROPOSED
NEW GENERAL AVIATION ACCESS DRIVE, MODIFICATIONS
TO THE AIRFIELD FENCE (SOUTH OF B78), NEW MANGATE
AND GATE INSTALLATION, REMOVAL OF LANDSCAPE
ISLANDS, PAVEMENT INSTALLATION, ASSOCIATED
UNDERGROUND UTILITIES, BOLLARDS AND BOLLARD
FARM. THE EXISTING PARKING LOT NORTH OF B85 AND
THE EXISTING DRIVE AISLE LOCATED EAST AND NORTH OF
B78 SHALL REMAIN OPERATIONAL UNTIL THE NEW MAIN
ACCESS DRIVE, PAVEMENT INSTALLATION AND GATES
ARE COMPLETED AND ACCEPTED BY THE GOVERNMENT.
WORK TO BE SUBSTANTIALLY COMPLETED IN TWO
MONTHS AFTER TEMPORARY CONSTRUCTION WAIVER IS
APPROVED BY GOVERNMENT (REFER TO SECTION 01 00 00
FOR ADDITIONAL INFORMATION).
C. PHASE 3: UPON NTP CONTRACTOR SHALL PROCESS AND
COMPLETE ALL DOCUMENTATION AND SUBMITTALS AS
RELATED TO CONSTRUCTION AND AIRFIELD OPERATIONS
INCLUDING THE NEW CYBERSPACE BUILDING (B90)
CONSTRUCTION EFFORTS. PREPARATION OF SUCH
SUBMITTALS SHALL START AT NTP AND BE SUBMITTED
WITHIN 30 DAYS OF NTP. IT IS ANTICIPATED THAT THE
REQUIRED AIRFIELDS REVIEWS SHALL TAKE
APPROXIMATELY 1 TO 2 MONTHS FOR REVIEW AND
APPROVAL. UPON APPROVALS CONSTRUCTION EFFORTS
WILL INITIATE ON THE CONSTRUCTION OF THE SITE WORK
AND NEW CYBERSPACE BUILDING (B90) AND ASSOCIATED
INFRASTRUCTURE. WORK EFFORTS OUTSIDE OF THE
AIRFIELD OPERATIONS MAY INITIATE AT NTP.
3. BUILDING 78 (PMEL) OPERATIONS CONDUCTS TESTING THAT
CAN BE AFFECTED BY CONSTRUCTION ACTIVITIES THAT
GENERATE VIBRATIONS IN THE GROUND (I.E.: HEAVY EARTH
MOVING, COMPACTION EQUIPMENT, ETC.) AND REQUIRES A 15
DAY ADVANCE NOTICE BEFORE THE WORK STARTS.
4. OPEN TRENCHES, EXCAVATIONS, AND STOCKPILED MATERIAL
AT THE CONSTRUCTION SITE SHOULD BE PROMINENTLY
MARKED WITH ORANGE FLAGS AND LIGHTED WITH FLASHING
RED OR YELLOW LIGHT UNITS DURING HOURS OF
RESTRICTED VISIBILITY AND/OR DARKNESS.
5. CRANE/HOIST OPERATIONS:
A. COORDINATION WITH AIRFIELD OPERATIONS IS REQUIRED
IF THE HEIGHT OF AN EQUIPMENT WHILE IN OPERATION
WILL PENETRATE ANY OF THE AIRFIELD OPERATION
PLANE SURFACES (CLEAR ZONES).
B. IF EQUIPMENT PENETRATES THE OPERATION PLANE
SURFACES (CLEAR ZONES) AN FAA 7460-1, NOTICE OF
PROPOSED CONSTRUCTION ALTERATION, WILL REQUIRE
SUBMITTAL AND APPROVAL PRIOR TO CONSTRUCTION
START.
7. REFER TO SPECIFICATION SECTIONS 01 00 00 - ADDITIONAL
SPECIAL REQUIREMENTS, SECTION 01 11 00 - SUMMARY OF
WORK, 01 14 00 - WORK RESTRICTIONS FOR ADDITIONAL
REQUIREMENTS FOR CONSTRUCTION.
8. CONTRACTOR SHALL COORDINATE THE LIMITS OF
PERMANENT PAVEMENT MARKINGS INSTALLATION,
INCLUDING MATERIAL , SIZE, AND TYPE, WITH THE BASE
AIRFIELD MANAGER AT LEAST 45 DAYS PRIOR TO
INSTALLATION. AIRFIELD CONSTRUCTION OF TEMPORARY
AND PERMANENT PAVEMENT MARKINGS SHALL FOLLOW
CRITERIA PER UFC 3-260-04.
PHASE 2 - CONSTRUCTION LIMITS, REFER TO NOTE 2.B.
PHASE 3 - CONSTRUCTION LIMITS, REFER TO NOTE 2.C.
NEW GATE IN 6 FT
CONSTRUCTION FENCE
GENERAL PARKING APRON
(CONTRACTOR STAGING /
LAYDOWN AREA)
E
X
I
S
T
I
G
R
K
I
N
G
N
T
R
A
C
T
R
K
I
N
G
EXISTING PARKING
(NO CONTRACTOR PARKING)
PLASTIC WATER FILLED
JERSEY BARRIERS
PLASTIC WATER FILLED
JERSEY BARRIERS
NEW BUILDING 90
CYBERSPACE
TEST FACILITY
EXISTING PERIMETER
ROAD NOT IN USE
DURING CONSTRUCTION
EXISTING FENCE
NEW 6 FT
CONSTRUCTION FENCE
THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO THE
MAIN ENTRANCE OF THE EXISTING FACILITIES AND PARKING LOT
APPROACHES ADJACENT TO THE PROJECT SITE AND
SPECIFICALLY PMEL BUILDING (PHASE 1).
NEW GENERAL AVIATION
ACCESS DRIVE
AM
EN
DM
EN
T
/28
/20
CE
B
AMENDMENT 0002
AutoCAD SHX Text
TW T
AutoCAD SHX Text
TW T APR
AutoCAD SHX Text
TW O
AutoCAD SHX Text
TW S APR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 72A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C I0
.d w g
/0 7/
2:
P M B y:
G er th , J am es
W R
CI001FTFA 163007
G E
N E
R A
L
C
I V
L
T
E S
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
I D
W G
M
M
GENERAL CIVIL NOTES
GENERAL:
1. BENCHMARK FOR CONSTRUCTION HAS BEEN PROVIDED ON SHEET V-102.
2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN
STRICT ACCORDANCE WITH THE MINIMUM ENGINEERING AND
CONSTRUCTION STANDARDS ADOPTED BY THE U.S, ARMY CORPS OF
ENGINEERS (USACE) MOBILE DISTRICT. WHERE CONFLICTS OR OMISSIONS
EXIST, THE USACE (MOBILE DISTRICT) STANDARDS SHALL DICTATE.
SUBSTITUTIONS AND DEVIATION FROM PLANS AND SPECIFICATIONS SHALL
BE PERMITTED ONLY WHEN WRITTEN APPROVAL HAS BEEN ISSUED BY
THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).
3. SHOP DRAWINGS OF ALL MATERIALS BEING USED SHALL BE SUBMITTED
AS PER SPECIFICATI0NS (SUBMITTALS).
4. ANY PENALTIES, STOP WORK ORDERS OR ADDITIONAL WORK RESULTING
FROM THE CONTRACTOR BEING IN VIOLATION OF THE REQUIREMENTS
ABOVE, SHALL BE FULLY BORNE BY THE CONTRACTOR.
5. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES AND
TO MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATION OF
THESE UTILITIES WITH THE OWNER OF THE UTILITY. THE CONTRACTOR
SHALL EXERCISE CAUTION WHEN CROSSING UNDERGROUND UTILITIES,
WHETHER SHOWN ON THE PLAN OR LOCATED BY THE UTILITY COMPANY.
ALL UTILITIES WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION
SHALL BE BROUGHT TO THE ATTENTION OF THE COR FIRST.
6. THE SEQUENCE OF CONSTRUCTION SHALL BE SUCH THAT ALL
UNDERGROUND INSTALLATIONS OF EVERY KIND, INCLUDING LANDSCAPE
SPRINKLERS LINES, SHALL BE PLACED BENEATH THE PAVEMENT AND ITS
EDGES PRIOR TO THE CONSTRUCTION OF THE PAVEMENT. THE
PAVEMENT SHALL NOT BE CUT WITHOUT PRIOR APPROVAL OF THE COR.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING ANY
CONSTRUCTION ACTIVITIES FROM TAKING PLACE OUTSIDE OF THE LIMITS
OF CONSTRUCTION SHOWN ON THE PLANS. ANY ON-SITE OR OFFSITE
AREAS DISTURBED BY CONTRACTOR OR SUB CONTRACTOR (EQUIPMENT
AND/OR PERSONNEL VEHICLES) SHALL BE RESTORED TO ORIGINAL
CONDITION OR BETTER.
