W9124P-20-R-0007 Amendment 1.0 11 Sept 2020.pdf
PDF 908 KB Posted
- Solicitation number
- W9124P-20-R-0007
About this file
This solicitation seeks proposals for installation support services at Redstone Arsenal in Huntsville, Alabama. The Army Contracting Command - Redstone Arsenal is soliciting these non-personal services under NAICS code 561210 with a small business set-aside. Services include facilities maintenance, environmental services, landfill operations, and engineering support across Redstone Arsenal's 1,807 buildings and 38,000 acres. The period of performance consists of a 60-day transition period followed by a five-year base period and five one-year option periods. Proposals are due by September 30, 2020. Services will be provided to over 80 Department of Defense and federal agency tenants employing 43,000 people, including the Army Materiel Command, Space and Missile Defense Command, and Federal Bureau of Investigation. The anticipated contract will procure labor, materials, supplies, and equipment to perform maintenance, repair, environmental, and engineering services.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 30Sept2020
A X B
C D E
G F 97 - 111
X H 113
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 113
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W9124P 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and Section L Table1copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Sparkman Bldg. 5300 Lobby conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SECTION L
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3 4 - 82
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 83 - 90 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
91 - 95
PART II - CONTRACT CLAUSES
CCAM-CAD-C
SPARKMAN CENTER BLDG 5303
REDSTONE ARSENAL AL 35898
256-313-0065
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
31 Jul 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W9124P20R0007
Section A - Solicitation/Contract Form
SOLICITATION NARRITIVE
NOTES TO OFFERORS
The United States Army Garrison-Redstone is located on Redstone Arsenal surrounded by 38,000 acres of land in Northern Alabama. US Army Garrison provides a wide range of Installation Support Services (ISS) that represent an estimated 30,000 service calls per year to the estimated 2,000 facilities located on Redstone Arsenal. The many agencies that call Redstone Arsenal home include but are not limited to:
Army Materiel Command (AMC), United States Army Aviation and Missile Command (AMCOM), the Space and Missile Defense Command (SMDC), numerous Program Executive Offices (PEO), and major components of the Defense Intelligence Agency, the Missile Defense Agency (MDA) and the Federal Bureau of Investigation (FBI). Also located here are numerous tenant and satellite organizations (located in Technical Exhibit #08).
The purpose of this service acquisition is to satisfy recurring requirements for ISS consisting of Facilities Maintenance, HVAC service, Landfill Operations, Pavement Clearance Operations, Environmental Services, Supply Operations, Facilities Engineering Services and Preventative Maintenance. Any additional services will be incidental to installation support.
This requirement will be acquired as a total set aside acquisition for exclusive competition under the Small Business Administration (SBA) 8(a) program and classified under North American Industry Classification System (NAICS) code 561210. Statutory authority being found at 15 USC.637(a) in accordance with (IAW) FAR Part 19.8, Contracting with the Small Business Administration (The 8(a) Program).
The projected Period of Performance is ten (10) years, inclusive of a five (5) year base, and five (5) Option Periods. 60 day Phase In/ Transition will begin 1 April 2021 and will be immediately followed by performance commencement on 1 June 2021 as identified below.
Phase-in/Transition Period 1 April 2021 to 31 May 2021
Base Period 1 June 2021 to 31 March 2026
Option Period 1 1 June 2026 to 31 May 2027
Option Period 2 1 June 2027 to 31 May 2028
Option Period 3 1 June 2028 to 31 May 2029
Option Period 4 1 June 2029 to 31 May 2030
Option Period 5 1 June 2030 to 31 May 2031
The anticipated contract vehicle is as follows:
Standard requirement, “C” type contract
CLIN Type/Structure::
Firm Fixed Price (FFP) Cost Plus Fixed Fee- Level of Effort (CPFF-LOE) Cost Reimbursable (CR)
NOTES TO OFFERORS CONTINUED:
1. This requirement is Subject to Availability of Funds, in accordance with AFARS 5132.702. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
2. The Government will not reimburse any costs associated with preparing or submitting a proposal.
3. Offers/Proposals shall be submitted by in accordance with the instructions provided in Section L of this solicitation no later than 30 September 2020 at 3:00 pm Central Standard Time (CST).
