This solicitation is for the construction of a new Cyberspace Test Group Facility at Eglin Air Force Base in Florida. The project involves construction of a 52,003 square-foot facility with a SCIF, utilizing conventional construction methods. Work includes installation of fire suppression systems, all utilities, pavements, communications infrastructure, site improvements, and associated support facilities. The facility will consist of a concrete foundation, split-faced concrete block and steel frame construction, and sloped standing seam metal roof. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Mobile. Responses are due in accordance with the solicitation schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127820R0057 JA_Redacted.pdf | ||
| AM05.pdf | ||
| AM05 DRAWINGS.pdf | ||
| AM04.pdf | ||
| AM03 DRAWINGS.pdf | ||
| AM03.pdf | ||
| AM02 DRAWINGS.pdf | ||
| AM01 DRAWINGS.pdf | ||
| AM01.pdf | ||
| Site visit sign in sheet.pdf | ||
| VOL1.PDF | ||
| VOL6.PDF | ||
| VOL4.PDF | ||
| RTA DRAWINGS VOL1.pdf | ||
| VOL5.PDF | ||
| VOL3.PDF | ||
| VOL2.PDF | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS VOL2 .pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127820R0057-0002 30 JUL 2020 MEF19017
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127820R0057
9B. DATED (SEE ITEM 11)
7 JUL 2020
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: CYBERSPACE TEST GROUP FACILITY FTFA 163007, EGLIN AIR FORCE BASE, FLORIDA Is modified in the following: REFER TO THE ENCLOSED REVISED AND ADDED SPECIFICATIONS/REVISED DRAWINGS
FOR AMENDMENT NO. 0002
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
CYBERSPACE TEST GROUP FACILITY FTFA 163007 W9127820R0057
EGLIN AIR FORCE BASE, FLORIDA MEF19017
SF 30 Page 2
W9127820R0057-0002
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page.
Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
VOLUME 1
Table of Contents Revised as indicated herein.
01 00 00 Revised Paragraph 1.18 Added Paragraph 1.41.3
01 33 29 Revised Paragraphs 1.2, 1.4, 1.4.4, 1.4.5.2 and 1.5.1 Added TPC Checklist Added Air Force Sustainability Scoresheet
01 45 00.00 10 Revised Paragraph 3.4.3
01 57 19 Revised Paragraph 3.2
VOLUME 2
09 29 00 Revised Paragraph 2.1.3
09 69 13 Revised Paragraphs 2.1.1.2 and 2.2.4
10 28 13 Revised Paragraph 2.2.1
VOLUME 3
28 10 05 Revised Paragraphs 2.1 and 2.2
VOLUME 5
Appendix A Revised Order Data Sheets A10, A13A-D, S1 and S11
SF 30 Page 3
PART II - NOTE: Revised drawings are listed below. These revised drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
Sheet Reference Number Title
COVER SHEET
GC005 SITE WORK PHASING PLAN
CI001 GENERAL CIVIL NOTES
CI002 ABBREVIATIONS AND LEGEND
CD101 OVERALL DEMOLITION PLAN
CD104 PARKING DEMOLITION PLAN NORTH
CS101 BUILDING SITE PLAN - NORTH
CS111 JOINT LAYOUT PLAN BUILDING WEST AND SIDEWALKS
CS502 CIVIL AND PAVING DETAILS
CL101 GEOMETRIC LAYOUT PLAN - BUILDING NORTH
CG101 BUILDING GRADING PLAN - NORTH
CG104 PARKING LOT GRADING PLAN - NORTH
CG105 PARKING LOT GRADING PLAN - SOUTH
CG501 DRAINAGE DETAILS
CG601 STORM DRAIN STRUCTURE TABLE
CE502 STORWATER POLLUTION PREVENTION PLAN
S-001 GENERAL NOTES
S-101 FOUNDATION AND SLAB-ON-GRADE PLAN - WEST
S-201 FRAMING ELEVATIONS
S-202 FRAMING ELEVATIONS
S-203 FRAMING ELEVATIONS
S-204 BRACED FRAME DETAILS
S-402 FOUNDATION SECTIONS AND DETAILS
S-403 FOUNDATION SECTIONS AND DETAILS
S-404 FOUNDATION SECTIONS AND DETAILS
A-103 ENLARGED FIRST FLOOR PLAN EAST
A-156 FIRST FLOOR SECURITY/ STC 50 GYPSUM WALLBOARD REFLECTED CEILING
PLAN
A-157 SECOND FLOOR SECURITY/STC 50 GYPSUM WALLBOARD REFLECTED CEILING
PLAN
A-203 BUILDING ELEVATIONS
A-313 WALL SECTIONS
A-410 ENLARGED PLANS - RESTROOMS
I-109 PARTIAL FIRST FLOOR FURNITURE PLAN - WEST
I-110 PARTIAL FIRST FLOOR FURNITURE PLAN - EAST
I-202 INTERIOR ELEVATIONS
M-504 HVAC DETAILS-4
M-602 HVAC SCHEDULES-2
E-008 GROUNDING SYSTEM RISER DIAGRAM
E-011 LIGHTING DETAILS
E-113 FIRST FLOOR GROUNDING PLAN - WEST
E-313 FIRST FLOOR MECHANICAL POWER PLAN - EAST
E-602 PANEL SCHEDULE
T-008 ENLARGED EXISTING MANHOLE 73 AREA
TY302 SECURITY SINGLE LINE DIAGRAMS
SF 30 Page 4
Encl as stated:
Revised and added pages of the specifications as indicated in Part I.