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE EXISTING SITE
CONDITIONS OF SOIL PRIOR TO NOTICE TO PROCEED. CONTRACTOR TO
DETERMINE IF ANY OFF SITE MATERIALS WILL NEED TO BE IMPORTED TO
ACHIEVE THE GRADES SPECIFIED ON THE PLANS.
9. CONTRACTOR TO PERFORM FIRE FLOW TEST ON ALL ADJACENT FIRE
HYDRANTS. FINAL FLOW TESTS AT THE END OF THE PROJECT WILL BE
REQUIRED ON ALL NEW FIRE HYDRANTS INSTALLED.
10. ALL PERMITTING AND REGULATORY COORDINATION MUST BE
CONDUCTED THROUGH THE EGLIN AFB CIVIL ENGINEER WITH THE
EXCEPTION OF THE NPDES CONSTRUCTION PERMIT, WHICH THE
CONTRACTOR MUST COORDINATE DIRECTLY WITH FDEP, SEE EROSION
CONTROL NOTE 6, THIS SHEET, AND SPECIFICATION SECTION 01 00 00.
ADDITIONAL SPECIAL CONTRACT REQUIREMENTS AND 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS. THE CONTRACTOR IS NOT TO
CONTACT OR COORDINATE ANY OTHER PERMITTING / REGULATORY
ACTIVITY WITHOUT PRIOR APPROVAL BY EGLIN AFB.
DEMOLITION:
1. THE CONTRACTOR SHALL OBTAIN NECESSARY PERMITS AND LICENSES
FOR PERFORMING THE DEMOLITION WORK AND SHALL FURNISH A COPY
OF SAME TO THE COR PRIOR TO COMMENCING THE WORK. THE
CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE PERMITS.
2. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES OR LOCAL
AUTHORITIES FURNISHING ELECTRICAL, POWER SERVICE SO THEY CAN
REMOVE, RELOCATE, DISCONNECT, CAP OR PLUG THEIR EQUIPMENT IN
ORDER TO FACILITATE DEMOLITION. ALL OTHER UTILITIES (WATER,
TELEPHONE OR SEWER) SHALL BE DISCONNECTED, CAPPED OR PLUGGED
BY THE CONTRACTOR AS DIRECTED BY COR REPRESENTATIVE.
3. THE PAVING MARKED FOR DEMOLITION WHICH INCLUDES ALL ASPHALT,
CONCRETE, BASE, AND RETAINING WALLS (INCLUDING THE FOOTERS)
SHALL BE REMOVED.
4. ANY TREES MARKED FOR DEMOLITION, WHICH INCLUDES THE ROOTS
ASSOCIATED WITH THE TREE SHALL BE FULLY REMOVED. TREES NOT
MARKED FOR REMOVAL SHALL BE PROTECTED FROM DAMAGE.
5. SAW-CUT A SMOOTH STRAIGHT EDGE ON ANY PAVEMENT PROPOSED FOR
DEMOLITION PRIOR TO ITS REMOVAL. PRIOR TO CONNECTING PROPOSED
PAVEMENT TO EXISTING PAVEMENT, THE CONTRACTOR SHALL ENSURE
THAT THE EDGE OF THE EXISTING PAVEMENT IS STRAIGHT AND UNIFORM
PRIOR TO REPAVING.
6. CONTRACTOR TO DIVERT A MINIMUM OF 50%, AND PREFERABLY 75% IF
POSSIBLE, OF THE SOLID WASTE FROM THE LANDFILL. RECYCLE MATERIAL
TO BE SEPARATED AND DIVERTED TO RECYCLING FACILITY.
7. ALL MATERIAL SUCH AS ASPHALT AND CONCRETE SHALL BE STOCKPILED
AND REUSED ON SITE WHERE PRACTICAL. ALL EXCESS WASTE /
RECYCLED MATERIAL NOT RE-USED SHALL BE PROPERLY DISPOSED OF
OFF BASE AT AN APPROVED FACILITY.
OTHER UTILITY INFORMATION:
1. CONTRACTOR SHALL APPLY FOR AN EGLIN AFB DIG PERMIT BEFORE ANY
EXCAVATION IS BEGUN ON THE PROJECT.
2. LANDSCAPING SHALL NOT BE LOCATED WITHIN 3 FEET OF ANY FIRE
HYDRANT AND/OR FIRE DEPARTMENT CONNECTION.
3. WATER FOR FIRE FIGHTING PURPOSES SHALL BE AVAILABLE PRIOR TO
COMBUSTIBLES BEING BROUGHT ON SITE.
STORM DRAINAGE CONSTRUCTION NOTES:
1. UNLESS OTHERWISE NOTED, ALL STORM STRUCTURES SHALL MEET FDOT
STANDARDS.
2. UNLESS OTHERWISE NOTED ON THE PLANS STORM INLETS, MANHOLES,
AND CATCH BASINS SHALL BE PRE-CAST REINFORCED CONCRETE
STRUCTURES OR APPROPRIATE HDPE STRUCTURES SHALL BE REQUIRED
AT EACH CHANGE OF PIPE SIZE, CHANGE IN PIPE DIRECTION, OR PIPE
MATERIAL.
3. ALL SWALES, DITCHES MAXIMUM SIDE AND BACK SLOPES MUST NOT BE
GREATER THAN 4 TO 1, UNLESS OTHERWISE SPECIFIED ON THE PLAN
SHEETS AND SODDING PROVIDED AS STABILIZATION.
4. CONCRETE CURBS SHALL BE SAW CUT 1/4" AT INTERVALS OF TEN FEET
(10') WITH EXPANSION JOINTS AT STREET INTERSECTIONS, STRUCTURES,
AND ALONG CURVES AT SIXTY FEET (60') INTERVALS. ALL EXPANSION
JOINT MATERIAL IS REQUIRED TO BE INSTALLED THROUGH THE ENTIRE
DEPTH OF THE CONCRETE CURB.
5. ORDER OF CONSTRUCTION ACTIVITIES SHALL BE APPROVED BY COR
PRIOR TO CONSTRUCTION.
EARTHWORK, GRADING, STABILIZATION, PAVING AND DRAINAGE:
1. ALL ORGANIC SOILS BELOW UTILITY TRENCHES, PAVEMENT AND
BUILDINGS, SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIAL
AND COMPACTED TO NO LESS THAN 95% OF THE MODIFIED PROCTOR
MAXIMUM DENSITY (ASTM D-1557).
2. ALL PAVEMENT MARKINGS SHALL BE NON-REFLECTORIZED PAINT UNLESS
OTHER WISE NOTED.
3. THE REINFORCED CONCRETE PIPE SHALL BE CLASS III WITH WALL
THICKNESS "B" CONFORMING TO ASTM C - 76 OR AWWA 302 - 74 AND
GASKETS SHALL BE IN ACCORDANCE WITH ASTM C - 443 OR ASTM D - 412.
4. ALL PIPE CALL OUTS ARE MEASURED CENTER LINE TO CENTER LINE FOR
MANHOLES AND INLETS AND FROM THE END OF THE PIPE FOR MITERED
END SECTIONS.
5. DEWATERING MAY BE REQUIRED. SPECIAL CONDITIONS WILL BE
NECESSARY FOR DEWATERING IF REQUIRED (SEE SPECIFICATIONS).
6. ALL UTILITY PIPES SHALL HAVE 3 FEET MINIMUM COVER UNLESS
OTHERWISE SPECIFIED IN PLANS.
7. PLANS AND SPECIFICATIONS REQUIRE THAT COMPACTED BACKFILL BE
PLACED ALONG SIDE OF AND OVER ALL UTILITIES. TESTING SHALL BE PER
ASUS SPECIFICATIONS AND DETAILS AND CONTRACT SPECIFICATION
SECTION 31 00 00 - EARTHWORK .
8. INSTALL AND MAINTAIN GRASS OR SOD ON EXPOSED SLOPES WITHIN 48
HOURS OF COMPLETED FINAL GRADES, AS NOTED ON PLANS, AND AT ANY
OTHER TIME AS NECESSARY TO PREVENT EROSION, SEDIMENTATION OR
TURBID DISCHARGES TO ANY DOWNSTREAM WATER BODY, WETLAND, OR
OFF-SITE PROPERTY. SODDING ON SLOPES 3:1 AND STEEPER SHALL BE
STAKED.
9. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO CONTROL
TURBIDITY AND SEDIMENT INCLUDING, BUT NOT LIMITED TO, THE
INSTALLATION OF TURBIDITY BARRIERS AND SILT FENCES AT ALL
LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED
SOLIDS INTO THE RECEIVING WATER BODY EXISTS DUE TO THE
PROPOSED WORK. TURBIDITY AND SEDIMENT BARRIERS MUST BE
MAINTAINED AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED
AND DISTURBED SOIL AREAS ARE STABILIZED. THE CONTRACTOR SHALL
ALSO BE RESPONSIBLE FOR REMOVING THE BARRIERS. AT NO TIME
SHALL THERE BE ANY OFFSITE DISCHARGE WHICH VIOLATES THE WATER
QUALITY STANDARDS IN CHAPTERS 62-302 AND 62-4, FLORIDA
ADMINISTRATIVE CODE.