4. It is the responsibility of the offeror to monitor the beta.sam.gov website for additional/official information pertaining to this requirement.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Lot
Environmental Services
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All first line supervision, labor, administrative support and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the Overarching PWS and Attachments 1 through 5 where referenced. *All five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
FOB: Destination
PSC CD: J056
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Lot
Material - Environmental Services
COST
BASE PERIOD - POP: 1 June 2021- 31 May 2026 - All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the PWS and Attachments 1 through 5 where referenced. *All five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.The NTE amount of $616,205.00 is inclusive of all 5 years of base period.
FOB: Destination
PSC CD: J056
ESTIMATED COST
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 Lot
Program Management
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and Attachments 1 through 6 where referenced. Each Calendar Year cost shall be reflected in the Attachment 9 - Pricing Matrix.
PSC CD: J056
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 Lot
Supply Operations
FFP
BASE PERIOD - POP: 1 June 2021 to 31 May 2026 - All first line supervision, labor, material and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the requirements asdefined in the Overarching PWS and Attachments 1 through 6 where referenced. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
NET AMT
0005 Lot
Replenishment of Gov.Furnished Material
COST
BASE PERIOD - POP: 1 June 2021-31 May 2026 - This CLIN is established as a placeholder for the purpose of recording and obligating cost associated with restocking Government furnished material (GFM) with contractor acquired property (CAP) when the GFM inventory is expended in the performance of work requirements defined in Attachments 2 through 5 Offerors shall not propose any pricing for this CLIN.
PSC CD: J056
ESTIMATED COST
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 Lot
Facilities Engineering Services
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All first line supervison, labor, administrative support, other direct costs, material, tools, equipment, and vehicles costs associated with Facilities Engineering Services (CLS 400), work in the performance of the requirements as defined in the Overarching PWS and Attachments 2 through 6 where referenced. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0007 Lot Landfill Operations
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - IAW CLS 403, All first line supervison labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Landfill Operations as defined in Attachment 4.
*Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0008 Lot Pavement Clearance Operations
CPFF
BASE PERIOD - POP: 1 June 2021-31 May 2026 - (CPFF-LOE) IAW CLS 408, All direct labor, administrative support, and other direct costs associated with Pavement Clearance Operations defined in Attachments 2 and 8 where referenced. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
FIXED FEE
TOTAL EST COST + FEE
0009 Lot Material Pavement Clearance
COST
BASE PERIOD - POP: 1 June 2021-31 May 2026 - IAW CLS 408, All material, tools, equipment, and vehicles costs associated with Pavement Clearance Operations defined in Attachment 2. The NTE amount of $1,581,000.00 is inclusive of all 5 years of Base Period. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0010 Lot Heating-Cooling Utility Services
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - IAW CLS 501, All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Heating and Cooling Utility Services requirements as defined in the PWS and in Attachment 5 where referenced. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0011 Lot Preventative and Operations Maint Orders
CPFF
BASE PERIOD - POP: 1 June 2021-31 May 2026 - (CPFF-LOE) All direct labor, administrative support, and other direct costs associated with work in the performance of Preventative Maintenance (PMO) and Operational Work Orders (OWO) work as defined in the PWS and Attachments 1-6 where referenced.
*Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0012 Lot Material Prev. and Oper. Maint Orders
COST
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All material, tools, equipment, and vehicles costs associated with Preventative Maintenance Order (PMO)and Operational Work Order (OWO) work in the performance of work as defined in the PWS and Attachments 1-6 where mentioned. The NTE amount of $5,401,690.00 is inclusive of all 5 years of base period. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
Demand Maintenance Orders, DMO
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All first line supervision, labor, administrative support, and other direct costs associated with Demand Maintenance work in the performance of the work as defined in the PWS and Attachments 1-6 where referenced. *Price for all five (5) calendar years of the Base Period shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for SubCLINs 0013AA-0013AF.