43 Revised drawings as indicated in Part II.
TOC - 1
Revised by Amendment No. W9127820R0057-0002
TABLE OF CONTENTS
VOLUME 1 OF 6
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
BASE ACCESS FORM
EP310-1-6a PROJECT SIGNS
DD FORM 1354
DD FORM 1354 CHECKLIST
WAGE RATES
01 00 01 GENERAL CONTRACT REQUIREMENTS
CESAM FORM 1151
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM 4025
01 33 29 SUSTAINABILITY REQUIREMENTS
TPC CHECKLIST
AIR FORCE SUSTAINABILITY SCORESHEET
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
STATEMENT OF SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS – EGLIN STANDARD
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
TOC - 2
Revised by Amendment No. W9127820R0057-0002
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
VOLUME 2 OF 6
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 72 00 ROOFTOP FALL PROTECTION AND ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
HARDWARE SETS
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
TOC - 3
Revised by Amendment No. W9127820R0057-0002
DIVISION 09 – FINISHES (CONTINUED)
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 66 16 TERRAZZO FLOOR TILE
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 72 00 WALLCOVERINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 73 16 CANTILEVERED ENTRANCE CANOPY
DIVISION 11 – EQUIPMENT
11 13 19.13 LOADING DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 59 00 SYSTEMS FURNITURE
12 70 00 FURNITURE, FIXTURES AND EQUIPMENT
DIVISION 13 – SPECIAL CONSTRUCTION
13 12 20 EXTRUDED ALUMINUM CANOPY SYSTEM
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
VOLUME 3 OF 6
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
TOC - 4
Revised by Amendment No. W9127820R0057-0002
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) (CONTINUED)
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 73 13 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
VOLUME 4 OF 6
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS
32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
TOC - 5
Revised by Amendment No. W9127820R0057-0002
DIVISION 32 - EXTERIOR IMPROVEMENTS (CONTINUED)
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 MONORAIL HOISTS
VOLUME 5 OF 6
APPENDICES
APPENDIX A FURNITURE, FIXTURES, AND EQUIPMENT (FFE) PACKAGE
APPENDIX B BORING LOGS AND RESISTIVITY TEST DATA
APPENDIX C AIR FORCE FORMS 813
AF 813 PRIMARY SITE AREA NORTH OF DAYTONA ROAD
& AF 813 UTILITY SITES AND NEW PARKING LOT SITE SOUTH
OF DAYTONA ROAD
APPENDIX D AF FORM 103, BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
APPENDIX E EGLIN AIR FORCE BASE
PRE-CONSTRUCTION (PRECON) ENVIRONMENTAL MANAGEMENT CHECKLIST
(V12) EFFECTIVE: 6 MARCH 2019
APPENDIX F EXISTING COMM MANHOLE BUTTERFLY DIAGRAMS
APPENDIX G EGLIN BEST PRACTICE 1 – TEMPLATE FOR SMS BUILDER
APPENDIX H 96TH COMMUNICATIONS SQUADRON CYBER INFRASTRUCTURE DESIGN
GUIDE APRIL 2019
APPENDIX I AMERICAN STATES UTILITY SERVICES, INC. (ASUS)
STANDARD DETAILS AND SPECIFICATIONS - WATER AND SEWER
VOLUME 6 OF 6
APPENDICES (CONTINUED)
APPENDIX J CHELCO STANDARDS
APPENDIX K TECHNICAL SPECIFICATIONS FOR CONSTRUCTION AND MANAGEMENT OF
SENSITIVE COMPARTMENTED INFORMATION FACILITIES (VERSION 1.4)
IC TECH SPEC-FOR ICD/ICS 705, DATED SEPTEMBER 28, 2017
and UFC 4-010-05 (1 February 2013, Change 1, 1 October 2013)
SENSITIVE COMPARTMENTED INFORMATION FACILITIES PLANNING,
DESIGN, AND CONSTRUCTION
and
DODM 5200.01 VOL 3, APPENDIX TO ENCLOSURE 3 PHYSICAL
SECURITY
STANDARDS, DATED FEBRUARY 24, 2012
APPENDIX L EXISTING BUILDING 85 FIRST FLOOR PLAN (For Information Only)
-- End of Project Table of Contents --
This page was intentionally left blank for duplex printing.
01 00 00
1.18 SCHEDULE OF AVAILABLE UTILITIES
Existing utilities are available in the Project area. The utilities are privatized at Eglin AFB. For water, sewer, and power, the Contractor shall provide temporary service back to the connection to the water and sewer, or transformer for power, and the privatization Contractor will connect and later disconnect the temporary utility to the existing system. If medium voltage line extension is required, the Privatization Contractor will perform at a cost to the Contractor. The Privatization Contractor would later retire any pole or transformer that was just for temporary use. There is a connection fee for both companies, however as it is dependent upon where the connection will be made and the individual contractor’s requirements, the contractor will need to contact both companies for pricing during the bid phase.