EROSION CONTROL NOTES:
1. TEMPORARY STABILIZATION IS REQUIRED OF ALL SOIL LEFT BARE.
MAXIMUM TIME FOR BARE SOIL WITHOUT COVER WILL BE 14 DAYS.
2. PERMANENT SOIL STABILIZATION REQUIRED FOR ALL DISTURBED AREAS
OF THE SITE.
3. STORMWATER INLETS AND STRUCTURES SHOULD BE PROTECTED FROM
SOIL DEPOSITION FIRST, TO PREVENT SOIL LOSS DURING THE
CONSTRUCTION PROCESS.
4. REQUIRED INSPECTIONS BY CONTRACTOR DURING CONSTRUCTION:
a. ONCE EACH WEEK OR WITHIN 24 HRS OF A STORM EVENT
(GREATER THAN 1/2 IN.) INSPECT ALL CONTROL MEASURES.
b. REPAIR ALL DAMAGED AREAS WITHIN 24 HRS OF
DISCOVERY.
c. REMOVE ANY BUILT-UP SEDIMENT AROUND FENCES THAT
REACHES 1/3 OF THE SILT FENCE HEIGHT, REMOVE
SEDIMENT THAT COLLECTS IN DRAINAGE BASINS AND
EXFILTRATION TRENCHES.
d. SILT FENCES SHOULD BE INSPECTED FOR DEPTH OF
SEDIMENT AND TEARS TO INSURE FABRIC HAS NOT PULLED
AWAY FROM POSTS.
e. INSPECT ALL TEMPORARY AND PERMANENT SOIL
STABILIZATION FOR WASHOUTS OR BARE SPOTS.
f. INSPECTION REPORTS MUST BE AVAILABLE FOR
INSPECTION AT ALL TIMES. THE SITE SUPERINTENDENT OR
QUALIFIED STORMWATER INSPECTOR SHALL CONDUCT ALL
INSPECTIONS AND MAINTAIN REPORTS.
g. DATES OF ALL MAJOR GRADING ACTIVITIES MUST BE
RECORDED AND MAINTAINED WITH SITE INSPECTIONS WHEN
MAJOR GRADING HAS CEASED IN ANY AREA, THE DATE
MUST ALSO BE RECORDED.
h. INSPECTION AND RECORD KEEPING SHALL BE IN
ACCORDANCE WITH THE PROJECT NPDES PERMIT
REQUIRED TO BE OBTAINED THROUGH FDEP.
5. GOOD HOUSEKEEPING. THE SITE SHOULD BE KEPT IN AN ORDERLY
FASHION, THE CONTRACTOR SHALL INSURE THE FOLLOWING ITEMS ARE
ADDRESSED.
a. AN EFFORT TO STORE ONLY WHAT IS NEEDED ON THE SITE.
b. KEEP ALL STORED MATERIALS IN A NEAT AND ORDERLY
FASHION IN THE ORIGINAL CONTAINERS WHEN POSSIBLE.
c. FOLLOW ALL MANUFACTURERS RECOMMENDED
PROCEDURES FOR DISPOSAL OF WASTE MATERIAL.
d. INSPECT DAILY TO ENSURE WASTE MATERIAL IS DISPOSED
OF PROPERLY.
6. THIS PROJECT HAS GREATER THAN ONE ACRE OF DISTURBED SOIL AND
REQUIRES AN NPDES PERMIT. SWPPP WILL BE PREPARED BY THE
CONTRACTOR AND MUST BE SIGNED BY THE CONTRACTOR AND
SUB-CONTRACTORS FOR COMPLIANCE BEFORE THE NTP IS APPROVED.
CONTRACTOR WILL PREPARE THE NOI APPLICATION, SHALL BE THE
SIGNATORY AUTHORITY / APPLICANT AND SHALL SUBMIT FOR THE NPDES
PERMIT THROUGH FDEP, ONCE APPROVED BY COR REPRESENTATIVE.
CONTRACTOR TO VERIFY THE PROJECT SWPPP IS IN ACCORDANCE WITH
(IAW) THE OVERALL EGLIN AFB SWPPP.
SPILL CONTROL NOTES:
1. IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT
PRACTICES DISCUSSED IN THE PREVIOUS NOTES OF THIS PLAN, THE
FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION AND
CLEANUP IAW PROJECT SPECIFICATION SECTION 01 57 19.
a. ALL SPILLS WILL BE REPORTED TO THE AIR FORCE
IMMEDIATELY TO EGLIN AFB ENVIRONMENTAL DEPARTMENT
(850.240.1628) PRIOR TO ANY CLEAN UP, AND IF AN
IMMEDIATE EMERGENCY CALL 911 FIRST. POINT OF
CONTACT IS ROBERT (BRUCE) STIPPICH.
b. ALL SPILL PREVENTION, CONTROL, CLEAN UP AND/OR
DISPOSAL SHALL BE IAW PROJECT SPECIFICATION SECTION
01 57 19.
SURVEY:
1. HORIZONTAL COORDINATES BASED ON FLORIDA STATE PLANE - NORTH
ZONE (NAD83), US SURVEY FEET. SURVEY PERFORMED BY SAM, LLC.
2. ELEVATIONS ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88) UNITED STATES COASTAL AND GEODETIC SURVEY (U.S.C. & G.S.),
AS DETERMINED BY SAM, LLC.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL SURVEY AND
PROPERTY MONUMENTS. IF A MONUMENT IS DISTURBED, THE
CONTRACTOR SHALL CONTRACT WITH THE SURVEYOR OF RECORD FOR
REINSTALLATION OF THE MONUMENT.
4. ALL CONSTRUCTION LINES AND GRADES SHALL BE ESTABLISHED AND
MAINTAINED BY THE CONTRACTOR.
OUTAGES:
1. CONTRACTOR SHALL COORDINATE ALL UTILITY OUTAGES A MINIMUM OF 14
WORKING DAYS PRIOR TO THE SCHEDULED EVENT WITH COR
REPRESENTATIVE AND ASUS.
2. TEMPORARY UTILITY TIE-INS: FOR TEMPORARY UTILITY TIE-INS, (I.E.
CONTRACT'S TRAILER) ELECTRICITY AND POTABLE WATER ARE USUALLY
AVAILABLE ON EGLIN AND THE CONTRACTOR MAY TIE INTO THESE. BOTH
TIE-INS MUST MEET CODE REQUIREMENTS, MUST BE METERED WITH
APPROVED REMOTE READABLE METERS, AND THE CONTRACTOR SHALL
PROVIDE ALL MANPOWER/EQUIPMENT FOR THESE TIE-INS. EGLIN WILL
ONLY PERFORM THE FINAL ELECTRICAL TIE-IN TO BASE LINES; ALL OTHER
WORK WILL BE ACCOMPLISHED BY THE CONTRACTOR.
3. CONTRACTOR AWARDED THIS PROJECT IS RESPONSIBLE FOR
MONITORING CONSTRUCTION AND SUBMITTING TO THE DISTRICT/FDEP
NOTICE OF CONSTRUCTION COMMENCEMENT AND AS-BUILT
CERTIFICATIONS FOR THE PROJECT WHEN COMPLETED THE CONTRACTOR
SHALL UTILIZE A PROFESSIONAL ENGINEER TO MONITOR THE
CONSTRUCTION ACTIVITIES FOR THE WATER, SEWER AND STORM WATER
IMPROVEMENTS PER THE CONDITIONS OF THE APPROVED PERMITS. A
PROFESSIONAL ENGINEER IS REQUIRED BY PERMIT CONDITIONS TO
SUBMIT THE CONSTRUCTION COMPLETION PERMITS TO THE PERMITTING
AGENCIES
GAS NOTES:
1. OKALOOSA GAS DISTRICT FACILITIES ARE AVAILABLE IN THE AREA
ADJACENT TO THE PROJECT SITE. NO IMPROVEMENTS ARE EXPECTED TO
THE NATURAL GAS INFRASTRUCTURE AS PART OF THE PROJECT.
2. SHORT DURATION OUTAGES WILL BE PERMITTED AND MUST BE APPROVED
BY THE CONTRACTING OFFICER, GAS MAIN SHUTDOWNS/OUTAGES SHALL
LAST NO LONGER THAN 60 MINUTES AND CAN OCCUR NO MORE THAN 2
TIMES DURING THE CONSTRUCTION PERIOD.
SPECIAL REQUIREMENTS:
1. THIS PROJECT REQUIRES WORK ON THE EXISTING SANITARY SEWER
SYSTEM. THE EXISTING SANITARY SEWER SYSTEM MUST REMAIN IN
OPERATION DURING CONSTRUCTION. SHORT DURATION OUTAGES WILL BE
PERMITTED AND MUST BE APPROVED BY THE CONTRACTING OFFICER.
