This document contains a pricing matrix and instructions for a solicitation seeking installation support services. The solicitation number is W9124P-20-R-0007 and is a 100% small business set-aside issued by Army Contract Command - Redstone Arsenal for non-personal services supporting US Army Garrison-Redstone and tenants. The period of performance is 60 days for phase-in followed by a five-year base and five one-year option periods. Services include environmental, landfill operations, facilities maintenance, engineering, and more across 1,807 buildings supporting over 80 tenants and 43,000 personnel at Redstone Arsenal. Offerors must provide pricing for 23 CLINs, labor rate tables, and coefficients for future project orders under CLIN 0017.

View the file

Other files

File Type Posted
W9124P-20-R-0007 Amendment 2.0 Sept 23 2020.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-4 Amendment Clarifications 1-2 W9124P-20-R-0007 23 Sept 2020.xlsx XLSX spreadsheet
Attachment 16 Section LM_ RFP Amendment 002 23 Sept 2020 .pdf PDF
Attachment 4 420 Facility Maint Horiz NS FY21 10Oct19 rev5 27Jul20 - RWB....pdf PDF
Attachment 8 SCLS WD and CBA Information Worksheet_Pricing10Sep20.xlsx XLSX spreadsheet
Attachment 17 Technical Exhibit Library C 16_47 PDF Files.pdf PDF
Attachment 15 Redstone Garrison DD254 w attachments (Jul20).pdf PDF
Attachment 2 408 Pavement Clearance 10Oct19 rev5 14Jul20.pdf PDF
Attachment 16 Section LandM_ RFP Amendment 001 10 Sept 2020 MASTERCOPY.pdf PDF
Attachment 3 411 Facility Maintenence Vertical 10Oct19 rev5 14Jul20 - 25....pdf PDF
Attachment 17 Technical Exhibit Library E 50A_50B_15A_15B Excel Files.xlsx XLSX spreadsheet
Attachment 1 400 Engineering Services 10Oct19 rev7 14Jul20 - RWB 10 Sept2020.pdf PDF
Attachment A Overarching PWS rev8 29July2020 - Aug26.pdf PDF
Attachment 10 CAGE Code and Cognizant DCMA DCAA Information Matrix.xlsx XLSX spreadsheet
Attachment 7 Staffing Matrix.xlsx XLSX spreadsheet
Attachment 17 Technical Exhibit Library D 48_56 PDF Files 11 Sept 2020.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-3 W9124P-20-R-0007 2 Sept 2020 - Copy.xlsx XLSX spreadsheet
Attachment 17 Technical Exhibit Library A 1_14 PDF Files 11 Sept 2020.pdf PDF
Attachment 5 501 Heating Cooling 10Oct19 rev5 14Jul2020.pdf PDF
Attachment 14 Tech Ex 11 - (also in ATT 17 A) CDRLs-Deliverables 25 Aug 2020.pdf PDF
Attachment 17 Technical Exhibit Library Index 11 Sept 2020.xlsx XLSX spreadsheet
Attachment 9 Pricing Matrix_Pricing 10Sept2020.xlsx XLSX spreadsheet
Attachment 12 Combined DBA and SCA Wage Determinations.pdf PDF
Attachment 17 Technical Exhibit Library B 15A _ 15B PDF Files.pdf PDF
Attachment 6 505 Environmental Compliance Svs 10Oct19 rev7 14Jul20.pdf PDF
Attachment 11 Pre-Award Survey of Prospective Contractor Accounting Syst....pdf PDF
W9124P-20-R-0007 Amendment 1.0 11 Sept 2020.pdf PDF
Attachment 13 Combined CBAs for Locals 558 - 720 and Local 320.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-4 W9124P-20-R-0007 11 Sept 2020.xlsx XLSX spreadsheet
Attachment 15 Redstone Garrison DD254 w attachments (Jul20).pdf PDF
Attachment 12 Combined DBA and SCA Wage Determinations.pdf PDF
W9124P-20-R-0007 Amendment 1.0 11 Sept 2020.pdf PDF
Attachment A Overarching PWS rev8 29July2020 - Aug26.pdf PDF
Attachment 16 Section LandM_ RFP Amendment 001 10 Sept 2020 MASTERCOPY.pdf PDF
Attachment 13 Combined CBAs for Locals 558 - 720 and Local 320.pdf PDF
Attachment 8 SCLS WD and CBA Information Worksheet_Pricing10Sep20.xlsx XLSX spreadsheet
RFP Questions Sets 1-15 and Clarifications 1-4 W9124P-20-R-0007 11 Sept 2020.xlsx XLSX spreadsheet
Attachment 1 400 Engineering Services 10Oct19 rev7 14Jul20 - RWB 10 Sept2020.pdf PDF
Tech Ex 03 - Real Property Assets 26 Aug 20.pdf PDF
Tech Ex 11 - CDRLs-Deliverables 25 Aug 2020.pdf PDF
Attachment 3 411 Facility Maintenence Vertical 10Oct19 rev5 14Jul20 - 25....pdf PDF
Redstone Garrison DD254 (Jul20) with Attachments.pdf PDF
Attachment 1 400 Engineering Services 10Oct19 rev6 14Jul20 - RWB 26 Aug.....pdf PDF
Tech Ex 02 - Historical Workload Data 26 Aug 20.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-3 W9124P-20-R-0007 2 Sept 2020.xlsx XLSX spreadsheet
Tech Ex 14 - MDA FBI Facilities List 12 Aug 20.pdf PDF
Attachment 4 420 Facility Maint Horiz NS FY21 10Oct19 rev5 27Jul20 - RWB....pdf PDF
Tech Ex 56 - IMCOM Facility Preventive Maintenance Guide 6 May 20.pdf PDF
RFP Questions Sets 1-12 W9124P-20-R-0007 25 Aug 2020 1600.xlsx XLSX spreadsheet
RFP Questions Sets 1-11 W9124P-20-R-0007 25 Aug 2020 1300.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

"CLIN Pricing" worksheet INSTRUCTIONS:
Enter the requested information in the yellow highlighted cells. The offeror shall propose a price for each CLIN as identified in the "CLIN Pricing" worksheet.
"FFP CLIN 0017 Labor Rate Tables" worksheet INSTRUCTIONS
The offeror shall complete the FFP CLIN 0017 Labor Rate Table for every labor category identified and for every Base Year Period (1 through 5) and Option Period. The offeror may propose in the FFP CLIN 0017 Labor Rate Table any additional labor categories needed for supervision, lead positions, and support staff required for the accomplishment of the work that are not captured in any other CLINs or included in the offeror's proposed indirect rates. FBLRs by labor category shall include the offeror’s proposed base labor rates with any applicable indirect rate(s)/burden(s) and profit. The FBLRs shall be a blended (prime/subcontract) labor rate and will be utilized when proposing on any future PWOs under CLIN 0017.
"FFP CLIN 0017 Coefficients" worksheet INSTRUCTIONS
The offeror shall propose an FFP CLIN 0017 Direct Material Coefficient for every Base Period (1 through 5) and Option Period to be applied to any proposed direct material costs on future PWOs. The coefficient shall include any applicable indirect rate(s)/burden(s) and proposed profit. For example, if the offeror proposes a General & Administrative (G&A) rate of 5 percent and a profit rate of 8 percent, the total direct material coefficient is 1.13 (1 + .05 G&A + .08 profit). For future PWOs, the Direct Material Coefficients will be applied to the proposed PWO direct material costs, resulting in the fully burdened material costs that will be used in the calculation of the total PWO price.

The offeror shall propose an FFP CLIN 0017 Other Direct Cost (ODC) Coefficient for every Base Period (1 through 5) and Option Period to be applied to any proposed non-material and non-labor costs on future PWOs. The coefficient shall include any applicable indirect rate(s)/burden(s) and proposed profit. For example, if the offeror proposes a G&A rate of 5 percent and a profit rate of 8 percent, the total ODC coefficient is 1.13 (1 + .05 G&A + .08 profit). For future PWOs, the ODC Coefficient will be applied to the PWO non-material and non-labor costs, resulting in the fully burdened ODCs that will be used in the calculation of the total PWO price.

CLIN Pricing

Redstone Arsenal Installation Support Services CLIN Pricing
Solicitation Number:W9124P-20-R-0007
Prime Contractor Name:
CAGE Code:
Redstone Arsenal Installation Support Services W9124P-20-R-0007
Pricing MatrixBase Period #1Base Period #2Base Period # 3Base Period #4Base Period #5Option Period 1Option Period 2Option Period 3Option Period 4Option Period 5
DescriptionCLIN TypeQuantityUnit MeasureCLINSLINPricePricePricePricePriceBase Period TotalCLINSLINPriceCLINSLINPriceCLINSLINPriceCLINSLINPriceCLINSLINPrice
Environmental ServicesFFP1Lot0001$ - 0$ - 0$ - 0$ - 010012001300140015001
Material -Environmental ServicesCOST1Lot0002$ 123,205$ 123,205$ 123,205$ 123,205$ 123,205$ 616,0251002$ 123,2052002$ 123,2053002$ 123,2054002$ 123,2055002$ 123,205
Program ManagementFFP1Lot0003$ - 0$ - 0$ - 0$ - 010032003300340035003
Supply OperationsFFP1Lot0004$ - 0$ - 0$ - 0$ - 010042004300440045004
Replenishment of Gov.Furnished MaterialCOST (NSP)1Lot0005$ - 0$ - 0$ - 0$ - 010052005300540055005
Facilities Engineering ServicesFFP1Lot0006$ - 0$ - 0$ - 0$ - 010062006300640065006
Landfill OperationsFFP1Lot0007$ - 0$ - 0$ - 0$ - 010072007300740075007
Pavement Clearance OperationsCPFF-LOE1Lot0008$ - 0$ - 0$ - 0$ - 010082008300840085008
Material Pavement ClearanceCOST1Lot0009$ 316,200$ 316,200$ 316,200$ 316,200$ 316,200$ 1,581,0001009$ 316,2002009$ 316,2003009$ 316,2004009$ 316,2005009$ 316,200
Heating-Cooling Utility ServicesFFP1Lot0010$ - 0$ - 0$ - 0$ - 010102010301040105010
Preventative Maintenance Orders, PMO/OWOCPFF-LOE1Lot0011$ - 0$ - 0$ - 0$ - 010112011301140115011
Material Preventative Maintenance Orders/OWOCOST1Lot0012$ 1,080,338$ 1,080,338$ 1,080,338$ 1,080,338$ 1,080,338$ 5,401,6901012$ 1,080,3382012$ 1,080,3383012$ 1,080,3384012$ 1,080,3385012$ 1,080,338
Demand Maintenance Orders, DMO(Informational)Lot0013$ - 0$ - 0$ - 0$ - 010132013301340135013
Capability Level 1 18,000 - 20,000 DMOsFFP1Lot0013AA$ - 0$ - 0$ - 0$ - 01013AA2013AA3013AA4013AA5013AA
Capability Level 2 20,001 - 22,000 DMOsFFP1Lot0013AB$ - 0$ - 0$ - 0$ - 01013AB2013AB3013AB4013AB5013AB
Capability Level 3 22,001 - 24,000 DMOsFFP1Lot0013AC$ - 0$ - 0$ - 0$ - 01013AC2013AC3013AC4013AC5013AC
Capability Level 4 24,001 - 26,000 DMOsFFP1Lot0013AD$ - 0$ - 0$ - 0$ - 01013AD2013AD3013AD4013AD5013AD
Capability Level 5 26,001 - 28,000 DMOsFFP1Lot0013AE$ - 0$ - 0$ - 0$ - 01013AE2013AE3013AE4013AE5013AE
Capability Level 6 28,001 - 30,000 DMOsFFP1Lot0013AF$ - 0$ - 0$ - 0$ - 01013AF2013AF3013AF4013AF5013AF
Material Demand Maintenance OrdersCOST1Lot0014$ 2,862,669$ 2,862,669$ 2,862,669$ 2,862,669$ 2,862,669$ 14,313,3451014$ 2,862,6692014$ 2,862,6693014$ 2,862,6694014$ 2,862,6695014$ 2,862,669
Maintenance and Repair for UPWO'sCPFF-LOE1Lot0015$ - 0$ - 0$ - 0$ - 0$ - 0$ - 01015$ - 02015$ - 03015$ - 04015$ - 05015$ - 0
Material Mantenance and Repair for UPWOCOST1Lot0016$ 353,223$ 353,223$ 353,223$ 353,223$ 353,223$ 1,766,1151016$ 353,2232016$ 353,2233016$ 353,2234016$ 353,2235016$ 353,223
M&R for PWO's and Sustainment ProjectsFFP1Lot0017$ 6,500,000$ 6,500,000$ 6,500,000$ 6,500,000$ 6,500,000$ 32,500,0001017$ 6,500,0002017$ 6,500,0003017$ 6,500,0004017$ 6,500,0005017$ 6,500,000
Repair GOV. Prop. damaged by 3rd PartyCOST (NSP)1Lot0018$ - 0$ - 010182018301840185018
Transition / Phase InFFP1Job0019$ - 010192019301940195019
Contractor Acquired Property (CAP)COST (NSP)1Lot0020$ - 0$ - 0$ - 0$ - 0$ - 01020$ - 02020$ - 03020$ - 04020$ - 05020$ - 0
Contractor Manpower ReportingFFP1Lot0021$ - 0$ - 0$ - 0$ - 0$ - 0$ - 01021$ - 02021$ - 03021$ - 04021$ - 05021$ - 0
Contract Data Requirements List (CDRL)1Lot0022$ - 0$ - 0$ - 0$ - 0$ - 0$ - 01022$ - 02022$ - 03022$ - 04022$ - 05022$ - 0

FFP CLIN 0017 Labor Rate Table

FFP CLIN 0017 Labor Rate Table
Solicitation Number:W9124P-20-R-0007
Wage Determination:2015-4603, Revision No. 13, dated 23 Dec 2019
Prime Contractor Name:
CAGE Code:
*For future PWOs issued under CLIN 0017, the FBLRs from the CLIN 0017 Labor Rate Table will be applied to the PWO proposed labor hours, resulting in the fully burdened labor costs that will be used in the calculation of the total PWO price.
CLIN 0017 Labor Rate Table
Base Period #1Base Period #2Base Period #3Base Period #4Base Period #5Option Period 1Option Period 2Option Period 3Option Period 4Option Period 5
CLIN 0017 WD Occupation CodeCLIN 0017 WD Labor CategoryDBAProposed FBLR*Proposed FBLR*Proposed FBLR*Proposed FBLR*Proposed FBLR*Proposed FBLR*Proposed FBLR*Proposed FBLR*Proposed FBLR*Proposed FBLR*
ASBE0078-001ASBESTOS WORKER/HEAT & FROST INSULATORDBA
BOIL0108-001BOILERMAKERDBA
ELEC0558-001ELECTRICIANDBA
ENGI0312-001POWER EQUIPMENT OPERATOR - CraneDBA
SFAL0669-002POWER EQUIPMENT OPERATOR - ForkliftDBA
SUAL2015-019SPRINKLER FITTER (Fire Sprinklers)DBA
SUAL2015-019BRICKLAYERDBA
SUAL2015-019CARPENTER, Includes Form WorkDBA
SUAL2015-019CEMENT MASON/CONCRETE FINISHERDBA
SUAL2015-019GLAZIERDBA
SUAL2015-019IRONWORKER, REINFORCINGDBA
SUAL2015-019IRONWORKER, STRUCTURALDBA
SUAL2015-019LABORER: Common or GeneralDBA
SUAL2015-019LABORER: Mason Tender - BrickDBA
SUAL2015-019LABORER: Mason Tender - Cement/ConcreteDBA
SUAL2015-019LABORER: PipelayerDBA
SUAL2015-019OPERATOR: Backhoe/Excavator/TrackhoeDBA
SUAL2015-019OPERATOR: BulldozerDBA
SUAL2015-019OPERATOR: Grader/BladeDBA
SUAL2015-019OPERATOR: LoaderDBA
SUAL2015-019OPERATOR: RollerDBA
SUAL2015-019PAINTER (Brush and Roller)DBA
SUAL2015-019PAINTER: SprayDBA
SUAL2015-019PIPEFITTER, Includes HVAC Pipe InstallationDBA
SUAL2015-019PLUMBER, Excludes HVAC Pipe InstallationDBA
SUAL2015-019ROOFERDBA
SUAL2015-019SHEET METAL WORKER, Includes HVAC Duct InstallationDBA
SUAL2015-019TILE SETTERDBA
SUAL2015-019TRUCK DRIVER: Dump TruckDBA
SUAL2015-019WELDERSDBA

FFP CLIN 0017 Coefficients

CLIN 0017 Coefficients
Solicitation Number:W9124P-20-R-0007
Prime Contractor Name:
CAGE Code:
*For future PWOs, the Direct Material Coefficients will be applied to the proposed PWO direct material costs, resulting in the fully burdened material costs that will be used in the calculation of the total PWO price.
**For future PWOs, the ODC Coefficient will be applied to the PWO non-material and non-labor costs, resulting in the fully burdened ODCs that will be used in the calculation of the total PWO price.
CLIN 0017 Coefficients
Base Period #1Base Period #2Base Period #3Base Period #4Base Period #5Option Period 1Option Period 2Option Period 3Option Period 4Option Period 5
Direct Material Coefficient*
ODC Coefficient**

File details come from the government source that posted it. Updated .