As such, the Contractor is responsible for formally requesting temporary service connection 30 days in advance from the privatization contractors through the COR to obtain these temporary utility connections until permanent utility connections are made. The Contractor is required to provide certified backflow preventers for the water and meters for all utilities, as well as pay all connection charges for temporary utilities and notify each utility provider through the COR when the Contractor is ready to remove the temporary connections distribution lines, meters, and associated paraphernalia. The contact information for connection pricing from these utility providers is as follows:
a. Water/Sewer: ASUS - POC: Jason Drayer; Telephone:
(850)324-2595; Email: jason.drayer@ecus.asusinc.com.
b. Electric: CHELCO - POC: Chris Eddy; Telephone: (850)307-1229;
Email: ceddy@chelco.com.
Once utility connections are made, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government, as indicated herein or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The current utility rates are as follows:
a. Electric: $0.0953 per KWh.
b. Natural Gas: $6.37 per Dekatherms.
c. Sewer: $5.04 per kilo gallons.
d. Water: $2.733 per kilo gallons.
1.41.3 Existing Building 85T Conditions
Eglin Unit Environmental Coordinator advised there are no hazardous materials in Building 85T.
(Note: The remainder of the section is unchanged by this amendment.)
01 33 29
1.2 SUMMARY
This specification includes general requirements and procedures for this project to be constructed and documented per the federally mandated High Performance and Sustainable Building or HPSB Guiding Principles (GP), Third Party Certification (TPC) requirements, UFC 1-200-02 High Performance and Sustainable Building Requirements (Oct 1, 2019), and other requirements identified in this specification.
1.4 GUIDING PRINCIPLES VALIDATION (GPV)
Provide construction related sustainability documentation to verify achievement of HPSB Guiding Principles Validation (GPV). Provide the following for GPV:
a. Refer to HPSB Checklist (Air Force Sustainability Requirement Scoresheet) provided at the end of this specification section. These requirements are based on legislative mandates that must be met by all projects. (Multiple checklists indicate multiple buildings that require HPSB tracking.)
(Note: The remainder of Paragraph 1.4 is unchanged by this amendment.)
1.4.4 Third Party Certification (TPC) Documentation
This project has been designed for, and must be constructed to attain a sustainability rating of GBCI GP Assessment. The TPC Documentation for the design elements has already been submitted to GBCI for review using a split-review process. This information will be provided after contract award to include in the Sustainability Notebook. The Contractor shall provide Provide construction related sustainability documentation, in the format required by the TPC Organization, to the Contracting Officer for approval, and for final approval by the TPC organization. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation.
Execute the following:
a. Refer to TPC Checklist at the end of this specification section. (Multiple checklists indicate multiple buildings that require TPC.)
(Note: The remainder of Paragraph 1.4.4 is unchanged by this amendment.)
1.4.5.2 TPC Management and Certification
Execute the following TPC Certification, assessment, or validation requirements:
a. Refer to TPC Checklist at the end of this specification section. (Multiple checklists indicate multiple buildings that require TPC.)
(Note: The remainder of Paragraph 1.4.5.2 is unchanged by this amendment.)
1.5.1 High Performance Sustainable Building (HPSB) Checklist (Air Force Sustainability Requirements Scoresheets)
Provide construction documentation that provides proof of and supports compliance with the completed HPSB Checklist.
GBCI Project ID: 1000130150 Project Name: Cyberspace Test Group Facility Application Phase: Design - Preliminary Submission
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path Two
Documentation Path: Path Two
Documentation Path: Path One
Documentation Path: Path Two
Documentation Path: Path Three
Documentation Path: Path One
Guiding Principles Assessment Project Information Form
New Construction and Renovation Projects Supporting the UFC 1-200-02 published December 2016
2-2 Employ Integrated Design Principles
Directions: Select the documentation path for each requirement. See the Technical Guide section for more information on documentation paths. Provide this form with the initial design and construction submissions to
GBCI and if updates are necessary between review phases. The 'Team Management' tab will update accordingly.