SANITARY SEWER SHUTDOWNS/OUTAGES SHALL LAST NO LONGER THAN
60 MINUTES, AND CAN OCCUR NO MORE THAN 4 TIMES DURING THE
CONSTRUCTION PERIOD. NO SHUTDOWN/OUTAGES SHALL OCCUR DURING
WET WEATHER EVENTS. THE CONTRACTOR SHALL COORDINATE ALL
SHUTDOWNS/OUTAGES WITH THE USACE AND BASE CIVIL ENGINEERING
OFFICE.
2. WATER AND SEWER, DESIGN AND CONSTRUCTION, SHALL CONFORM WITH
THE REQUIREMENTS SET FORTH BY THE AMERICAN STATES UTILITIES
SERVICES, INC. (ASUS) STANDARD DETAILS AND SPECIFICATIONS
INCLUDED IN CONTRACT DOCUMENTS APPENDIX I FOR REFERENCE TO
THE WORK THEY WILL BE PERFORMING FOR COORDINATION PURPOSES
BY THE GENERAL CONTRACTOR.
3. THE CONTRACTOR SHALL SUBMIT THE TEMPORARY AIRFIELD SECURITY
FENCING AND/OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) TEMPORARY
FENCING LOCATION AND PAVEMENT MARKINGS FOR APPROVAL BY THE
BASE ENGINEER AND SECURITY FORCES PRIOR TO CONSTRUCTION
ACTIVITIES COMMENCING AT THE PROJECT SITE. THE TEMPORARY
AIRFIELD SECURITY FENCE SHALL FOLLOW DESIGN CRITERIA AS STATED
ON THE ENGINEERING DESIGN MANUAL, EGLIN AIR FORCE BASE (AFB)
FLORIDA, FEBRUARY 2019 AND UFC 3-260-01, APPENDIX B SECTION 14. THE
TEMPORARY AIRFIELD SECURITY FENCING SHALL BE INSTALLED BEFORE
EXISTING FENCE CAN BE REMOVED. TEMPORARY FENCE CANNOT BE
WITHIN 50 FEET OF REDLINE. TEMPORARY FENCE SHALL BE 6 FEET HIGH
(MINIMUM) CHAIN LINK WITH TOP AND BOTTOM RAILS AND MESH FABRIC
SCREENING. THE TEMPORARY AIRFIELD SECURITY FENCE SHALL HAVE
MOUNTED SIGNS AT 100 FEET ON CENTERS IDENTIFYING A “CONTROLLED
AREA” SIGN LEGEND.
4. CONTRACTOR SHALL COORDINATE THE LIMITS OF PERMANENT PAVEMENT
MARKINGS INSTALLATION, INCLUDING MATERIAL , SIZE, AND TYPE, WITH
THE BASE AIRFIELD MANAGER AT LEAST 45 DAYS PRIOR TO INSTALLATION.
AIRFIELD CONSTRUCTION OF TEMPORARY AND PERMANENT PAVEMENT
MARKINGS SHALL FOLLOW CRITERIA PER UFC 3-260-04.
5. CONSTRUCTION ACTIVITIES ON THE AIRFIELD, IN PROXIMITY TO, OR
AFFECTING AIRCRAFT OPERATIONAL AREAS OR NAVIGABLE AIRSPACE,
SHALL BE COORDINATED WITH ALL AIRFIELD USERS BEFORE INITIATING
SUCH ACTIVITIES. IN ADDITION, BASIC RESPONSIBILITIES MUST BE
IDENTIFIED AND ASSIGNED PROCEDURES DEVELOPED AND DISSEMINATED
TO INSTRUCT CONSTRUCTION PERSONNEL IN AIRPORT PROCEDURES AND
FOR MONITORING CONSTRUCTION ACTIVITIES FOR CONFORMANCE WITH
SAFETY REQUIREMENTS. THESE AND OTHER SAFETY CONSIDERATIONS
SHALL BE ADDRESSED IN THE EARLIEST STAGES OF PROJECT
FORMULATION AND INCORPORATED IN THE CONTRACT SPECIFICATIONS,
THE WORK ORDER PROJECT REQUIREMENTS CHECKLIST, AND/OR OTHER
PROJECT GUIDANCE DOCUMENTS DEVELOPED FOR IN-HOUSE.
CONSTRUCTION PROJECTS. THE QUALITY ASSURANCE PERSONNEL,
AIRFIELD MANAGER, AND CONTRACT ADMINISTRATOR SHOULD CLOSELY
MONITOR CONSTRUCTION ACTIVITY THROUGHOUT ITS DURATION TO
ENSURE CONTINUAL COMPLIANCE WITH SAFETY REQUIREMENTS
DELINEATED ON THE PROJECT PLANS. THE QUALITY ASSURANCE
PERSONNEL, AIRFIELD MANAGER, AND CONTRACT ADMINISTRATOR
SHOULD CLOSELY MONITOR CONSTRUCTION ACTIVITY THROUGHOUT ITS
DURATION TO ENSURE CONTINUAL COMPLIANCE WITH SAFETY
REQUIREMENTS.
AM
EN
DM
EN
T
/24
/20
CE
B
AMENDMENT 0002
AM
EN
DM
EN
T
/28
/20
CE
B
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C I0
.d w g
/0 7/
0:
A M B y:
G er th , J am es
W R
CI002FTFA 163007
A B
B R
E V
I A
T I O
G
E N
D
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
I D
W G
M
M
LEGEND
TOPOGRAPHY
1 FT CONTOUR (EXISTING GRADE)
1 FT CONTOUR (FINISH GRADE)
DIRECTION OF FLOW
EXISTING SPOT ELEVATION
NEW SPOT ELEVATION
NEW TOP OF CURB ELEVATION
NEW EDGE OF PAVEMENT ELEVATION
DEMOLITION
LIMITS OF CONSTRUCTION
DEMOLITION (ITEM)
DEMOLITION (LINEAR)
DEMOLITION (AREA)
EROSION & SEDIMENT CONTROL
SILT FENCE
INLET PROTECTION
PAVING
NEW ASPHALT PAVEMENT
EXISTING ASPHALT PAVEMENT
EXISTING CONCRETE PAVEMENT
NEW CONCRETE PAVEMENT
NEW GRAVEL
DETECTABLE WARNINGS
CONTROL JOINT
EXPANSION JOINT
DRAINAGE
NEW STORM MANHOLE
NEW TYPE C STORM INLET
NEW STORM DRAIN PIPE
NEW STORM YARD DRAIN
NEW STORM DRAIN CLEANOUT
NEW SWALE
NEW MES
NEW RIP-RAP
NEW TYPE E STORM STRUCTURE
UTILITIES
NEW SANITARY SEWER MANHOLE
NEW SANITARY SEWER LINE
NEW FIRE WATER MAIN
NEW WATER MAIN
BACKFLOW PREVENTER (BFP)
FIRE DEPARTMENT CONNECTION (FDC)
NEW FIRE HYDRANT
POST INDICATOR VALVE
WATER VALVE
CONNECTION POINT TO EXISTING UTILITY
SITE FEATURES
BASELINE
33' UNOBSTRUCTED SPACE
CONSTRUCTION FENCE
REMOVABLE BOLLARD
FIXED BOLLARD
SOIL BORING
NOTE: REFER TO SHEET V-100 FOR EXISTING CONDITIONS LEGEND
ELEVELEV
LOC
X
SF
D
SD SD SD
S
SS SS SS
F F F
W W W
BFP
PIV
X X X X X X X X X X X
BORING ID
CJ
EJ
TOC ELEV
EOP ELEV
(17)
ABBREVIATIONS
ACP ASBESTOS CEMENT PIPE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
APPROX APPROXIMATE
BD BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLT BUILT
BRK BRICK
BRKR BREAKER
BSMT BASEMENT
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMP CORRUGATE METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
CONC CONCRETE
CU COPPER
CU FT CUBIC FOOT
CU IN CUBIC INCH
CU YD CUBIC YARD
DIA/Ø DIAMETER
DBL DOUBLE
DBT DRY-BULB TEMPERATURE
DEG DEGREE
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DISC DISCONNECT
DIP DUCTILE IRON PIPE
DL DEAD LOAD
DN DOWN
DS
DOWN SPOUT
DOWN STREAM
DWG DRAWING
EF EXHAUST FAN
FFE FINISH FLOOR ELEVATION
ERCP
ELLIPTICAL REINFORCED
CONCRETE PIPE
EX EXISTING
EXH EXHAUST
EXP JT /EJ EXPANSION JOINT
EXT EXTERIOR
FH FIRE HYDRANT
FIN FINISH
FL FLOOR
FLUOR FLUORESCENT
FP FIREPLACE
FR FIRE RATING
FT FOOT/FEET
FTG FOOTING
GALV GALVANIZED
GB GRADE BREAK
GFI
GROUND FAULT CIRCUIT
INTERRUPT
GOV'T GOVERNMENT
GRFL GROUND FLOOR
GV GATE VALVE
GYP GYPSUM
HC HOLLOW CORE
HDG HOT DIPPED GALVANIZED
HDPE
HIGH DENSITY
POLYETHELYNE
HDR HEADER
HDWR HARDWARE
HOR, H