0013AA Lot Capability Level 1 18,000 - 20,000 DMOs
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - DMO Annual Range from 18,000 min to 20,000 max. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
FOB: Destination
0013AB Lot Capability Level 2 20,001 - 22,000 DMOs
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - DMO Annual Range from 20,001 min to 22,000 max. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0013AC Lot Capability Level 3 22,001 - 24,000 DMOs
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - DMO Annual Range from 22,001 min to 24,000 max. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0013AD Lot Capability Level 4 24,001 - 26,000 DMOs
FFP
.BASE PERIOD - POP: 1 June 2021-31 May 2026 - DMO Annual Range from 24,001 min to 26,000 max. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0013AE Lot Capability Level 5 26,001 - 28,000 DMOs
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - DMO Annual Range from 26,001 min to 28,000 max.. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0013AF Lot Capability Level 6 28,001 - 30,000 DMOs
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - DMO Annual Range from 28,001 min to 30,000 max. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0014 Lot Material Demand Maintenance Orders .
COST
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All material, tools, equipment, and vehicles associated with Demand Maintenance work in the performance of work as defined in the Overarching PWS and Attachments 1-6 where referenced. The NTE amount of $14,313,345.00 is inclusive of all 5 years of the Base Period. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0015 Lot Maintenance and Repair for UPWO's
CPFF
BASE PERIOD - POP:1 June 2021-31 May 2026 - (CPFF-LOE) All direct labor, administrative support, and other direct costs associated with Maintenance & Repair work in the performance of work as defined in Overarching PWS and Attachments 1-6 where referenced. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
0016 Lot Material Mantenance and Repair for UPWO
COST
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All material, tools, equipment, and vehicles costs associated with Maintenance & Repair work in the performance of the work as defined in the Overarching PWS and Attachments 1-6 where referenced. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*. The Not To Exceed (NTE) amount of $1,766,115.00 is inclusive of all 5 years of the Base Period.
0017 1 Lot M&R for PWO's and Sustainment Projects
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - All direct labor to include supervision, lead positions, and support staff not captured in any other CLINS;
subcontract labor; direct material; Other Direct Costs (ODCs) defined as non-labor and non-material costs; the applicable indirect costs/burdens; and profit needed to perform in accordance with Attachment 1 para. 2.7.2.3. Information shall be reflected in the SF 33 – Section B and Attachment 9 Pricing Matrix.
Future FFP Project Work Orders (PWOs) will be issued under this CLIN and priced utilizing the FBLRs by labor category, Direct Material Coefficients, and ODC Coefficients identified in the Pricing Matrix at Attachment 9.
The amount associated with this CLIN represents the Not-To-Exceed value (NTE) of $6,500,000 per year. Specifically for the 5 year Base Period, $32,500,000 (5yrs x $6.5M) shall be utilized.
0018 Lot Repair GOV. Prop. Damaged by 3rd Party
COST
BASE PERIOD - 1 June 2021-31 May 2026 - This CLIN is established as a place holder for the purpose of recording and obligating cost associated with supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with the repair of property damage caused by third parties. Offerors shall not propose any pricing for this CLIN.
0019 Job Transition / Phase In
FFP
BASE PERIOD - POP: 1 April 2021-31 May 2021 - Transition/Phase In effort as set forth in Exhibit 7 to be completed within 60 days of contract award.Pricing for CLIN 0019 only applies to the 60 day transition phase and is therefore inactive beyond 60 days after contract award. . All invoices/ requests for payment against this CLIN will not be authorized beyond the base 60 day phase in transition period.
0020 Lot Contractor Acquired Property (CAP)
COST
BASE PERIOD - POP: 1 June 2021-31 May 2026 - This CLIN is established as a placeholder for the purpose of recording title transfer from the Contractor to the Government for Contractor acquired property utilized in the performance of this contract IAW FAR 52.245-1. Offerors shall not propose any pricing for this
CLIN.
0021 Lot Contractor Manpower Reporting
FFP
BASE PERIOD - POP: 1 June 2021-31 May 2026 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications. The Contractor Manpower Reporting application is available via the Internet at https://www.sam.gov. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
Contract Data Requirements List (CDRL)
BASE PERIOD - POP: 1 June 2021-31 May 2026 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of the CDRL is to provide a standardized method of clearly and unambiguously delineating the Government’s minimum essential data needs. FAR 27.401 reference the term "technical data and computer software", however, DFAR subpart 215.470 Installation Support Services (ISS) CDRLs Info Paper requires the use of the CDRL in solicitations when the contract will require delivery of any data. *Price for all five (5) calendar years of the Base Period shall be reflected in SF33 Section B and Attachment 9 Pricing Matrix*.