2-2.1.3 Evaluation of the Site - Design Submittal
2-2.1 Integrated Design - Design Submittal
2-2.1.1 Integrated Planning - Design Submittal
2-3.1.4 Energy Efficient Products - Construction Submittal
2-2.1.2 Evaluation for Design Strategies - Design Submittal
2-3.1.3 Renovations - Design Submittal
2-3.1.1 Commercial and Multi-Family High-Rise Residential Building - Design Submittal
2-3.1.2 Low-Rise Residential Buildings - Design Submittal
2-3 Optimize Energy Performance
2-2.1.4 Site Integration and Design of the Building - Design Submittal
2-2.2 Commissioning - Construction Submittal
2-3.1.5 Standby Powered Device - Construction Submittal
2-3.2 On-Site Renewable Energy - Design Submittal
2-3.2.1 Solar Domestic Hot Water (SDHW) - Design Submittal
2-3.4 Metering - Design Submittal
Project-Information-Form_GPA-UFC-2016 -CYBERSPACE.xlsxGP Info Form 1 of 3 Added by Amendment No. W9127820R0057-0002 maggiore Text Box Specification Section 01 33 29 Attach 1 - TPC Checklist (Design - Preliminary Submission)
Guiding Principles Assessment Project Information Form
New Construction and Renovation Projects Supporting the UFC 1-200-02 published December 2016
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path Three
Documentation Path: Path One
Documentation Path: Path Three
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path Three
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path One
Documentation Path: Path Three
2-4.2.1 Outdoor Water Landscaping - Design Submittal
2-5 Enhance Indoor Environmental Quality
2-5.1 Part 2 - Thermal Comfort - Design Submittal
2-5.2 Daylighting & Lighting Controls - Design Submittal
2-5.1 Part 1 - Ventilation - Design Submittal
2-4.3 Alternative Water- Design Submittal
2-4.3.1 Stormwater Management - Design Submittal
2-5.3.1 IAQ Moisture Control - Construction Submittal
2-5.3.2 Reduce VOC Low-Emitting Materials - Construction Submittal
2-5.3.3 Protect Indoor Air Quality During Construction - Construction Submittal
2-5.4 Occupant Health and Wellness - Design Submittal
2-6 Reduce Environmental Impact of Materials 2-6.1.1 Recycled Content - Construction Submittal
2-4.2 Outdoor Water Metering - Design Submittal
2-4.1 Indoor Water - Design Submittal
2-4 Protect and Conserve Water
2-4.1.1 Indoor Water Metering - Design Submittal
Project-Information-Form_GPA-UFC-2016 -CYBERSPACE.xlsxGP Info Form 2 of 3 Added by Amendment No. W9127820R0057-0002
Guiding Principles Assessment Project Information Form
New Construction and Renovation Projects Supporting the UFC 1-200-02 published December 2016
Documentation Path: Path Two
Documentation Path: Path One
Documentation Path: Path Two
Documentation Path: Path Two
Documentation Path: Path Two
Documentation Path: Path One v1.1
2-6.1.2 Biologically-Based Products - Construction Submittal
2-7 Address Climate Change Risk 2-7 Address Climate Change Risk - Design Submittal
2-6.1.3 Ozone Depleting Substances - Construction Submittal
2-6.2.1 Storage and Collection of Recyclables - Design Submittal
2-6.2.2 Waste Diversion- Construction Submittal
Project-Information-Form_GPA-UFC-2016 -CYBERSPACE.xlsxGP Info Form 3 of 3
GBCI Project ID
Project Name
2-2 Employ Integrated Design Principles
D P P P Path One
D P P P Path One
D P P P Path One
D S P Path One
D P P Path One
C S S S Path One
2-3 Optimize Energy Performance
D S P Path One ELECTRICAL SECONDARY
D Path Two N/A
D Path Two N/A
C S P Path One Interior Design - PRIMARY
D P Path Two ELECTRICAL PRIMARY
D Path Three ELECTRICAL PRIMARY - Not sure if this is an NA (electrical confirm)
D P Path One
D P S Path One ELECTRICAL PRIMARY
2-4 Protect and Conserve Water
D P P Path One Electing to do as CONSTRUCTION CREDIT
D P Path One
D Path One Landscape Primary
D Path Three Landscape Primary
D P S Path One Landscape
D P Path Three
2-5 Enhance Indoor Environmental Quality
D P Path One
D P Path One
D Path Three N/A
DOCUMENTATION PATH:
fields will auto populate from the GP Info Form tab)
NOTES
Cyberspace Test Group Facility
RESPONSIBLE PARTY
P: Primary
S: Secondary
SU
BM
IT
TA
L
PH
AS
E
D:
D es ig n C:
C on st ru ct io n
A:
A rc hi te ct
M E:
M ec ha ni ca l
En gi ne er
C:
C iv il
U se r D ef in ed
Project Team Management
G C:
G en er al
Co nt ra ct or1000130150
Guiding Principles Assessment
2-2.1 Integrated Design
2-2.1.2 Evaluation for Design Strategies
2-2.1.1 Integrated Planning
2-2.1.3 Evaluation of the Site
2-2.1.4 Site Integration and Design of the Building
2-2.2 Commissioning
2-3.1.1 Commercial and Multi-Family High-Rise Residential Building
2-3.1.2 Low-Rise Residential Buildings
2-3.1.3 Renovations
2-3.1.4 Energy Efficient Products
2-4.2 Outdoor Water Metering
2-4.3 Alternative Water
2-4.3.1 Stormwater Management
2-3.1.5 Standby Powered Device
2-3.2 On-Site Renewable Energy
2-3.2.1 Solar Domestic Hot Water (SDHW)
2-3.4 Metering
2-4.1 Indoor Water
2-4.2.1 Outdoor Water Landscaping
2-4.1.1 Indoor Water Metering
2-5.1 Part 1 - Ventilation
2-5.1 Part 2 - Thermal Comfort
2-5.2 Daylighting & Lighting Controls
Project-Information-Form_GPA-UFC-2016 -CYBERSPACE.xlsx Team Managment 1 of 2
GBCI Project ID
Project Name
DOCUMENTATION PATH:
fields will auto populate from the GP Info Form tab)
NOTES
Cyberspace Test Group Facility
RESPONSIBLE PARTY
P: Primary
S: Secondary
SU
BM
IT
TA
L
PH
AS
E
D:
D es ig n C:
C on st ru ct io n
A:
A rc hi te ct
M E:
M ec ha ni ca l
En gi ne er
C:
C iv il
U se r D ef in ed
Project Team Management
G C:
G en er al
Co nt ra ct or1000130150
Guiding Principles Assessment
C P S P Path One Electing to do as DESIGN SUBMITTAL
C P Path One
C P Path One
D P Path Three