HORIZONTAL
HP HORSEPOWER
HT HEIGHT
HTR HEATER
HV HIGH VOLTAGE
HVAC
HEATING, VENTILATING AND
AIR CONDITIONING
HWY HIGHWAY
ID INSIDE DIAMETER
IN INCH
INCAND INCANDESCENT
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INV EL INVERT ELEVATION
JST JOIST
KD KILN DRIED
KW KILOWATT
KWH KILOWATT HOUR
LAM LAMINATED
LAV LAVATORY
LB POUND
LTG LIGHTING
LGTH LENGTH
LIN LINEAR
LL LIVE LOAD
MANUF MANUFACTURE
MAX MAXIMUM
MEG MEET EXISTING GRADE
MES MITERED END SECTION
MF MILL FINISH
MIN MINIMUM
MJ MECHANICAL JOINT
MLDG MOLDING
MHW MEAN HIGH WATER
MHHW MEAN HIGHER HIGH WATER
MLW MEAN LOW WATER
MLLW MEAN LOWER LOW WATER
MSL MEAN SEA LEVEL
MOD MODIFICATION
NTS NOT TO SCALE
NO./# NUMBER
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFC OFFICE
O/H OVER HEAD
OPP OPPOSITE
PARTN PARTITION
PC PORTLAND CEMENT
PCF POUNDS PER CUBIC FOOT
PE PROFESSIONAL ENGINEER
PERF PERFORATE
PERP PERPENDICULAR
PL PLATE
PLG PILING
PLYWD PLYWOOD
PNL PANEL
POD POINT OF DEMARKATION
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLYVINYL CHLORIDE
QS QUARTER SAWN
R RADIUS
RCP
REINFORCED CONCRETE
PIPE
RCPT RECEPTACLE
REBAR REINFORCING BAR
REFRIG REFRIGERATION
REINF REINFORCING
RFG ROOFING
RGH ROUGH
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
SC SOLID CORE
SCH SCHEDULE
SDG SIDING
SECT SECTION
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SH SHINGLES
SPEC SPECIFICATION
SPR SPRUCE
SQ SQUARE
SQ FT SQUARE FOOT
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS STAINLESS STEEL
STL STEEL
SUB FL SUBFLOOR
SUP SUPPLY
SW SWITCH
SYM SYMMETRICAL
SYP SOUTHERN YELLOW PINE
SYS SYSTEM
S4S SURFACED FOUR SIDES
TBM TEMPORARY BENCHMARK
TCP TERRA COTTA PIPE
TEL TELEPHONE
THK
THICK, THICKNESS
T&G TONGUE-AND-GROOVE
TOB TOP OF BANK
TOC TOP OF CURB
TOS
TOP OF SIDEWALK /
TOE OF SLOPE
TOW TOP OF WALL
TYP TYPICAL
UE UNDERGROUND ELECTRIC
UG UNDER GROUND
UL
UNDERWRITERS
LABORATORIES, INC
US UPSTREAM
V VOLT
VB VALVE BOX
VCP VITRIFIED CLAY PIPE
VENT VENTILATOR
VERT, V
VERTICAL
VIF VERIFY IN FIELD
VOL VOLUME
VP VENT PIPE
VTR VENT THRU ROOF
W WATER
WBT WET BULB TEMPERATURE
WC WATER CLOSET
WD WOOD
WM WATER METER
WP WATERPROOF
WWF WELDED WIRE FABRIC
YD YARD
AMENDMENT 0002
AM
EN
DM
EN
T
/28
/20
CE
B
15.2
BM
BM
BM
BM
BM
BM
STO
P
ST
O P
FOD
F O D
L O A D
IN
G
Z O N E
B
B
STOP
S
D
S
D
S
D
S
D
S
D
S
D
S
D
SD
S
D
S D
S D
S
D
S
D
S
D
S
D
S
D
S
D
S D
BM
BM
BM
BM
BM
BM
BM
BM
BM
BM
BM
BM
BM
BMBM
B78 FDC
S
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W x
W x
W x W x
W x
W x
W x
W x
W x
W x
W x
W x W x
W x
W x
W x
W x
W x
W x
W x
W x
W x W x
W x W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
NG
x
NG
x
NG
x
NG
x
NG
x
NG
x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N G x
N G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N G x
N
G x
N
G x
N
G x
N
G x
N
Gx
N
Gx
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
N
G x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
D x
S
D x
W x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
SD
x
SD
x
SD
x
SD
x
W x W x
S
D x
S
D x
S
D x
S
D x
S D x
S D x S
D x
S D x
S D x
S
D x
S
D x
S
D x
SD
x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S D x
S D x
S
D x
S
D x
S
D x
S
Dx
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W x
W x
S S x
N:
E
545900
N:
E
545900
N:
E
545800
N:
E
545700
N:
E
545900
N:
E
546100
N:
E
546300
N:
E
546200
N:
E
546400
N:
E
546600
N:
E
546600
N:
E
546100
N:
E
546600
N:
E
546200
FOD FOD
FOD
FOD
FOD
F O
D
F O
D
F O
D
F O
D
F O
D
FOD
FOD
FOD
F O
D
F O
D
FOD
FOD
F O
D
F O
D
F O
D
F O
D
0 60' 120'
N
DEMOLITION NOTES:
1. CONTRACTOR SHALL COORDINATE UTILITY DEMOLITION
WITH CONTRACTING OFFICER. VERIFY ALL UTILITIES
NOTED FOR DEMOLITION HAVE BEEN SHUT OFF AND
ABANDONED PRIOR TO ANY WORK
2. CONTRACTOR SHALL FIELD VERIFY ALL UTILITIES PRIOR
TO BEGINNING CONSTRUCTION ACTIVITIES. COORDINATE
WITH CONTRACTING OFFICER AND NOTIFY IMMEDIATELY
OF ANY DISCREPANCY WITH UTILITY LOCATIONS. EACH
CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL DAMAGE
TO UTILITIES CAUSED BY THEIR CONSTRUCTION
ACTIVITIES.
3. CONTRACTOR SHALL PROVIDE A TEMPORARY TRAFFIC
CONTROL PLAN FOR APPROVAL BY CONTRACTING
OFFICER AND BASE ENGINEER PRIOR TO STARTING
CONSTRUCTION ACTIVITIES. TEMPORARY TRAFFIC
CONTROL PLAN SHALL COMPLY WITH FDOT MAINTENANCE
AND TRAFFIC DESIGN REQUIREMENTS, SPECIFICATIONS,
AND 600 SERIES INDEXES LATEST EDITION.
4. CONTRACTOR SHALL PERFORM AIRFIELD DEMOLITION AS
NECESSARY AT THE LOCATION OF AN EXISTING
CONCRETE JOINT.
48 HOURS BEFORE DIGGING
1-800-432-4770
SUNSHINE STATE ONE CALL CENTER
CALL 811
TOLL FREE
OR
Know what's below.
Call before you dig.
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C D1
.d w g
/0 7/
0:
A M B y:
G er th , J am es
W R
CD101FTFA 163007
O V
E R
A L
L
D
E M
O L
I T
I O
N
P
L A
N
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
D D
W G
M
M
D
A
Y
T
O
A
D
D
A
Y
T
O
A
D
OVERALL DEMOLITION PLAN
1" = 60'
BLDG.
BLDG.
CD102
WASH
RACK
T A
X I L
A N
E
S
CD104
STRUCTURE(S) TO BE REMOVED BY
GOVERNMENT PRIOR TO CONTRACTOR
COMMENCING WORK
UTILITY DEMOLITION
FOD FENCE
FOD
REFER TO GC004
AND GC005
FOR ADDITIONAL
LIMITS OF FOD FENCE
REFER TO GC004
AND GC005
FOR ADDITIONAL
LIMITS OF FOD FENCE
DEMOLITION NOTES
1. FOR EXISTING CONDITIONS LEGEND REFER TO SHEET
V-100.
2. FOR PROPOSED WORK LEGEND REFER TO SHEET CI002.
3. REFER TO GC004 AND GC005 FOR PROPOSED FOREIGN
OBJECT DEBRIS (FOD) AND CONSTRUCTION FENCE
LOCATIONS.
AM
EN
DM
EN
T
/24
/20
CE
B
AMENDMENT 0002
TAXILANE "T"
CURB/GUTTER DEMOLITION
CLEARING AND GRUBBING
DEMOLITION LEGEND
CONCRETE REMOVAL
STRUCTURE AND PAVEMENT
DEMOLITION
BUILDING 78
FFE = 56.80
CD105
GENERAL
AVIATION
RAMP
E
X
I
S
T
I
R
K
I
T
BLDG.
