Attachment 11 Pre-Award Survey of Prospective Contractor Accounting Syst....pdf

PDF 1 MB Posted

Attached to
Installation Support Services to the US Army Garrison-Redstone
Solicitation number
W9124P-20-R-0007
Issued by

About this file

This pre-award survey checklist is for a prospective contractor's accounting system in relation to a federal contract opportunity. The checklist requires answers regarding the contractor's accounting practices and compliance with regulations. It covers topics such as prior audits, cost accounting standards, timekeeping systems, cost segregation, and financial reporting capabilities.

The related federal contract opportunity is solicitation number W9124P-20-R-0007 issued by the Army Contracting Command - Redstone Arsenal. It is for installation support services at Redstone Arsenal, a federal center of excellence home to over 80 tenants and 43,000 employees. Required services include facility maintenance, utilities operation, environmental services, and engineering support across 1,807 buildings. The five-year contract allows for five additional option years. It is set aside 100% for small businesses.

View the file

Other files

File Type Posted
W9124P-20-R-0007 Amendment 2.0 Sept 23 2020.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-4 Amendment Clarifications 1-2 W9124P-20-R-0007 23 Sept 2020.xlsx XLSX spreadsheet
Attachment 16 Section LM_ RFP Amendment 002 23 Sept 2020 .pdf PDF
Attachment 4 420 Facility Maint Horiz NS FY21 10Oct19 rev5 27Jul20 - RWB....pdf PDF
Attachment 8 SCLS WD and CBA Information Worksheet_Pricing10Sep20.xlsx XLSX spreadsheet
Attachment 17 Technical Exhibit Library C 16_47 PDF Files.pdf PDF
Attachment 15 Redstone Garrison DD254 w attachments (Jul20).pdf PDF
Attachment 2 408 Pavement Clearance 10Oct19 rev5 14Jul20.pdf PDF
Attachment 16 Section LandM_ RFP Amendment 001 10 Sept 2020 MASTERCOPY.pdf PDF
Attachment 3 411 Facility Maintenence Vertical 10Oct19 rev5 14Jul20 - 25....pdf PDF
Attachment 17 Technical Exhibit Library E 50A_50B_15A_15B Excel Files.xlsx XLSX spreadsheet
Attachment 1 400 Engineering Services 10Oct19 rev7 14Jul20 - RWB 10 Sept2020.pdf PDF
Attachment A Overarching PWS rev8 29July2020 - Aug26.pdf PDF
Attachment 10 CAGE Code and Cognizant DCMA DCAA Information Matrix.xlsx XLSX spreadsheet
Attachment 7 Staffing Matrix.xlsx XLSX spreadsheet
Attachment 17 Technical Exhibit Library D 48_56 PDF Files 11 Sept 2020.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-3 W9124P-20-R-0007 2 Sept 2020 - Copy.xlsx XLSX spreadsheet
Attachment 17 Technical Exhibit Library A 1_14 PDF Files 11 Sept 2020.pdf PDF
Attachment 5 501 Heating Cooling 10Oct19 rev5 14Jul2020.pdf PDF
Attachment 14 Tech Ex 11 - (also in ATT 17 A) CDRLs-Deliverables 25 Aug 2020.pdf PDF
Attachment 17 Technical Exhibit Library Index 11 Sept 2020.xlsx XLSX spreadsheet
Attachment 9 Pricing Matrix_Pricing 10Sept2020.xlsx XLSX spreadsheet
Attachment 12 Combined DBA and SCA Wage Determinations.pdf PDF
Attachment 17 Technical Exhibit Library B 15A _ 15B PDF Files.pdf PDF
Attachment 6 505 Environmental Compliance Svs 10Oct19 rev7 14Jul20.pdf PDF
W9124P-20-R-0007 Amendment 1.0 11 Sept 2020.pdf PDF
Attachment 13 Combined CBAs for Locals 558 - 720 and Local 320.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-4 W9124P-20-R-0007 11 Sept 2020.xlsx XLSX spreadsheet
Attachment 15 Redstone Garrison DD254 w attachments (Jul20).pdf PDF
Attachment 12 Combined DBA and SCA Wage Determinations.pdf PDF
W9124P-20-R-0007 Amendment 1.0 11 Sept 2020.pdf PDF
Attachment A Overarching PWS rev8 29July2020 - Aug26.pdf PDF
Attachment 9 Pricing Matrix_Pricing 10Sept2020.xlsx XLSX spreadsheet
Attachment 16 Section LandM_ RFP Amendment 001 10 Sept 2020 MASTERCOPY.pdf PDF
Attachment 13 Combined CBAs for Locals 558 - 720 and Local 320.pdf PDF
Attachment 8 SCLS WD and CBA Information Worksheet_Pricing10Sep20.xlsx XLSX spreadsheet
RFP Questions Sets 1-15 and Clarifications 1-4 W9124P-20-R-0007 11 Sept 2020.xlsx XLSX spreadsheet
Attachment 1 400 Engineering Services 10Oct19 rev7 14Jul20 - RWB 10 Sept2020.pdf PDF
Tech Ex 03 - Real Property Assets 26 Aug 20.pdf PDF
Tech Ex 11 - CDRLs-Deliverables 25 Aug 2020.pdf PDF
Attachment 3 411 Facility Maintenence Vertical 10Oct19 rev5 14Jul20 - 25....pdf PDF
Redstone Garrison DD254 (Jul20) with Attachments.pdf PDF
Attachment 1 400 Engineering Services 10Oct19 rev6 14Jul20 - RWB 26 Aug.....pdf PDF
Tech Ex 02 - Historical Workload Data 26 Aug 20.pdf PDF
RFP Questions Sets 1-15 and Clarifications 1-3 W9124P-20-R-0007 2 Sept 2020.xlsx XLSX spreadsheet
Tech Ex 14 - MDA FBI Facilities List 12 Aug 20.pdf PDF
Attachment 4 420 Facility Maint Horiz NS FY21 10Oct19 rev5 27Jul20 - RWB....pdf PDF
Tech Ex 56 - IMCOM Facility Preventive Maintenance Guide 6 May 20.pdf PDF
RFP Questions Sets 1-12 W9124P-20-R-0007 25 Aug 2020 1600.xlsx XLSX spreadsheet
RFP Questions Sets 1-11 W9124P-20-R-0007 25 Aug 2020 1300.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM

Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.

PLEASE ANSWER THE QUESTIONS BELOW:

HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90 - "Information for Contractors" ON For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").

Pre-award Survey of Prospective Contractor Accounting System Checklist

1. Has your organization's Accounting System ever been audited by DCAA?

the DCAA Report number or DCAA POC info.

1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?

1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?

1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?

2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?

Pre-award Survey of Prospective Contractor Accounting System Checklist

2. Is your organization subject to CAS (48 CFR Chapter 99)?

(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey) 2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?

2.c. Is any aspect of this proposal inconsistent with your orgnaization's disclosed practices or applicable CAS?

Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:

3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?

4. Is your organization's Accounting System currently in full operation?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

6. Is your organization's Accounting System ready for a DCAA audit?

7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)

5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?

8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?

9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?

10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

11. Does the Accounting System Provide for the accumulation of costs under general ledger control?

12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?

13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?

14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?

15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?

16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

17. Does the Accounting System provide for the segregation of preproduction costs from production costs?

18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?

19. Does the Accounting System provide financial information required to support requests for Progress Payments?

Pre-award Survey of Prospective Contractor Accounting System Checklist

22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?

21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?

20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

Pre-award Survey of Prospective Contractor Accounting System Checklist 11.0.0.20130303.1.892433.887364 7142287093 1/06/2016 DCAA/Policy and Plans DCAA Preaward survey of Prospective Contractor Accounting System Checklist Naomi Vaughn Draft Preaward survey of Prospective Contractor Accounting System Checklist

Enter Date as MONTH/DAY/YEAR XX/XX/XXXX:
TextField1:
TextField2:
TextField3:
DateField2:
TextField4:
TextField5:
CheckBox1:
CheckBox2:
CheckBox3:
TextField6:
CheckBox4:
CheckBox5:
TextField7:
CheckBox6:

File details come from the government source that posted it. Updated .