2-6 Reduce Environmental Impact of Materials
C P Path Two
C P Path One
C P P Path Two
D P Path Two INTERIOR DESIGN - Primary
C P Path Two
2-7 Address Climate Change Risk
D S P Path One
2-6.2.1 Storage and Collection of Recyclables
2-6.2.2 Waste Diversion
2-7 Address Climate Change Risk
2-5.3.3 Protect Indoor Air Quality During Construction
2-5.4 Occupant Health and Wellness
2-6.1.1 Recycled Content
2-6.1.2 Biologically-Based Products
2-6.1.3 Ozone Depleting Substances
2-5.3.1 IAQ Moisture Control
2-5.3.2 Reduce VOC Low-Emitting Materials
Project-Information-Form_GPA-UFC-2016 -CYBERSPACE.xlsx Team Managment 2 of 2
Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry
General Information FTFA163007 Project ID (e.g. ABCD12345) XXXXXXXXXXXXXXXXXX Real Property Unique ID (RPUID) 90 Facility Number Cyberspace Test Group Facility Building Name Eglin AFB Installation Valpariso City FL State Yes CONUS
AFMC MAJCOM
USACE Construction Agent Schrage, Brian AFCEC DM/CM (Last Name, First Name)
$32,680,000.00 PA
52,000 Building Size (SF) 2019 Program Year (FY####) Design Complete Project Phase 04/10/19 Design Started (MM/DD/YY)
09/15/22 BOD (MM/DD/YY)
USGBC GP Guiding Principles Compliance Certification Method
78% HPSB Compliant 19% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA
Standard 90.1-2013) 2017V1 Scoresheet version
Federal Requirements
Complete
03/30/20 Date Project Registered (MM/DD/YY)
Date Project Certified (MM/DD/YY)
5/19/2020 1 Added by Amendment No. W9127820R0057-0002 maggiore Text Box Specification Section 01 33 29 Attach 2- Air Force Sustainability Scoresheet
Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required
90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2
Yes HPSB I.1 Integrated Design 1 Yes HPSB I.2 Commissioning 1
HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3) Total Points 3 Possible Points 5
Yes HPSB II.1 Energy Efficiency 1
Yes Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective
19.4% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)
166.4 Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR
Yes Roof Attributes (Recommended) 1 Select roof types (Check below)
Energy Efficient Products 1 Yes
No HPSB II.2 On-site Renewable Energy 1
No Installed renewable energy elements or projects were not lifecycle cost effective Renewable energy types (check below)
0.0 Insert generation capacity (kW)
0.0% Insert percentage of total building
No HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1
No Installed solar hot water heater system or found installation not lifecycle cost effective
0.0 Insert generation capacity (MMBtu/yr)
0.0% Insert percentage of demand
Yes HPSB II.4 Metering 1 Yes Electric Metering: Select N/A if no service N/A Natural Gas Metering: Select N/A if no service N/A Steam Metering: Select N/A if no service
HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4) Total Points 3 Possible Points 6
Yes HPSB III.1 Indoor Water 1 Yes Indoor Water Metering 1 No HPSB III.2 Outdoor Water 1 No Outdoor Water Metering 1 No HPSB III.3 Alternative Water 1 Yes HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1
101897.0 Change in Impervious Area (SF)
$65,000.00 Pre-Award Cost Estimate ($)
Yes Project addressed EISA 438 1 EISA Technical Constraints
15.0%
Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)
On-Site LID Features Locations 2 Integrated Management Practices Employed
Drop-Down Box No Entry Required Custom Entry
Solar PV
Solar CP
Solar Thermal Electric
Geothermal
GSHP Wind
Hydro Waste to Energy
Renewables were not lifecycle cost effective
Cool roof
Green roof
Solar electric
Solar thermal
Solar Passive
Retaining stormwater impact receving water flow
Site too small to infiltrate significant volume
State or local restrict water harvesting
Shallow bedrock, contaminated soil, high ground water table, underground utilities
Non-potable water demand to small Structural, plumbing, and other mods not feasible
Soil infiltration capacity limited
State or local restrict use of green infrastructure or LID
Other
5/19/2020 2
Final LID Construction Cost ($) Post Construction Analysis (Name of DOR)
HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5) Total Points 7 Possible Points 8
Yes HPSB IV.1 Thermal Comfort 1 Yes HPSB IV.2 Ventilation 1 No HPSB IV.3 Daylighting 1 Yes HPSB IV.4 1 Yes HPSB IV.5 Low Emitting Materials 1 Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 Yes HPSB IV.7 Environmental Tobacco Smoke Control 1 Yes HPSB IV.8 Occupant Health and Wellness 1
HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 5
Yes HPSB V.1 Recycled Content 1 Yes HPSB V.2 Biologically-based Products 1 Yes HPSB V.3 Ozone Depleting Substances 1 Yes HPSB V.4 Waste and Materials Management - Recycling 1 Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1
Yes 60% or greater diverted 60.0% Insert percentage diverted from landfill
HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7) Total Points 1 Possible Points 1
Yes HPSB VI.1 Address Climate Change Risk 1 Possible Points 27
21 Federal Requirements - Yes or N/A 7 Federal Requirements - No
78% Percentage of Federal Requirements Met
Moisture Control
Bio-Retention
Infiltration Trench
Soil Amendments
Dry Wells Inlet Pollution Removal Device
Permeable Pavement/Pavers
Filter Strips Grassed Swells
Rain Barrels/Cisterns
Tree Box Filters Vegetated Buffers Vegetated Roof
Other
5/19/2020 3
Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02 Instructions: Provide a common or project specific justification for an element to be non-applicable, when completed, the Scoresheet tab will allow an N/A response.