1001 Lot OPTION Environmental Services
FFP
OPTION PERIOD 1- POP: 1 June 2026 to 31 May 2027 - All first line supervision, labor, administrative support and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the Overarching PWS and Attachments 1 through 5 where referenced. *Price shall reflect Option Period 1 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
1002 Lot OPTION Material - Environmental Services
COST
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the PWS and Attachments 1 through 5 where referenced. *Price shall reflect Option Period 1 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $123,205 represents Option Period 1 IAW the POP dates stated herein.
1003 Lot OPTION Program Management
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and Attachments 1 through 6 where referenced. Each Calendar Year cost shall be reflected in the Attachment 9 - Pricing Matrix.
1004 Lot OPTION Supply Operations
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - All first line supervision, labor, material and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the requirements asdefined in the Overarching PWS and Attachments 1 through 6 where referenced. *Price shall reflect Option Period 1
1005 Lot OPTION Replenishment of Gov.Furnished Material
COST
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - This CLIN is established as a placeholder for the purpose of recording and obligating cost associated with restocking Government furnished material (GFM) with contractor acquired property (CAP) when the GFM inventory is expended in the performance of work requirements defined in Attachments 2 through 5 Offerors shall not propose any pricing for this CLIN.
1006 Lot OPTION Facilities Engineering Services
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - Includes the restocking of the Government furnished material (GFM) with contractor acquired property (CAP) when the GFM inventory is expended in the performance of work requirements defined in Attachments 2 through 5. *Price shall reflect Option Period 1 performance period (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
1007 Lot OPTION Landfill Operations
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - IAW CLS 403, All first line supervison labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Landfill Operations as defined in Attachment
4. *Price shall reflect Option Period 1 performance period (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
1008 Lot OPTION Pavement Clearance Operations
CPFF
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - (CPFF-LOE) IAW CLS 408, All direct supervision, labor, administrative support, and other direct costs associated with Pavement Clearance Operations defined in Attachment 2 where referenced. *Price shall reflect Option Period 1 (one calendar year) on
1009 Lot OPTION Material Pavement Clearance
COST
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - IAW CLS 408, All material, tools, equipment, and vehicles costs associated with Pavement Clearance Operations defined in Attachment 2. *Price shall reflect Option Period 1 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $316,200 represents Option Period 1 IAW the POP dates stated herein.
1010 Lot OPTION Heating-Cooling Utility Services
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - IAW CLS 501, All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Heating and Cooling Utility Services requirements as defined in the PWS and in Attachment 5 where referenced. *Price shall reflect Option Period 1 (one calendar year) on SF33 and Pricing
1011 Lot OPTION Preventative and Operations Maint Orders
CPFF
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - (CPFF-LOE) All direct labor, administrative support, and other direct costs associated with work in the performance of Preventative Maintenance Orders (PMO) and Operational Work Orders (OWO) work as defined in the PWS and Attachments 1-6 where referenced.*Price shall reflect Option Period 1 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
1012 Lot OPTION Material Prev. and Oper. Maint Orders
COST
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - All material, tools, equipment, and vehicles costs associated with Preventative Maintenance Orders (PMO) and Operational Work Order (OWO) work in the performance of work as defined in the PWS and Attachments 1-6 where mentioned. *Price shall reflect Option Period 1 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $1,080,338 represents Option Period 1 IAW the POP dates stated herein.
OPTION Demand Maintenance Orders, DMO
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - All first line supervision, labor, administrative support, and other direct costs associated with Demand Maintenance work in the performance of the work as defined in the PWS and Attachments 1-6 where referenced. *Price for Option Period 1 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for SubCLINs1013AA-1013AF.
1013AA Lot OPTION Capability Level 1 18,000 - 20,000 DMOs
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - DMO Annual Range from 18,000 min to 20,000 max. *Price for Option Period 1 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for
1013AB Lot OPTION Capability Level 2 20,001 - 22,000 DMOs
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - DMO Annual Range from 20,001 min to 22,000 max. *Price for Option Period 1 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for
1013AC Lot OPTION Capability Level 3 22,001 - 24,000 DMOs
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - DMO Annual Range from 22,001 min to 24,000 max. *Price for Option Period 1 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for
1013AD Lot OPTION Capability Level 4 24,001 - 26,000 DMOs
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - DMO Annual Range from 24,001 min to 26,000 max. *Price for Option Period 1 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for
1013AE Lot OPTION Capability Level 5 26,001 - 28,000 DMOs
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - DMO Annual Range from 26,001 min to 28,000 max. *Price for Option Period 1 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for
1013AF Lot OPTION Capability Level 6 28,001 - 30,000 DMOs
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - DMO Annual Range from 28,001 min to 30,000 max. *Price for Option Period 1 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for
1014 Lot OPTION Material Demand Maintenance Orders
COST
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - All material, tools, equipment, and vehicles associated with Demand Maintenance work in the performance of work as defined in the Overarching PWS and Attachments 1-6 where referenced. *Price shall reflect Option Period 1 performance period (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $2,862,669 represents Option Period 1 IAW the POP dates stated herein.
1015 Lot OPTION Maintenance and Repair for UPWO's
CPFF
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - (CPFF-LOE) All direct labor, administrative support, and other direct costs associated with Maintenance & Repair work in the performance of work as defined in Overarching PWS and Attachments 1-6 where referenced. *Price shall reflect Option Period 1 performance period (one calendar year) on SF33 and Pricing
1016 Lot OPTION Material Mantenance and Repair for UPWO
COST
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - All material, tools, equipment, and vehicles costs associated with Maintenance & Repair work in the performance of the work as defined in the Overarching PWS and Attachments 1-6 where referenced. *Price shall reflect Option Period 1 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $353,224 represents Option Period 1 IAW the POP dates staed herein.
1017 1 Lot OPTION M&R for PWO's and Sustainment Projects
FFP
OPTION PERIOD 1- POP: 1 June 2026 to 31 May 2027 - All direct labor to include supervision, lead positions, and support staff not captured in any other CLINS; subcontract labor; direct material; Other Direct Costs (ODCs) defined as non-labor and non-material costs; the applicable indirect costs/burdens; and profit needed to perform in accordance with Attachment 1 para. 2.7.2.3. Information shall be reflected in the SF 33 – Section B and Attachment 9 Pricing Matrix.
Future FFP Project Work Orders (PWOs) will be issued under this CLIN and priced utilizing the FBLRs by labor category, Direct Material Coefficients, and ODC Coefficients identified in the Pricing Matrix at Attachment 9.
The amount associated with this CLIN represents the Not-To-Exceed value (NTE) of $6,500,000 per year.
1018 Lot OPTION Repair GOV. Prop. Damaged by 3rd Party
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - This CLIN is established as a place holder for the purpose of recording and obligating cost associated with supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with the repair of property damage caused by third parties. Offerors shall not propose any pricing for this CLIN.
1019 Lot
OPTION INACTIVE - NO BID
1020 Lot OPTION Contractor Acquired Property (CAP)
COST
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - This CLIN is established as a placeholder for the purpose of recording title transfer from the Contractor to the Government for Contractor acquired property utilized in the performance of this contract IAW FAR 52.245-1. Offerors shall not propose any pricing for this CLIN
1021 Lot OPTION Contractor Manpower Reporting
FFP
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications. The Contractor Manpower Reporting application is available via the Internet at https://www.sam.gov
OPTION Contract Data Requirements List (CDRL)
OPTION PERIOD 1 - POP: 1 June 2026 to 31 May 2027 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of the CDRL is to provide a standardized method of clearly and unambiguously delineating the Government’s minimum essential data needs. FAR 27.401 reference theterm "technical data and computer software", however, DFAR subpart 215.470 Installation Support Services (ISS) CDRL Info Paper requires use of the CDRL in solicitations when the contract will require delivery of any data.
2001 Lot OPTION Environmental Services
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All first line supervision, labor, administrative support and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the Overarching PWS and Attachments 1 through 5 where referenced. *Price shall reflect Option Period 2 performance period (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
2002 Lot OPTION Material - Environmental Services
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the PWS and Attachments 1 through 5 where referenced. *Price shall reflect Option Period 2 performance period (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $123,205 represents Option Period 2 IAW the POP dates stated herein.
2003 Lot OPTION Program Management
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and Attachments 1 through 6 where referenced. Each
2004 Lot OPTION Supply Operations
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All first line supervision, labor, material and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the requirements asdefined in the Overarching PWS and Attachments 1 through 6 where referenced. *Price shall reflect Option Period 2 performance period (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
2005 Lot OPTION Replenishment of Gov.Furnished Material
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - This CLIN is established as a placeholder for the purpose of recording and obligating cost associated with restocking Government furnished material (GFM) with contractor acquired property (CAP) when the GFM inventory is expended in the performance of work requirements defined in Attachments 2 through 5 Offerors shall not
2006 Lot OPTION Facilities Engineering Services
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - Includes the restocking of the Government furnished material (GFM) with contractor acquired property (CAP) when the GFM inventory is expended in the performance of work requirements defined in Attachments 2 through 5. *Price shall reflect Option Period 2 performance period (one calendar year) on SF33 and Pricing
2007 Lot OPTION Landfill Operations
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - IAW CLS 403, All first line supervison labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Landfill Operations as defined in Attachment
4. *Price shall reflect Option Period 2 performance period (one calendar year) on
2008 Lot OPTION Pavement Clearance Operations
CPFF
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - (CPFF-LOE) IAW CLS 408, All direct supervision, labor, administrative support, and other direct costs associated with Pavement Clearance Operations defined in Attachment 2.
*Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing
2009 Lot OPTION Material Pavement Clearance
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - IAW CLS 408, All material, tools, equipment, and vehicles costs associated with Pavement Clearance Operations defined in Attachment 2. *Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $316,200 represents Option Period 2 IAW the POP dates staed
2010 Lot OPTION Heating-Cooling Utility Services
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - IAW CLS 501, All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Heating and Cooling Utility Services requirements as defined in the PWS and in Attachment 5 where referenced. *Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing
2011 Lot OPTION Preventative and Operations Maint Orders
CPFF
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - (CPFF-LOE) All direct labor, administrative support, and other direct costs associated with work in the performance of Preventative Maintenance Orders (PMO) and Operational Work Orders (OWO) work as defined in the PWS and Attachments 1-6 where referenced.*Price shall reflect Option Period 2 (one calendar year) on SF33 and
2012 Lot OPTION Material Prev. and Oper. Maint Orders
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All material, tools, equipment, and vehicles costs associated with Preventative Maintenance Orders (PMO) and Operational Work Order (OWO) work in the performance of work as defined in the PWS and Attachments 1-6 where mentioned. *Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $1,080,338 represents Option Period 2 IAW the POP dates staed herein.
OPTION Demand Maintenance Orders, DMO
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All first line supervision, labor, administrative support, and other direct costs associated with Demand Maintenance work in the performance of the work as defined in the PWS and Attachments 1-6 where referenced. *Price for Option Period 2 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9 for SubCLINs 2013AA-2013AF.
2013AA Lot OPTION Capability Level 1 18,000 - 20,000 DMOs
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028- DMO Annual Range from 18,000 min to 20,000 max. *Price for Option Period 2 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9.
2013AB Lot OPTION Capability Level 2 20,001 - 22,000 DMOs
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - DMO Annual Range from 20,001 min to 22,000 max. *Price for Option Period 2 (one calendar year)
2013AC Lot OPTION Capability Level 3 22,001 - 24,000 DMOs
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - DMO Annual Range from 22,001 min to 24,000 max. *Price for Option Period 2 (one calendar year)
2013AD Lot OPTION Capability Level 4 24,001 - 26,000 DMOs
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - DMO Annual Range from 24,001 min to 26,000 max. *Price for Option Period 2 (one calendar year) shall be reflected in the SF33 Section B and Pricing Matrix, Attachment 9.
2013AE Lot OPTION Capability Level 5 26,001 - 28,000 DMOs
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - DMO Annual Range from 26,001 min to 28,000 max. *Price for Option Period 2 (one calendar year)
2013AF Lot OPTION Capability Level 6 28,001 - 30,000 DMOs
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - DMO Annual Range from 28,001 min to 30,000 max. *Price for Option Period 2 (one calendar year)
2014 Lot OPTION Material Demand Maintenance Orders
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All material, tools, equipment, and vehicles associated with Demand Maintenance work in the performance of work as defined in the Overarching PWS and Attachments 1-6 where referenced. Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $2,862,669 represents Option Period 2 IAW the POP dates stated herein.
2015 Lot OPTION Maintenance and Repair for UPWO's
CPFF
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - (CPFF-LOE) All direct labor, administrative support, and other direct costs associated with Maintenance & Repair work in the performance of work as defined in Overarching PWS and Attachments 1-6 where referenced. Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
2016 Lot OPTION Material Mantenance and Repair for UPWO
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All material, tools, equipment, and vehicles costs associated with Maintenance & Repair work in the performance of the work as defined in the Overarching PWS and Attachments 1-6 where referenced. Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $353,224 represents Option Period 2 IAW the POP dates stated herein.
2017 Lot OPTION M&R for PWO's and Sustainment Projects
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - All direct labor to include supervision, lead positions, and support staff not captured in any other CLINS; subcontract labor; direct material; Other Direct Costs (ODCs) defined as non-labor and non-material costs; the applicable indirect costs/burdens; and profit needed to perform in accordance with Attachment 1 para. 2.7.2.3. Information shall be reflected in the SF 33 – Section B and Attachment 9 Pricing Matrix.
Future FFP Project Work Orders (PWOs) will be issued under this CLIN and priced utilizing the FBLRs by labor category, Direct Material Coefficients, and ODC Coefficients identified in the Pricing Matrix at Attachment 9.
The amount associated with this CLIN represents the Not-To-Exceed value (NTE)
2018 Lot OPTION Repair GOV. Prop. Damaged by 3rd Party
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - This CLIN is established as a place holder for the purpose of recording and obligating cost associated with supervision, personnel, labor, administrative support, other direct costs, FEE, G&A, material, tools, equipment, and vehicles associated with the repair of property damage caused by third parties. Offerors shall not propose any
2019 Lot OPTION Inactive - NO BID
2020 Lot OPTION Contractor Acquired Property (CAP)
COST
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - This CLIN is established as a placeholder for the purpose of recording title transfer from the Contractor to the Government for Contractor acquired property utilized in the performance of this contract IAW FAR 52.245-1. Offerors shall not propose any
2021 Lot OPTION Contractor Manpower Reporting
FFP
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - Contractor Manpower Reporting as set forth in Paragraph 3.3 of the Overarching PWS. IAW AFARS 5137.9101, Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications. The Contractor Manpower Reporting application is available via the Internet at https://www.sam.gov. Price shall reflect Option Period 2 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.*
OPTION PERIOD 2 - POP: 1 June 2027 to 31 May 2028 - BASE PERIOD - POP: 1 April 2021-31 March 2026 - IAW Paragraph 6.0 in the Overarching PWS - The purpose of the CDRL is to provide a standardized method of clearly and unambiguously delineating the Government’s minimum essential data needs. FAR
27.401 reference the term "technical data and computer software", however, DFAR subpart 215.470 Installation Support Services (ISS) CDRLs Info Paper requires the use of the CDRL in solicitations when the contract will require delivery of any data. Each Calendar Year cost shall be reflected in the Attachment 9 - Pricing Matrix.
3001 Lot OPTION Environmental Services
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - All first line supervision, labor, administrative support and other direct costs associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the Overarching PWS and Attachments 1 through 5 where referenced. Price shall reflect Option Period 3
3002 Lot OPTION Material - Environmental Services
COST
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - All materials associated with Sampling/Analysis and Monitoring Services, Hazardous Waste Disposal, Clean Water Services, Safe Drinking Water Services, Recycling Operations, and Restoration as defined in Attachment 6 in support of the PWS and Attachments 1 through 5 where referenced. Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $123,205 represents Option Period 3 IAW the POP
3003 Lot OPTION Program Management
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Program Management requirements as defined in the Overarching PWS and Attachments 1 through 6 where referenced. Each
3004 Lot OPTION Supply Operations
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - All first line supervision, labor, material and other direct costs associated with the Management of supply operations to include receipt, stocking, inventory, and distribution of supplies and materialsof the requirements asdefined in the Overarching PWS and Attachments 1 through 6 where referenced.Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* .
3005 Lot OPTION Replenishment of Gov.Furnished Material
COST
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - This CLIN is established as a placeholder for the purpose of recording and obligating cost associated with restocking Government furnished material (GFM) with contractor acquired property (CAP) when the GFM inventory is expended in the performance of work requirements defined in Attachments 2 through 5 Offerors shall not
3006 Lot OPTION Facilities Engineering Services
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - Includes the restocking of the Government furnished material (GFM) with contractor acquired property (CAP) when the GFM inventory is expended in the performance of work requirements defined in Attachments 2 through 5. Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* .
3007 Lot OPTION Landfill Operations
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - IAW CLS 403, All first line supervison labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Landfill Operations as defined in Attachment
4. Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing
3008 Lot OPTION Pavement Clearance Operations
CPFF
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - (CPFF-LOE) IAW CLS 408, All direct supervision, labor, administrative support, and other direct costs associated with Pavement Clearance Operations defined in Attachment 2.Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing
3009 Lot OPTION Material Pavement Clearance
COST
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - IAW CLS 408, All material, tools, equipment, and vehicles costs associated with Pavement Clearance Operations defined in Attachment 2. Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $316,200 represents Option Period 3 IAW the POP dates staed
3010 Lot OPTION Heating-Cooling Utility Services
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - IAW CLS 501, All first line supervision, labor, administrative support, material, tools, equipment, vehicles and other direct costs associated with Heating and Cooling Utility Services requirements as defined in the PWS and in Attachment 5 where referenced. Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing
3011 Lot OPTION Preventative and Operations Maint Orders
CPFF
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - (CPFF-LOE) All direct labor, administrative support, and other direct costs associated with work in the performance of Preventative Maintenance Orders (PMO) and Operational Work Orders (OWO) work as defined in the PWS and Attachments 1-6 where referenced.Price shall reflect Option Period 3 (one calendar year) on SF33 and
3012 Lot OPTION Material Prev. and Oper. Maint Orders
COST
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - All material, tools, equipment, and vehicles costs associated with Preventative Maintenance Orders (PMO) and Operational Work Order (OWO) work in the performance of work as defined in the PWS and Attachments 1-6 where mentioned. Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* The Not To Exceed (NTE) amount of $1,080,338 represents Option Period 3 IAW the POP dates stated herein.
OPTION Demand Maintenance Orders, DMO
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - All first line supervision, labor, administrative support, and other direct costs associated with Demand Maintenance work in the performance of the work as defined in the PWS and Attachments 1-6 where referenced. Price shall reflect Option Period 3 (one calendar year) on SF33 and Pricing Matrix,Attachment 9.* for SubCLINs
3013AA-3013AF.
3013AA Lot OPTION Capability Level 1 18,000 - 20,000 DMOs
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - DMO Annual Range from 18,000 min to 20,000 max. *Price for Option Period 3 (one calendar year)
3013AB Lot OPTION Capability Level 2 20,001 - 22,000 DMOs
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - DMO Annual Range from 20,001 min to 22,000 max. *Price for Option Period 3 (one calendar year)
3013AC Lot OPTION Capability Level 3 22,001 - 24,000 DMOs
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - DMO Annual Range from 22,001 min to 24,00 max. *Price for Option Period 3 (one calendar year)
3013AD Lot OPTION Capability Level 4 24,001 - 26,000 DMOs
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - DMO Annual Range from 24,001 min to 26,000. *Price for Option Period 3 (one calendar year) shall be reflected in the SF33 and Pricing Matrix, Attachment 9.
3013AE Lot OPTION Capability Level 5 26,001 - 28,000 DMOs
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May 2029 - DMO Annual Range from 26,001 min to 28,000 max. *Price for Option Period 3 (one calendar year)
3013AF Lot OPTION Capability Level 6 28,001 - 30,000 DMOs
FFP
OPTION PERIOD 3 - POP: 1 June 2028 to 31 May…