85T
CD103
ST
S D
S D
S D
S D
S
D
S
D
S
D
SD
SD
SD
S
D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
B
M
B
M
S D
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x W x W x W x W x W x
W x
W x
W x
W x
W x W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
N G
N
G x
N
G x
N
G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
N G x
NG
x
NG
x
NG
x
N G x
N G x
N G x
N G x
N G x
N G x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S
D x
S D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
S
D x
S
D x
S D x
S D x
S D x
SD
x
SD
x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E
BM
S
W
B78 FDC
0 30' 60'
N
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C D1
.d w g
/0 7/
2:
P M B y:
G er th , J am es
W R
CD104FTFA 163007
P A
R K
I N
G
D
E M
O L
I T
I O
N
P
L A
N
N
O R
T H
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
D D
W G
M
M
KEY MAP
1" = 300'
PARKING DEMOLITION PLAN NORTH
1" = 20'
ENTRANCE
DRIVE
D A
Y T
O N
A
R
O A
D
EXISTING
ASPHALT
PARKING
EXISTING ASPHALT
PARKING
INSTALL TREE
PROTECTION
(TYP)
DEMOLITION KEYNOTES
KEY NOTE:
REMOVE EXISTING BUILDING 85T AND
ASSOCIATED INFRASTRUCTURES
REMOVE EXISTING STORM STRUCTURE
REMOVE CONCRETE SIDEWALK
REMOVE EXISTING STORM PIPE
DEMO EXISTING PAVILION
REMOVE BOLLARDS & CONCRETE BASE
REMOVE FENCE
REMOVE EXISTING ASPHALT DRIVEWAY
REMOVE EXISTING SANITARY STRUCTURE
PROTECT EXISTING SANITARY SEWER
SYSTEM AND END SECTIONS
REMOVE EXISTING CULVERT
LIMITS OF ASPHALT REMOVAL AND
PROVIDE A SMOOTH SAW CUT EDGE
REMOVE CURB AND GUTTER
PROTECT EXISTING COMMUNICATION BOX
& LINES
REMOVE EXISTING LIGHT POLE
REMOVE EXISTING WATER LINE
REMOVE EXISTING FIRE HYDRANT
REMOVE PARKING MARKINGS (6 TYP)
REMOVE & DISPOSE OF DITCH PAVEMENT
TREE PROTECTION
BUILDING 24
1 STORY BLOCK
F.F.E.=52.71
COMMUNICATIONS BELOW
GROUND VAULT
DEMOLITION NOTES
1. FOR EXISTING CONDITIONS LEGEND REFER TO SHEET
V-100.
2. FOR PROPOSED WORK LEGEND REFER TO SHEET CI002.
3. REFER TO GC004 AND GC005 FOR PROPOSED FOREIGN
OBJECT DEBRIS (FOD) AND CONSTRUCTION FENCE
LOCATIONS.
AM
EN
DM
EN
T
/24
/20
CE
B
AM
EN
DM
EN
T
/28
/20
CE
B
AMENDMENT 0002
CURB/GUTTER DEMOLITION
CLEARING AND GRUBBING
UTILITY DEMOLITION
LEGEND
CONCRETE REMOVAL
STRUCTURE AND PAVEMENT
DEMOLITION
STRUCTURE(S) TO BE REMOVED BY
GOVERNMENT PRIOR TO CONTRACTOR
COMMENCING WORK
M A
T C
H
L
I N
E
S
H E
CONTRACTOR TO PROVIDE SAFE PEDESTRIAN
PASSAGE DURING CONSTRUCTION
CD104
CD102
CD103
CD105
AutoCAD SHX Text
DAYTONA ROAD
A D
IN
G
Z O N E
B
B
BM
BM
X
X
X X
X X
X X
X
S
D
F O D
D
20'
6'
32'
6'
33'
4+
5+006+006+80
9+
9+
20'
18'
4'
16'
R
R
5'
12'
19'
R
S
F x
F x
F x
F x
F x
R
9'
R
R
4'
END TYPE "F" CURB
AND GUTTER
END RIBBON CURB
Sta: 4+01.59
Off: 10.00 L
6"
6"
6"
6"
6"
N
.9
E
.1
S
6"
8"
8"
D
D
D
D
0 20' 40'
N
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C S1
.d w g
/0 7/
2:
P M B y:
G er th , J am es
W R
CS101FTFA 163007
B U
I L
D I N
G
S
I T
E
P
L A
N
N
O R
T H
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
S D
W G
M
M
BUILDING SITE PLAN NORTH
1" = 20'
NEW
BUILDING 90
FFE = 57.5
BUILDING 78
FFE = 56.80
SWMF 1A
SWMF 2
NEW SECURITY FENCE
33' UNOBSTRUCTED SPACE
33' UNOBSTRUCTED SPACE
MECHANICAL
YARD
TYPE "F" CURB
AND GUTTER
MATCH LINE SHEET CS102
WASH
RACK
GENERAL
AVIATION
RAMP
LEGEND
NEW BUILDING
33' UNOBSTRUCTED SPACE
LIGHT DUTY ASPHALT PAVEMENT
NEW 12" CONCRETE PAVEMENT
EQUIPMENT YARD GRAVEL MATERIAL
NOTES:
1. REFER TO SHEET V-100 FOR EXISTING SITE LEGEND
2. REFER TO SHEET CI002 FOR NEW WORK LEGEND
3. REFER TO SHEET CL101-CL601 FOR ADDITIONAL
HORIZONTAL CONTROL INFORMATION.
NEW 4" CONCRETE SIDEWALK
EXISTING BUILDING
POV PARKING SPACE COUNT41
PEDESTRIAN CROSSWALK
MATCH LINE
TYPE 'F' CURB AND GUTTER
TRAFFIC FLOW DIRECTION
EXISTING PAVEMENT MARKING
EXISTING ASPHALT PAVEMENT
NEW 6" CONCRETE PAVEMENT
CR-X CURB RAMP TYPE, FDOT INDEX 522-002
KEY MAP
1" = 300'
CS105
CS104
CS102
CS101
CS103
SWMF 1B
SECURITY FENCE
CS505
PERSONNEL
GATE
CS506
CS501
FIXED BOLLARDS
CS503
PEDESTRIAN
CROSSWALK
CS503
SEE STRUCTURAL SHEETS FOR LANDING
TOB
TOS
TOB
TOS
T O
B
T O
S
AIRFIELD RAMP
CONCRETE PAVEMENT
CS502
REMOVABLE BOLLARDS
(3.5' OC TYP )
CS503
REMOVABLE
BOLLARD
STORAGE
CS503
CHILLER
CHILLER, SEE
MECHANICAL PLANS FOR
DESIGN
TRANSFORMER
GENERATOR,
SEE ELECTRICAL PLANS
FOR DESIGN
MAIN ACCES
DRIVE BASELINE
TRUCK ACCESS BASELINE
LOADING DOCK SECTION
REFER TO STRUCTURAL PLANS
(S-401/S-403) FOR DESIGN
CONCRETE
SIDEWALK
CS504
CONCRETE
SIDEWALK
CS504
SUMP PUMP SYSTEM
CS502
CONCRETE
SIDEWALK
CS504
TRUCK RAMP
PAVEMENT
CS501
CONCRETE STAIR, (2) RISERS @ 7", (1) TREAD @ 11"
AM
EN
DM
EN
T
7-
-2
CE
B
6" CONCRETE PAVEMENT
4" CONCRETE PAVEMENT
AMENDMENT 0002
12" CONCRETE PAVEMENT
12" CONCRETE PAVEMENT
FIXED BOLLARDS
CS503
FIXED BOLLARDS
CS503
TYPE 'F' CURB
CURB RAMP
TYPE 'F' CURB
RAMP
DAYTONA ROAD
LOADING
ZONE
B M
FOD
20' 20' 20' 20'
20' 20' 20' 20'
20'
20' 20'
20'
22' 15'
20' 20' 20'
E J
E J
E J
E J
E J
E J
E J
E J
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
R
R
R
5'
28'
5'
5.6'
TYP.
EJ
EJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
20'
R
R
R
R R
R
R R R R
4'
11.75'11.75' 13'11.75'
RR
R
11.33'
12.56'
R
R
4.23'
14.91'8.67'
R
7.22'8.29'
8.67'
CJ
CJ
CJ
CJ
C J
C J
C J
E J
C J
C J
C J
C J
C J
C J
C J
C J
DJ
DJ
DJ
DJ
4.35' 4.8' 4.8' 4.8' 4.8' 4.8' 4.8' 4.8' 4.8' 4.8' 4.8' 4.8'
4'
C J
C J
C J
C J
C J
C J
C J
E J
E J
C J
C J
E J
EJ
8.49'
EJ
CJ
CJ CJ
EJ EJ
5.38' 7'
7'
R
CJ
4' 5'
4.8'
4'
D
D
D
S
W
S
S
D
S D
RD
0 10' 20'
N
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C S1
.d w g
/0 7/
:0
PM B
y:
G er th , J am es
W R
CS111FTFA 163007
J O
I N
T
L
A Y
O U
T
P
L A
N
B U
I L
D I N
G
W
E S
T
A
N D
S I D
E W
A L
K S
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
S D
W G
M
M
NEW BUILDING 90
FFE = 57.5
JOINT LAYOUT PLAN BUILDING WEST
1" = 10'
KEY MAP
NTS
N
GENERAL AVIATION RAMP
NEW BUILDING 90
FFE = 57.5
GENERAL AVIATION RAMP
REFER TO STRUCTURAL
SHEETS FOR DESIGN
AIRFIELD RAMP
CONCRETE PAVEMENT
CS502
AM
EN
DM
EN
T
7-
-2
CE
B
6" THICK CONCRETE PAVEMENT
T E
T E
T E
E J
C J
E J
E J
E J
E J
T E
TCJ
TCJ
TCJ
AMENDMENT 0002
AM
EN
DM
EN
T
CE
B
/28
/20
JOINT LAYOUT PLAN SIDEWALKS
1" = 10'
0 10' 20'
N
NEW BUILDING
NEW 6" CONCRETE PAVEMENT
EXISTING ASPHALT PAVEMENT
NEW GRAVEL
NOTES:
1. DOWELS REQUIRED IN LAST THREE TRANSVERSE
CONTRACTION JOINTS AT RUNWAY ENDS AND OTHER
LONG EXPANSES OF PAVEMENTS.