Justification for Non-Applicable Answers Common Justification Project Specific Justification Complete?
HPSB I: Employ Integrated Design Principles (UFC 1-200-02, 2-2) HPSB I.1 Integrated Design Applicable HPSB I.2 Commissioning Applicable HPSB II: Optimize Energy Performance (UFC 1-200-02, 2-3) HPSB II.1 Energy Efficiency Applicable HPSB II.1 Energy Efficient Products Applicable HPSB II.2 On-site Renewable Energy Applicable HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System Applicable HPSB II.4 Metering HPSB II.4 Electric Metering: Select N/A if no service Applicable HPSB II.4 Natural Gas Metering: Select N/A if no service No Service Yes HPSB II.4 Steam Metering: Select N/A if no service No steam available Yes HPSB III: Protect and Conserve Water (UFC 1-200-02, 2-4) HPSB III.1 Indoor Water Applicable HPSB III.1 Indoor Water Metering: Select N/A if no service Applicable HPSB III.2 Outdoor Water Applicable HPSB III.2 Outdoor Water Metering: Select N/A if no service Applicable HPSB III.3 Alternative Water Applicable HPSB III.4 Stormwater Management HPSB III.4 Project addressed EISA 438 Applicable HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02, 2-5) HPSB IV.1 Thermal Comfort Applicable HPSB IV.2 Ventilation Applicable HPSB IV.3 Daylighting Applicable HPSB IV.4 Moisture Control Applicable HPSB IV.5 Low Emitting Materials Applicable HPSB IV.6 Protect Indoor Air Quality during Construction Applicable HPSB IV.8 Occupant Health and Wellness Applicable HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02, 2-6) HPSB V.1 Recycled Content Applicable HPSB V.2 Biologically based products Applicable HPSB V.3 Ozone Depleting Substances Applicable HPSB V.4 Waste and Materials Management - Recycling Applicable HPSB V.5 Waste and Materials Management - Divert 60% from Disposal Applicable HPSB VI: Adress Climate Change Riskd (UFC 1-200-02, 2-7) HPSB VI.1 Address Climate Change Risk Applicable
Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade
HPSB I: Employ Integrated Design Principles Integrated Design
HPSB I.1
UFC 1-200-02 para 2-2.1
Incorporate the following planning and evaluation into the integrated design, as described in ASHRAE 189.1 Informative Appendix F (Integrated Design). Follow the steps of design optimization, as applicable, in ASHRAE 189.1 Section F1.1.1 (Charrette Process).
Use a collaborative, integrated planning and design team, composed of user, government support staff, and appropriate professionals, to identify requirements and to establish performance goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals. Ensure incorporation of these goals throughout the design and lifecycle of the building, including deconstruction.
Evaluate the site and building components to determine whether passive and natural design strategies and features are cost effectively incorporated before the active and mechanical systems are designed. Incorporate these features where applicable.
Take into account site attributes, including climate and local and regional context, which impact the design of the building.
During the site selection process, meet the requirements of UFC 2-100-01. See Appendix B “Best Practices” for desirable site characteristics.
During the planning and design process meet the requirements of applicable UFCs, and use the following site development considerations and passive strategies:
• Site design elements that ensure safe and convenient pedestrian access.
• Meet the requirements of UFC 3-201-02.
• Incorporate results of site analysis, in order to design the building, focusing on orientation, configuration and massing.
• Orient building to maximize energy efficiency, passive solar and daylighting potential.
• Select, design and integrate into the overall building, high performance and sustainable systems (e.g., HVAC, plumbing, water heating systems, lighting systems, control systems, elevators, building envelope and fire protection systems).
• Promote opportunities for occupants to voluntarily increase physical movement such as making stairwells a desirable option for circulation and active workstations.
Commissioning
HPSB I.2
UFC 1-200-02 para 2-2.2
In order to verify design and performance, and ensure that the Government requirements are met, employ commissioning practices appropriate to the size and complexity of the building and its system components. This must include an experienced commissioning provider, who should be independent of the project design and construction team, and the operations team. The choice of either contracted services or Government personnel to serve as the commissioning provider will be determined at project level.
Meet the requirements of ASHRAE 189.1 Section 10.3.1.2 (Building Project Commissioning), with the following modifications:
• For buildings and systems that are less complex6, commissioning may be tailored as determined by the DOD Component AHJ.
• “Schematic design” is the design charrette or similar conceptual design activity.
• Documentation as described in ASHRAE 55 Section 6.2 is not required.
For Air Force projects, the Project Delivery Team must determine the level of commissioning activities required.
Requirement Source Document(s) Executive Order 13693
UFGS 01 91 00.15, Total Building Commissioning
High Performance Sustainable Building Requirements References
Added by Amendment No. W9127820R0057-0002 https://www.fedcenter.gov/programs/eo13693/ https://www.fedcenter.gov/programs/eo13693/ http://www.wbdg.org/ccb/browse_cat.php?c=3
High Performance Sustainable Building Requirements HPSB II: Optimize Energy Performance
Energy Efficiency
HPSB II.1
UFC 1-200-02 para 2-3.1
Energy Efficiency - Base energy efficiency design decisions on life-cycle cost as indicated in Chapter 1 of UFC 1-200-02.
Commercial and Multi-Family High-Rise Residential Buildings:
• Meet the requirements of ASHRAE 90.1. Use ASHRAE 90.1(2010) for all projects with design starts before November 6, 2016. Use ASHRAE 90.1(2013) thereafter.
• Design the building to achieve at least 30% energy consumption reduction from ASHRAE 90.1 baseline.
• If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.
• Determine energy consumption levels for both the ASHRAE Baseline Building and proposed building by using the Performance Rating Method found in appendix G of ASHRAE 90.1, except the formula for calculating the Performance Rating.
Replace the formula in G1.2 with the following:
Percentage improvement = 100 × ((Baseline building consumption − Receptacle and process loads) − (Proposed building consumption − Receptacle and process loads)) / (Baseline building consumption − Receptacle and process loads)
Low-Rise Residential Buildings:
• Meet the requirements of International Energy Conservation Code (IECC).
• Design the building to achieve at least 30% energy consumption reduction from the IECC baseline using the Simulated Performance Alternative found in Section 405 of the
IECC.
• If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.
Renovations:
• Renovation projects that replace everything above the foundation must either apply 2-3.1.1 or 2-3.1.2 as applicable.
• All other renovations choose one of the following options:
1. Reduce measured building energy use by at least 30%, below FY 2003 energy use baseline.
2. Reduce measured building energy use by at least 20% below FY 2015 energy use baseline.
3. Reduce modeled energy use (from all sources including renewable energy) by 20% compared to the ASRHAE 90.1 baseline building design.
• If none of the reduction choices is life-cycle cost-effective, modify the design of the proposed building system(s) to achieve an energy consumption level at the highest level of energy efficiency that is life-cycle cost-effective.
Energy Efficient Products
HPSB II.1
UFC 1-200-02 para 2-3.1.4
Energy Efficient Products – Per EISA 2007 Section 525, acquire products that are ENERGY STAR®-qualified or meet FEMP-designated efficiency requirements in all covered product categories. Select products based on life cycle cost, not initial cost. Link to EPA sites: http://www.energystar.gov/ or http://www1.eere.energy.gov/femp/
Per EISA 2007 Section 524, provide commercially available, off-the-shelf products that use no more than 1 watt in their standby mode.
Requirement Source Document(s) 10 CFR 433, EPAct 05
Links Energy Star® Federal Energy Management Program
On-site Renewable Energy
HPSB II.2
UFC 3-440-01 para 2-3.2
Provide on-site renewable energy systems in accordance with ASHRAE 189.1 Section 7.4.1.1 (On-Site Renewable Energy Systems) and UFC 3-440-01 where LCCE, considering climate, infrastructure condition, mission compatibility, and effects on base wide electrical system (grid) power quality. Exception: Do not use purchase of renewable energy certificates (RECs) as a substitute for the Section 7.4.1.1 new building requirement.
Air Force will utilize an installation-level solution to renewable energy systems and will not require ASHRAE 189.1 Section 7.3.2 if a building-level solution is not LCCE.
Requirement Source Document(s):
Executive Order 13693
Added by Amendment No. W9127820R0057-0002 http://www.gpo.gov/fdsys/granule/CFR-2011-title10-vol3/CFR-2011-title10-vol3-sec433-5/content-detail.html https://www.energystar.gov/ https://www1.eere.energy.gov/femp
On-Site Renewable Energy – Solar Hot Water Heater System
HPSB II.3
UFC 1-200-02 para 2-3.2.1
Per EISA 2007 Section 523, meet at least 30% of the annual domestic hot water requirement through the installation of solar water heating unless SDHW is not LCCE. If 30% is not LCCE, modify the design of the proposed system to achieve the highest level of solar water heating that is LCCE.
Requirement Source Document(s):
Measurement and Verification
HPSB II.4
UFC 1-200-02 para 2-3.4
A utility meter must be installed at each building, for each utility serving the building (e.g., district steam, district hot and chilled water, electricity, natural gas, fuel oil, etc.) in the standard units of the measure. Meters must be connected to a base wide energy and utility monitoring and control system using the installation’s advanced metering protocols.
The installation of meters is required per DODI 4170.11, and as amended by DOD Utilities Meter Policy, 16 April 2013.
Requirement Source Document(s):
Federal Leadership in High Performance and Sustainable Buildings MOU
HPSB III: Protect and Conserve Water
Indoor Water
HPSB III.1
UFC 1-200-02 para 2-4.1
Indoor Water – Base water efficiency design decisions on life-cycle cost as indicated in Chapter 1 of UFC 1-200-02.
• Meet the requirements of ASHRAE 189.1 Section 6.3.2 (Building Water Use Reduction), which incorporates USEPA WaterSense-labeled products. Water closet replacements in renovations may have a flush value of up to 1.6 GPF (6.1 LPF) to accommodate existing plumbing capacity.
• Meet the requirements of ASHRAE 189.1 Section 6.4.2 (Building Water Use Reduction).
