Tech Ex 42 - Central Plants 10 Sep 19.pdf
PDF 2 MB Posted
- Solicitation number
- W9124P-21-R-1234
About this file
This document provides details on heating and cooling equipment across multiple facilities as well as information on an upcoming federal contract opportunity for installation support services. The equipment list specifies steam boilers and chilled water chillers by building number, including capacity in pounds per hour. Installation types are denoted as heating, cooling, or both. The federal contract opportunity is a pre-solicitation for non-personal services to provide maintenance, operations, supply, transportation, and administrative support to tenants located on Redstone Arsenal, Alabama. The requirement includes maintenance of equipment and facilities, operations and maintenance of utility systems, supply operations, and transportation. The contractor shall perform to standards in an attached performance work statement. Questions will only be accepted via email to the listed point of contact by the specified date.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a representative list of equipment as of date of publication and is subject to update as required
Bldg. Type (heating-H; cooling-C) Nomenclature/Capacity (LBS/HR) Comments
3775 H-Steam Boiler #1 / 3451
5494 H-Steam Boiler#1 / 2070
5540 H-Steam Boiler #1 / 5175
5661 H-Steam Boiler #1 / 1380 (layed up) Bldg. closed
7105 H-Steam Boiler #1 / 8625
H-Steam Boiler #2 / 8625
7153 H-Steam Boiler #1 / 6000
H-Steam Boiler #2 / 6000
7291 H-Steam Boiler #1 / 8625
H-Steam Boiler #2 / 2760
7668 H-Steam Boiler #1 / 20700
H-Steam Boiler #2 / 8625
H-Steam Boiler #3 / 8625
H-Steam Boiler #4 / 13800
7855 H-Steam Boiler #1 / 5175
H-Steam Boiler #2 / 5175
8028 H-Steam Boiler #1 / 2760
H-Steam Boiler #2 / 2760
8874 H-Steam Boiler #1 /2070
H-Steam Boiler #2 / 2020
8977 H-Steam Boiler #1 / 5175
H-Steam Boiler #2 / 3450
7549 H-Steam Boiler #1 / 2760
Technical Exhibit #42 Central Heating/Boiler Plants 10 Sep 19
H-Steam Boiler #2 / 1600
3316 C-Chilled Water Chiller#1 / 300 ton Centrifugal
C-Chilled Water Chiller #2 / 700 ton Centrifugal
C-Chilled Water Chiller #3 / 500 ton Centrifugal
Cont. Central Heating/Cooling Plants:
Bldg. Type (heating-H; cooling-C) Nomenclature/Capacity (LBS/HR) Comments
5306 H-Steam to Hot Water; C-chilled Water Chiller #1 /1400 Ton Centrifugal
Chiller #2 / 380 Ton Absorption
Chiller #3 / 380 Ton Absorption
Chiller #4 /800 Ton Absorption
Chiller #5 / 1050 Ton Absorption
5221 H-steam to Hot water; Gas to Hot
Water; C-Chilled Water Chiller #1 / 1050 Ton Centrifugal
Chiller #2 / 550 Ton Centrifugal
Chiller #3 / 550 Ton Centrifugal
Technical Exhibit #42 Central Heating/Boiler Plants 10 Sep 19