2. REFER TO SHEET V-100 FOR EXISTING SITE LEGEND.
3. REFER TO SHEET CI002 FOR NEW WORK LEGEND.
4. REFER TO SHEETS CS502 AND CS504 FOR SIDEWALK AND
CONCRETE JOINT DETAILS.
5. REFER TO CS502 AND CS504 FOR AIRFIELD JOINT DETAILS.
6. NO CHANGES SHALL BE MADE IN THE JOINTING PATTERN
WITHOUT WRITTEN APPROVALOF THE DESIGN ENGINEER.
7. EJs SHALL BE PLACED AROUND BOLLARDS, STORM
STRUCTURES AND BUILDING.
EXISTING CONCRETE PAVEMENT
NEW 4" CONCRETE SIDEWALK
EXISTING BUILDING
TYPE 'F' CURB AND GUTTER
CONTRACTION JOINT
EXPANSION JOINTEJ
CJ
TE THICKENED EDGE JOINT
R REINFORCED SECTION
DOWELED JOINTDJ
LEGEND
NEW 12" CONCRETE PAVEMENT
NEW LIGHT DUTY ASPHALT PAVEMENT
NEW HEAVY DUTY ASPHALT PAVEMENT
T E
T E
T E
T E
T E
T E
T E
TE TE TE TE
TE TE
DJ DJ DJ
DJDJDJDJ
DJDJDJDJ
EJ
E J
TRANSVERSE CONTRACTION JOINTTCJ
LONGITUDINAL CONSTRUCTION JOINTLCJ
L C
J
L C
J L C
J
L C
J L C
J
L C
J
L C
J
L C
J
L C
J
L C
J
L C
J
L C
J
L C
J
L C
J
L C
J
L C
J L C
J
TCJ TCJ TCJ
TCJ
TCJTCJTCJTCJTCJTCJ
TCJ TCJ
EXISTING AIRFIELD CONCRETE JOINT
TCJ
TCJ
REFER TO STRUCTURAL SHEETS
FOR EQUIPMENT PAD DESIGN
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C S5
.d w g
/0 7/
:4
PM B
y:
G er th , J am es
W R
CS502FTFA 163007
C I V
V
I N
G
D
E T
A I L
S
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
S D
W G
M
M
AIRFIELD RAMP CONCRETE PAVEMENT
NTS
12" STABILIZED SUBGRADE AT LBR 40
(COMPACT TO MINIMUM 95% DENSITY
FOR COHENSIONLESS SOILS PER ASTM
D1557 COMPACT IN PLACE)
SUBGRADE
12" PORTLAND CEMENT
CONCRETE
12" GRADED CRUSHED AGGREGATE WITH LBR 100 BASE COURSE
(COMPACT TO MINIMUM 98% MODIFIED PROCTOR)
NOTE: REFER TO SECTION 31 00 00 FOR SUBGRADE REQUIREMENTS.
REFER TO SECTION 32 11 23 FOR AGGREGATE BASE COURSE REQUIREMENTS
ASPHALT PAVEMENT TRANSITION DETAIL
NTS
3' MIN.
HMA (HOT MIX ASPHALT)
IN LIGHT-DUTY LOCATIONS USE 2" (ONE LIFT)
IN HEAVY-DUTY LOCATIONS USE 4" (TWO EQUAL LIFTS)
SEAL COAT
EXISTING PAV'T
CONTRACTOR TO
VERIFY THICKNESS
6" TRANSITION
(REFER TO PLANS)
VARIES
(REFER TO PLANS)
12"STABILIZED SUBGRADE AT LBR 40
(COMPACT TO MINIMUM 95% DENSITY FOR
COHENSIONLESS SOILS PER
ASTM D1557, COMPACT IN PLACE)
SAW CUT PAVEMENT
EDGE
EXISTING SUBGRADE
EXISTING
BASE COURSE
COMPACTED BACKFILL
FOR NEW PIPING
INSTALLATION
6" GRADED CRUSHED AGGREGATE WITH
100-CBR BASE COURSE
(COMPACT TO 98% MODIFIED PROCTOR)
6" TRANSITION
(REFER TO PLANS)
6"
TRANSITION
EXISTING PAV'T
CONTRACTOR TO
VERIFY THICKNESS
SAW CUT PAVEMENT EDGE
EXISTING SUBGRADE
EXISTING
BASE COURSE
NEW UTILITY
SUMP PUMP SYSTEM FOR
LOADING DOCK DETAIL
NTS
PCCP FINISHED
GRADE
5' W
AL
L D
EP
TH
#57 STONE
FDOT TYPE C INLET STRUCTURE
REFER TO FDOT INDEX 425-052 FOR HORIZONTAL WALL
REINFORCING SCHEDULE
AUTOMATIC SUMP PUMP - LITTLE GIANT,
HP
MODEL 6EC-CIA-SFS, 115 VOLTS, EPOXY COATED
CAST IRON BASE OR APPROVED EQUAL
GRATE
JUNCTION BOX
SEE ELECTRICAL PLANS
PUMP CONTROL CABLES
SHUT OFF
VALVE AND
CHECK VALVE
1-1/2" PVC SCH 40
DISCHARGE TO
SWMF 2
3'
FOREIGN OBJECT DEBRIS
FENCE MATERIAL
NTS
FOREIGN OBJECT DEBRIS
FENCE MATERIAL
(L AND M 70 GRAM
PRODUCT CODE 6953
WITH HORIZONTAL WIRES
ORANGE FENCE FABRIC
OR APPROVED EQUAL)
NOTE:
FOD FENCE MATERIAL WILL BE EITHER FREE STANDING OR CAN BE ATTACHED
TO CHAINLINK CONSTRUCTION FENCE.
6"
TRANSITION
DETECTABLE WARNINGS FOR
CURB RAMP DETAIL
NTS
PLAN VIEW
2.35"
2.3 5"
0.2"
0.9"
THE DETECTABLE WARNING SHALL EXTEND THE FULL WIDTH AND DEPTH OF THE CURB RAMP AND SHALL CONSIST OF TACTILE COMPOSITE PANELS WITH FASTENERS AND ADHESIVE BOND AND SEAL PER MANUFACTURER'S RECOMMENDATIONS. COLOR TO BE
APPROVED BY CITY.
DETECTABLE WARNINGS SHALL CONSIST OF RAISED TRUNCATED DOMES WITH A DIAMETER OF NOMINAL 0.9 INCH, A HEIGHT OF NOMINAL 0.2 INCH AND A CENTER-TO-CENTER SPACING OF NOMINAL 2.35 INCH AND SHALL CONTRAST VISUALLY WITH ADJOINING
SURFACES, EITHER LIGHT-ON-DARK, OR DARK-ON-LIGHT.
THE MATERIAL USED TO PROVIDE CONTRAST SHALL BE AN INTEGRAL PART OF THE WALKING SURFACE. DETECTABLE WARNINGS USED ON INTERIOR SURFACES SHALL DIFFER FROM ADJOINING WALKING SURFACES IN RESILIENCY OR SOUND-ON-CANE CONTACT.
THE MATERIAL USED TO PROVIDE CONTRAST SHOULD CONTRAST BY AT LEAST 70%. CONTRAST IN PERCENT IS DETERMINED BY:
CONTRAST = [(B1-B2)/B1] x 100
WHERE B1 = LIGHT REFLECTANCE VALUE (LRV) OF THE LIGHTER AREA AND B2 = LIGHT REFLECTANCE VALUE (LRV) OF THE DARKER
AREA.
NOTE THAT IN ANY APPLICATION BOTH WHITE AND BLACK ARE NEVER ABSOLUTE; THUS, B1 NEVER EQUALS 100 AND B2 IS ALWAYS
GREATER THAN 0.
TRUNCATED DOME
(SEE DETAIL)
2"
˂ 2"EDGE OF DETECTABLE
WARNING
INTEGRAL DOME
DETECTABLE WARNINGS ON WALKING SURFACES
TRUNCATED DOME
CURB RAMP DETECTABLE WARNING DETAIL
THE JOINT
3"
1"
EITHER ONE PIECE OR
THREADED SPLIT-TYPE
DOWEL MAY BE USED
ONE END
OF DOWEL
D* DENOTES DOWEL DIAMETER
PAINT & OIL
REINFORCING STEEL IS
D
NOT CARRIED THROUGH
1"
REINFORCING
STEEL
NOTE: SAW CUT WILL NOT EXTEND BELOW THE REINFORCING STEEL.
TIE BARS 30" LONG AND
SPACED 30" ON CENTERS
NO. 5 DEFORMED STEEL
LONGITUDINAL
TRANSVERSE
TIED LONGITUDINAL
REINFORCING
STEEL IS CARRIED
THROUGH THE
JOINT
SEE JOINT SEALANT
SEE JOINT SEALANT
SEE JOINT SEALANT
3" h d h d
1" h d h d h d h d h d h d
REINFORCED PAVEMENT
CONTRACTION JOINT DETAIL
NTS
SEE PLAN FOR WIDTH
4"1" SLOPE TO DRAIN 1/4": 1' - 0"
BROOM FINISH
1/4" R
COMPACTED SUBGRADE
FINISHED GRADE, SLOPE AWAY FROM
SIDEWALK (TYP.)
6 X 6- W1.4 X W1.4 WWF
REINFORCED SIDEWALK DETAIL
NTS
CS504
CS504
CS504
FOR FENCE STANDING FOD
FENCE PROVIDE STANDING
SYSTEM AT LOCATIONS SHOWN
(AS REQUIRED)
SEE SHEET CS101 FOR LOCATION OF
SUMP PUMP SYSTEM AT LOADING DOCK
AM
EN
DM
EN
T
/28
/20
CE
B
AMENDMENT 0002
NOTE: REINFORCING STEEL SHALL CONSIST OF No. 5 REBAR 12" OCBW
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
FOD
O A D
IN
G
Z O N E
B
B
BM
BM
X
X
X X
X X
X X
X
S
D
F O D
D
9+
9+
6+80
4+
5+00
6+00 L2
C1
L3
R35'
R48'
8.67'
18' 6'
20'
END MAIN
ACCESS DRIVE
N: 546393.59 E: 1337042.33
N: 546511.20 E: 1337370.00
N: 546519.79 E: 1337083.46
N: 546430.92 E: 1337133.34
N: 546423.90 E: 1337367.38
N: 546432.50 E: 1337080.84
N: 546458.42 E: 1337044.94
N: 546505.23 E: 1337046.34
N: 546380.89 E: 1337232.37
N: 546344.86 E: 1337266.31
N: 546326.70 E: 1337236.81
N: 546325.78 E: 1337265.11
N: 546442.05 E: 1337373.93
N: 546457.54 E: 1337380.06
N: 546492.86 E: 1337381.12
N: 546404.72 E: 1337105.05
N: 546384.73 E: 1337104.43
N: 546345.26 E: 1337286.33
N: 546359.20 E: 1337356.37N: 546359.74
E: 1337338.38
N: 546394.67 E: 1337239.79
RP1
RP2
RP5
RP6
RP4
RP7
RP3
CSF-01-19
CSF-02-19
CSF-03-19
CSF-04-19
CSF-05-19
CSF-06-19
CSF-09-19
R21
R21'
N: 546429.75 E: 1337172.61
N: 546405.35 E: 1337171.90
N: 546403.01 E: 1337249.93
N: 546427.36 E: 1337250.66
N: 546426.54 E: 1337278.21
N: 546419.25 E: 1337296.36
N: 546397.52 E: 1337277.34
N: 546395.67 E: 1337339.04
N: 546417.95 E: 1337339.71
RP8 RP9
42'
12'
42'
12'
GP 1001GP 1002
GP 1003
GP 1004
GP 1005
GP 1006
GP 1051
28.5'
12.5'
N: 546356.78 E: 1337103.46
N: 546358.55 E: 1337043.50
N: 546438.51 E: 1337045.97
N: 546439.10 E: 1337025.99
N: 546518.47 E: 1337048.50
N: 546519.06 E: 1337028.50
N: 546578.44 E: 1337050.39 N: 546577.44
E: 1337085.34
60'
34.83'
20'
135' 60'
N: 546318.77 E: 1337376.01
N: 546379.66 E: 1337185.13
N: 546378.05 E: 1337242.25
N: 546397.41 E: 1337148.56
N: 546405.79 E: 1337069.37
N: 546527.79 E: 1337083.70
RADIUS POINTS
Point #
Description
RP1
RP2
RP3
RP4
RP5
RP6
RP7
RP8
RP9
Northing
546554.43
546547.17
546400.69
546402.41
546345.91
546346.69
546359.09
546551.25
546548.98
Easting
1337135.51
1337399.14
1337139.34
1337148.71
1337231.32
1337238.35
1337315.10
1337270.29
1337338.72
6"
6"
6"
6"
6"
S
D
D
D
D
D
D
0 20' 40'
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ®
Mobile District
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S I G
N E
D
B
Y
B U
L L
O C
K
T
I C
E
A
S S
O C
I A
T E
S
E
C
E R
V A
N T
R
E E
T
S
U I T
E
B
P E
N S
A C
O L
A
F
L O
R I D
A
2 3 4 5
B
C
D
D R
A W
N
B
Y
S B
P L
A
L E
S I Z
E
C K
D
B
Y
P L
T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
P R
O J E
M
B E
R
F I L
E
N
A M
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R x
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
M E
F
C Y
B E
R S
P A
S
T
G
R O
C
I L
I T
Y
E G
L
B
F
L O
R I D
A
V:
\2
6\ ac tiv e\
4\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
M
EF
7C L1
.d w g
/0 7/
2:
P M B y:
G er th , J am es
W R
CL101FTFA 163007
G E
O M
E T
R
Y
O U
T
P
L A
N
B
U I L
D I N
G
N
O R
T H
C
B
R O
C K
M E
I E
R
J
G
E R
T H
S T
A N
T E
C
A
M
O R
A L E
S
M E
F C
L D
W G
M
M
GEOMETRIC LAYOUT PLAN - BUILDING NORTH
1" = 20'
NEW
BUILDING 90
FFE = 57.5
BUILDING 78
FFE = 56.80
SWMF 1A
SWMF 2
33' UNOBSTRUCTED SPACE
33' UNOBSTRUCTED SPACE
MECHANICAL
YARD
MATCH LINE SHEET CL102
WASH
RACK
GENERAL
AVIATION
RAMP
LEGEND
NEW BUILDING
33' UNOBSTRUCTED SPACE
NEW HEAVY DUTY
ASPHALT PAVEMENT
NEW 6" CONCRETE PAVEMENT
NEW GRAVEL
NOTES:
1. REFER TO SHEET V-100 FOR EXISTING SITE LEGEND
2. REFER TO SHEET CI002 FOR NEW WORK LEGEND
3. REFER TO SHEET CL601 FOR HORIZONTAL CONTROL
TABLES.
EXISTING CONCRETE PAVEMENT
NEW 4" CONCRETE SIDEWALK
EXISTING BUILDING
MATCH LINE
TYPE 'F' CURB AND GUTTER
SOIL BORING LOCATIONCSF-XX-XX
RIP RAP
NEW LIGHT DUTY
ASPHALT PAVEMENT
NEW 12" CONCRETE PAVEMENT
N
KEY MAP
1" = 300'
CL101
SWMF 1B
CL102
CL103
CL104
CL105
MAIN ACCESS
DRIVE BASELINE
TRUCK
ACCESS
BASELINE
GENERATOR
YARD
PAVEMENT MATERIAL TRANSITION POINTS
ID LABEL MATERIAL NORTHING EASTING BASELINE STATION OFFSET
GP1000 BEGIN CONSTRUCTION ASPHALT - LIGHT DUTY 546233.03 1337272.96 MAIN ACCESS DRIVE 3+09.11 0.00 GP1001 END CONSTRUCTION ASPHALT - LIGHT DUTY 546391.72 1337104.65 MAIN ACCESS DRIVE 6+17.65 0.00 GP1002 EDGE OF CONCRETE - AIRFIELD RAMP CONCRETE - 12" PCCP 546393.53 1337044.58 MAIN ACCESS DRIVE 6+64.46 0.00 GP1003 BEGIN CONSTRUCTION - AIRFIELD RAMP CONCRETE 12" PCCP 546357.67 1337073.48 MAIN ACCESS DRIVE 6+41.02 28.52L GP1004 EDGE OF PAVEMENT CONCRETE - 12" PCCP 546457.58 1337072.92 MAIN ACCESS DRIVE 6+57.88 64.88R GP1005 EDGE OF PAVEMENT CONCRETE - 12" PCCP 546504.39 1337074.33 MAIN ACCESS DRIVE 6+57.89…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .