This document outlines the requirements for an installation support services contract for the U.S. Army Garrison-Redstone. The contractor will provide maintenance of equipment and facilities, operations and maintenance of utility systems, supply operations, transportation, and administration to support USAG-Redstone and its tenant offices, including the George C. Marshall Space Flight Center, Army Medical and Dental Activities, Army Test and Diagnostic Equipment Support Group, Army Information Processing Center-Huntsville, Army Space and Missile Defense Command, and Missile and Space Intelligence Center. Services will be performed according to the attached Performance Work Statement and questions regarding the pre-solicitation must be directed to the primary point of contact via email. The solicitation number is W9124P-21-R-1234 and will be issued by the Department of the Army Materiel Command Contracting Command Redstone Arsenal for non-personal installation support services.

View the file

Other files

File Type Posted
Tech Ex 15 - Builder Program Data 10 Sep 19_Reduced Size.pdf PDF
Tech Ex 47 - Installation Restoration Sites 10 Sep 19.pdf PDF
Tech Ex 55 - Hydrdants 11 Sep 19.pdf PDF
Tech Ex 03 - Real Property Assets 10 Sep 19.pdf PDF
Tech Ex 42 - Central Plants 10 Sep 19.pdf PDF
Tech Ex 16 - Pavement-Drainage MaintenanceZoneMap 10 Sep 19.pdf PDF
Tech Ex 46 - Bridges-Culverts 10 Sep 19.pdf PDF
Tech Ex 07 - Phase-in Phase-Out Plan 10 Sep 19.pdf PDF
Tech Ex 04 - Wage Rate Requirements Shop 4 Oct 19.pdf PDF
Tech Ex 21 - Cranes and Hoists 10 Sep 19.pdf PDF
Tech Ex 14 - MDA-FBI Bldgs at CL1 10 Sep 19.pdf PDF
Tech Ex 28 - Giant Voice Location Map-Bldg Notification Systems List 10 Sep 19.pdf PDF
Tech Ex 49 - RSA SWEEPING SCHEDULE 4 Oct 19.pdf PDF
Tech Ex 23 - Fire Alarms Sprinklers Hood Suppression Systems 10 Sep 19.pdf PDF
Tech Ex 01 - Redstone Arsenal Area Map 10 Sep 19.pdf PDF
Tech Ex 51 - Winterizing List 10 Sep 19.pdf PDF
Tech Ex 05 - Form DD 254 10 Sep 19.pdf PDF
ISS Questions and Response_Rev 1_6 Apr 20.xlsx XLSX spreadsheet
Tech Ex 33 - Backflow Preventers 10 Sep 19.pdf PDF
Tech Ex 20 - Generator Testing Refusal Memo 10 Sep 19.pdf PDF
Tech Ex 27 - Air Compressors 10 Sep 19.pdf PDF
Tech Ex 53 - Playground Equipment 10 Sep 19.pdf PDF
Tech Ex 09 - RSA Historic Property List 10 Sep 19.pdf PDF
Tech Ex 06 - Gov Facilities Assigned to Contractor 10 Sep 19.pdf PDF
Tech Ex 43 - Boiler 10 Sep 19.pdf PDF
Tech Ex 26 - IMRE-PW (EIP Ref Recvry) Form 1 10 Sep 19.pdf PDF
Tech Ex 48 - General Notes-Individual Site Maps 10 Sep 19.pdf PDF
Tech Ex 30 - Points of Demarcation 10 Sep 19.pdf PDF
Tech Ex 19 - Generator List 10 Sep 19.pdf PDF
Tech Ex 45 - RSA Road Map with Boundaries 10 Sep 19.pdf PDF
Tech Ex 22 - Elevators 10 Sep 19.pdf PDF
Tech Ex 13 - Preventative Maintenance Task Sheet 10 Sep 19.pdf PDF
Tech Ex 29 - Utility Meter Count 10 Sep 19.pdf PDF
PWS November 13 2019 r4 6Apr20.docx DOCX document
Tech Ex 17 - Bldg Component Checklist 10 Sep 19.pdf PDF
Tech Ex 12 - PM Frequency Tables 10 Sep 19.pdf PDF
Tech Ex 35 - Sump Pumps 10 Sep 19.pdf PDF
Tech Ex 52 - Ice-Snow Plan 10 Sep 19.pdf PDF
Tech Ex 10 - Facilities with Niagra or JACE Controls 10 Sep 19.pdf PDF
Tech Ex 18 - Cooking Exhaust Systems List 10 Sep 19.pdf PDF
Tech Ex 54 - Retention Ponds 10 Sep 19.pdf PDF
Tech Ex 50 - Gov Furnished Equipment List 10 Sep 19.pdf PDF
Tech Ex 08 - Supported Organizations 10 Sep 19.pdf PDF
Tech Ex 02 - Historical Workload Data 10 Sep 19.pdf PDF
Tech Ex 36 - Grease Pits-Oil-Water Separators 10 Sep 19.pdf PDF
Tech Ex 37 - Septic Tanks_Lift Stations 10 Sep 19.pdf PDF
Attachment 1 400 Engineering Services NS FY21 10Oct19 r3 25Mar20.docx DOCX document
PWS November 13 2019 r3 25Mar20.docx DOCX document
Attachment 3 411 Facility Maintenence Vertical NS FY21 10Oct19 r3 26Mar2....docx DOCX document
Attachment 6 505 Environmental Compliance Services NS FY21 10Oct19 r3 26....docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This list is representative of the equipment on date of publication and is subject to update

ITEM / (Quantity)

• Primary Substations / (3):

Schweitzer (HMI) / (1) Conventional (RTU) (2)

• Unit Substations / (20) :

Schweitzer (HMI) / (8) “Substation 24 will make 9” Conventional (RTU) / (12)

• 900 MHz Radios / (29) (Radios are in location but powered down and not being used)

• Antennas / (29) :

(2) Omni

(27) Yagi

• Network Servers / (4):

Server A / (1) (Main) Bldg 3329 Server B / (1) (Main) Bldg 4488 Server AA / (1) (Back up) Bldg 3329 Server BB / (1) (Back up) Bldg 4488

• 5 or 8 port Ethernet Switches for meter and Capacitor bank / (12):

Reports station metering and (2) stand-alone Schweitzer Relays SEL ICON fiber multiplexers (30)

• Remote Terminal Units (RTU ) / (12):

Survalent scouts that are comprised of digital input, digital output, analog input, communication boards, or processors that report station data back to the Control Room servers

• Human Machine Interfaces (HMI) / (6):

Schweitzer Relays with processors that report station data back to the Control Room (Bldg. 3329) servers

• Boiler Alarms / (16)

• High Water Alarms / (2)

• Refrigeration Alarms / (4)

• Building Power Alarms / (3)

• NECR – GMSI building Alarms – (5) 3317, 5298, 4790, 7118, 8332

• Lift Station Alarms / (3) 5301, 5302

Technical Exhibit #39 RSA SCADA Systems 10 Sep 19

• Work Stations / (5) (1 future):

Composed of towers, monitors, keyboards with mouse

• Rack mounted Ethernet switches (mounted in server cabinet) / (2)

• Rack mounted UPS (mounted in server cabinet) / (2) 3329, 4488

• Scout Mounted-In Server cabinet / (SEL 2440 at Bldg 5298) (1) Housing for alarms (i.e. Boiler, High Water, etc.)

• Shark 200 / (72) Meters in stations on main and feeder breakers reporting data back

• Shark 100 / (14) Meters in stations on mains and feeders reporting data back

• Shark 200 / (66) (10 more future) To be installed on more feeders to report back. When installed, will increase size and amount of Ethernet switches

• Schweitzer 751A (16)

• 787 SEL protection relay (1)

• Schweitzer 734 Meter / (35) (metering in NASA area)

• Schweitzer 735 Meters / (6) reporting 161kV and 46kV in Primary Substations (main and feeders)

• 900 MHz Radios and Antennas / (25) (metering in NASA area)

• 750 W UPS / (25):

For back-up power to the RTU and radio systems

• 734b capacitor bank controllers (4)

• SEL RTACs (3):

Sub 21 (1), Sub 23 (1), Primary 2 (1)

• SEL 351 Switching station 2 (1)

• SEL satellite clocks (7) substation 3, 4, 7, 8, 21, 22, and 3329

• SEL 2411 for building alarm monitoring (6)

NOTE: The SCADA System is composed of several systems. RTU’s or HMI’s take station data and report it back over the SEL ICON Fiber system to the servers at the Control Room (Bldg. 3329) for operations and dispatch. The same ICON system transmits meter and stand-alone Schweitzer data back via the Ethernet switches. The NASA metering data is transmitted over a separate 900 MHz radio network back to the servers.

The UPS in each station is for back-up power for the radio and RTU’s. The alarm panel alarms are transmitted over copper phone wires from each site through several skiffs, Bldg. 5298 and then back to the Control Room over fiber. The substation data is transmitted from stations over fiber and delivered back to the Control Room to the servers and workstations.

Technical Exhibit #39 RSA SCADA Systems 10 Sep 19