• Meet the requirements of ASHRAE 189.1 Section 6.4.3 (Special Water Features).
Indoor Water Metering
HPSB III.1
UFC 1-200-02 para 2-4.1.1
Indoor Water Metering -- Install advanced water meters to monitor building indoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.
Requirement Source Document(s):
EPAct 1992
Outdoor Water
HPSB III.2
UFC 1-200-02 para 2-4.2
Outdoor Water --
• Limit potable irrigation water use by 50% compared to the conventional methods, and when LCCE, by using the methodologies in ASHRAE 189.1: Section 6.3.1 (Mandatory Provisions: Site Water Use Reduction) and either Section 6.4.1 (Prescriptive Option: Site Water Use Reduction) or Section 6.5.1 (Performance Option: Site Water Use Reduction).
• For existing systems, if a building has a single water meter, reduce indoor and outdoor potable water use combined by at least 20% compared to building water use in 2007.
Compare results to a baseline building, using the EPA WaterSense landscape water budget tool version 1.01 or later, or a Component approved tool.
• Show preference for irrigation contractors who are certified through a WaterSense labeled program, or other industry-recognized credentialing programs.
• Refer to UFC 3-201-02 for additional requirements.
Outdoor Water MeteringWater
HPSB III.2
UFC 1-200-02 para 2-4.2.1
Water metering for landscaping – When potable water is used, provide water meters for irrigation systems serving more than 25,000 square feet of landscape, when life-cycle cost-effective. Install advanced water meters to monitor outdoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.
For all other irrigation systems, separate water meters for locations with outdoor water use are encouraged.
Requirement Source Document(s):
Executive Order 13693
Alternative Water
HPSB III.3
UFC 1-200-02 para 2-4.3
Where life-cycle cost-effective and permitted by local laws and regulations, use alternative water sources, such as harvested rainwater, treated wastewater, air handler condensate capture, grey water, and reclaimed water.
Requirement Source Document(s):
Added by Amendment No. W9127820R0057-0002 http://thomas.loc.gov/cgi-bin/query/z?c102:H.R.776.ENR:
Stormwater Management
HPSB III.4
UFC 3-210-10 para 2-4.3.1
The criteria and design standards in UFC 3-210-10 are required for the planning, design and construction of all Department of Defense (DoD) projects in the United States, United States Territories and Possessions of the United States that meet both of the following conditions:
1) The project includes construction or expansion of one or more buildings as part of its primary scope (i.e., primary facilities vice supporting facilities).
2) The “footprint” is greater than 5,000 gross square feet (464.5 square meters). “Footprint” consists of all new impervious surfaces associated with the building(s), including both building area and pavement area of associated supporting facilities (such as parking and sidewalks). “Footprint” does not include existing building area to be renovated, existing pavement area to be resurfaced, or new pavement area other than supporting facilities associated with the building(s).
For projects in the United States, United States Territories, and Possessions of the United States that do not meet the applicability requirements above, LID techniques apply to the extent practical.
Requirement Source Document(s):
EISA 2007 Sec 438 http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h6enr.txt.pdf
HPSB IV: Enhance Indoor Environmental Quality
Thermal Comfort
HPSB IV.1
UFC 1-200-02 para 2-5.1
Meet the requirements of ASHRAE 55. Compliance with standards by providing passive (non-mechanical) thermal comfort methods are allowed and encouraged as described in paragraph entitled, “Integrated Design” in UFC 1-200-02.
Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for thermal comfort criteria.
Requirement Source Document(s):
Executive Order 13693
Ventilation
HPSB IV.2
UFC 1-200-02 para 2-5.1
Meet the requirements of ASHRAE 62.1 (62.2 for low-rise residential).
Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for ventilation criteria.
Requirement Source Document(s):
Executive Order 13693
Daylighting
HPSB IV.3
UFC 1-200-02 para 2-5.2
All regularly occupied spaces located on the exterior wall must have vision fenestration. Where mission precludes vision fenestration for regularly occupied spaces located on the exterior wall, daylighting is still required. All classrooms and offices must have daylighting. Meet the requirements of ASHRAE 189.1 Section 8.4.1.2 (Minimum Sidelighting effective Aperture for Office Spaces and Classrooms) or Section 8.5.1.2 (Usable Daylight Illuminance in Office Spaces and Classrooms). Provide automated lighting controls in accordance with UFC 3-530-01.
Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for additional daylighting criteria.
Requirement Source Document(s):
Executive Order 13693
Moisture Control
HPSB IV.4
UFC 1-200-02 para 2-5.3.1
Establish and implement a moisture control strategy for controlling moisture flows and condensation to prevent building damage, minimize mold contamination, and reduce health risks related to moisture. Meet the requirements of ASHRAE 189.1 Section 10.3.1.5 (Moisture Control), UFC 3-410-01, Chapter 3, Sections 3-2 and 3-3 (Ventilation Air), and UFC 3-101-01 Chapter 3 (Building Envelope Requirements). Refer to Appendix B “Protect Indoor Air Quality” for best practices.
Requirement Source Document(s):
Executive Order 13693
Low Emitting Materials
HPSB IV.5
UFC 1-200-02 para 2-5.3.2
Specify materials and products with low or no pollutant emissions, including composite wood products, adhesives, sealants, interior paints and finishes, carpet systems, and furnishings.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .